Documented examples

Each record describes something a country built that the indicators do not capture. The source provides the published number; the mechanism is our interpretation.

Scores describe outcomes. These records describe how a country acted, what it needed and what happened. 742 of 742 records include a mechanism. They do not affect scores.

Narrow the list

4 of 742 deliveries

Coordination

1 delivery linked to Public-private collaboration.

Angolasince 2022still operatingbears on Public-private collaboration

Lobito Corridor rail concession

Angola's Ministry of Transport signed a 30-year concession with Lobito Atlantic Railway, in which Mota-Engil holds equity, on 4 November 2022 to rehabilitate, operate and maintain about 1,300 km of the Benguela line from Lobito to Luau and the Lobito mineral terminal. By September 2026 the concessionaire was operating the corridor with about 945 workers, 529 of them transferred from state rail and port operators.

1,300 km, rail infrastructure operated, maintained and modernised under the concession, 2026-09-10. 945 workers, workers employed by the concessionaire, of whom 529 transferred from state-owned operators, 2026-09-10. Multilateral Investment Guarantee Agency (World Bank Group), press release of 10 September 2026, retrieved 2026-10-02.

The move, and what it needed

Angola's Ministry of Transport tendered the freight operation of a state railway to a private consortium for 30 years, keeping passenger service public and moving state rail and port staff into the concession company.

Preconditions

  • Mineral traffic from the DRC and Zambia large enough to attract a commodity trader as operator
  • Political risk cover and development finance (MIGA, DFC, AfDB) to make a 30-year private commitment bankable

Limits: Neither figure measures delivery. 1,300 km is the length of an asset handed over, and the press release does not say what was rehabilitated, what freight moved or what the concessionaire invested. The publisher is a guarantor promoting its own transaction, and the April 2024 summary that dates the contract was written by the concessionaire. 2022 is the contract date, and the source does not say when operations passed to the concessionaire. The concession is four years into 30, so it shows that the state handed over operations, not that the partnership delivered. Passenger service stays with the state operator. The corridor is driven by DRC and Zambian copper exports and by US and EU strategic finance, so the national objective it serves is as much foreign as Angolan. It is one contract, and the construct asks for the frequency and scale of public-private delivery across the country.

Learning

1 delivery linked to Adult learning participation.

Angolasince 2023still operatingbears on Adult learning participation

Sistema Nacional de Formaรงรฃo Profissional under INEFOP

Angola's national vocational training system, the INEFOP-supervised centres together with the accelerated 'plano intercalar' courses, FUNEA and licensed private centres, enrolled 204,026 trainees in 2024, against 112,478 in 2023, with 152,625 passing, across 1,914 training centres.

204,026 trainees enrolled, matriculados no sistema nacional de formaรงรฃo profissional (tabela 3), 2024. 112,478 trainees enrolled, same count for the previous year (tabela 3), 2023. Instituto Nacional de Estatรญstica (INE) Angola with the Ministรฉrio da Administraรงรฃo Pรบblica, Trabalho e Seguranรงa Social, Anuรกrio de Estatรญstica do Trabalho Estruturado e Seguranรงa Social 2024, section 4.2 Formaรงรฃo profissional, Tabela 3, retrieved 2026-10-02.

The move, and what it needed

The labour ministry's training institute runs its own centres and mobile units, licenses private providers into one national system, and adds an accelerated short-course programme, then counts enrolment, passes and dropouts across all of them in an annual yearbook.

Preconditions

  • A licensing regime that brings private training centres into the national count
  • Mobile and rural units that reach trainees outside the main cities
  • A ministry statistics office that publishes the returns with the national statistics institute

Limits: The numbers sit in a 43-page PDF: the breakdown by channel is on printed page 12 and Tabela 3 on printed page 19. The figures are the labour ministry's administrative returns from its own training institute and from centres it licenses, republished by INE. The text calls the trainees 'jovens' throughout, gives no age split, and the system includes initial vocational training for school leavers, so this is a count of vocational trainees rather than of adults returning to learning. The 81 percent jump from 2023 rests largely on the 'plano intercalar', an acceleration programme that enrolled 56,329, and on 57,127 enrolments reported by private centres, whose returns the ministry does not audit in this document. Counts are enrolments, not unique people. Only two years are compared, so the series cannot show whether 2024 is a lasting scale or a one-year push. The started year is the first year in the cited table, not the start of INEFOP, which is older.

Adaptability

2 deliveries linked to Institutional responsiveness, Disaster preparedness and recovery.

Angolasince 2015operating below its peakbears on Institutional responsiveness

Fuel subsidy removal, and its erosion

Angola's government removed gasoline and diesel subsidies by raising retail prices at the end of 2015, but subsidies returned as costs rose, reaching 3.7 percent of GDP in 2023 from 1.5 percent in 2019. A second reform raised gasoline prices 87.5 percent in June 2023, but the kwanza's depreciation took the gasoline subsidy from 39 percent of the market price in June back to 65 percent by October 2023.

65 % of market price, gasoline subsidy as a share of the market price, after depreciation, 2023-10. 39 % of market price, gasoline subsidy as a share of the market price, after the june 2023 price rise, 2023-06. World Bank, Policy Research Working Paper 10939, Fuel Subsidy Reforms: Lessons from the Literature and Assessing the Price Shock for Different Sectors through an Input-Output Table in the Case of Angola (October 2024), retrieved 2026-10-02.

The move, and what it needed

Angola's government raised administered fuel prices in discrete steps, in 2015 and again from June 2023, while leaving them fixed in kwanza between steps. Each devaluation or oil price rise then rebuilt the subsidy the step had removed.

Preconditions

  • Administered retail fuel prices set by decree with no automatic adjustment
  • A currency exposed to oil price shocks and sharp devaluation
  • Fuel subsidies acting as the de facto social spending before a cash transfer (Kwenda) could reach the poor

Where else it has been used: The 2023 reform drew on the 2010 Iranian and Indonesian lessons cited in the same paper: compensate before raising prices. Kwenda was meant to be that compensation, but the same paper says it has failed to reach enough people.

Limits: This is a World Bank working paper, which disclaims representing the Bank's view. Every subsidy share is the authors' own estimate from IGAPE and INE data, not a published government series. No figure is given for the 2015 removal itself: the source only says subsidies were removed and then reemerged. The 2019 to 2023 rise is in part an oil price and exchange rate effect, so it measures exposure as much as inaction. The October 2023 figure reflects a 40 percent depreciation in May and June 2023, which no price rule could have tracked. The government did act again: the gasoline rise in June 2023, a 1 June 2023 decree setting out a multiphase reform, and a diesel rise from 135 to 200 kwanzas in April 2024. Between the two steps retail prices remained constant until May 2023, and the June 2023 decree was the first since 2016. The figures are read from a PDF.

Angolasince 2025delivered and closedbears on Disaster preparedness and recovery

Response to the 2025 cholera outbreak, with a high fatality rate

Angola's Ministry of Health, with WHO, UNICEF, the World Bank and the ICRC, vaccinated over 900,000 people with oral cholera vaccine in a five-day reactive campaign in January 2025, with 99.5 percent administrative coverage, in an outbreak that had reached 8,543 cases and 329 deaths, a case fatality rate of 3.9 percent, in 16 of 21 provinces by 23 March 2025.

900,000 people (stated as 'over 900 000'), people vaccinated in the january 2025 reactive oral cholera vaccination campaign, 2025-01. 3.9 % of reported cases, case fatality rate of the outbreak (329 deaths in 8,543 cases), 2025-03-23. World Health Organization, Disease Outbreak News, Cholera - Angola (2025-DON562), 28 March 2025, retrieved 2026-10-02.

The move, and what it needed

The health ministry used the international oral cholera vaccine stockpile to mount a five-day mass campaign in the first affected areas, while case management and water and sanitation lagged behind the spread to 16 provinces.

Preconditions

  • Access to the global oral cholera vaccine stockpile and partners to fund delivery
  • Vaccination teams able to reach crowded urban districts within days
  • Treatment centres and oral rehydration close enough to patients to keep deaths low, which here was missing

Limits: The record shows a fast vaccination campaign inside a response that failed on its main outcome: WHO says a case fatality rate can be kept below 1 percent with timely care, and Angola's was 3.9 percent, with a third of deaths in the community, which WHO attributes to late presentation, gaps in surveillance and early response, and weak access to treatment. The 99.5 percent is administrative coverage of a target population the DON does not define, not a survey, and the 900,000 is rounded. The campaign was run with WHO, UNICEF, the World Bank and the ICRC, so the national share cannot be separated, and the DON does not say where the doses came from. The DON is a snapshot at 23 March 2025 while the outbreak was still spreading; this record does not show when or how it ended. The status 'concluded' refers to the January campaign, not the outbreak. The underlying cause, poor water and sanitation in crowded areas, is a standing gap the vaccination does not address; WHO notes cholera re-emerged in 2006 after a decade-long absence and recurs periodically.