Skip to content
NCBNational Capability Benchmark
Navigate with ↑ ↓Enter to openEsc to close

Challenge the benchmark

Choose a score and give the benchmark a specific reason to reconsider it.

When you submit, the form attaches the current score and confidence for the country and capability you chose.

Submissions are public and start as awaiting review. A maintainer can add a response and signature after review.

Capability agendas

Each agenda turns a country's scores into actions: what to raise, what to measure first, and what to keep watching. The register below records what countries have already built in areas the benchmark cannot yet measure.

A delivery is filed against an indicator that has no dataset behind it, so none of these records moves a score or a confidence. Filter or sort the register to find a delivery, then open its full record. The same records in a grouped view, with preconditions and where else each move has been used, are at patterns.

Where examples exist

Every benchmark country and all nine capabilities stay visible. Filled cells link to the source-checked examples; empty cells show where the research agenda is still open.

Documented deliveries
742
Countries represented
125/125
Country-capability cells filled
487/1125

A number is the count of source-checked delivery records in that cell. A dash is an uncovered research slot, not evidence that the country lacks the capability. Select a number to filter the full register below.

Documented delivery coverage for every benchmark country and capability
CountryAnticipationAgencyCoordinationTrustLearningExperimentationAdaptabilityBuildingShared PurposeCoverage
Albania00001 documented delivery for Albania, Learning: Public vocational training centres of the National Agency for Employment and Skills01 documented delivery for Albania, Adaptability: Reconstruction programme after the 26 November 2019 earthquake1 documented delivery for Albania, Building: Regional and Local Roads Connectivity Project03/93 records
Angola001 documented delivery for Angola, Coordination: Lobito Corridor rail concession01 documented delivery for Angola, Learning: Sistema Nacional de Formação Profissional under INEFOP02 documented deliveries for Angola, Adaptability: Fuel subsidy removal, and its erosion; Response to the 2025 cholera outbreak, with a high fatality rate003/94 records
Argentina001 documented delivery for Argentina, Coordination: Vaca Muerta unconventional energy build-out0004 documented deliveries for Argentina, Adaptability: The Convertibility Plan, and its collapse; Asignación Universal por Hijo child benefit; SUBE national electronic fare and subsidy rail; SINARAME national weather radar network2 documented deliveries for Argentina, Building: ARSAT-3 satellite programme suspended before launch; Atucha II nuclear plant, and its 33-year build03/97 records
Armenia001 documented delivery for Armenia, Coordination: Water management contracts and leases, and the national lease from 20170001 documented delivery for Armenia, Adaptability: Earthquake Reconstruction Project in the Spitak earthquake zone1 documented delivery for Armenia, Building: North-South Road Corridor Investment Program, Tranche 103/93 records
Australia002 documented deliveries for Australia, Coordination: Cooperative Research Centres programme; New Payments Platform, the shared fast-payment rail01 documented delivery for Australia, Learning: VET FEE-HELP, and its abolition1 documented delivery for Australia, Experimentation: ASIC enhanced regulatory sandbox2 documented deliveries for Australia, Adaptability: JobKeeper Payment; Disaster Recovery Funding Arrangements1 documented delivery for Australia, Building: Inland Rail, and its consolidation at Parkes1 documented delivery for Australia, Shared Purpose: Compulsory voting6/98 records
Austria001 documented delivery for Austria, Coordination: COMET, Competence Centers for Excellent Technologies02 documented deliveries for Austria, Learning: AMS training measures (Schulungen) for jobseekers; Bildungskarenz with Weiterbildungsgeld, and its abolition1 documented delivery for Austria, Experimentation: FMA Regulatory Sandbox1 documented delivery for Austria, Adaptability: COVID-19-Kurzarbeit, 2020 to 20211 documented delivery for Austria, Building: Koralmbahn Graz to Klagenfurt, opened seven years after its contracted completion date05/96 records
Azerbaijan001 documented delivery for Azerbaijan, Coordination: Private solar and wind plants under government investment agreements01 documented delivery for Azerbaijan, Learning: Self-Employment Program business training1 documented delivery for Azerbaijan, Experimentation: Central Bank of Azerbaijan regulatory sandbox2 documented deliveries for Azerbaijan, Adaptability: AZN 190 monthly allowance to people who lost work, April to June 2020; Housing reconstruction after the February 2019 Shamakhi earthquake2 documented deliveries for Azerbaijan, Building: Second National Water Supply and Sanitation Project (rayon centres), and its downsizing; Third Highway Project: M4 Baku-Shamakhi and M3 Yenikend-Shorsulu motorways05/97 records
Bangladesh001 documented delivery for Bangladesh, Coordination: Public Private Partnership Authority project portfolio01 documented delivery for Bangladesh, Learning: National adult literacy projects of the Bureau of Non-Formal Education, and their erosion02 documented deliveries for Bangladesh, Adaptability: Cyclone Preparedness Programme; COVID-19 frontloading of old age, widow and disability allowances1 documented delivery for Bangladesh, Building: Padma Multipurpose Bridge04/95 records
Belarus00000002 documented deliveries for Belarus, Building: M6 Minsk to Grodno transit corridor upgrade; Belarusian nuclear power plant (BelAES), delivered behind schedule01/92 records
Belgium1 documented delivery for Belgium, Anticipation: Bureau federal du Plan01 documented delivery for Belgium, Coordination: De Kade prison in Antwerp, a federal DBFM contract0003 documented deliveries for Belgium, Adaptability: Chômage temporaire corona, 2020; Federal strategic stock of protective masks, and its dismantling; BE-Alert003/95 records
Bolivia001 documented delivery for Bolivia, Coordination: Interoperable QR immediate payments, built by the banks and the Banco Central de Bolivia01 documented delivery for Bolivia, Learning: Yo, sí puedo national literacy campaign and post-literacy programme03 documented deliveries for Bolivia, Adaptability: Bono Juana Azurduy maternal and child health transfer; Renta Dignidad non-contributory old-age pension; COVID-19 vaccination campaign3 documented deliveries for Bolivia, Building: Mi Teleférico urban cable-car network; Industrial lithium carbonate plant below design capacity; El Mutún steel complex, inaugurated in 2025 and found never to have operated04/98 records
Bosnia and Herzegovina0000001 documented delivery for Bosnia and Herzegovina, Adaptability: Floods Emergency Recovery Project after the May 2014 floods1 documented delivery for Bosnia and Herzegovina, Building: Federation Road Sector Modernization Project, and its shrunken rehabilitation scope02/92 records
Botswana0000001 documented delivery for Botswana, Adaptability: COVID-19 vaccination campaign1 documented delivery for Botswana, Building: Morupule B coal power station, and its underperformance02/92 records
Brazil3 documented deliveries for Brazil, Anticipation: Embrapa, a fifty-year bet on tropical agriculture; Lei de Informática, a sectoral industrial policy; CGEE, the strategic studies center04 documented deliveries for Brazil, Coordination: Itaipu Binacional, the treaty-built power system; EMBRAPII, industry-led applied research; SIBRATEC, the national technology networks; MAI/DAI, innovation scholarships for research with partner companies2 documented deliveries for Brazil, Trust: Cadastro Único, the unified social registry; Portal da Transparência, the federal open-books system3 documented deliveries for Brazil, Learning: CAPES, federal postgraduate funding; INEP, the standing education statistics institution; Educação de Jovens e Adultos (EJA), and its erosion1 documented delivery for Brazil, Experimentation: Banco Central regulatory sandbox, first cycle5 documented deliveries for Brazil, Adaptability: Plano Real, the 1994 currency stabilisation; Proalcool, the fuel substitution after the oil shock; Telebras, the telecom system that was dismantled; Salário mínimo and its permanent revaluation rule; Auxílio Reconstrução, the federal cash grant after the 2024 Rio Grande do Sul floods10 documented deliveries for Brazil, Building: Pix instant payment system; GOV.BR federal identity and service platform; Sistema Unico de Saude, universal public health system; Programa Nacional de Imunizacoes, and its erosion; Luz para Todos, rural electrification; Bolsa Familia and the single registry behind it; Fully electronic national elections; Deepwater and pre-salt oil production; BNDES, the national development bank; Casa da Moeda do Brasil, the national mint1 documented delivery for Brazil, Shared Purpose: SUS health councils, permanent public participation8/929 records
Bulgaria00001 documented delivery for Bulgaria, Learning: Employment Agency adult training, including the DI-GI digital skills vouchers01 documented delivery for Bulgaria, Adaptability: The 60/40 employment retention measure, 2020 to 20212 documented deliveries for Bulgaria, Building: Road Infrastructure Rehabilitation Project, and its cut after the 2009 budget squeeze; Belene nuclear power plant, and its cancellation03/94 records
Burkina Faso00001 documented delivery for Burkina Faso, Learning: Adult literacy centres financed through FONAENF, and their erosion01 documented delivery for Burkina Faso, Adaptability: Burkin-Naong-Sa Ya adaptive cash transfers for COVID-19 and the lean season1 documented delivery for Burkina Faso, Building: Ouagadougou Water Supply Project (Ziga)03/93 records
Burundi001 documented delivery for Burundi, Coordination: Private-led coffee sector governance through InterCafe, and its dismantling00001 documented delivery for Burundi, Building: Jiji and Mulembwe hydropower project02/92 records
Canada1 documented delivery for Canada, Anticipation: Policy Horizons Canada, the federal foresight unit, and its 2024 disruption scan02 documented deliveries for Canada, Coordination: PPP Canada and the P3 Canada Fund, and its dissolution; Mitacs Accelerate research internships01 documented delivery for Canada, Learning: Skills Development under the Labour Market Development Agreements, and its 2024-25 funding cut1 documented delivery for Canada, Experimentation: CSA Regulatory Sandbox, succeeded by the Financial Innovation Hub2 documented deliveries for Canada, Adaptability: The 1997 Canada Pension Plan financing reform; Disaster Financial Assistance Arrangements3 documented deliveries for Canada, Building: Phoenix pay system, and its prolonged failure; Canadian long-gun registry, its information system overrun and its dismantling; Samuel De Champlain Bridge corridor06/910 records
Chile1 documented delivery for Chile, Anticipation: Senate Commission on Future Challenges, Science, Technology and Innovation04 documented deliveries for Chile, Coordination: ChileCompra, a national public-procurement marketplace; Start-Up Chile, a public accelerator for global startups; Sistema de Concesiones de Obras Públicas; CORFO Programas y Consorcios Tecnológicos01 documented delivery for Chile, Learning: Franquicia Tributaria SENCE, and its erosion02 documented deliveries for Chile, Adaptability: 27F reconstruction, a nationwide recovery programme after the 2010 earthquake; Ingreso Familiar de Emergencia, the COVID-19 household transfer1 documented delivery for Chile, Building: Transantiago, an integrated transport reform with rising subsidy dependence05/99 records
China1 documented delivery for China, Anticipation: National basic-research funding allocation01 documented delivery for China, Coordination: National PPP programme and project library, and its dismantling01 documented delivery for China, Learning: Vocational skills upgrading action, 2019-202102 documented deliveries for China, Adaptability: Dynamic zero-COVID containment, and its dismantling; Phased exemption of enterprise social insurance contributions, 20201 documented delivery for China, Building: National high-speed rail network05/96 records
Colombia001 documented delivery for Colombia, Coordination: SECOP II, a transaction platform for public procurement01 documented delivery for Colombia, Learning: SENA complementary training (formación complementaria)03 documented deliveries for Colombia, Adaptability: Cédula digital, an identity service upgraded for mobile use; Victims' reparations, a long-running administrative response to conflict; Fondo Adaptación, recovery and safer resettlement after La Niña2 documented deliveries for Colombia, Building: 4G road concessions, a national infrastructure portfolio; Reficar, a refinery modernization with a fiscal-liability finding04/97 records
Costa Rica001 documented delivery for Costa Rica, Coordination: FONAFIFO Payment for Environmental Services01 documented delivery for Costa Rica, Learning: INA national vocational training, and its contraction04 documented deliveries for Costa Rica, Adaptability: Certified digital signature across public services; REDCUDI childcare network and SINIRUBE referrals; Ramp Up, PROCOMER's export-readiness programme; Hurricane Otto priority reconstruction works2 documented deliveries for Costa Rica, Building: ICE and a mostly renewable national electricity system; CCSS universal health-insurance reach04/98 records
Côte d'Ivoire1 documented delivery for Côte d'Ivoire, Anticipation: Bureau National de la Prospective et de la Veille Stratégique and the national prospective studies01 documented delivery for Côte d'Ivoire, Coordination: Henri Konan Bédié toll bridge01 documented delivery for Côte d'Ivoire, Learning: Centres d'alphabétisation, and their erosion02 documented deliveries for Côte d'Ivoire, Adaptability: Programme de transferts monetaires productifs (PTMP), government-funded COVID-19 expansion; COVID-19 vaccination campaign1 documented delivery for Côte d'Ivoire, Building: Yabayo-Gagnoa road under the Fourth Highway Project, and its cost and time overrun05/96 records
Croatia001 documented delivery for Croatia, Coordination: Public-private partnership contracts in Croatia's PPP register, and their dwindling01 documented delivery for Croatia, Learning: Vaučeri za obrazovanje, training vouchers of the Croatian Employment Service02 documented deliveries for Croatia, Adaptability: Potpore za očuvanje radnih mjesta (job preservation grants), 2020; Zagreb earthquake recovery under the World Bank loan, and its delays1 documented delivery for Croatia, Building: Pelješac Bridge, the first stage of the road connection to South Dalmatia04/95 records
Cuba00001 documented delivery for Cuba, Learning: Campaña Nacional de Alfabetización03 documented deliveries for Cuba, Adaptability: National COVID-19 vaccination campaign; Civil Defence hurricane evacuation system; Tarea Ordenamiento's single exchange rate, and its fragmentation1 documented delivery for Cuba, Building: Programa Nacional de la Vivienda, and its collapse03/95 records
Cyprus00001 documented delivery for Cyprus, Learning: Human Resource Development Authority (HRDA) subsidised training programmes00001/91 record
Czechia002 documented deliveries for Czechia, Coordination: Centra kompetence, the Technology Agency's competence centres programme 2012 to 2019; D4 Příbram to Písek motorway, the first Czech transport PPP0001 documented delivery for Czechia, Adaptability: Antivirus job retention programme, 2020 to 20222 documented deliveries for Czechia, Building: Motorway construction by the Road and Motorway Directorate, and its unit cost; Modernizace dálnice D1 (D1 motorway modernisation, Mirošovice to Kývalka)03/95 records
Democratic Republic of the Congo00001 documented delivery for Democratic Republic of the Congo, Learning: Institut National de Préparation Professionnelle (INPP)01 documented delivery for Democratic Republic of the Congo, Adaptability: Response to the 2018 to 2020 North Kivu and Ituri Ebola outbreak1 documented delivery for Democratic Republic of the Congo, Building: Pro-Routes high-priority road reopening and maintenance03/93 records
Denmark1 documented delivery for Denmark, Anticipation: Teknologiraadet, the Danish Board of Technology, abolished in 201202 documented deliveries for Denmark, Coordination: Erhvervsforsker, the Industrial PhD and Industrial Postdoc programme; MitID, the digital identity built by the state and the banks01 documented delivery for Denmark, Learning: Arbejdsmarkedsuddannelser (AMU), adult vocational training courses, and their decline1 documented delivery for Denmark, Experimentation: Regulatorisk sandkasse for AI (Datatilsynet and Digitaliseringsstyrelsen)2 documented deliveries for Denmark, Adaptability: Lønkompensation, the 2020 wage compensation scheme; Civil defence shelters and protective trenches, and their erosion2 documented deliveries for Denmark, Building: Fehmarn Belt fixed link, and its cost and schedule overrun; Kvalitetsfonden hospital building programme (supersygehuse), and its overruns06/99 records
Dominican Republic001 documented delivery for Dominican Republic, Coordination: Plan Nacional de Viviendas Familia Feliz, and its intake freeze01 documented delivery for Dominican Republic, Learning: INFOTEP national technical and vocational training02 documented deliveries for Dominican Republic, Adaptability: National 9-1-1 emergency-response system; Quédate en Casa emergency cash transfer1 documented delivery for Dominican Republic, Building: Punta Catalina thermoelectric plant, and its cost overrun04/95 records
Ecuador002 documented deliveries for Ecuador, Coordination: SRI electronic invoicing at economy-wide scale; Crédito de Desarrollo Humano for beneficiary-led businesses0002 documented deliveries for Ecuador, Adaptability: Dollarization as an emergency monetary redesign; 2016 earthquake national emergency coordination2 documented deliveries for Ecuador, Building: Metro de Quito, a cross-administration urban rail delivery; Coca Codo Sinclair hydroelectric plant03/96 records
Egypt001 documented delivery for Egypt, Coordination: Renewable energy feed-in tariff programme and Benban0002 documented deliveries for Egypt, Adaptability: Takaful and Karama cash transfer programme; COVID-19 vaccination campaign1 documented delivery for Egypt, Building: Ain Sokhna supercritical power plant03/94 records
El Salvador001 documented delivery for El Salvador, Coordination: INSAFORP tripartite training institute, and its dissolution0002 documented deliveries for El Salvador, Adaptability: Bitcoin Law, and its 2025 rollback; National COVID-19 vaccination campaign1 documented delivery for El Salvador, Building: El Chaparral (3 de Febrero) hydroelectric plant03/94 records
Estonia1 documented delivery for Estonia, Anticipation: Foresight Centre at the Riigikogu (Arenguseire Keskus)01 documented delivery for Estonia, Coordination: National eID ecosystem with private trust-service partners01 documented delivery for Estonia, Learning: Upper secondary education for adults in non-stationary study02 documented deliveries for Estonia, Adaptability: Estonian Defence League, national defence rebuilt after independence; Estonian Stockpiling Agency (Eesti Varude Keskus) national emergency stocks1 documented delivery for Estonia, Building: X-Road national data exchange layer1 documented delivery for Estonia, Shared Purpose: Internet voting in national elections6/97 records
Ethiopia00001 documented delivery for Ethiopia, Learning: Integrated Functional Adult Education, and its erosion02 documented deliveries for Ethiopia, Adaptability: Productive Safety Net Programme for drought resilience; Floating the birr, July 20241 documented delivery for Ethiopia, Building: Modjo-Hawassa expressway, World Bank-financed Lot 303/94 records
Finland1 documented delivery for Finland, Anticipation: Government Report on the Future and the parliamentary Committee for the Future02 documented deliveries for Finland, Coordination: Strategic Centres for Science, Technology and Innovation (SHOKs), terminated in 2015; Finnish Trust Network for strong electronic identification02 documented deliveries for Finland, Learning: The public library system; Adult education allowance (aikuiskoulutustuki), and its abolition02 documented deliveries for Finland, Adaptability: Civil defence shelters; Business Finland disruption funding, 20201 documented delivery for Finland, Building: Kehärata airport rail loop, and its cost overrun05/98 records
France1 documented delivery for France, Anticipation: Senate foresight delegation (Délégation sénatoriale à la prospective)02 documented deliveries for France, Coordination: Plan France Très Haut Débit; Cifre industrial doctorates01 documented delivery for France, Learning: Compte personnel de formation1 documented delivery for France, Experimentation: Bac à sable réglementaire in the energy sector3 documented deliveries for France, Adaptability: France's long-term unemployment decline; Strategic stock of pandemic masks, and its erosion; Activité partielle in the 2020 crisis2 documented deliveries for France, Building: Flamanville 3 EPR, and the erosion of nuclear new-build delivery; Grand Paris Express06/910 records
Gambia0000002 documented deliveries for Gambia, Adaptability: Nafa Quick, the COVID-19 cash transfer carved out of the Nafa programme; COVID-19 emergency food support distributed by the National Disaster Management Agency1 documented delivery for Gambia, Building: Banjul Rehabilitation Project (roads, drainage and sewage), and its delay02/93 records
Georgia0000001 documented delivery for Georgia, Adaptability: Temporary unemployment benefit and one-off support for the self-employed, 20201 documented delivery for Georgia, Building: East-West Highway Corridor Improvement Project (Rikoti Pass sections)02/92 records
Germany1 documented delivery for Germany, Anticipation: Office of Technology Assessment at the German Bundestag (TAB)02 documented deliveries for Germany, Coordination: The Fraunhofer contract-research model; Dual vocational training (duale Ausbildung), and its contraction02 documented deliveries for Germany, Learning: Bildungsprämie training voucher, and its end; Aufstiegs-BAföG, upgrading training support1 documented delivery for Germany, Experimentation: SINTEG-Verordnung, the energy-transition experimentation clause3 documented deliveries for Germany, Adaptability: Kurzarbeit in the 2008-2009 crisis; Federal siren warning network, and its dismantling; Public civil defence shelters, and their dismantling1 documented delivery for Germany, Building: Floating LNG import terminals of 20221 documented delivery for Germany, Shared Purpose: THW, volunteer civil protection as a federal institution7/911 records
Ghana001 documented delivery for Ghana, Coordination: Sankofa Gas Project (Offshore Cape Three Points)01 documented delivery for Ghana, Learning: National Functional Literacy Programme, and its erosion1 documented delivery for Ghana, Experimentation: Bank of Ghana Regulatory Sandbox2 documented deliveries for Ghana, Adaptability: Domestic Debt Exchange Programme, December 2022 to February 2023; Ghana's 2022 Marburg virus disease response1 documented delivery for Ghana, Building: Accra bus rapid transit under the Ghana Urban Transport Project, and its cancellation05/96 records
Greece1 documented delivery for Greece, Anticipation: Special Secretariat of Foresight (now of Long-term Planning)01 documented delivery for Greece, Coordination: Greece's PPP programme under the 2005 PPP law0001 documented delivery for Greece, Adaptability: First state aid payments after Storm Daniel (Kratiki Arogi)1 documented delivery for Greece, Building: Second-wave motorway concessions (Central E-65, Olympia Odos, Moreas), and their reset04/94 records
Guatemala001 documented delivery for Guatemala, Coordination: Guatecompras, the national procurement marketplace01 documented delivery for Guatemala, Learning: Instituto Técnico de Capacitación y Productividad (INTECAP)02 documented deliveries for Guatemala, Adaptability: Bono Familia, the COVID-19 emergency cash transfer; Contingent disaster credit with a Catastrophe Deferred Drawdown Option1 documented delivery for Guatemala, Building: Chixoy hydroelectric project, and its cost and time overrun04/95 records
Guinea001 documented delivery for Guinea, Coordination: Urban water lease (affermage) with SEEG, and the return to public management after 20000001 documented delivery for Guinea, Adaptability: Guinea's 2021 Ebola outbreak response1 documented delivery for Guinea, Building: Fourth Highway Project: paving of the Mamou-Kankan and Dubreka-Kolaboui roads03/93 records
Guinea-Bissau00000001 documented delivery for Guinea-Bissau, Building: Bissau Port Project, delivered two and a half years late01/91 record
Haiti00001 documented delivery for Haiti, Learning: National literacy campaigns, 2010-201502 documented deliveries for Haiti, Adaptability: Routine immunization coverage, and its erosion; National cholera elimination drive, and the return of cholera1 documented delivery for Haiti, Building: PetroCaribe-financed public investment programme, and its audited failure03/94 records
Honduras001 documented delivery for Honduras, Coordination: Empresa Energía Honduras loss-reduction partnership, and its reversal01 documented delivery for Honduras, Learning: Instituto Nacional de Formación Profesional (INFOP)02 documented deliveries for Honduras, Adaptability: Sistema Nacional de Emergencias 911; Conditional cash transfer shock response, and its suspension after 20221 documented delivery for Honduras, Building: Aeropuerto Internacional de Palmerola04/95 records
Hungary001 documented delivery for Hungary, Coordination: Funding for Growth Scheme (Novekedesi Hitelprogram), central bank refinancing lent by commercial banks0002 documented deliveries for Hungary, Adaptability: Automatic loan repayment moratorium, March 2020; Defence against the June 2013 Danube flood1 documented delivery for Hungary, Building: Budapest metro line 4, first section, and its cost and time overrun03/94 records
India01 documented delivery for India, Agency: Pradhan Mantri Gramin Digital Saksharta Abhiyan2 documented deliveries for India, Coordination: Unified Payments Interface, the bank-and-app network; UDAN regional air connectivity scheme, and its lapsed routes01 documented delivery for India, Learning: SWAYAM national online-course platform1 documented delivery for India, Experimentation: Reserve Bank of India regulatory sandbox2 documented deliveries for India, Adaptability: CoWIN national COVID-19 vaccination platform; Pradhan Mantri Garib Kalyan Anna Yojana, the free foodgrain response to COVID-193 documented deliveries for India, Building: Pradhan Mantri Jan Dhan Yojana bank accounts; Delhi Commonwealth Games, and the cost-estimate escalation; Dedicated Freight Corridors, Eastern and Western06/910 records
Indonesia002 documented deliveries for Indonesia, Coordination: Palapa Ring national fibre network; Matching Fund Kedaireka university-industry matching grants01 documented delivery for Indonesia, Learning: Kartu Prakerja, a national lifelong-learning delivery system1 documented delivery for Indonesia, Experimentation: OJK regulatory sandbox for financial-sector technological innovation2 documented deliveries for Indonesia, Adaptability: Jaminan Kesehatan Nasional, a near-universal health-insurance pool; InaRISK national disaster-risk information platform2 documented deliveries for Indonesia, Building: Trans-Sumatra toll-road programme, still short of its planned network; Program 35.000 MW power generation programme, and its schedule slip05/98 records
Iran0000002 documented deliveries for Iran, Adaptability: Targeted Subsidy Reform cash transfer, and its erosion; Earthquake Emergency Recovery after the 2002 Changureh-Avaj earthquake1 documented delivery for Iran, Building: Tehran Sewerage Project (first phase: interceptors, trunk main and southern treatment plant)02/93 records
Iraq0000001 documented delivery for Iraq, Adaptability: Emergency Operation for Development, reconstruction of areas affected by terroristic operations1 documented delivery for Iraq, Building: Hartha power station units 2 and 3 rehabilitation, and its halt02/92 records
Ireland002 documented deliveries for Ireland, Coordination: National Broadband Plan rural fibre rollout; SFI Research Centres programme01 documented delivery for Ireland, Learning: Springboard+ upskilling programme04 documented deliveries for Ireland, Adaptability: MyGovID single sign-on for public services; National COVID-19 vaccination delivery; National Asset Management Agency crisis workout; Met Éireann national weather-warning service1 documented delivery for Ireland, Building: New Children's Hospital cost escalation04/98 records
Israel001 documented delivery for Israel, Coordination: Seawater desalination under private concessions01 documented delivery for Israel, Learning: Ministry of Labour Vocational Training Division adult courses1 documented delivery for Israel, Experimentation: Yozma, the venture capital catalyst2 documented deliveries for Israel, Adaptability: National COVID-19 vaccination campaign; Bank of Israel COVID-19 small-business credit programme2 documented deliveries for Israel, Building: Tel Aviv light rail Red Line; Israel Railways electrification and the Jerusalem express line, and their delays05/97 records
Italy002 documented deliveries for Italy, Coordination: Dottorati innovativi con le imprese (PNRR M4C2 investment 3.3), XXXVIII cycle; SPID, the public digital identity issued by accredited private providers01 documented delivery for Italy, Learning: Fondo nuove competenze1 documented delivery for Italy, Experimentation: Italy's FinTech regulatory sandbox, and its contraction2 documented deliveries for Italy, Adaptability: Cassa integrazione con causale Covid-19, 2020; Reconstruction after the 2016 and 2017 Central Italy earthquakes1 documented delivery for Italy, Building: MOSE, the Venice lagoon flood barrier05/97 records
Jamaica00001 documented delivery for Jamaica, Learning: HEART/NSTA Trust training enrolment1 documented delivery for Jamaica, Experimentation: Bank of Jamaica FinTech Regulatory Sandbox2 documented deliveries for Jamaica, Adaptability: COVID-19 Allocation of Resources for Employees (CARE) programme; Catastrophe bond payout after Hurricane Melissa003/94 records
Japan1 documented delivery for Japan, Anticipation: Fukushima decommissioning roadmap, a 30–40-year risk-reduction horizon02 documented deliveries for Japan, Coordination: COI-NEXT, co-creation centres for industry, academia and government; PFI Act projects and concessions01 documented delivery for Japan, Learning: Hello Training, public vocational training1 documented delivery for Japan, Experimentation: Project-based regulatory sandbox (new technology demonstration scheme)2 documented deliveries for Japan, Adaptability: My Number Card, a national identity rail extended into services; Tōhoku reconstruction, a decade-long recovery programme3 documented deliveries for Japan, Building: GIGA School, one learning device per student; Monju, a fast-breeder programme ended before commercial operation; Hokuriku Shinkansen Kanazawa to Tsuruga extension, and its overrun1 documented delivery for Japan, Shared Purpose: Volunteer fire corps, and its membership erosion7/911 records
Jordan001 documented delivery for Jordan, Coordination: Utility-scale renewable power through direct proposals and IPP rounds, and the stop after 2021001 documented delivery for Jordan, Experimentation: JoRegBox, the Central Bank of Jordan regulatory sandbox3 documented deliveries for Jordan, Adaptability: National Aid Fund temporary cash transfers to informal workers, 2020; COVID-19 vaccination campaign; Work permits for Syrian refugees under the Jordan Compact, and the end of the fee waiver1 documented delivery for Jordan, Building: Amman Development Corridor (Amman Ring Road phase 1), and its overrun04/96 records
Kazakhstan002 documented deliveries for Kazakhstan, Coordination: Innovation Consortia Matching Grant Program (Fostering Productive Innovation Project); National and local PPP and concession contracts001 documented delivery for Kazakhstan, Experimentation: AFSA FinTech Lab at the Astana International Financial Centre2 documented deliveries for Kazakhstan, Adaptability: KZT 42,500 income-loss payment during the 2020 state of emergency; Response and housing recovery after the spring 2024 floods1 documented delivery for Kazakhstan, Building: South-West Roads: Western Europe-Western China corridor (CAREC 1b and 6b)04/96 records
Kenya001 documented delivery for Kenya, Coordination: M-Pesa, and the regulator that let it run01 documented delivery for Kenya, Learning: Kenya's adult education centres, and their halving1 documented delivery for Kenya, Experimentation: Capital Markets Authority regulatory sandbox2 documented deliveries for Kenya, Adaptability: Hunger Safety Net Programme, a shock-responsive cash transfer for drought; Central Bank of Kenya emergency loan restructuring measures1 documented delivery for Kenya, Building: Standard Gauge Railway, Mombasa to Naivasha05/96 records
Kyrgyzstan000001 documented delivery for Kyrgyzstan, Experimentation: Special regulatory regimes (spetsialnye regulyativnye rezhimy) of the National Bank of the Kyrgyz Republic1 documented delivery for Kyrgyzstan, Adaptability: Flood Emergency Project after the 1998 southern floods2 documented deliveries for Kyrgyzstan, Building: National Road Rehabilitation (Osh-Batken-Isfana) Project; Bishkek-Osh road rehabilitation, third phase03/94 records
Laos001 documented delivery for Laos, Coordination: Nam Theun 2 hydropower concession0001 documented delivery for Laos, Adaptability: Typhoon Ketsana road recovery under the Road Sector Project1 documented delivery for Laos, Building: Road No. 13 South upgrading under the Third Highway Improvement Project03/93 records
Latvia002 documented deliveries for Latvia, Coordination: Kompetences centri, the industry competence centres programme; Ķekava bypass, the first major road PPP in the Baltic states01 documented delivery for Latvia, Learning: Mācības pieaugušajiem, the ESF training programme for employed adults 2017 to 202301 documented delivery for Latvia, Adaptability: National warning siren network and its twice-yearly test1 documented delivery for Latvia, Building: Rail Baltica in Latvia, and its cost and schedule overrun04/95 records
Lebanon0000002 documented deliveries for Lebanon, Adaptability: Emergency Social Safety Net (AMAN), and its slow start; COVID-19 vaccination campaign1 documented delivery for Lebanon, Building: Greater Beirut Water Supply Project (Awali to Beirut conveyor), and its unfinished delivery02/93 records
Lesotho0000001 documented delivery for Lesotho, Adaptability: Child Grants Programme drought top-ups, 20201 documented delivery for Lesotho, Building: Metolong Dam and Water Supply Programme02/92 records
Lithuania1 documented delivery for Lithuania, Anticipation: STRATA foresight for the Lietuva 2050 state progress strategy02 documented deliveries for Lithuania, Coordination: Inočekiai LT, innovation vouchers for SMEs to buy research services from universities and institutes; Public-private partnership contracts monitored by CPVA001 documented delivery for Lithuania, Experimentation: Bank of Lithuania regulatory sandbox, with one test in seven years01 documented delivery for Lithuania, Building: Decommissioning of the Ignalina nuclear power plant, and its delays04/95 records
Madagascar0000002 documented deliveries for Madagascar, Adaptability: FID crisis response transfers, including Fiavota; Tosika Fameno, the COVID-19 urban emergency cash transfer1 documented delivery for Madagascar, Building: Transport Infrastructure Investment Project (national roads, ports and the Northern Railway)02/93 records
Malawi1 documented delivery for Malawi, Anticipation: National Planning Commission foresight work for Malawi 20630001 documented delivery for Malawi, Learning: National Adult Literacy Programme02 documented deliveries for Malawi, Adaptability: Shock-responsive social cash transfers and the Cat DDO; COVID-19 Urban Cash Intervention, and its slow payment1 documented delivery for Malawi, Building: Energy Sector Support Project (substations and distribution lines)04/95 records
Malaysia003 documented deliveries for Malaysia, Coordination: JENDELA national digital-network plan; DuitNow on the Real-time Retail Payments Platform; Public-Private Research Network (PPRN) matching grants01 documented delivery for Malaysia, Learning: Kolej Komuniti part-time and lifelong-learning (Pembelajaran Sepanjang Hayat) courses1 documented delivery for Malaysia, Experimentation: Bank Negara Malaysia Fintech Regulatory Sandbox2 documented deliveries for Malaysia, Adaptability: MySejahtera and the national COVID-19 immunisation programme; National flood-warning SMS system2 documented deliveries for Malaysia, Building: MRT Putrajaya Line; Kuala Lumpur–Singapore high-speed rail, terminated before construction05/99 records
Mali001 documented delivery for Mali, Coordination: Transrail concession of the Dakar to Bamako railway, and its collapse0002 documented deliveries for Mali, Adaptability: Programme Gouvernemental de Transferts Monetaires d'Urgence COVID-19 (PGTMU); Mali's 2014 Ebola containment1 documented delivery for Mali, Building: Urban Water Supply Project (PEMU), part of the Kabala programme for Bamako03/94 records
Mauritius002 documented deliveries for Mauritius, Coordination: Collaborative Research and Innovation Grant Scheme (CRIGS); MauCAS Instant Payment System, run by the Bank of Mauritius with banks and non-banks01 documented delivery for Mauritius, Learning: Mauritius Institute of Training and Development part-time training1 documented delivery for Mauritius, Experimentation: Regulatory Sandbox Licence of the Economic Development Board2 documented deliveries for Mauritius, Adaptability: Wage Assistance Scheme and Self-Employed Assistance Scheme, paid by the MRA; COVID-19 vaccination campaign1 documented delivery for Mauritius, Building: B6 Belle Rive to Quartier Militaire road upgrade05/97 records
Mexico01 documented delivery for Mexico, Agency: Puntos México Conectado, national digital learning centres1 documented delivery for Mexico, Coordination: Jóvenes Construyendo el Futuro, government-workplace training01 documented delivery for Mexico, Learning: INEA adult basic education04 documented deliveries for Mexico, Adaptability: COFEPRIS digital regulatory procedures; Simulacro Nacional 2024, a nationwide emergency exercise; PROSPERA, and its replacement by a new scholarship authority; FONDEN, the natural disaster fund, and its abolition4 documented deliveries for Mexico, Building: Seguro Popular, and its abolition; CFE Telecomunicaciones e Internet para Todos; New International Airport of Mexico, and its cancellation; Olmeca refinery at Dos Bocas05/911 records
Moldova002 documented deliveries for Moldova, Coordination: ANCD innovation vouchers (Vouchere Inovationale) for SME research services; Chisinau International Airport concession, and its rescission in 202001 documented delivery for Moldova, Learning: ANOFM voucher-based vocational training for the unemployed01 documented delivery for Moldova, Adaptability: State Hydrometeorological Service severe weather warning upgrade1 documented delivery for Moldova, Building: Local Roads Improvement Project, and its halved scope04/95 records
Mongolia000001 documented delivery for Mongolia, Experimentation: Financial Regulatory Commission sandbox regulatory environment1 documented delivery for Mongolia, Adaptability: Social insurance contribution exemption, April to September 20201 documented delivery for Mongolia, Building: Second Energy Sector Project, distribution rehabilitation and the 10 MWp western solar plant03/93 records
Morocco1 documented delivery for Morocco, Anticipation: Institut Royal des Etudes Stratégiques (IRES)0001 documented delivery for Morocco, Learning: Agence Nationale de Lutte contre l'Analphabetisme literacy and post-literacy programmes02 documented deliveries for Morocco, Adaptability: Catastrophe insurance regime and the Solidarity Fund against Catastrophic Events (FSEC); Tadamon emergency cash transfers to informal workers, 20201 documented delivery for Morocco, Building: Noor-Ouarzazate solar complex04/95 records
Mozambique002 documented deliveries for Mozambique, Coordination: Beira railways concession, and its termination; Maputo water lease to Aguas de Mocambique, and the public buyout of the operator in 201001 documented delivery for Mozambique, Learning: Alfabetização e Educação de Adultos (public adult literacy and adult primary education), and its decline1 documented delivery for Mozambique, Experimentation: Sandbox Regulatório do Banco de Moçambique1 documented delivery for Mozambique, Adaptability: Instituto Nacional de Gestao de Calamidades (INGC)004/95 records
Myanmar0000002 documented deliveries for Myanmar, Adaptability: COVID-19 Economic Relief Plan household transfers, and their halt after the 2021 coup; Flood and Landslide Emergency Recovery Project, and its slow delivery001/92 records
Namibia00001 documented delivery for Namibia, Learning: NAMCOL secondary education programme for out-of-school learners1 documented delivery for Namibia, Experimentation: NAMFISA Regulatory Sandbox, microlending cohort0002/92 records
Nepal00001 documented delivery for Nepal, Learning: Enhanced Vocational Education and Training (EVENT II) short-term training02 documented deliveries for Nepal, Adaptability: Earthquake housing reconstruction programme (National Reconstruction Authority); Nepal Rastra Bank COVID-19 refinance and loan relief1 documented delivery for Nepal, Building: Melamchi Water Supply Project, and its erosion after the 2021 flood03/94 records
Netherlands1 documented delivery for Netherlands, Anticipation: The Delta Programme and its fund06 documented deliveries for Netherlands, Coordination: Social and Economic Council, the institutionalised polder bargain; Top Sectors and mission-driven innovation policy; iDEAL, interoperable online payments through Dutch banks; eHerkenning, a public-private business identity framework; Digipoort, an electronic post office for government–business data; NWO Perspectief, ended by the 2026 spring budget01 documented delivery for Netherlands, Learning: STAP-budget training grant, abolished in 20241 documented delivery for Netherlands, Experimentation: Experimenten Elektriciteitswet 2015-2018, and its erosion7 documented deliveries for Netherlands, Adaptability: Room for the River, flood safety delivered across the Rhine branches; Childcare benefits administration, and the recovery after institutional failure; National Police, one corps from twenty-five regional forces; NL-Alert, a tested multi-channel emergency warning system; DigiD Machtigen, delegated access to public services; DigiNotar, a certificate breach that forced a trust-chain reset; Programmatic Approach to Nitrogen, and the permitting reversal8 documented deliveries for Netherlands, Building: Groningen gas system, and its closure after induced earthquakes; DigiD, a shared digital identity rail for public services; Delta Works, a 43-year national flood-defence programme; Betuweroute, a freight railway that missed its operating promise; MijnOverheid, a shared citizen mailbox and data portal; Fyra V250, a high-speed service withdrawn after a failed launch; OVpay, nationwide contactless transit payments; Omgevingswet and the Digital Environment System06/924 records
New Zealand1 documented delivery for New Zealand, Anticipation: Long-term Insights Briefings under the Public Service Act 202001 documented delivery for New Zealand, Coordination: Ultra-Fast Broadband programme01 documented delivery for New Zealand, Learning: Adult and community education at tertiary providers, and its halving02 documented deliveries for New Zealand, Adaptability: COVID-19 Wage Subsidy Scheme; Earthquake Commission Canterbury Home Repair Programme1 documented delivery for New Zealand, Building: City Rail Link, Auckland, and its cost and time overrun05/96 records
Nicaragua0000002 documented deliveries for Nicaragua, Adaptability: SINAPRED evacuation for hurricanes Eta and Iota; Catastrophe risk insurance through CCRIF1 documented delivery for Nicaragua, Building: Rural electrification and near-universal grid coverage02/93 records
Nigeria001 documented delivery for Nigeria, Coordination: NIBSS Instant Payment (NIP)01 documented delivery for Nigeria, Learning: Adult literacy education under the National Commission for Mass Literacy, Adult and Non-Formal Education1 documented delivery for Nigeria, Experimentation: SEC Nigeria Regulatory Incubation Program3 documented deliveries for Nigeria, Adaptability: eNaira, a national rollout with an adoption gap; Nigeria's 2014 Ebola containment; National Social Safety Nets Project and the COVID-19 Rapid Response Register1 documented delivery for Nigeria, Building: Abuja-Kaduna-Zaria-Kano dual carriageway, and the termination of its 2017 contract05/97 records
North Macedonia00000001 documented delivery for North Macedonia, Building: Kicevo to Ohrid motorway, and its cost and time overrun01/91 record
Norway1 documented delivery for Norway, Anticipation: Teknologiraadet, the Norwegian Board of Technology02 documented deliveries for Norway, Coordination: Senter for forskningsdrevet innovasjon (SFI), Centres for Research-based Innovation; OPS road projects of the Norwegian Public Roads Administration01 documented delivery for Norway, Learning: Grunnskoleopplæring for voksne, municipal primary and lower secondary education for adults1 documented delivery for Norway, Experimentation: Datatilsynet's regulatory sandbox for privacy-friendly innovation1 documented delivery for Norway, Adaptability: Civil defence public warning sirens (tyfoner) and their twice-yearly test005/96 records
Pakistan00001 documented delivery for Pakistan, Learning: NCHD Adult Literacy Programme, and its collapse after 20131 documented delivery for Pakistan, Experimentation: SECP Regulatory Sandbox, four cohorts and an open window2 documented deliveries for Pakistan, Adaptability: Ehsaas Emergency Cash; Rural housing reconstruction after the 2005 Kashmir earthquake2 documented deliveries for Pakistan, Building: Neelum-Jhelum Hydropower Project, and its shutdown; Tarbela Fourth Extension Hydropower Project04/96 records
Panama00001 documented delivery for Panama, Learning: INADEH national vocational training03 documented deliveries for Panama, Adaptability: 120 a los 65 social pension; Canal water-and-transit response to the 2023–24 drought; Plan Panamá Solidario, Vale Digital2 documented deliveries for Panama, Building: Panama Canal expansion and self-financing operations; Metro de Panamá network operations03/96 records
Papua New Guinea00000002 documented deliveries for Papua New Guinea, Building: Road Maintenance and Rehabilitation Project; Lae Port Development Project (Lae Tidal Basin, phase 1)01/92 records
Paraguay001 documented delivery for Paraguay, Coordination: Ruta PY02 public-private road concession01 documented delivery for Paraguay, Learning: Educación Permanente para personas jóvenes y adultas (MEC)03 documented deliveries for Paraguay, Adaptability: Tekoporã Mbarete family-support programme; SIFEN national electronic invoicing rollout; Secretaría de Emergencia Nacional response to the 2019 floods3 documented deliveries for Paraguay, Building: Itaipú binational hydropower operations; Metrobús, an unfinished bus rapid transit project; Puente Héroes del Chaco, Asunción to Chaco'i bridge04/98 records
Peru001 documented delivery for Peru, Coordination: Obras por Impuestos, firms financing public infrastructure01 documented delivery for Peru, Learning: Educación Básica Alternativa (EBA), and its erosion02 documented deliveries for Peru, Adaptability: Juntos, a conditional-transfer system at national scale; National COVID-19 vaccination campaign4 documented deliveries for Peru, Building: Invierte.pe, a national multi-year investment-management system; Reconstrucción con Cambios, a delayed recovery portfolio; Gasoducto Sur Peruano, a terminated pipeline concession; Talara refinery modernisation, delivered late and over cost04/98 records
Philippines002 documented deliveries for Philippines, Coordination: CRADLE, DOST's collaborative R&D grant for academe and companies; InstaPay under the National Retail Payment System01 documented delivery for Philippines, Learning: TESDA technical-vocational training at national scale03 documented deliveries for Philippines, Adaptability: PhilSys foundational national ID rollout; Pantawid Pamilyang Pilipino Program (4Ps); Typhoon Yolanda shelter and recovery programme2 documented deliveries for Philippines, Building: DPWH national infrastructure delivery and transparency portal; Bataan Nuclear Power Plant, a mothballed megaproject04/98 records
Poland1 documented delivery for Poland, Anticipation: Rządowe Centrum Studiów Strategicznych, liquidated in 200602 documented deliveries for Poland, Coordination: Baltic Pipe gas interconnection; Doktorat wdrożeniowy (implementation doctorate) programme01 documented delivery for Poland, Learning: County and city general secondary schools for adults (licea ogólnokształcące dla dorosłych)03 documented deliveries for Poland, Adaptability: mObywatel digital ID wallet; Rodzina 500+ and 800+ child-benefit delivery; Alert RCB national emergency SMS channel2 documented deliveries for Poland, Building: Ostrołęka C coal block, and its abandonment; Vistula Spit shipping canal (Przekop Mierzei Wiślanej)05/99 records
Portugal1 documented delivery for Portugal, Anticipation: PLANAPP and REPLAN, a centre-of-government foresight network1 documented delivery for Portugal, Agency: e.escola, a national laptop-and-broadband push2 documented deliveries for Portugal, Coordination: Portugal's CoLAB applied-research network; Agendas Mobilizadoras and green innovation alliances1 documented delivery for Portugal, Trust: Civil-court clearance and the CEPEJ monitoring series2 documented deliveries for Portugal, Learning: Programa Qualifica and Portugal's adult-learning network; Novas Oportunidades, and the qualification-policy interruption3 documented deliveries for Portugal, Experimentation: Portugal Ventures, a public venture-capital bridge; Rede Nacional de Test Beds for company experimentation; Zonas Livres Tecnológicas, regulator-supervised experimentation zones6 documented deliveries for Portugal, Adaptability: Chave Móvel Digital and Portugal's digital identity layer; Empresa na Hora and the one-stop company registry; Sistema de Gestão Integrada de Fogos Rurais; Simplex and LabX, a standing simplification-and-experimentation loop; Programa Nacional de Vacinação and seasonal immunisation; STAYAWAY COVID, a contact-tracing app suspended after the emergency2 documented deliveries for Portugal, Building: Plano de Recuperação e Resiliência delivery governance; Lisbon–Madrid high-speed rail concession, formally abandoned1 documented delivery for Portugal, Shared Purpose: Orçamento Participativo Portugal9/919 records
Republic of the Congo0000001 documented delivery for Republic of the Congo, Adaptability: Lisungi emergency cash transfers for COVID-191 documented delivery for Republic of the Congo, Building: Realignment of the Congo-Ocean Railway through the Mayombe, and its overruns02/92 records
Romania002 documented deliveries for Romania, Coordination: Proiect de transfer la operatorul economic (PTE) research-to-firm transfer grants; Prima Casa / Noua Casa state-guaranteed mortgages through banks, and their wind-down01 documented delivery for Romania, Learning: ANOFM national vocational training plan, and its fall after 202302 documented deliveries for Romania, Adaptability: State-paid technical unemployment indemnity in the 2020 state of emergency; Hazard Risk Mitigation and Emergency Preparedness Project: seismic retrofitting and the emergency information system1 documented delivery for Romania, Building: A1 motorway, Bucharest to Nadlac04/96 records
Russia002 documented deliveries for Russia, Coordination: Government Resolution 218 complex projects for high-tech production; Faster Payments System (SBP), run by the Bank of Russia with the banks01 documented delivery for Russia, Learning: Federal project Sodeystvie zanyatosti (Employment Promotion) vocational training of adults1 documented delivery for Russia, Experimentation: Bank of Russia regulatory sandbox (regulativnaya pesochnitsa)2 documented deliveries for Russia, Adaptability: One-off COVID-19 payments to families with children, 2020; Roshydromet modernization: accuracy of hazard warnings to emergency agencies1 documented delivery for Russia, Building: Central Ring Road around Moscow (TsKAD), audited by the Accounts Chamber05/97 records
Rwanda001 documented delivery for Rwanda, Coordination: Government of Rwanda and Zipline drone delivery network01 documented delivery for Rwanda, Learning: Rwanda's adult literacy centres, and their decline02 documented deliveries for Rwanda, Adaptability: Rwanda's 2024 Marburg outbreak response; Food relief from the national reserve during the July 2021 lockdown01 documented delivery for Rwanda, Shared Purpose: Umuganda community work4/95 records
Serbia002 documented deliveries for Serbia, Coordination: Innovation Fund Collaborative Grant Scheme (Program saradnje nauke i privrede); Moja prva plata, state-paid first-job training placed with employers, and its 2025 halt01 documented delivery for Serbia, Learning: National Employment Service labour market training, and its 2025 non-delivery02 documented deliveries for Serbia, Adaptability: Three minimum wages paid to private employers in the 2020 state of emergency; Recovery from the May 2014 floods: power supply and flood defences1 documented delivery for Serbia, Building: Corridor X motorway sections (E-75 and E-80)04/96 records
Singapore1 documented delivery for Singapore, Anticipation: Centre for Strategic Futures, foresight inside government1 documented delivery for Singapore, Agency: Singapore's national ICT-skills measurement and baseline1 documented delivery for Singapore, Coordination: Tuaspring desalination partnership, and its collapse1 documented delivery for Singapore, Trust: Singapore Courts' case-clearance discipline1 documented delivery for Singapore, Learning: SkillsFuture Credit1 documented delivery for Singapore, Experimentation: MAS FinTech Regulatory Sandbox variants2 documented deliveries for Singapore, Adaptability: Jobs Support Scheme and the four 2020 Budgets; PUB drainage programme and the shrinking of flood-prone land1 documented delivery for Singapore, Building: Housing and Development Board, public housing at scale08/99 records
Slovakia001 documented delivery for Slovakia, Coordination: D4/R7 Bratislava bypass PPP01 documented delivery for Slovakia, Learning: Zručnosti pre trh práce, retraining and training contributions of the labour offices1 documented delivery for Slovakia, Experimentation: Narodna banka Slovenska regulatory sandbox1 documented delivery for Slovakia, Adaptability: Prvá pomoc (First Aid) job retention scheme, 2020 to 20221 documented delivery for Slovakia, Building: Decommissioning of the Bohunice V1 nuclear power plant, and its four-year slip05/95 records
Slovenia00001 documented delivery for Slovenia, Learning: Upper secondary education for adults (srednješolsko izobraževanje odraslih)01 documented delivery for Slovenia, Adaptability: Recovery after the August 2023 floods1 documented delivery for Slovenia, Building: Šoštanj thermal power plant unit 6 (TEŠ 6), and its cost overrun03/93 records
South Africa1 documented delivery for South Africa, Anticipation: Labour Market Intelligence Programme and forward skills planning02 documented deliveries for South Africa, Coordination: Renewable Energy Independent Power Producer Procurement Programme; TIA Technology Stations Programme, and its erosion02 documented deliveries for South Africa, Learning: SETAs and workplace-based learning delivery; Community Education and Training colleges, and their erosion1 documented delivery for South Africa, Experimentation: IFWG Regulatory Sandbox2 documented deliveries for South Africa, Adaptability: Gauteng e-tolls, and their cancellation after public resistance; South African Weather Service radar network, and its erosion2 documented deliveries for South Africa, Building: Grid power, and load shedding; MeerKAT radio telescope, a delivered national research facility06/910 records
South Korea1 documented delivery for South Korea, Anticipation: National Assembly Futures Institute01 documented delivery for South Korea, Coordination: Economic Planning Board, long-run industrial coordination1 documented delivery for South Korea, Trust: MyData, citizen-directed data portability1 documented delivery for South Korea, Learning: Employer and in-work training under Employment Insurance, and its erosion1 documented delivery for South Korea, Experimentation: Korean regulatory-sandbox system across eight sectors2 documented deliveries for South Korea, Adaptability: Korea Internet and Security Agency, a consolidated digital authority; KMA earthquake early warning service1 documented delivery for South Korea, Building: Gyeongbu high-speed railway (KTX), and its cost and schedule overrun07/98 records
Spain002 documented deliveries for Spain, Coordination: Kit Digital SME digitalisation programme; Doctorados Industriales (State Research Agency industrial doctorates)01 documented delivery for Spain, Learning: Formación programada por las empresas (FUNDAE training credit)1 documented delivery for Spain, Experimentation: Sandbox financiero (Ley 7/2020), and the fall in applications2 documented deliveries for Spain, Adaptability: Cl@ve shared digital identity; La Palma volcanic-eruption recovery and monitoring2 documented deliveries for Spain, Building: AVE high-speed rail network; Castor underground gas storage, and its closure05/98 records
Sri Lanka0000002 documented deliveries for Sri Lanka, Adaptability: Emergency cash transfer top-ups after the 2022 default; Owner-driven housing reconstruction after the 2004 tsunami1 documented delivery for Sri Lanka, Building: Southern Expressway (Southern Transport Development Project)02/93 records
Sudan0000002 documented deliveries for Sudan, Adaptability: Sudan Family Support Programme (Thamarat), and its halt after the October 2021 coup; Routine immunization through the 2023 war, and its erosion1 documented delivery for Sudan, Building: Rahad Irrigation Project, and its cost and time overrun02/93 records
Sweden1 documented delivery for Sweden, Anticipation: Framtidskommissionen, the Prime Minister's time-limited future commission02 documented deliveries for Sweden, Coordination: Swish mobile instant payments; Competence Centres Programme (Kompetenscentrumprogrammet) 1995 to 200501 documented delivery for Sweden, Learning: Kunskapslyftet adult education initiative04 documented deliveries for Sweden, Adaptability: BankID federated electronic identity; 1177 national health portal and helpline; VMA multi-channel public warning system; State medical emergency stockpiles, and their dismantling3 documented deliveries for Sweden, Building: Nya Karolinska Solna public–private hospital project; Barsebäck nuclear plant closure and decommissioning; Botniabanan coastal railway05/911 records
Switzerland1 documented delivery for Switzerland, Anticipation: Federal Chancellery situation and environment analysis (Perspektivstab)02 documented deliveries for Switzerland, Coordination: Dual-track vocational training; Innosuisse innovation projects with implementation partners0002 documented deliveries for Switzerland, Adaptability: Covid-19 bridging credits; Civil protection shelters1 documented delivery for Switzerland, Building: Gotthard Base Tunnel04/96 records
Tajikistan0000001 documented delivery for Tajikistan, Adaptability: Emergency Flood Assistance Project after the 1998 and 1999 floods1 documented delivery for Tajikistan, Building: Rogun hydropower plant02/92 records
Tanzania001 documented delivery for Tanzania, Coordination: Central railway concession to the RITES-led Tanzania Railways Limited, and its collapse in 201101 documented delivery for Tanzania, Learning: Integrated Community-Based Adult Education (MEMKWA), and its decline001 documented delivery for Tanzania, Building: Julius Nyerere Hydropower Project03/93 records
Thailand001 documented delivery for Thailand, Coordination: PromptPay national instant-payment rail01 documented delivery for Thailand, Learning: Department of Skill Development skill-upgrading training1 documented delivery for Thailand, Experimentation: Bank of Thailand regulatory sandbox4 documented deliveries for Thailand, Adaptability: Universal Coverage Scheme and the 30-baht health system; National Digital ID framework; T-Alert national cell-broadcast warning system; Public disaster warning network of the Department of Disaster Prevention and Mitigation, and its erosion1 documented delivery for Thailand, Building: Hopewell elevated road-and-rail concession, and its termination05/98 records
Trinidad and Tobago00001 documented delivery for Trinidad and Tobago, Learning: Youth Training and Employment Partnership Programme (YTEPP), and its shrinking enrolment01 documented delivery for Trinidad and Tobago, Adaptability: COVID-19 Salary Relief Grant and income support002/92 records
Tunisia001 documented delivery for Tunisia, Coordination: ONAS regional sanitation concessions, and their seven-year procurement01 documented delivery for Tunisia, Learning: Programme national d'enseignement des adultes (national adult education programme)1 documented delivery for Tunisia, Experimentation: Banque Centrale de Tunisie regulatory sandbox, first cohort2 documented deliveries for Tunisia, Adaptability: AMEN Social emergency transfers, 2020; Sfax flood protection (belt canal) after the 1982 flood1 documented delivery for Tunisia, Building: Reseau Ferroviaire Rapide de Tunis, lines D and E, and its overruns05/96 records
Turkey003 documented deliveries for Turkey, Coordination: e-Devlet Gateway, a shared public-service front door; TÜBİTAK 1505 university–industry support programme; Kamu-Özel İşbirliği, the national public-private partnership programme01 documented delivery for Turkey, Learning: MEB public lifelong-learning network03 documented deliveries for Turkey, Adaptability: The 2001 stabilisation, and its unwinding; AFAD earthquake shelter and recovery operation; DASK compulsory earthquake insurance3 documented deliveries for Turkey, Building: Marmaray, the Bosphorus rail crossing; FATİH education technology infrastructure; YEKA RES-1 renewable tender, and its cancellation04/910 records
Uganda001 documented delivery for Uganda, Coordination: Private electricity distribution concessions, and the 2022 decision to end them01 documented delivery for Uganda, Learning: Functional Adult Literacy programme, and its decline1 documented delivery for Uganda, Experimentation: Bank of Uganda regulatory sandbox2 documented deliveries for Uganda, Adaptability: Bank of Uganda COVID-19 credit relief and loan restructuring; Response to the 2022 Sudan ebolavirus outbreak1 documented delivery for Uganda, Building: Karuma Hydropower Project05/96 records
Ukraine001 documented delivery for Ukraine, Coordination: Brave1 defence technology cluster001 documented delivery for Ukraine, Experimentation: Sandbox for AI and blockchain products, Ministry of Digital Transformation and Ukrainian Startup Fund2 documented deliveries for Ukraine, Adaptability: eRecovery (єВідновлення) housing compensation programme; eSupport one-off 6,500 hryvnia payment to workers in combat regions, March 20221 documented delivery for Ukraine, Building: Road Sector Development Project on the M-03 and M-12, and its cut scope04/95 records
United Arab Emirates001 documented delivery for United Arab Emirates, Coordination: UAE Pass, the shared digital identity layer001 documented delivery for United Arab Emirates, Experimentation: ADGM RegLab, the first fintech sandbox in the region2 documented deliveries for United Arab Emirates, Adaptability: National COVID-19 vaccination campaign; Targeted Economic Support Scheme (TESS)1 documented delivery for United Arab Emirates, Building: Barakah Nuclear Energy Plant04/95 records
United Kingdom1 documented delivery for United Kingdom, Anticipation: Legally binding carbon budgets02 documented deliveries for United Kingdom, Coordination: Knowledge Transfer Partnerships; Private Finance Initiative and PF2, and their abolition01 documented delivery for United Kingdom, Learning: Government-funded adult further education in England, and its erosion3 documented deliveries for United Kingdom, Experimentation: The FCA regulatory sandbox; British Patient Capital, a public venture-capital catalyst; ICURe, from university research to spinouts2 documented deliveries for United Kingdom, Adaptability: COVID-19 Vaccine Taskforce and national vaccination rollout; Coronavirus Job Retention Scheme3 documented deliveries for United Kingdom, Building: Sure Start children's centres, and their erosion; High Speed Two, and the cancellation of Phase 2; Crossrail, the Elizabeth line06/912 records
United States1 documented delivery for United States, Anticipation: Office of Technology Assessment, defunded and closed in 199503 documented deliveries for United States, Coordination: Affordable Connectivity Program, and its lapse; Operation Warp Speed; Manufacturing USA innovation institutes01 documented delivery for United States, Learning: State-administered adult education under the Adult Education and Family Literacy Act, and its erosion1 documented delivery for United States, Experimentation: CFPB Compliance Assistance Sandbox, rescinded in 2022 and withdrawn again in 20252 documented deliveries for United States, Adaptability: National Flood Insurance Program coverage, and its erosion; Expanded Child Tax Credit of 2021, and its lapse2 documented deliveries for United States, Building: Measles elimination, and its erosion; Interstate Highway System1 documented delivery for United States, Shared Purpose: Federal funding gaps and the 2019 shutdown7/911 records
Uruguay002 documented deliveries for Uruguay, Coordination: SNIG, universal individual cattle traceability; ANII Alianzas para la Innovación01 documented delivery for Uruguay, Learning: INEFOP, the tripartite national training institute02 documented deliveries for Uruguay, Adaptability: Partial and flexible unemployment subsidy, 2020-2021; Plan Nacional de Relocalizaciones, moving households out of flood-prone land4 documented deliveries for Uruguay, Building: Electricity supply rebuilt on renewable sources; Plan Ceibal, one connected laptop per child; AFE passenger rail and network contraction; Línea Rivera rail rehabilitation, and its decay04/99 records
Uzbekistan001 documented delivery for Uzbekistan, Coordination: Competitive renewable IPP programme, from Navoi Scaling Solar01 documented delivery for Uzbekistan, Learning: Short-term vocational training of the unemployed in monocentres and district vocational training centres02 documented deliveries for Uzbekistan, Adaptability: COVID-19 low-income family allowances and unemployment benefits, 2020; Housing recovery after the Sardoba reservoir dam failure, 20201 documented delivery for Uzbekistan, Building: Pap-Angren railway and Kamchik tunnel04/95 records
Venezuela0000001 documented delivery for Venezuela, Adaptability: COVID-19 vaccination campaign2 documented deliveries for Venezuela, Building: Gran Misión Vivienda Venezuela's five-million-home milestone; Programa Ampliado de Inmunizaciones, and its erosion02/93 records
Vietnam001 documented delivery for Vietnam, Coordination: North-South eastern expressway BOT sections, and the retreat to public investment01 documented delivery for Vietnam, Learning: Project 1956 vocational training for rural workers03 documented deliveries for Vietnam, Adaptability: VNeID national electronic identity; Vietnam Social Security health-insurance expansion; Typhoon Yagi emergency restoration3 documented deliveries for Vietnam, Building: National expressway build-out in 2024; Cat Linh–Ha Dong metro, a delayed and over-budget delivery; Quang Trach to Pho Noi 500kV circuit-3 transmission line04/98 records
Zambia001 documented delivery for Zambia, Coordination: Zambia Railways concession to Railway Systems of Zambia, and its cancellation in 2012001 documented delivery for Zambia, Experimentation: Regulatory Sandbox Framework for Capital Markets, first cohort1 documented delivery for Zambia, Adaptability: Drought Emergency Cash Transfer through the Social Cash Transfer1 documented delivery for Zambia, Building: Solar powered milling plants contract, and its erosion04/94 records
Zimbabwe001 documented delivery for Zimbabwe, Coordination: Beitbridge Border Post modernisation (Zimborders build-operate-transfer concession)001 documented delivery for Zimbabwe, Experimentation: Securities and Exchange Commission of Zimbabwe regulatory sandbox01 documented delivery for Zimbabwe, Building: Harare-Masvingo-Beitbridge highway rehabilitation, behind schedule03/93 records
Countries with a record28/12530 records4/1254 records86/125135 records4/1255 records82/12589 records45/12549 records115/125240 records115/125182 records8/1258 records125/125

Documented examples

Each delivery shows its claim alongside the year, country, capability, status, published number, source, and mechanism.

Narrow the list

742 of 742 deliveries

Bank of Ghana Regulatory Sandbox

The Bank of Ghana, which launched a regulatory and innovation sandbox pilot in 2021, admitted six firms into its Regulatory Sandbox for one year in January 2026 to test the exchange, custody, administration and issuance of virtual assets.

Published number
6 firmsentities admitted into the bank of ghana regulatory sandbox (virtual assets cohort), 2026-01
Mechanism
written

Securities and Exchange Commission of Zimbabwe regulatory sandbox

The Securities and Exchange Commission of Zimbabwe published a list of seven innovative financial technology solutions approved for testing in its regulatory sandbox in July 2026, among them asset, securities and infrastructure tokenisation platforms, a crowdfunding platform and a blockchain capital raising platform.

Published number
7 solutionssolutions approved for participation in regulatory sandbox testing, 2026-07-24
Mechanism
written

T-Alert national cell-broadcast warning system

Thailand launched T-Alert in September 2025 as a nationwide cell-broadcast warning system: it covers eight hazard categories, was built with the disaster agency, digital ministry, telecom regulator and AIS, True and NT, and followed three staged tests in 2025 before use in real floods and other incidents.

Published number
8 hazard categorieshazard categories covered by t-alert at launch, 2025-093 test phases cell-broadcast test phases completed before national rollout, 2025
Source
Government Public Relations Department of Thailand, T-Alert launchofficial statistical, retrieved 2026-08-31
Mechanism
written

Response to the 2025 cholera outbreak, with a high fatality rate

Angola's Ministry of Health, with WHO, UNICEF, the World Bank and the ICRC, vaccinated over 900,000 people with oral cholera vaccine in a five-day reactive campaign in January 2025, with 99.5 percent administrative coverage, in an outbreak that had reached 8,543 cases and 329 deaths, a case fatality rate of 3.9 percent, in 16 of 21 provinces by 23 March 2025.

Published number
900,000 people (stated as 'over 900 000')people vaccinated in the january 2025 reactive oral cholera vaccination campaign, 2025-013.9 % of reported cases case fatality rate of the outbreak (329 deaths in 8,543 cases), 2025-03-23
Mechanism
written

Sandbox for AI and blockchain products, Ministry of Digital Transformation and Ukrainian Startup Fund

Ukraine's Ministry of Digital Transformation and the Ukrainian Startup Fund opened a sandbox for AI and blockchain products in 2025 and, in its first year, received more than 80 applications and admitted 15 companies to a first cohort that completed testing.

Published number
15 companiescompanies admitted to the first cohort that completed testing, 2026-06-0480 applications applications received in the first year (more than), 2026-06-04
Mechanism
written

ANOFM voucher-based vocational training for the unemployed

Moldova's National Employment Agency (ANOFM) enrolled 1,751 registered unemployed people, 1,223 of them women, in voucher-based vocational training courses between January and August 2026, and 952 unemployed people graduated from voucher courses in the same months, some of them enrolled in 2025.

Published number
1,751 peopleunemployed people enrolled in voucher-based vocational training courses since the start of the year (row 16, art. 32), January to August 2026952 people unemployed people who graduated from voucher-based courses since the start of the year, including those enrolled in 2025 (row 17), January to August 2026
Mechanism
written

Omgevingswet and the Digital Environment System

On 1 January 2024 the Netherlands put the Omgevingswet and its Digital Environment System into operation, joining municipalities, provinces, water boards and the national government behind one Omgevingsloket for rules, maps and permit applications.

Published number
4 government tiersgovernment tiers represented in the shared environment portal, 20241 portal national environment portal, 2024
Source
Rijksoverheid, Omgevingsloket descriptionofficial statistical, retrieved 2026-08-31
Mechanism
written

National expressway build-out in 2024

Vietnam's Ministry of Transport reported that seven road projects were completed and opened in 2024, bringing the national expressway network to more than 2,021 kilometres.

Published number
2,021 kilometresnational expressway network in operation, 20247 projects road projects completed and opened in 2024, 2024
Mechanism
written

Typhoon Yagi emergency restoration

After Typhoon Yagi struck northern Vietnam, the government reported on 16 September 2024 that power had returned to 92.5% of customers in affected localities and that 8,386 of 9,235 damaged mobile base stations had been restored.

Published number
92.5 % of customerspower customers restored in affected localities, 2024-09-168,386 stations damaged mobile base stations restored, 2024-09-16
Mechanism
written

Simulacro Nacional 2024, a nationwide emergency exercise

Mexico's national civil-protection system coordinated a countrywide earthquake exercise in September 2024 in which 9,727,000 people participated, with alerts carried over 14,490 public loudspeakers and a multi-agency task force of 1.9 million personnel.

Published number
9,727,000 peopleparticipants in the national drill, 2024-09-1914,490 loudspeakers public loudspeakers activated, 2024-09-19
Source
Secretaría de Seguridad y Protección Ciudadana, Government of Mexicoofficial statistical, retrieved 2026-09-02
Mechanism
written

MEB public lifelong-learning network

Türkiye's Ministry of National Education reported 7,909,495 participants in public adult-learning programmes in 2024, including 6,493,700 attending in person and 1,415,795 using the HEMBA online platform; 5,305,688 earned a course certificate.

Published number
7,909,495 participantsadult-learning participants, 20245,305,688 participants participants completing courses and eligible for a certificate, 2024
Mechanism
written

TÜBİTAK 1505 university–industry support programme

TÜBİTAK's 1505 University–Industry Collaboration Support Programme received 116 project applications and began support for 59 projects in 2024, with 52 fellows working across the collaboration pipeline.

Published number
59 projectsprojects entering the support process, 2024116 applications project applications received, 2024
Mechanism
written

Quang Trach to Pho Noi 500kV circuit-3 transmission line

Vietnam built the 519-kilometre Quang Trach to Pho Noi 500kV circuit-3 transmission line across nine provinces after construction began on 18 January 2024, and the Government reported it in operation on 29 August 2024 'after six months of construction', meeting the Prime Minister's deadline of completion before September, at an investment of over VND22.3 trillion.

Published number
519 kilometreslength of the 500kv circuit-3 transmission line put into operation, 2024-08-296 months construction period as reported by the government, 2024-08-29
Source
Viet Nam Government News (Government Office portal), inauguration reportofficial statistical, retrieved 2026-10-01
Mechanism
written

Rwanda's 2024 Marburg outbreak response

Rwanda's Ministry of Health declared a Marburg virus disease outbreak on 27 September 2024 and declared it over on 20 December 2024. WHO reported 66 confirmed cases and 15 deaths, a case fatality ratio of 23 percent, with the last confirmed case on 30 October.

Published number
23 % of confirmed casescase fatality ratio of the 2024 marburg outbreak, 2024-12-1966 confirmed cases confirmed marburg cases, 2024-12-19
Mechanism
written

Auxílio Reconstrução, the federal cash grant after the 2024 Rio Grande do Sul floods

After the floods that began in late April 2024 in Rio Grande do Sul, the federal government paid R$ 2.1 billion in Auxílio Reconstrução to 429,000 families, according to the balance its extraordinary secretary for the reconstruction of Rio Grande do Sul presented to a Chamber of Deputies committee on 12 February 2025.

Published number
429,000 familiesfamilies paid the auxílio reconstrução, 2025-02-122.1 R$ billion auxílio reconstrução paid, 2025-02-12
Mechanism
written

Floating the birr, July 2024

The National Bank of Ethiopia floated the birr on 29 July 2024, and by 20 September the former official rate had moved from 57.8 to an indicative 119.2 birr per US dollar while the parallel-market spread over it fell from 96 percent to around 5 percent.

Published number
5 %parallel-market spread over the nbe indicative rate (around), 2024-09-2096 % parallel-market spread over the official rate before the float, 2024-07-26
Mechanism
written

Drought Emergency Cash Transfer through the Social Cash Transfer

After the President declared the 2024 El Niño drought a national disaster, Zambia's Ministry of Community Development and Social Services enumerated households in all 116 districts within four to eight weeks. From May 2024 to April 2025 it paid a drought emergency cash transfer to 1,631,007 households in 84 districts through the Social Cash Transfer, and paid a nationally funded price-shock transfer to 632,664 households in the other 32 districts.

Published number
1,631,007 householdshouseholds supported by the drought emergency cash transfer (d-ect) in 84 drought-affected districts, May 2024 to April 2025632,664 households households paid the government-funded indirect price shock emergency cash transfer in the remaining 32 districts, May 2024 to April 2025
Mechanism
written

Regulatorisk sandkasse for AI (Datatilsynet and Digitaliseringsstyrelsen)

Denmark's data protection authority and digitalisation agency selected two projects from 23 applications for the first round of their regulatory sandbox for AI in July 2024, two from 18 applications in June 2025 and three more in July 2026, seven projects in all.

Published number
7 projectsprojects selected across the first three rounds (2 + 2 + 3), 2026-07-0923 applications applications received for the first round, 2024-05-21
Mechanism
written

Zručnosti pre trh práce, retraining and training contributions of the labour offices

Slovakia's Central Office of Labour, Social Affairs and Family enrolled 17,008 clients in its national project 'Zručnosti pre trh práce' in 2025 and paid training contributions for 16,853 of them, 14.56 million euros in all, with 9,714 registered jobseekers starting retraining courses against 5,904 in 2024.

Published number
17,008 clientsclients enrolled in the national project zručnosti pre trh práce, 20259,714 jobseekers registered jobseekers who started retraining under the project, 2025
Mechanism
written

ANCD innovation vouchers (Vouchere Inovationale) for SME research services

Moldova's National Agency for Research and Development (ANCD) financed 13 innovation voucher projects in 2025, in which small and medium firms buy research and development services from research organisations, after 28 applications to the 2025-2026 call yielded 10 funded projects and four funded projects were stopped when the firms declined to sign contracts.

Published number
13 projectsinnovation voucher projects financed in the year (10 from the 2025-2026 call plus continuing 2024-2025 projects, less those stopped), 202528 proposals proposals submitted to the 2025-2026 innovation voucher call, 2025
Mechanism
written

JoRegBox, the Central Bank of Jordan regulatory sandbox

The Central Bank of Jordan approved three companies on 31 October 2024, out of nine applications to the first cohort of its JoRegBox regulatory sandbox launched in February 2024, to begin testing digital financial products with real customers, among them the escrow platforms E-Damana and Watheq.

Published number
3 companiescompanies approved to enter the sandbox for live testing, 2024-10-31
Mechanism
written

ONAS regional sanitation concessions, and their seven-year procurement

Tunisia's national sanitation utility ONAS launched procurement of its first two ten-year regional concessions in September 2017; the south-east concession started in June 2024 and served 797,000 people by July 2026, and the North Tunis concession entered into force only on 9 July 2026 after the original consortium had to be reorganised.

Published number
797,000 peoplepeople receiving wastewater collection and treatment from the concessionaire (south-east lot only), 2026-070 agreements concession agreements signed and effective at the june 2023 status report, against a target of two by december 2020, 2023-06-05
Mechanism
written

Response and housing recovery after the spring 2024 floods

Kazakhstan's government reported that during the spring 2024 floods, which it called the largest in 80 years, more than 120,000 people were rescued and placed in temporary accommodation centres, and that by December 2024 it had bought 5,767 homes, fully repaired 9,156 and built 2,680 new houses for owners of the 19,359 flooded homes inspected, while 36,455 families received one-off assistance.

Published number
120,000 people (more than)people rescued and placed in temporary accommodation during the flood period, 2024-042,680 houses new individual houses built for flood victims (64 billion tenge), 2024-12-25
Mechanism
written

Central Bank of Azerbaijan regulatory sandbox

The Central Bank of the Republic of Azerbaijan began testing its first regulatory sandbox participant in December 2024 and admitted three more whose testing began in 2026, out of 14 applicants.

Published number
3 firmsfirms whose sandbox testing began in 2026, counted from the registry, 202614 applicants (cumulative) applicants to the sandbox since launch, 2026-10
Source
Central Bank of the Republic of Azerbaijan, Regulatory Sandbox Registryofficial statistical, retrieved 2026-10-02
Mechanism
written

MyData, citizen-directed data portability

South Korea's MyData policy gives people a route to request and direct the transfer of personal data between services, with the Personal Information Protection Commission describing the scheme as a way to give people control over data portability after the March 2023 legal amendment.

Published number
2023 yearyear of the legal amendment establishing the data portability right, 2023
Source
Personal Information Protection Commission, MyData policy noticeofficial statistical, retrieved 2026-08-30
Mechanism
written

Top Sectors and mission-driven innovation policy

In November 2023 the Netherlands renewed its mission-driven innovation compact: businesses, knowledge institutions, governments and other organisations committed an estimated €5.7 billion a year, coordinated through five missions and eight Knowledge and Innovation Agendas.

Published number
5,700,000,000 euros per yearannual joint mission-driven innovation effort, 202330 organisations partners signing the innovation covenant, 2023
Mechanism
written

OVpay, nationwide contactless transit payments

Translink and the Dutch public-transport operators rolled out OVpay nationwide in 2023, embedding bank-card and mobile check-in across the country; in 2024 the system processed 390 million travel transactions, 15 percent of all transit transactions.

Published number
390,000,000 transactionsovpay travel transactions processed, 202415 % of transit transactions ovpay share of all travel transactions, 2024
Source
Translink, 2024 annual reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Canal water-and-transit response to the 2023–24 drought

During the extreme 2023–24 drought, the Panama Canal Authority adjusted draft and booking rules to preserve water for the canal and the lakes supplying more than half of Panama's population, reducing daily transits from the normal 36 to 22 in December 2023 while keeping the waterway operating.

Published number
22 transits per daydaily transits during the december drought restriction, 2023-1236 transits per day normal daily transit capacity, normal conditions
Source
Autoridad del Canal de Panamá, drought transit advisoryofficial statistical, retrieved 2026-08-31
Mechanism
written

National flood-warning SMS system

Malaysia's National Disaster Management Agency (NADMA), water and meteorological agencies and telecommunications companies sent more than five million flood-warning SMS messages during the 2023/24 monsoon season and upgraded 442 transmission-tower sites to keep warnings and communications functioning.

Published number
5,000,000 messagesflood-warning sms messages sent, 2024-03442 sites transmission-tower sites upgraded for disaster resilience, 2024
Mechanism
written

Salário mínimo and its permanent revaluation rule

Brazil's Congress and president established a permanent annual valorização do salário mínimo in Law 14.663/2023, setting the national floor at R$1,320 from May 2023 and linking later adjustments to INPC inflation plus real GDP growth from two years earlier.

Published number
1,320 Brazilian reais per monthnational minimum wage set by law 14.663/2023, 2023-05
Source
Presidency of the Republic, Law No. 14.663/2023official statistical, retrieved 2026-08-31
Mechanism
written

National basic-research funding allocation

China's National Bureau of Statistics, Ministry of Science and Technology and Ministry of Finance reported 225.91 billion yuan in basic-research expenditure in 2023, equal to 6.77% of national R&D spending.

Published number
6.77 % of total R&D expenditurebasic-research share of national r&d expenditure, 2023
Mechanism
written

COFEPRIS digital regulatory procedures

Mexico's medicines and health-products regulator COFEPRIS completed 509,921 procedures entirely online with traceability by 5 September 2024, replacing paper hand-offs for a large share of its regulated users.

Published number
509,921 proceduresprocedures completed fully digitally, 2024-09-05
Mechanism
written

AFAD earthquake shelter and recovery operation

After the February 2023 earthquakes, Türkiye's AFAD established 350 tent cities providing shelter for 2.5 million people, moved about 700,000 people into 414 container cities before the first winter and delivered 46,000 permanent homes within the first year.

Published number
2,500,000 peoplepeople sheltered in post-earthquake tent cities, 202346,000 homes permanent disaster homes delivered within the first year, 2024-02
Mechanism
written

SEC Nigeria Regulatory Incubation Program

Nigeria's Securities and Exchange Commission opened a one-year Regulatory Incubation sandbox in September 2023 and had admitted seven firms across cohorts 001/23 and 002/24 to test capital-market products, then cleared seven more entities into its Accelerated Regulatory Incubation Programme in July 2026.

Published number
7 firmsfirms admitted to the regulatory incubation sandbox across two cohorts, 2024-08-297 entities entities cleared for the accelerated regulatory incubation programme in one announcement, 2026-07-02
Mechanism
written

eRecovery (єВідновлення) housing compensation programme

Ukraine's government, through the Ministry for Development and the Diia digital platform, paid war-damage housing compensation to 231,681 families totalling UAH 119.1 billion by 10 July 2026. Of these, more than 153,000 families received repair payments, and more than 74,000 received certificates to buy replacement housing for homes that were destroyed.

Published number
231,681 familiesfamilies that received erecovery compensation, cumulative, 2026-07-10119.1 UAH billion total erecovery compensation paid, cumulative, 2026-07-10
Mechanism
written

Brave1 defence technology cluster

Ukraine's government set up the Brave1 cluster in 2023 under the Ministry of Digital Transformation. By September 2026 it had awarded more than 1,000 non-repayable grants worth UAH 6.2 billion to private defence-technology developers, whose products it tests with the armed forces and moves toward serial production.

Published number
6.2 UAH billiondefence technology development funded by brave1 since 2023, 2026-091,000 grants (published as more than 1,000) grants awarded to ukrainian defence developers since 2023, 2026-09
Mechanism
written

Sistema Nacional de Formação Profissional under INEFOP

Angola's national vocational training system, the INEFOP-supervised centres together with the accelerated 'plano intercalar' courses, FUNEA and licensed private centres, enrolled 204,026 trainees in 2024, against 112,478 in 2023, with 152,625 passing, across 1,914 training centres.

Published number
204,026 trainees enrolledmatriculados no sistema nacional de formação profissional (tabela 3), 2024112,478 trainees enrolled same count for the previous year (tabela 3), 2023
Mechanism
written

De Kade prison in Antwerp, a federal DBFM contract

Belgium's federal Buildings Agency had the new 440-place prison de Kade in Antwerp, part of the federal prisons masterplan, designed, built and financed by the consortium Hortus Conclusus under a DBFM contract, with works from 2023 to 2026 at a construction cost of EUR 195.5 million and an annual availability fee of EUR 23.1 million for 25 years of maintenance, after which the prison returns to the federal state free of charge.

Published number
195.5 EUR millionconstruction cost of the dbfm prison, excluding vat, 2025-0923.1 EUR million per year annual availability fee, including vat, 2023 prices, 2025-09
Mechanism
written

Recovery after the August 2023 floods

Slovenia's Ministry of Natural Resources and Spatial Planning reported in July 2025 that after the floods of 4 August 2023 it had completed all intervention and emergency works on 850 km of watercourses by June 2024, paid 35.7 million euros in advance payments for home repairs to more than 7,350 individuals, transferred 218 million euros in advances to municipalities and completed more than 430 watercourse repair sites, within a five-year recovery programme funded at 2.3 billion euros.

Published number
7,350 people (more than)individuals paid advance payments for urgent repair of damaged homes, 2025-07-25850 km length of watercourses on which all intervention and emergency works were completed by june 2024, 2024-06
Mechanism
written

First state aid payments after Storm Daniel (Kratiki Arogi)

Greece's Ministry of Climate Crisis and Civil Protection paid almost 65 million euros of first state aid (proti arogi) to about 14,000 people affected by the September 2023 Thessaly floods within the first month after the storm, and by 15 February 2024 had paid 154.94 million euros to 45,292 households, firms, farms and livestock units in the first round.

Published number
45,292 recipientsrecipients of first state aid (households, businesses, farms and livestock units), first round, cumulative, 2024-02-1514,000 people (about) recipients paid within about the first month after the floods, 2023-10-13
Mechanism
written

Private solar and wind plants under government investment agreements

Azerbaijan's government brought its first utility-scale private solar plant, Masdar's 230 MW Garadagh plant built with US$262 million of foreign investment, into operation on 26 October 2023, followed on 16 September 2026 by the 100 MW Gobustan plant won at a 2024 auction, with further private wind and solar plants under investment agreements and power purchase contracts.

Published number
230 MWcapacity of the garadagh solar power plant, the first private utility-scale plant, in operation, 2023-10-26262 million US$ foreign investment in the garadagh plant, 2023
Mechanism
written

NAMFISA Regulatory Sandbox, microlending cohort

Namibia's non-bank financial regulator NAMFISA launched its Regulatory Sandbox in May 2023, received 10 applications for its first, microlending cohort, and had admitted three participants (ReferredBy Financial Solutions, Ergo Analytics trading as Verime, and the microlender Express Credit) with a fourth application under review by its 2025 annual report.

Published number
3 firmsparticipants admitted to the namfisa regulatory sandbox (cumulative), 202510 applications applications received for the first (microlending) cohort, 2024
Mechanism
written

Cédula digital, an identity service upgraded for mobile use

In 2024 Colombia's Registraduría deployed version 2.0 of its digital ID app and sent 2,642,775 polycarbonate digital identity cards to offices nationwide while continuing a pilot to refine digital services.

Published number
2,642,775 cardspolycarbonate digital identity cards sent to offices, 20242,644,783 cards polycarbonate digital identity cards produced, 2024
Mechanism
written

National Digital ID framework

Thailand's Digital ID Framework aligned government and private identity providers around common standards in its 2022–2024 first phase; the Electronic Transactions Development Agency reports at least 113 million users across the major ThaiD, Tang Rat, Paotang and NDID platforms and services.

Published number
113,000,000 users/accounts reported by platformsusers represented across major digital id platforms and services, 20244 platforms major digital id platforms included in the first-phase account base, 2024
Mechanism
written

PLANAPP and REPLAN, a centre-of-government foresight network

Portugal's PLANAPP operates as a Centre of Government body for evidence-based foresight, planning, monitoring, evaluation and impact analysis; its REPLAN network lists five multisectoral team remits and held its inaugural meeting on 23 November 2022.

Published number
5 team remitsnamed multisectoral replan team remits, 2022-11-23
Source
PLANAPP, REPLAN presentationofficial statistical, retrieved 2026-09-02
Mechanism
written

Rede Nacional de Test Beds for company experimentation

ANI's National Innovation Report records 47 recognised Portuguese test beds and €150 million allocated to the national network for developing and testing new products and services at technology-readiness levels 5 to 9.

Published number
47 test bedsrecognised test beds, 2024-12-31150,000,000 EUR prr allocation to the test-bed network, 2022-2025
Source
Agência Nacional de Inovação, Relatório Nacional de Inovação 2024official statistical, retrieved 2026-09-02
Mechanism
written

Floating LNG import terminals of 2022

After Russia's invasion of Ukraine the federal government chartered floating storage and regasification units, commissioned the first at Wilhelmshaven in December 2022, and by February 2023 expected to spend about 10 billion euros renting and running five units, against 2.94 billion euros of federal funding made available for four in May 2022.

Published number
10,000,000,000 eurosexpected expenditure for chartering and operating five fsrus (government estimate), 2023-022,940,000,000 euros federal funding available for four fsrus at the may 2022 decision, 2022-05
Mechanism
written

STAP-budget training grant, abolished in 2024

The Dutch employee insurance agency UWV paid individual training grants of up to 1,000 euros from 2022, approved more than 214,000 applications in five rounds that year, and stopped the scheme on 1 January 2024.

Published number
214,000 approved applications (more than, 'ruim')stap-budget applications approved in 2022, 2022
Mechanism
written

Lobito Corridor rail concession

Angola's Ministry of Transport signed a 30-year concession with Lobito Atlantic Railway, in which Mota-Engil holds equity, on 4 November 2022 to rehabilitate, operate and maintain about 1,300 km of the Benguela line from Lobito to Luau and the Lobito mineral terminal. By September 2026 the concessionaire was operating the corridor with about 945 workers, 529 of them transferred from state rail and port operators.

Published number
1,300 kmrail infrastructure operated, maintained and modernised under the concession, 2026-09-10945 workers workers employed by the concessionaire, of whom 529 transferred from state-owned operators, 2026-09-10
Mechanism
written

Response to the 2022 Sudan ebolavirus outbreak

Uganda's Ministry of Health contained the Sudan ebolavirus outbreak declared on 20 September 2022, for which no licensed vaccine existed, through national and district emergency committees, listing 4,793 contacts, and declared it over on 11 January 2023 after 142 confirmed and 22 probable cases and 77 deaths.

Published number
113 daysdays from outbreak declaration (20 september 2022) to declared end (11 january 2023), 2023-01-114,793 contacts contacts listed during the outbreak, 2023-01-11
Mechanism
written

Domestic Debt Exchange Programme, December 2022 to February 2023

After losing market access and requesting IMF support in July 2022, Ghana's government launched a domestic debt exchange on 5 December 2022 covering all medium- and long-term local-currency government, Daakye and ESLA bonds, and settled it on 21 February 2023 with 85 percent of the face value of bonds held by investors other than pension funds exchanged, giving almost GHS 50 billion of cash debt relief in 2023.

Published number
85 %share of the face value of eligible bonds held by investors other than pension funds exchanged in the dde, 2023-02-2178 days days from launch of the exchange (5 december 2022) to settlement (21 february 2023), computed, 2023-02-21
Mechanism
written

Ghana's 2022 Marburg virus disease response

Ghana's Ministry of Health declared the country's first Marburg virus disease outbreak on 7 July 2022, identified and monitored 198 contacts through 42 days, and declared the outbreak over on 16 September 2022 after three confirmed cases, all from one household, and two deaths.

Published number
198 contactscontacts identified, monitored and completed observation, 2022-09-163 confirmed cases confirmed marburg cases (two deaths, cfr 67 percent), 2022-09-16
Mechanism
written

Narodna banka Slovenska regulatory sandbox

Slovakia's central bank opened its regulatory sandbox on 1 January 2022 and lists one former participant, Crowdberry Investment Platform, which entered on 22 November 2023, tested an electronic bulletin board for secondary trading of crowdfunded securities with selected clients from 15 December 2024 to 18 April 2025, and exited on 15 May 2025.

Published number
1 firmsfirms listed as former participants (completed) of the regulatory sandbox, 2025-05-15
Source
Narodna banka Slovenska, Regulatory sandbox pageofficial statistical, retrieved 2026-10-02
Mechanism
written

Special Secretariat of Foresight (now of Long-term Planning)

Greece's Special Secretariat of Foresight published its Megatrends 2040 report and seven megatrend notes in February and March 2022 and then six further foresight studies to September 2026, including Generative AI Greece 2030 (January 2024), The Future of Work and Skills in Greece (February 2025) and Mediterranean Foresight (September 2026).

Published number
6 studiesforesight studies published on the secretariat's studies pages, january 2023 to september 2026, 2026-09-298 publications megatrends 2040 report and megatrend notes published in february and march 2022, 2022-03
Mechanism
written

STRATA foresight for the Lietuva 2050 state progress strategy

Lithuania's Government Strategic Analysis Center (STRATA) followed six thematic public discussions on the country's future in May and June 2022 with nine foresight studies on megatrends and scenarios by policy area, which fed the vision and strategic ambitions of the draft state progress strategy Lietuva 2050.

Published number
9 studiesforesight studies prepared for lietuva 2050, 20226 discussions thematic discussions on lithuania's future, 2022-05 to 2022-06
Mechanism
written

Vaučeri za obrazovanje, training vouchers of the Croatian Employment Service

The Croatian Employment Service enrolled 23,627 people in training paid for by its education vouchers in 2025, 9,786 of them in digital-skills programmes and 2,558 in green-skills programmes, and 53,106 people in total from the scheme's start on 1 April 2022 to the end of 2025.

Published number
23,627 personspersons included in the measure 'obrazovanje za stjecanje kompetencija potrebnih za rad putem vaučera' during the year, 202553,106 persons users included since the voucher system began (1 april 2022 to end of 2025), 2025-12-31
Mechanism
written

Dottorati innovativi con le imprese (PNRR M4C2 investment 3.3), XXXVIII cycle

Italy's Ministry of University and Research funded 1,708 company co-financed innovative doctoral scholarships in the 38th doctoral cycle (academic year 2022/2023), against the 5,000 that decree 352/2022 had allocated for that year, and cut the measure's target from 15,000 scholarships and 450 million euros to 6,000 scholarships and 360 million euros.

Published number
1,708 doctoral scholarshipsscholarships assigned ('borse assegnate'), xxxviii cycle, summed over tabella a of d.d. 1424/2024, 2022/2023 academic year5,000 doctoral scholarships scholarships planned for 2022/2023 by d.m. 352 of 9 april 2022 (allocation, not delivery), 2022
Mechanism
written

National warning siren network and its twice-yearly test

Latvia's State Fire and Rescue Service tested the national early warning siren network on 23 May 2025 and reported that 160 of the 162 sirens tested worked without faults, out of 164 installed, against 119 of 155 in the test of 20 May 2024.

Published number
160 of 162 tested (164 installed)sirens that worked without faults in the national test, 2025-05-23119 of 155 tested (164 installed) sirens that worked without faults in the national test a year earlier, 2024-05-20
Mechanism
written

eSupport one-off 6,500 hryvnia payment to workers in combat regions, March 2022

After Russia's full-scale invasion on 24 February 2022, Ukraine's Cabinet allocated UAH 21,450 million for a one-off eSupport payment by Resolution 199 of 4 March 2022, opened applications in the Diia app on 8 March to insured employees and sole proprietors in regions with active fighting, paid the first 6,500 hryvnia transfers on 21 March, and by 27 March had paid 2.7 million people UAH 17.9 billion against 4 million applications.

Published number
2.7 million peoplepeople paid the 6,500 hryvnia esupport payment, cumulative, 2022-03-2725 days days from the invasion to the first esupport payments (24 february to 21 march 2022), 2022-03-21
Mechanism
written

Emergency cash transfer top-ups after the 2022 default

After Sri Lanka suspended external debt service on 12 April 2022, the government topped up Samurdhi and categorical cash transfers to Rs 5,000 to 7,500 per family per month from May to December 2022 for 2.5 million existing recipients and 0.8 million waitlisted recipients, raising spending on these programmes to Rs 142 billion in 2022.

Published number
3.3 million recipientsrecipients of crisis top-up or additional cash transfers, may to december 2022 (2.5 million existing plus 0.8 million waitlisted), 2022-12142 billion Sri Lankan rupees (0.6 percent of GDP) spending on the four main social safety net programmes in 2022, 2022
Mechanism
written

SIFEN national electronic invoicing rollout

Paraguay's tax administration approved 651,894,711 electronic tax documents during 2024 and reported 6,659 electronic billers using the SIFEN system, combining mandatory onboarding for larger firms with the free e-Kuatia'i route for small taxpayers.

Published number
651,894,711 documentselectronic tax documents approved, 20246,659 taxpayers electronic billers registered, 2024-12
Mechanism
written

VNeID national electronic identity

Vietnam's Ministry of Public Security reported more than 70.2 million electronic-identification accounts issued by January 2024, with VNeID designed to replace paper documents and authenticate public and private services against the national population database.

Published number
70,200,000 accountselectronic-identification accounts issued, 2024-01-16
Mechanism
written

MySejahtera and the national COVID-19 immunisation programme

Malaysia's national COVID-19 immunisation programme had administered 57,119,777 doses by 31 December 2021, while the MySejahtera application was used to collect 974,134 adverse-event responses for vaccine safety monitoring.

Published number
57,119,777 dosescovid-19 vaccine doses administered, 2021-12-31974,134 responses adverse-event responses submitted through mysejahtera, 2021-12-31
Source
Malaysia Ministry of Health, Annual Report 2021official statistical, retrieved 2026-08-31
Mechanism
written

Kit Digital SME digitalisation programme

Spain's Red.es Kit Digital programme used public grants, volunteer representatives and private digitalising agents to help small firms adopt software and online services; by 3 August 2026 the programme reported 1,566,846 transformation projects delivered by 10,727 agents, 96 percent of them ICT SMEs.

Published number
1,566,846 projectsdigital transformation projects launched through kit digital, 2026-08-0310,727 agents adhered digitalising agents, 2026-08-03
Source
Red.es, Kit Digital public-private collaboration resultsofficial statistical, retrieved 2026-08-31
Mechanism
written

La Palma volcanic-eruption recovery and monitoring

After the Cumbre Vieja eruption began on 19 September 2021, Spain coordinated a state–Canary Islands–island recovery commission; by February 2024 the state reported €929 million mobilised and 650 CO2 monitoring devices installed, allowing more than 220 families to return safely to homes in affected areas.

Published number
929,000,000 eurosstate resources mobilised for la palma recovery, 2024-02650 devices co2 monitoring devices installed in affected areas, 2024-02
Source
Government of Spain, La Moncloa recovery commission reportofficial statistical, retrieved 2026-08-31
Mechanism
written

eNaira, a national rollout with an adoption gap

By June 2024, the Central Bank of Nigeria reported 28.46 million eNaira customers onboarded but only 197,041 active wallets, showing that the national CBDC rollout had not converted broad registration into sustained use.

Published number
197,041 walletsactive enaira wallets, 2024-0628,460,316 customers onboarded enaira customers, 2024-06
Source
Central Bank of Nigeria, Financial Stability Report June 2024official statistical, retrieved 2026-08-31
Mechanism
written

National COVID-19 vaccination campaign

Cuba's national COVID-19 vaccination campaign had given at least one vaccine dose to 94% of the country's population by 31 December 2021, according to the Pan American Health Organization.

Published number
94 % of populationpopulation receiving at least one covid-19 vaccine dose, 2021-12-31
Source
Pan American Health Organization, Health in the Americas country profile: Cubainternational organization, retrieved 2026-08-31
Mechanism
written

Bitcoin Law, and its 2025 rollback

El Salvador's 2025 reform made private-sector Bitcoin acceptance voluntary, limited the law to private participation and repealed Articles 4, 8 and 9 of the 2021 Bitcoin Law.

Published number
3 articlesbitcoin law articles repealed by the 2025 reform, 2025-01-302 sectors (private and public) sectors with mandatory bitcoin acceptance under the original law, 2021-09-07
Mechanism
written

Ramp Up, PROCOMER's export-readiness programme

Costa Rica's export agency PROCOMER reported that 40 SMEs graduated from its 16-week Ramp Up 2024 programme, delivered with INA and the Sistema de Banca para el Desarrollo, bringing the number of firms benefiting since the programme began in 2021 to 175.

Published number
40 SMEssmes graduating from ramp up 2024, 2025-02-26175 SMEs smes benefiting since launch, 2025-02-26
Source
PROCOMER, Ramp Up 2024 export-capability programmeofficial statistical, retrieved 2026-08-31
Mechanism
written

Plano de Recuperação e Resiliência delivery governance

Portugal's PRR barometer recorded €21.9 billion across 121 investments and 43 reforms, with €14.43 billion paid to beneficiaries by 27 August 2026.

Published number
14,431,510,367.98 EUR paidprr funds paid, 2026-08-27121 investments investments in the plan, 2026-08-27
Mechanism
written

Agendas Mobilizadoras and green innovation alliances

Portugal's PRR transparency portal reports 52 Agendas Mobilizadoras and Verdes representing €5,278,338,665.70 of approved investment and €3,051,632,468.10 of approved support as of 17 August 2026.

Published number
52 consortia/agendasagendas mobilizadoras and verdes represented, 2026-08-175,278,338,665.7 EUR approved investment across the agendas, 2026-08-17
Mechanism
written

Zonas Livres Tecnológicas, regulator-supervised experimentation zones

ANI's National Innovation Report records four Portuguese Zonas Livres Tecnológicas (technological free zones) by the end of 2024, where innovators can test technology-based processes in real or near-real environments under continuous regulator supervision.

Published number
4 zonestechnological free zones identified, 2024-12-31
Source
Agência Nacional de Inovação, Relatório Nacional de Inovação 2024official statistical, retrieved 2026-09-02
Mechanism
written

CoWIN national COVID-19 vaccination platform

India used CoWIN to register and scale COVID-19 vaccination nationally, recording more than 2.2067 billion vaccinations and 1.1093 billion registrations by 21 November 2023.

Published number
2,206,700,000 vaccinationscovid-19 vaccinations recorded by cowin, 2023-11-211,109,300,000 registrations cowin registrations, 2023-11-21
Mechanism
written

Banco Central regulatory sandbox, first cycle

Brazil's central bank opened its regulatory sandbox to applications in February 2021, received 52 projects, admitted seven to test under relaxed rules from 6 December 2021, and ran the cycle for one year with one permitted extension.

Published number
7 projectsprojects admitted to the first cycle, 202252 projects projects that applied to the first cycle, 2021
Mechanism
written

Affordable Connectivity Program, and its lapse

The Federal Communications Commission ran the Affordable Connectivity Program from 31 December 2021, paying monthly broadband discounts through voluntarily participating internet providers to more than 23 million enrolled households, and ended it on 1 June 2024 when the funding Congress had provided ran out.

Published number
23 million householdshouseholds enrolled in the acp when new enrolments stopped, 2024-02
Mechanism
written

Tarea Ordenamiento's single exchange rate, and its fragmentation

On 1 January 2021 Cuba's government replaced its dual-currency system with a single exchange rate of 24 pesos per dollar for the whole economy. By 1 October 2026 the Central Bank of Cuba published three official dollar rates, of 24, 120 and 689 pesos.

Published number
689 CUP per USDcentral bank of cuba floating-segment (segment iii) usd rate, 2026-10-0124 CUP per USD single exchange rate set at monetary unification, 2021-01-01
Source
Banco Central de Cuba, exchange-rate API (tasas de cambio activas)official statistical, retrieved 2026-10-01
Mechanism
written

COVID-19 vaccination campaign

Venezuela's health authorities reported to WHO that 22,157,232 people, 78 per 100 population, had received at least one COVID-19 vaccine dose by 29 December 2023, from a first dose given on 22 February 2021, with 14,287,370 (50 per 100) completing the primary series.

Published number
22,157,232 peoplepeople vaccinated with at least one covid-19 vaccine dose, 2023-12-2950 per 100 population people who completed the primary series (last dose), 2023-12-29
Mechanism
written

Estonian Stockpiling Agency (Eesti Varude Keskus) national emergency stocks

After COVID-19 exposed supply gaps, Estonia set up a state stockpiling company in 2021 that holds food, healthcare, veterinary and fuel stocks. By the National Audit Office's January 2026 review, its food stocks covered 10% of the population for 30 days, against a government target of 14 days for the whole population, and just over 90% of the required pharmaceutical stock was in place.

Published number
10 % of population (30 days)food stocks: share of population covered for 30 days, 2026-0114 days (entire population) government target for food stocks: days of supply for the entire population, 2026-01
Mechanism
written

Sandbox financiero (Ley 7/2020), and the fall in applications

Spain's Treasury ran a national financial regulatory sandbox under Law 7/2020 from 2021. Its first cohort drew 66 applications, 12 of which entered testing. By 2025 demand had fallen to two applications across the ninth and tenth cohorts, one of which received a favourable assessment, and the Government approved a draft law (Anteproyecto, 17 December 2024) that replaces closed cohorts with year-round intake and cuts pre-assessment to 45 working days.

Published number
2 applicationsapplications received in the 9th and 10th cohorts, 202566 applications applications received in the first cohort (peak), 2021
Mechanism
written

National COVID-19 vaccination campaign

From its first dose on 9 February 2021 to the end of 2023, Peru's national COVID-19 vaccination campaign administered 91.3 million doses and completed the primary series for 28.7 million people, 87 per 100 population, with 22.2 million boosted.

Published number
28,709,882 personspersons with a completed primary series, 2023-12-2987 per 100 population persons with a completed primary series per 100 population, 2023-12-29
Source
World Health Organization, COVID-19 vaccination data (country-reported)international organization, retrieved 2026-10-02
Mechanism
written

National COVID-19 vaccination campaign

From its first dose on 17 February 2021 to the end of 2023, El Salvador's national COVID-19 vaccination campaign administered 11.5 million doses and completed the primary series for 4.4 million people, 68 per 100 population.

Published number
4,397,817 personspersons with a completed primary series, 2023-12-2968 per 100 population persons with a completed primary series per 100 population, 2023-12-29
Source
World Health Organization, COVID-19 vaccination data (country-reported)international organization, retrieved 2026-10-02
Mechanism
written

Expanded Child Tax Credit of 2021, and its lapse

The American Rescue Plan, passed in March 2021, expanded the Child Tax Credit and made it payable monthly, and on 15 July 2021 the IRS paid roughly 15 billion dollars to families of nearly 60 million children; Congress did not extend the expansion beyond 2021.

Published number
60,000,000 children (nearly)eligible children in families paid in the first monthly payment, 2021-07-1515,000,000,000 US dollars (roughly) paid in the first monthly payment, 2021-07-15
Source
US Department of the Treasury, press release of 15 July 2021official statistical, retrieved 2026-10-02
Mechanism
written

Food relief from the national reserve during the July 2021 lockdown

After the cabinet ordered a lockdown on 14 July 2021, Rwanda's government released part of the national food reserves on 15 July, and between 18 and 30 July local governments delivered about 7,000 tonnes of food door to door to more than 327,000 families in Kigali and eight districts, including 103,000 families not on the initial list.

Published number
327,000 families (more than)families receiving food relief, 2021-07103,000 families families added beyond the initial list, 2021-07
Mechanism
written

Interoperable QR immediate payments, built by the banks and the Banco Central de Bolivia

Bolivia's banks first offered QR payments under their own SIMPLE standard, and the Banco Central de Bolivia then made QR transfers interoperable across banks, cooperatives, housing lenders and development finance institutions with a universal standard compatible with the banks' codes, mandatory electronic channels and free transfers; immediate QR payments rose from 6 million operations in 2021 to 892 million in 2025, 86 percent of electronic fund transfer orders that year.

Published number
892 million operationsimmediate payments by qr code processed in the year, 2025357,747 million bolivianos, nominal value of immediate payments by qr code in the year, 2025
Source
Banco Central de Bolivia, Informe de Vigilancia del Sistema de Pagos 2025official statistical, retrieved 2026-10-02
Mechanism
written

Plan Nacional de Viviendas Familia Feliz, and its intake freeze

By May 2024 the Dominican government's Familia Feliz plan, in which private developers build low-cost homes and the state pays down-payment, tax and mortgage-rate subsidies, had built 3,979 homes and assigned RD$1,108 million in subsidies.

Published number
3,979 housing unitshomes built under the plan since launch, 2024-051,108 RD$ million subsidies assigned (bono inicial, bono itbis and bono tasa 7 años), 2024-05
Mechanism
written

Matching Fund Kedaireka university-industry matching grants

Indonesia's Directorate General of Higher Education, Research and Technology funded 427 university-industry collaboration proposals through the Kedaireka Matching Fund in 2021, its first year, and 1,093 in 2022.

Published number
1,093 proposalsmatching fund proposals funded, 2022427 proposals matching fund proposals funded in the first year, 2021
Mechanism
written

COVID-19 vaccination campaign

Bolivia's health authorities reported to WHO that 7,505,389 people, 64 per 100 population, had received at least one COVID-19 vaccine dose by 29 December 2023, from a first dose given on 30 January 2021, with 6,307,628 (54 per 100) completing the primary series.

Published number
7,505,389 peoplepeople vaccinated with at least one covid-19 vaccine dose, 2023-12-2954 per 100 population people who completed the primary series (last dose), 2023-12-29
Mechanism
written

Italy's FinTech regulatory sandbox, and its contraction

Italy's FinTech sandbox, run by the Bank of Italy, Consob and IVASS under the MEF's FinTech Committee, admitted 16 projects from its first application window (November 2021 to January 2022) but only 3 from its second (November to December 2023), after applications fell by about 80.7 percent.

Published number
3 projects admittedprojects admitted to the sandbox from the second application window (2 by ivass, 1 by the bank of italy, 0 by consob), 202416 projects admitted projects admitted from the first application window, the peak (13 by the bank of italy, 3 by ivass), 2022
Mechanism
written

Guinea's 2021 Ebola outbreak response

Guinea's Ministry of Health announced an Ebola outbreak in N'Zérékoré Prefecture on 14 February 2021 and declared it over on 19 June 2021. It activated national and district emergency committees, vaccinated 10,873 people and followed 1,031 of 1,110 contacts daily, and held the outbreak to 23 confirmed and probable cases and 12 deaths, five years after the 2014 to 2016 West African epidemic.

Published number
23 casesebola cases in the 2021 outbreak, confirmed and probable, 2021-06-1910,873 people people vaccinated against ebola in the response, including 885 contacts and 2,779 frontline workers, 2021-05-27
Mechanism
written

Bank of Uganda regulatory sandbox

The Bank of Uganda reviewed five applications to its regulatory sandbox in the year to June 2025, issued deficiency letters to all of them, and reported one firm, Rexial Payment Systems Limited, exiting the sandbox after testing and applying for a payment systems operator licence.

Published number
1 firmsfirms exiting the regulatory sandbox in the financial year, FY2024/25 (July 2024 to June 2025)5 applications applications to the regulatory sandbox reviewed in the financial year, FY2024/25
Mechanism
written

Regulatory Sandbox Framework for Capital Markets, first cohort

Zambia's Securities and Exchange Commission admitted four innovations to the first cohort of its capital markets sandbox, with testing starting on 19 November 2021, and announced on 15 July 2024 that live testing had been completed and directed all four to suspend operations inside the sandbox pending evaluation and exit.

Published number
4 innovationsinnovations admitted to the first sandbox cohort and completing live testing, 2024-07-15
Mechanism
written

COVID-19 vaccination campaign

Botswana's health authorities reported to WHO that 1,951,054 people, 83 per 100 population, had received at least one COVID-19 vaccine dose by 31 December 2023, from a first dose given on 26 March 2021, with 1,663,490 (71 per 100) completing the primary series.

Published number
1,951,054 peoplepeople vaccinated with at least one covid-19 vaccine dose, 2023-12-3171 per 100 population people who completed the primary series (last dose), 2023-12-31
Mechanism
written

COVID-19 vaccination campaign

Mauritius's health authorities reported to WHO that 1,123,773 people, 88 per 100 population, had received at least one COVID-19 vaccine dose by 31 December 2023, from a first dose given on 26 January 2021, with 1,088,142 (86 per 100) completing the primary series.

Published number
1,123,773 peoplepeople vaccinated with at least one covid-19 vaccine dose, 2023-12-3186 per 100 population people who completed the primary series (last dose), 2023-12-31
Mechanism
written

Programme Gouvernemental de Transferts Monetaires d'Urgence COVID-19 (PGTMU)

Mali's government launched its own emergency COVID-19 cash transfer programme in 2021, paying one-off transfers to 400,000 poor households across the country through the targeting and payment systems built by the Jigisemejiri safety net project, and kept it running in 2022, but only FCFA 42 billion of the FCFA 100 billion budgeted was disbursed because of the political crisis.

Published number
400,000 householdshouseholds covered by the pgtmu one-off emergency transfers, 202242 billion FCFA pgtmu funds disbursed against fcfa 100 billion budgeted, 2022
Mechanism
written

Sudan Family Support Programme (Thamarat), and its halt after the October 2021 coup

After Sudan cut fuel subsidies and unified its exchange rate in February 2021, the transitional government's Sudan Family Support Programme began paying cash in March 2021 and by 25 October 2021 had registered about 2.7 million families and paid about 30.6 billion Sudanese pounds to 1.4 million families, about 4.7 million people, before all activities, including cash delivery, were halted after the military takeover of that day.

Published number
1,395,295 familiesfamilies paid by the sfsp/thamarat before the halt (table e4 total, paid families), 2021-10-302,637,632 families families registered against a planned 6.5 million, 2021-10-30
Mechanism
written

COVID-19 vaccination campaign

Côte d'Ivoire's health authorities reported to WHO that 13,568,372 people, 51 per 100 population, had received at least one COVID-19 vaccine dose by 31 December 2023, from a first dose given on 1 March 2021, with 12,164,304 (46 per 100) completing the primary series.

Published number
13,568,372 peoplepeople vaccinated with at least one covid-19 vaccine dose, 2023-12-3146 per 100 population people who completed the primary series (last dose), 2023-12-31
Mechanism
written

MitID, the digital identity built by the state and the banks

Denmark's Agency for Digital Government, representing the state, regions and municipalities, and the banks, through a Finance Denmark subsidiary, jointly own MitID, launched in May 2021 to replace NemID and migrated in 2021 and 2022; by July 2026, 97.2 percent of residents over 15 had an active MitID, and it averaged 94.4 million transactions a month in 2025.

Published number
97.2 % of population over 15share of the population over 15 with an active mitid, 2026-0794.4 million transactions per month mitid transactions per month, average for 2025, 2025
Mechanism
written

D4 Příbram to Písek motorway, the first Czech transport PPP

The Czech Ministry of Transport procured the completion of the D4 motorway between Příbram and Písek as the country's first transport public-private partnership, and the concessionaire Via Salis opened 32 km of new motorway and 16 km of modernised sections on 17 December 2024 after 43 months of construction, as the ministry had announced in June 2021, with the state paying an availability payment until 2049.

Published number
32 km (plus 16 km modernised)new motorway built and opened under the ppp, 2024-12-1729.5 CZK billion availability payment approved by the chamber of deputies, against the audit office's inflation-adjusted estimate of about czk 33.7 billion, 2023-12-11
Mechanism
written

Ķekava bypass, the first major road PPP in the Baltic states

Latvia's Ministry of Transport and the state roads company signed a design, build, finance and maintain contract for the Ķekava bypass on the A7 on 16 July 2021, the private partner Kekava ABT built the roughly 18 km road from 2021 to 2023 and it opened on 13 October 2023, with the state paying EUR 250.13 million in availability payments over 20 years.

Published number
250.13 EUR milliontotal availability payments over the 20-year maintenance period, 2023-10-1327 months months from contract signature (16 july 2021) to opening (13 october 2023), 2023-10-13
Mechanism
written

Self-Employment Program business training

Azerbaijan's State Employment Agency trained 24,399 successful applicants to the national Self-Employment Program in business skills and business planning between May 2021 and November 2024, 2,155 of them in the third quarter of 2024, as a condition of receiving start-up assets.

Published number
24,399 peoplesuccessful sep applicants who completed business training (cumulative), May 2021 to 30 November 20242,155 people applicants who completed training and prepared business plans in one quarter, Q3 2024
Mechanism
written

Emergency Social Safety Net (AMAN), and its slow start

Lebanon's emergency cash transfer for the economic collapse that began in 2019 was approved by the World Bank in January 2021, rewritten by Parliament in March 2021 and declared effective only in July 2021, so that in October 2021 the number of households receiving basic cash transfers still stood at its 15,153 baseline against a target of 147,000; the programme later reached 158,770 households by March 2025.

Published number
15,153 householdshouseholds receiving basic cash transfers, unchanged from the june 2020 baseline, 2021-10-31158,770 households households that had received cash assistance under the programme (aman), 2025-03
Mechanism
written

COVID-19 vaccination campaign

Egypt's health authorities reported to WHO that 56,907,319 people, 56 per 100 population, had received at least one COVID-19 vaccine dose by 31 December 2023, from a first dose given on 24 January 2021, with 42,337,175 (41 per 100) completing the primary series.

Published number
56,907,319 peoplepeople vaccinated with at least one covid-19 vaccine dose, 2023-12-3141 per 100 population people who completed the primary series (last dose), 2023-12-31
Mechanism
written

COVID-19 vaccination campaign

Jordan's health authorities reported to WHO that 4,821,579 people, 47 per 100 population, had received at least one COVID-19 vaccine dose by 21 August 2022, from a first dose given on 13 January 2021, with 4,558,313 (45 per 100) completing the primary series.

Published number
4,821,579 peoplepeople vaccinated with at least one covid-19 vaccine dose, 2022-08-2145 per 100 population people who completed the primary series (last dose), 2022-08-21
Mechanism
written

COVID-19 vaccination campaign

Lebanon's health authorities reported to WHO that 2,740,227 people, 40 per 100 population, had received at least one COVID-19 vaccine dose by 22 December 2022, from a first dose given on 14 February 2021, with 2,414,223 (35 per 100) completing the primary series.

Published number
2,740,227 peoplepeople vaccinated with at least one covid-19 vaccine dose, 2022-12-2235 per 100 population people who completed the primary series (last dose), 2022-12-22
Mechanism
written

Financial Regulatory Commission sandbox regulatory environment

Mongolia's Financial Regulatory Commission admitted three products and services to its sandbox for one year in the fourth quarter of 2022 and released one, the MonPay digital bond, on 30 December 2022 after a year of testing, leaving four under test.

Published number
3 productsproducts and services admitted to the sandbox in 2022 q4, 2022-12-311 products products and services released from the sandbox in 2022, 2022-12-30
Mechanism
written

Catastrophe bond payout after Hurricane Melissa

Jamaica's government received confirmation in November 2025 of a full US$150 million payout under the catastrophe insurance it had bought from the World Bank, backed by a catastrophe bond issued in 2024 and renewing cover first placed in 2021, after Hurricane Melissa met the bond's parametric triggers in October 2025.

Published number
150 million US dollarscatastrophe bond payout to the government of jamaica, 2025-11-0712,200 million US dollars total damage and losses from hurricane melissa (pioj estimate), 2026-03-03
Mechanism
written

Kartu Prakerja, a national lifelong-learning delivery system

Indonesia's Kartu Prakerja skills programme reached 18.9 million beneficiaries across the country in its first five years, with 347 accredited training providers offering 2,085 online and offline courses in 58 districts and cities in the 2024 report.

Published number
18,900,000 peoplekartu prakerja beneficiaries reached, 20242,085 programmes accredited training programmes offered, 2024
Mechanism
written

JENDELA national digital-network plan

Malaysia's JENDELA Phase 1 connected 7.74 million premises with fibre by 2022, above its 7.5 million target, and raised 4G coverage in populated areas to 96.92% through a regulator-led programme delivered with telecommunications providers.

Published number
7,740,000 premisespremises passed by jendela fibre, 202296.92 % of populated areas 4g coverage in populated areas after jendela phase 1, 2022
Source
JENDELA, Phase 1 concluding reportofficial statistical, retrieved 2026-08-31
Mechanism
written

National COVID-19 vaccination delivery

Ireland's HSE vaccination programme built a national booking, supply and reporting operation during COVID-19; by 21 July 2021 its dashboard recorded 5,344,686 administered doses, including 2,854,040 first doses.

Published number
5,344,686 dosescovid-19 vaccine doses administered, 2021-07-212,854,040 first doses covid-19 vaccine first doses administered, 2021-07-21
Source
Health Service Executive, COVID-19 vaccination programme dashboardofficial statistical, retrieved 2026-10-02
Mechanism
written

STAYAWAY COVID, a contact-tracing app suspended after the emergency

Portugal launched the voluntary STAYAWAY COVID exposure-notification app on 1 September 2020; the European Commission's case study records more than 3.2 million downloads and says the app was later suspended.

Published number
3,200,000 downloadsapp downloads (more than), 2020-2021
Source
European Commission, Digital Contact Tracing Study: Portugal caseinternational organization, retrieved 2026-08-31
Mechanism
written

Reserve Bank of India regulatory sandbox

The Reserve Bank of India ran four themed sandbox cohorts between 2020 and 2024, retail payments, cross-border payments, MSME lending and fraud prevention, admitting 28 entities to test and finding 13 products viable in the three cohorts whose exits it published, and keeps the cohorts open on tap.

Published number
28 entitiesentities admitted to the test phase across four cohorts, 202413 products products found viable in the first, second and fourth cohorts, 2024
Mechanism
written

Dynamic zero-COVID containment, and its dismantling

China's State Council joint prevention and control mechanism ran a national COVID-19 containment regime from January 2020, under which the mainland had reported 4,634 COVID-19 deaths when vaccination began on 15 December 2020; it dismantled the regime by circular on 7 December 2022, and the National Health Commission then reported 59,938 COVID-related deaths in medical institutions between 8 December 2022 and 12 January 2023.

Published number
59,938 deathscovid-related deaths in medical institutions in the five weeks after the regime was dismantled, 2022-12-08 to 2023-01-124,634 deaths cumulative reported covid-19 deaths under containment, at the start of vaccination, 2020-12-15
Mechanism
written

Operation Warp Speed

Operation Warp Speed, an HHS and DOD partnership, financed private vaccine makers' development, at-risk manufacturing and advance purchases, including a $5.97 billion contract for 300 million Pfizer/BioNTech doses. Three of the vaccines it bought held FDA emergency use authorization by 1 March 2021, the first from 11 December 2020.

Published number
3 vaccinesows-purchased covid-19 vaccines holding fda emergency use authorization, 2021-03-015.97 USD billion ows contract value for 300 million pfizer/biontech doses, 2021-03-01
Mechanism
written

Covid-19 bridging credits

The Swiss Federal Council adopted an emergency ordinance on 25 March 2020 and, through 125 banks including PostFinance under federal guarantee, granted 137,870 Covid-19 credits worth CHF 16.9 billion between 26 March and 31 July 2020, with 76,034 applications submitted in the first eight days.

Published number
137,870 creditscovid-19 credits granted in the 128-day application window, 2020-07-3176,034 credits covid-19 credit applications submitted in the first eight days, 2020-04-02
Mechanism
written

JobKeeper Payment

Australia's Treasury designed, Parliament legislated and the tax office began paying the JobKeeper wage subsidy just over five weeks after its announcement on 30 March 2020, and in its first phase it supported on average around 925,000 businesses and 3.6 million individuals each month before ending on 28 March 2021.

Published number
5 weeks (just over)time from announcement to first jobkeeper payments, 2020-053,600,000 individuals individuals supported each month, first phase average, 2020-09
Mechanism
written

Quédate en Casa emergency cash transfer

Announced on 25 March 2020 and paying from April, the Dominican government's Quédate en Casa transfer was built on the existing SIUBEN registry and PROSOLI payment system and, by the president's report to the Senate of 10 July 2020, reached more than 1.6 million households, 780,000 of them new to social assistance.

Published number
1,600,000 households (more than)households benefiting from quédate en casa, as reported by the president to the senate, 2020-07-10780,000 households households new to social assistance among quédate en casa beneficiaries, 2020-07-10
Mechanism
written

Bono Familia, the COVID-19 emergency cash transfer

Guatemala's Ministry of Social Development (MIDES) made the first Bono Familia payments in May 2020, two months after the pandemic emergency was declared. By December 2020 the programme had reached 2.7 million beneficiaries, 21 times the 128,036 beneficiaries of the regular Bono Social cash transfer in 2019.

Published number
2,700,000 beneficiariesbono familia beneficiaries, 2020-12128,036 beneficiaries beneficiaries of the regular conditional cash transfer (bono social) before the shock, 2019
Mechanism
written

National COVID-19 vaccination campaign

The UAE's health authorities ran a national COVID-19 vaccination campaign from late 2020 that WHO records as having given at least one dose to 9,991,089 people, a first-dose coverage of 100 per 100 people on WHO's capped measure, and 24,922,054 doses in total by 6 July 2022.

Published number
9,991,089 peoplepersons vaccinated with at least one covid-19 vaccine dose, 2022-07-0624,922,054 doses total covid-19 vaccine doses administered, 2022-07-06
Source
World Health Organization, COVID-19 vaccination data (country-reported)international organization, retrieved 2026-10-01
Mechanism
written

Plan Panamá Solidario, Vale Digital

Panama's government created the Plan Panamá Solidario digital voucher during the 2020 COVID-19 closures, reaching 90,492 people in its first month (April 2020), 458,662 in May and a peak of 949,343 in November 2020, then tapered it as employment returned and ended it in 2023.

Published number
949,343 peoplemonthly voucher beneficiaries at peak, 2020-11458,662 people monthly voucher beneficiaries in the second month of operation, 2020-05
Mechanism
written

Public disaster warning network of the Department of Disaster Prevention and Mitigation, and its erosion

Thailand's State Audit Office found in 2024 that the public warning system, for which the state allocated THB 1,074.95 million in fiscal years 2020 to 2022, and whose telemetry the Department of Disaster Prevention and Mitigation publishes through its DPM Alert app, was not working as intended: 318 of 555 telemetry stations (57.30%) failed to measure continuously for more than two days, and 54 of 82 sampled warning towers and receivers (65.85%) were not ready to sound an alert, which the auditor attributed to damaged or deteriorated key parts.

Published number
65.85 % of 82 devices tested in 7 provincessampled warning devices (towers, satellite receivers, relay stations, broadcast towers) not ready to alert, audit findings released March 2024, covering FY2020-2022555 stations telemetry stations in the dpm alert warning network, the installed base the audit tested (of which 318 failed continuous measurement), audit findings released March 2024, covering FY2020-2022
Mechanism
written

Puente Héroes del Chaco, Asunción to Chaco'i bridge

Paraguay's Ministry of Public Works began building the Héroes del Chaco cable-stayed bridge, the first road link from Asunción to the Chaco, in 2020 on an estimated 36-month schedule; at the end of 2023 it reported 90% physical progress against 100% planned, and the bridge was inaugurated on 3 March 2024 and recorded as concluded with provisional acceptance in the 2024 balance.

Published number
90 % physical progressphysical progress against plan at year end (planned 100%), 2023-1236 months estimated execution period, 2021 balance
Mechanism
written

Jobs Support Scheme and the four 2020 Budgets

Singapore's Ministry of Finance introduced the Jobs Support Scheme in the Unity Budget of 18 February 2020, raised and extended it through the Resilience, Solidarity and Fortitude Budgets, the fourth of them presented on 26 May 2020, and disbursed $22.6 billion of wage support from April to December 2020.

Published number
22.6 billion SGDjobs support scheme wage support disbursed, 2020-04 to 2020-124 budgets budgets presented to parliament in 2020 by 26 may, 2020-05-26
Mechanism
written

IFWG Regulatory Sandbox

South Africa's Intergovernmental Fintech Working Group, a joint body of the financial regulators, opened a cross-regulator sandbox in April 2020 that took 54 unique applications and admitted nine sandbox tests from eight firms in its first cohort, then moved to a rolling intake.

Published number
9 sandbox testssandbox tests admitted to the first ifwg cohort, 202054 applications unique applications to the first cohort, 2020-05-15
Mechanism
written

National COVID-19 vaccination campaign

Israel started COVID-19 vaccination in December 2020 through its four health funds and had fully vaccinated about 70 percent of adults by April 2021; at the end of April 2021, 55 percent of its population was vaccinated, when coverage in most OECD countries was between 11 percent and less than one percent.

Published number
70 % of adults (about)adult population fully vaccinated (two doses), 2021-0455 % of population population vaccinated at the end of april 2021, 2021-04-30
Source
OECD, Economic Surveys: Israel 2023international organization, retrieved 2026-10-01
Mechanism
written

High Speed Two, and the cancellation of Phase 2

The Department for Transport and HS2 Ltd began building High Speed Two in 2020. The government cancelled everything beyond Birmingham in 2023. By May 2026 the London to Birmingham railway alone was estimated at £87.7 billion to £102.7 billion, more than double the 2020 Phase 1 estimate, with services from Old Oak Common expected between 2036 and 2039 against a 2012 plan to complete the full network by 2033.

Published number
100 % overrun (more than, excluding inflation)cost increase over the 2020 phase 1 estimate, low end of the may 2026 range, 2026-052033 year year dft expected the full london, manchester and leeds network to be complete at the 2012 approval, 2012
Mechanism
written

COVID-19 Vaccine Taskforce and national vaccination rollout

The UK government set up the Vaccine Taskforce in April 2020, became the first country to authorise a COVID-19 vaccine and begin vaccination in December 2020, and by the end of October 2021 the NHS in England had given two doses to 85% of adults.

Published number
85 % of adultsshare of adults in england who had received two doses, 2021-10-3187,000,000 doses (around) vaccine doses administered in england, 2021-10-31
Mechanism
written

ASIC enhanced regulatory sandbox

Australia's government introduced the enhanced regulatory sandbox on 1 September 2020, letting firms test financial services and credit activities for up to 24 months without a licence, and ASIC's register lists 23 users, four current and 19 past.

Published number
23 entitiesentities listed as current or past users of the enhanced regulatory sandbox exemption, 2026-10-02
Mechanism
written

Bac à sable réglementaire in the energy sector

Under the 2019 energy and climate law, France's energy regulator CRE and the energy directorate DGEC granted temporary derogations from network access rules to 30 projects, 25 by CRE and 5 by DGEC, of which six were running and reporting indicators in May 2025 and two had been generalised into regulation in 2024.

Published number
30 projectsprojects granted derogations under the energy regulatory sandbox, 2025-05-27
Mechanism
written

COI-NEXT, co-creation centres for industry, academia and government

Japan Science and Technology Agency ran 42 COI-NEXT co-creation centres in April 2023, 30 full-scale and 12 in a development stage, most led by universities and some by national research institutes, which in fiscal 2022 counted 1,073 participating organisations, 256 universities and research institutes and 817 companies and others, with 2,566 participants from the company side.

Published number
817 organisationscompanies and other non-academic organisations participating in coi-next centres, FY 202242 centres coi-next centres supported (30 full-scale, 12 development-stage), 2023-04-01
Mechanism
written

Coronavirus Job Retention Scheme

The UK's Coronavirus Job Retention Scheme, which started in March 2020, had 8.9 million jobs on furlough at its peak on 8 May 2020 and supported 11.7 million jobs from 1.3 million employers before it closed on 30 September 2021.

Published number
8,900,000 jobsjobs on furlough at the first-wave peak, 2020-05-0811,700,000 jobs jobs supported at any time over the life of the scheme, 2021-09-30
Mechanism
written

Activité partielle in the 2020 crisis

France scaled its short-time work scheme (activité partielle) from an industrial instrument into an economy-wide one in the spring of 2020, placing 8.4 million employees on it at the April 2020 peak and 11.3 million at some point between March 2020 and December 2021.

Published number
8,400,000 employeesemployees placed on activité partielle at the peak, 2020-0411,300,000 employees employees with at least one hour of activité partielle, march 2020 to december 2021, 2021-12
Mechanism
written

Pradhan Mantri Garib Kalyan Anna Yojana, the free foodgrain response to COVID-19

India's Department of Food and Public Distribution, acting on the Garib Kalyan package announced in March 2020, allocated about 121 lakh tonnes of extra free foodgrains to States on 30 March 2020, and States distributed 37.5 lakh tonnes covering about 75 crore beneficiaries in each of April and May 2020.

Published number
75 crore people (about)beneficiaries covered by the extra free grain each month, 2020-04111.52 lakh metric tonnes (93.5% of allocation) foodgrains distributed in phase i, april to june 2020, 2020-06
Mechanism
written

Targeted Economic Support Scheme (TESS)

The Central Bank of the UAE launched the Targeted Economic Support Scheme in March 2020, combining a zero-cost liquidity facility with loan deferrals and capital relief, and by 24 September 2020 more than 300,000 individuals, close to 10,000 SMEs and more than 1,500 private corporates had benefited from the facility.

Published number
300,000 individuals (more than)individuals who benefited from the tess zero-cost liquidity facility, 2020-09-2410,000 SMEs (close to) smes that benefited from the tess zero-cost liquidity facility, 2020-09-24
Mechanism
written

Phased exemption of enterprise social insurance contributions, 2020

China's human resources ministry, finance ministry and tax administration let provinces exempt or halve employer pension, unemployment and work-injury contributions from February 2020 under a notice dated 20 February, and exemptions, reductions, deferrals and rate cuts together reduced contributions by 1.54 trillion yuan between February and the end of 2020.

Published number
1.54 trillion yuancontributions reduced by exemption, reduction, deferral and rate cuts, february to december 2020, 2020-126,080,000 enterprises enterprises receiving unemployment insurance job-stabilisation refunds in 2020, 2020-12
Mechanism
written

Business Finland disruption funding, 2020

Finland redirected Business Finland, its innovation funding agency, to pay emergency development grants to firms hit by the epidemic, starting from a 700 million euro allocation in the supplementary budget adopted on 26 March 2020, and by 2 September 2020 it had allocated about 912 million euros to 18,770 projects out of 28,715 that applied.

Published number
912 million euros (approximately)business finland disruption funding allocated, 2020-09-0218,770 projects projects funded, 2020-09-02
Mechanism
written

Partial and flexible unemployment subsidy, 2020-2021

Uruguay's labour ministry created partial and flexible unemployment-subsidy modalities by resolution after the health emergency of 13 March 2020, and the social security bank (BPS) paid 12,773 beneficiaries under them in April 2020, while total unemployment-subsidy beneficiaries rose from 45,937 in February to a record 185,769 in May.

Published number
12,773 beneficiariesbeneficiaries under the new partial and flexible modalities in their first month, 2020-04185,769 beneficiaries total unemployment-subsidy beneficiaries at the 2020 peak, 2020-05
Mechanism
written

Ingreso Familiar de Emergencia, the COVID-19 household transfer

Chile's Congress created the Ingreso Familiar de Emergencia by Ley 21.230, published on 16 May 2020, and the Ministry of Social Development and Family issued payments to 3,419,351 households in 2020 and to 8,374,718 households in 2021, before the programme ended in 2021.

Published number
8,374,718 householdshouseholds issued an ife payment, 20213,419,351 households households issued an ife payment in the first year, 2020
Mechanism
written

Central Bank of Kenya emergency loan restructuring measures

The Central Bank of Kenya announced emergency measures on 18 and 24 March 2020 that let banks restructure loans performing on 2 March 2020, and by the end of February 2021, days before the measures expired on 2 March 2021, loans of Ksh 1.7 trillion, 57 percent of the banking sector's gross loans, had been restructured.

Published number
57 % of banking sector gross loansloans restructured under the emergency measures, cumulative, 2021-0219 % of banking sector gross loans restructured loans still outstanding when the measures expired, 2021-02
Mechanism
written

Conditional cash transfer shock response, and its suspension after 2022

Honduras widened its national conditional cash transfer during COVID-19 and Hurricanes Eta and Iota, from 1,153,069 beneficiaries in 2019 to 1,528,030 in 2020, and paid emergency top-ups to 24,891 households outside the roster in late 2020, but after the 2022 reorganisation of the social protection sector payments paused, rural payments resumed only in December 2022 and urban payments only in August 2025, after a three-year suspension.

Published number
3 yearssuspension of urban cct payments after the 2022 transition, 2025-081,528,030 beneficiaries beneficiaries of social safety net programmes at the 2020 peak, 2020
Mechanism
written

Bank of Israel COVID-19 small-business credit programme

After the Monetary Committee decided on 6 April 2020 to lend banks three-year fixed-rate money for credit to small and micro businesses, the Bank of Israel had NIS 1.2 billion outstanding under the programme by 30 April 2020 and NIS 28.1 billion by 31 March 2021.

Published number
28.1 NIS billionlong-term loans to the banking system for credit to small businesses, balance outstanding, 2021-03-311.2 NIS billion same programme, balance outstanding 24 days after the decision, 2020-04-30
Mechanism
written

North-South eastern expressway BOT sections, and the retreat to public investment

Vietnam built three component projects of the 2017-2020 North-South eastern expressway phase, 178 km at about VND 25,343 billion, as BOT public-private partnerships, then financed all ten 2021-2025 component projects on the Hanoi to Ho Chi Minh City stretch as public investment, and in June 2025 the Ministry of Construction reported that it had asked the Prime Minister to keep widening the corridor with public investment money, leaving PPP as a later option once tolls were collected.

Published number
0 of 10 component projects (all public investment)2021-2025 phase component projects on the hanoi to ho chi minh city stretch procured as ppp, 2025-063 component projects (178 km, about VND 25,343 billion) 2017-2020 phase component projects built as bot, the peak, 2017-2020 phase
Mechanism
written

Ehsaas Emergency Cash

Pakistan's government launched Ehsaas Emergency Cash in early April 2020 on BISP's existing payment and registry systems and had paid US$464 million to 6.4 million beneficiaries by 30 April 2020, reaching 15 million beneficiaries in all.

Published number
6.4 million beneficiariesbeneficiaries paid emergency cash by 30 april 2020, within about four weeks of launch, 2020-04-3015 million beneficiaries beneficiaries given temporary income support through ehsaas in 2020, 2020
Source
World Bank, COVID-19 G2Px country brief: Pakistaninternational organization, retrieved 2026-10-02
Mechanism
written

Fondo nuove competenze

Italy's Fondo nuove competenze, set up in 2020 and run by the national labour policy agency ANPAL through two notices, was created to pay for working hours employers turned into training under union agreements, and by the end of 2021 it had covered almost 30 million hours of training for almost 270,000 workers, about 110 hours each.

Published number
270,000 workersworkers trained under the first notice of the fondo nuove competenze, per anpal's thematic review of 30 december 2021, 2021-1230 million hours working hours converted to training, 2021-12
Mechanism
written

Catastrophe insurance regime and the Solidarity Fund against Catastrophic Events (FSEC)

Morocco's dual catastrophe insurance regime under Law 110-14 took effect in January 2020. It offered private cover to close to 9 million insured people and set up the FSEC, financed by a parafiscal levy, for the uninsured. After the September 2023 Al Haouz earthquake, the government deployed the FSEC for the first time, and it mobilised US$300 million to compensate uninsured victims.

Published number
300 US$ millioncompensation funding mobilised by the fsec for uninsured victims of the al haouz earthquake (us$25 million from reserves plus us$275 million from sovereign reinsurance), 20239 million people people insured against bodily injury in catastrophic events under the private scheme, 2022
Mechanism
written

Banque Centrale de Tunisie regulatory sandbox, first cohort

The Banque Centrale de Tunisie launched a regulatory sandbox in January 2020, admitted four fintech solutions to its first cohort in September 2020, ran tests with real customers and partner banks for 13 months, notified exit in September 2022, and drafted a circular on digital enrolment and remote bank account opening from the results (BCT Rapport annuel 2022).

Published number
4 solutionsfintech solutions admitted to the first cohort of the bct regulatory sandbox, 2020-09
Source
Banque Centrale de Tunisie, Rapport annuel 2020 (June 2021)official statistical, retrieved 2026-10-02
Mechanism
written

Harare-Masvingo-Beitbridge highway rehabilitation, behind schedule

Zimbabwe's government, funding the works from the budget, set out in its 2021 Budget to finish upgrading the roughly 580 km Harare-Beitbridge highway by 2022; it had opened 355 km to traffic by October 2022, and in July 2025 the Finance Ministry still reported 88 km outstanding, more than two and a half years past the 2022 target.

Published number
88 kmkilometres of the harare-masvingo-beitbridge highway still outstanding, against a 2022 completion target, 2025-07355 km kilometres of the 580 km harare-beitbridge highway opened to traffic, 2022-10
Mechanism
written

Jiji and Mulembwe hydropower project

The Government of Burundi, through REGIDESO and a World Bank project unit, built the 49.5 MW Jiji (32.5 MW) and Mulembwe (17 MW) run-of-river plants with their transmission lines and substations. The project was approved in 2014 at US$270.3 million with an original closing date of December 2019. Construction began only in February 2020, after the 2015 political crisis. The World Bank put the estimated cost at US$319.1 million in November 2024. Jiji was inaugurated in June 2025 and Mulembwe in June 2026.

Published number
319.1 million USDestimated total cost of the jiji and mulembwe hydropower project, all financiers, November 2024270.3 million USD appraised total cost at board approval, April 2014
Mechanism
written

National Planning Commission foresight work for Malawi 2063

Malawi's National Planning Commission, which signed a UNDP initiation plan in November 2020 to create a foresight unit and horizon scanning capability, reported for 2022/23 that it produced a foresight modelling report with modelled scenarios for the Malawi 2063 vision, policy briefs on three of the vision's pillars with UNDP and the finance ministry, and foresight modelling training for planners from ministries and academia.

Published number
1 reportsforesight modelling reports produced (assessing malawi's trajectory towards mip-1 milestones and mw2063 aspirations), FY2022/23
Mechanism
written

Tosika Fameno, the COVID-19 urban emergency cash transfer

Madagascar's social protection agency FID designed the Tosika Fameno emergency cash transfer after the March 2020 urban lockdown, registered almost 200,000 households in about 12 days, made the first payment four weeks after the lockdown began, and reached more than 368,000 urban households in ten cities with 100,000 ariary payments.

Published number
4 weekstime from the start of the urban lockdown to the first tosika fameno payment, 2020368,000 households vulnerable urban households reached (more than), 2020
Mechanism
written

Wage Assistance Scheme and Self-Employed Assistance Scheme, paid by the MRA

Mauritius made its revenue authority, the MRA, a payer of COVID-19 income support in March 2020, and by end June 2020 the MRA had disbursed Rs 9,985 million under the Wage Assistance Scheme (Rs 7,603 million) and the Self-Employed Assistance Scheme (Rs 2,382 million) to some 500,000 workers and self-employed people, after receiving 176,000 online SEAS applications within 10 days of the lockdown.

Published number
9,985 Rs millionwage assistance scheme and self-employed assistance scheme disbursements, march to june 2020, 2020-06176,000 applications online seas applications received within 10 days during the lockdown, 2020
Source
Mauritius Revenue Authority, Annual Report 2019/20official statistical, retrieved 2026-10-02
Mechanism
written

Child Grants Programme drought top-ups, 2020

After Lesotho declared a drought emergency in October 2019, the government and the World Bank restructured the Social Assistance Project in January 2020 to reallocate US$7.4 million, and between February and September 2020 the Ministry of Social Development paid more than 40,000 Child Grants Programme households a LSL 500 monthly top-up for six months and added about 10,000 new households, which it kept on the programme at its own cost.

Published number
40,000 householdschild grants programme households receiving drought top-ups (more than), 2020-0910,000 households new households added in the horizontal expansion and retained on the budget (around), 2020
Mechanism
written

COVID-19 Urban Cash Intervention, and its slow payment

Malawi declared a State of Disaster over COVID-19 on 20 March 2020 and enrolled 194,762 eligible urban households in a three-month cash transfer in four cities, but first payments came only after January 2021, and by 30 June 2021 just 32,000 households, 16 percent, had received all three payments while 29 percent had received none.

Published number
16.4 %eligible households that had received all three cuci payments by 30 june 2021, 2021-06-30194,762 households eligible households enrolled, 2021-06-30
Mechanism
written

Bank of Uganda COVID-19 credit relief and loan restructuring

The Bank of Uganda gave supervised financial institutions exceptional permission to restructure the loans of borrowers hit by COVID-19 from 1 April 2020, and banks restructured UGX 2.3 trillion of loans in April 2020 alone and UGX 5.9 trillion by July 2020, approving 893,018 of 895,241 applications.

Published number
5.9 UGX trillionloans restructured under bou credit relief, april to july 2020, 2020-07893,018 applications credit relief applications approved, april to july 2020, 2020-07
Source
Bank of Uganda, Financial Stability Report June 2020 (archived copy)official statistical, retrieved 2026-10-02
Mechanism
written

Burkin-Naong-Sa Ya adaptive cash transfers for COVID-19 and the lean season

Burkina Faso's national safety net programme (Burkin-Naong-Sa Ya) paid three rounds of FCFA 20,000 adaptive cash transfers to over 42,800 people between May and September 2020 in response to COVID-19, including 21,160 vendors from temporarily closed markets, and later raised the lean-season transfer from FCFA 20,000 to FCFA 45,000 in 2022 to align it with the food security response, paying three extra monthly payments to over 763,700 people in IPC3+ areas over the 2021 to 2023 lean seasons.

Published number
42,800 people (over)people who received three rounds of covid-19 adaptive cash transfers, may to september 2020, 2020-0945,000 FCFA per household lean-season adaptive transfer per household after the 2022 increase (from fcfa 20,000), 2022
Mechanism
written

Programme de transferts monetaires productifs (PTMP), government-funded COVID-19 expansion

In response to COVID-19, the government of Cote d'Ivoire used its own budget to enrol a fourth cohort of 100,000 households (80,000 urban, 20,000 rural) in December 2020 into the World Bank supported productive cash transfer programme, through the programme's existing targeting, enrolment and digital payment systems, taking it to 227,000 households and over 1.3 million people.

Published number
100,000 householdshouseholds enrolled in cohort 4 with government funding (table 2), 2020-12227,000 households beneficiary households of the cash transfer programme, all cohorts, 2023
Mechanism
written

Lisungi emergency cash transfers for COVID-19

The Republic of Congo's Ministry of Social Affairs and the Lisungi programme unit paid one-off emergency cash transfers of about US$82 to more than 206,800 mostly urban households hit by COVID-19 by April 2022, above a target of 200,000, while the social registry used to target them grew to more than 830,000 households and 95 percent of the transfers were paid digitally.

Published number
206,800 households (more than)households that received emergency cash transfers (ects) under the lisungi emergency covid-19 response project, 2022-04830,000 households (more than) households registered in the social registry (rsu) after the ect targeting, 2022-04
Mechanism
written

Nafa Quick, the COVID-19 cash transfer carved out of the Nafa programme

The Gambia's government had its new social safety net project restructured within three months of the pandemic (restructuring dated 9 June 2020) to create Nafa Quick, which between July and October 2020 paid two transfers of GMD 3,000 to 78,359 rural households in 30 districts, against a target of 60,000, with all payments made before the end of the lean season.

Published number
78,359 householdshouseholds benefiting from the temporary nafa quick intervention (oi 2.1), 2020-10100 % share of nafa quick payments made before the end of the lean season (ir 2.1), 2020-10
Mechanism
written

COVID-19 emergency food support distributed by the National Disaster Management Agency

The Gambia's government bought 264,500 bags of rice, 279,500 bags of sugar and 185,200 drums of oil for vulnerable households with about GMD909.9 million redirected in 2020, and the National Disaster Management Agency distributed them between May and 28 September 2020, with 228,367 bags of rice recorded as delivered to households, 36,133 fewer than procured.

Published number
228,367 bagsbags of rice (50 kg) delivered to households as recorded in the kobo-collect system, 2020-09-28264,500 bags bags of rice (50 kg) procured for distribution, 2020-05
Mechanism
written

FMA Regulatory Sandbox

Austria's Financial Market Authority admitted eight FinTechs to its Regulatory Sandbox between its launch on 1 September 2020 and January 2023, five seeking authorisation as European crowdfunding service providers and three offering crypto-asset or securities services, and one participant had obtained a licence for a digital trading platform by the start of 2022.

Published number
8 firmsfintechs admitted to the regulatory sandbox since launch, 2023-01-025 firms per year participants per year the federal funding was designed for, in the 2019 impact assessment of the fmabg amendment, 2019
Mechanism
written

Datatilsynet's regulatory sandbox for privacy-friendly innovation

Norway's data protection authority ran eight sandbox projects at the end of 2025, five of them jointly with the Financial Supervisory Authority on data sharing against financial crime, and completed two projects (Akershus University Hospital and Mobai's SALT biometric verification) during the year.

Published number
8 projectssandbox projects in progress at year end, 2025-12-312 projects sandbox projects completed during the year, 2025
Mechanism
written

COVID-19-Kurzarbeit, 2020 to 2021

Austria's social partners drafted a COVID-19 short-time work model on 13 and 14 March 2020, the AMS adopted its directive on 18 March and the ministers approved it on 19 March, three days after the first lockdown began, and in 2020 113,771 firms with 1.25 million employees used the scheme, against 508 firms in 2009.

Published number
1,250,000 employeesemployees in firms using covid-19 short-time work in the year, 20203 days days from the start of the first lockdown (16 march 2020) to ministerial approval of the ams directive (19 march 2020), 2020-03-19
Mechanism
written

Lønkompensation, the 2020 wage compensation scheme

Denmark's government, employers and unions agreed a wage compensation scheme on 14 March 2020, the Danish Business Authority opened applications 11 days later on 25 March and decided about 90 percent of applications within 30 days, paying DKK 12.7 billion in the first phase (March to August 2020) on 66,631 applications from 34,042 firms.

Published number
11 daysdays from the tripartite agreement to the opening of applications, 2020-03-2512.7 DKK billion wage compensation paid in the first phase, 2020-08
Mechanism
written

Chômage temporaire corona, 2020

Belgium's National Employment Office treated every COVID-19 work stoppage as temporary unemployment for force majeure and paid allowances to 939,532 workers for March 2020 and 1,117,133 for April, when 1,221,412 workers, 35.3 percent of private and contractual employees, were declared temporarily unemployed; almost 1.4 million received at least one payment during 2020.

Published number
1,117,133 workersworkers paid a temporary unemployment allowance for april 2020, 2020-04939,532 workers workers paid a temporary unemployment allowance for march 2020, 2020-03
Mechanism
written

Cassa integrazione con causale Covid-19, 2020

Italy's Cura Italia decree of 17 March 2020 created wage supplementation with a Covid-19 cause across ordinary CIG, the solidarity funds and CIG in deroga, and INPS recorded 5.27 million beneficiaries in April 2020 and 2.8 billion authorised hours from March to August, but about 83 percent of firms asked INPS to pay workers directly and the institute's own report records the resulting delay in payments for the first period.

Published number
5,274,000 beneficiariesbeneficiaries of wage supplementation with covid-19 cause in the month, 2020-042.8 billion hours hours authorised with covid-19 cause, march to august 2020, 2020-08
Source
INPS, XIX Rapporto annuale (October 2020)official statistical, retrieved 2026-10-02
Mechanism
written

Antivirus job retention programme, 2020 to 2022

The Czech government approved the Antivirus employment support programme on 31 March 2020, with costs eligible from 12 March, and the Labour Office paid CZK 51.2 billion through it from 2020 to 2022 to almost 71,000 employers for 1.2 million employees.

Published number
51.2 CZK billionantivirus contributions paid, 2020 to 2022, 202219 days days from the start of eligible costs (12 march 2020) to the government resolution approving the programme (31 march 2020), 2020-03-31
Mechanism
written

Prvá pomoc (First Aid) job retention scheme, 2020 to 2022

Slovakia's government approved the labour ministry's job retention scheme on 31 March 2020, labour offices began accepting applications on 6 April with support backdated to 13 March, and over two years the scheme paid almost EUR 2.5 billion to 176,000 employers and self-employed people, 5.7 million monthly payments covering more than 770,000 employees.

Published number
6 daysdays from government approval to the first applications, 2020-04-062.5 EUR billion first aid support paid over the life of the scheme (almost), 2022-02-28
Mechanism
written

Potpore za očuvanje radnih mjesta (job preservation grants), 2020

The governing board of the Croatian Employment Service decided on 20 March 2020 to introduce job preservation grants for employers hit by COVID-19, the service began implementing them on 23 March, taking applications online, and in 2020 it paid HRK 7.70 billion to 109,431 employers covering 697,126 workers on 225,390 applications.

Published number
697,126 workersworkers covered by job preservation grants in the year, 20203 days days from the board decision (20 march 2020) to the start of implementation (23 march 2020), 2020-03-23
Source
Hrvatski zavod za zapošljavanje (HZZ), Godišnjak 2020official statistical, retrieved 2026-10-02
Mechanism
written

Fehmarn Belt fixed link, and its cost and schedule overrun

The European Court of Auditors found in 2020 that the Fehmarn Belt fixed link, the 18 km rail and road tunnel that Denmark finances, designs and builds through its state company Femern A/S, had an initial cost estimate of 4.4 billion euros at 2008 prices (5.0 billion at 2019 values) against a latest estimate of 7.7 billion, a 54 percent increase, and that construction planned to start in 2012 for opening in 2018 had started in 2020 with opening expected in 2028.

Published number
7.7 billion euroslatest cost estimate of the fehmarn belt fixed link transport flagship infrastructure, 2019 values, 20195 billion euros initial cost estimate re-indexed to 2019 values (4.4 billion euros at 2008 values), 2008 estimate, 2019 values
Mechanism
written

Zagreb earthquake recovery under the World Bank loan, and its delays

Croatia's Ministry of Construction, Physical Planning and State Assets and Ministry of Health had disbursed 16 percent of the 200 million US dollar World Bank earthquake recovery loan approved in June 2020 by November 2024, when the closing date was extended for the second time to 30 June 2027, and by May 2026 had restored 40 percent of the targeted health and education buildings.

Published number
40 %health and education buildings with restored operational capacity and higher seismic performance, share of target, 2026-05-2916.32 % share of the ibrd loan disbursed at the second restructuring, 2024-11
Mechanism
written

Motorway construction by the Road and Motorway Directorate, and its unit cost

The Czech Supreme Audit Office reported in June 2026 that 41 motorway sections totalling more than 300 km were opened to traffic between 2020 and 2024, after years with almost none (no kilometre in 2014, four in 2018), but that the average cost the state paid per kilometre of motorway opened rose from nearly CZK 275 million in 2020 to CZK 505 million in 2024, an increase of nearly 84 percent.

Published number
505 million Czech koruna per kmaverage cost to the state per kilometre of motorway opened, 2024275 million Czech koruna per km average cost to the state per kilometre of motorway opened (nearly), 2020
Mechanism
written

State-paid technical unemployment indemnity in the 2020 state of emergency

Two days after the state of emergency was declared on 16 March 2020, Romania's Government made the unemployment insurance budget pay 75 percent of base salary to employees whose contracts were suspended (Emergency Ordinance 30 of 18 March 2020), and by mid-June 2020 the employment agency ANOFM had approved the indemnity for 2,067,970 employees and paid RON 2,937 million, with 241,453 employer requests approved within the legal deadline and 61 late.

Published number
2,067,970 employeesemployees for whom the technical unemployment indemnity was approved, 2020-06-152,937,320 thousand lei indemnities paid for suspended contracts during the state of emergency, 2020-06-15
Mechanism
written

Automatic loan repayment moratorium, March 2020

On 18 March 2020 Hungary's Government introduced a repayment moratorium until the end of 2020 that applied automatically to household and corporate loans disbursed before that date, and by June 2020 about 1.6 million of the roughly 2.7 million household borrowers used it on at least one loan, while 44 percent of corporate loans outstanding were in moratorium at the end of the second quarter.

Published number
1.6 million household customershousehold customers using the moratorium on at least one loan (around 60 percent of about 2.7 million), 2020-0644 % share of corporate loans outstanding in moratorium, 2020-Q2
Source
Magyar Nemzeti Bank, Financial Stability Report, November 2020official statistical, retrieved 2026-10-02
Mechanism
written

Three minimum wages paid to private employers in the 2020 state of emergency

After the state of emergency of 15 March 2020, Serbia's Government presented a EUR 5.1 billion economic package on 31 March that included paying micro, small and medium firms one minimum wage per employee for three months if they cut staff by no more than 10 percent, and on 7 May 2020 the Ministry of Finance paid about RSD 32 billion as the first minimum wage for 1.055 million employees of 232,000 businesses.

Published number
1.055 million employeesemployees covered by the first state-paid minimum wage, 2020-05-0737 days days from the 31 march 2020 package to the first payment on 7 may 2020, 2020-05-07
Mechanism
written

Moja prva plata, state-paid first-job training placed with employers, and its 2025 halt

Serbia's Government paid a monthly allowance to young people without work experience while employers trained them for nine months under the Moja prva plata programme run by the National Employment Service, which placed 9,237 young people with 5,471 employers in the 2021 cycle and 7,214 with 4,520 employers from the 2023 call in January 2024, but ran no call for 2024 and started no activity under the measure in 2025 against a plan of 10,000 places.

Published number
0 young peopleyoung people included in moja prva plata in the year (table 6, measure 5.8), against 10,000 planned, 20259,237 young people (at 5,471 employers) young people selected by participating employers in the 2021 cycle, the highest dated count read, 2021-12-03
Mechanism
written

The 60/40 employment retention measure, 2020 to 2021

Bulgaria's National Social Security Institute paid employers 60 percent of the wages and contributions of staff kept on during the COVID-19 emergency under Council of Ministers Decree No. 55 of 2020, starting with 68 employers and 1,065 employees on 15 April 2020, and by 4 March 2021 the Ministry of Labour and Social Policy reported BGN 884 million paid under the measure and 300,000 jobs kept.

Published number
884 million BGNpaid under the 60/40 measure, cumulative, 2021-03-041,065 employees employees in the first published payment list (68 employers), 2020-04-15
Mechanism
written

Reconstruction programme after the 26 November 2019 earthquake

Albania's government reported in November 2021, two years after the 26 November 2019 earthquake, that more than 33,400 families had received reconstruction and repair grants worth ALL12.7 billion, that 13,325 people were receiving rent bonuses while new homes were built, and that 27 schools had been completed, while promising 4,500 individual houses and 12,000 apartments by spring 2022.

Published number
33,400 familiesfamilies that received reconstruction and repair grants, 2021-11-2327 schools schools completed under the reconstruction programme, 2021-11-23
Mechanism
written

Special regulatory regimes (spetsialnye regulyativnye rezhimy) of the National Bank of the Kyrgyz Republic

The National Bank of the Kyrgyz Republic approved six special regulatory regimes between October 2020 and August 2026, letting a microcredit company, three payment and e-money firms and two banks test operations outside its standing rules, judged testing successful and closed for four of them between April 2022 and February 2025, and ended one early with the licence revoked in March 2022.

Published number
6 regimesspecial regulatory regimes approved and listed in the register, 2026-08-074 regimes regimes completed with testing judged successful, 2025-02-27
Mechanism
written

AZN 190 monthly allowance to people who lost work, April to June 2020

After Azerbaijan's first COVID-19 case on 28 February 2020 and the first lockdown in March, the government paid a monthly allowance of AZN 190 to 600,000 unemployed citizens, formal and informal, from April to June 2020, and in 2020 also granted targeted social assistance to 9,000 newly poor families without the usual household assessment and extended expired assistance for 9,408 households.

Published number
600,000 peopleunemployed citizens paid the azn 190 monthly allowance, april to june 2020, 2020-069,000 families (37,350 persons) newly poor families granted targeted social assistance without a full household assessment, 2020
Mechanism
written

Temporary unemployment benefit and one-off support for the self-employed, 2020

Georgia, which had no unemployment benefit, announced a temporary GEL 200 monthly benefit for laid-off formal workers and a one-off payment for self-employed and informal workers on 24 April 2020, a month after declaring a state of emergency, and by September 2021 had paid 231,487 unemployed people and 307,236 self-employed people.

Published number
231,487 peopleunemployed people paid the temporary unemployment benefit, 2021-09307,236 people self-employed people whose activity was affected and who received support, 2021-09
Mechanism
written

National Aid Fund temporary cash transfers to informal workers, 2020

Jordan's National Aid Fund reused the Takaful cash-transfer platform after the March 2020 curfew, opened online registration for ten days in mid-April and had paid about 150,000 newly identified households by 10 May 2020, and 237,000 households had received three months of temporary cash support by March 2021.

Published number
150,000 householdshouseholds identified and paid by the temporary cash transfer as of 10 may 2020, 2020-05-10237,000 households households that had received temporary cash transfers (three months of support), 2021-03-31
Mechanism
written

KZT 42,500 income-loss payment during the 2020 state of emergency

During the March to May 2020 state of emergency, Kazakhstan's government paid people who lost income because of business closures and lockdown KZT 42,500 per person per month, and about 4 million people received the payment.

Published number
4,000,000 people (about)people who received the kzt 42,500 monthly income-loss payment, 2020
Source
World Bank, Kazakhstan Economic Update, Summer 2020: Navigating the Crisisinternational organization, retrieved 2026-10-02
Mechanism
written

Tadamon emergency cash transfers to informal workers, 2020

Morocco created a Special Pandemic Fund in March 2020 and, through its Tadamon budget line, paid emergency cash transfers of MAD 800 to 1,200 to households of informal workers, reaching 4.2 million households in the first wave in April 2020 and 5.45 million across the first and second waves, for a total of MAD 16.15 billion by October 2020.

Published number
5,450,000 householdshouseholds reached by the first and second waves of tadamon emergency cash transfers, 20204,200,000 households households reached by the first wave, paid in april 2020, 2020-04
Mechanism
written

One-off COVID-19 payments to families with children, 2020

Russia's government adopted rules on 11 May 2020, the day the President announced it, for a one-off payment of 10,000 rubles per child aged 3 to 16, applied for through the state services portal, and on the first day of payment, 1 June 2020, the Pension Fund paid it for 15.3 million children, more than 150 billion rubles.

Published number
15,300,000 childrenchildren for whom the 10,000-ruble payment was made on the first payment day, 2020-06-0121 days days from the decree (no. 652) to the first payment, 2020-06-01
Mechanism
written

AMEN Social emergency transfers, 2020

After the March 2020 lockdown, Tunisia's government announced in April 2020 a vertical and horizontal expansion of the AMEN Social programme: a TND 50 top-up for two months to all 260,000 poor households, two TND 200 transfers to 450,000 vulnerable households on the subsidised health card, and a one-off TND 200 transfer to 300,000 further vulnerable households enrolled through a new simplified platform.

Published number
300,000 householdsvulnerable households outside the amen social registry enrolled through a simplified platform and paid a one-off tnd 200, 2020450,000 households vulnerable households on the subsidised health card paid two tnd 200 transfers, 2020
Mechanism
written

COVID-19 low-income family allowances and unemployment benefits, 2020

Uzbekistan's government expanded its COVID-19 unemployment support from a one-off to multiple benefits, which the World Bank followed by restructuring its emergency project on 12 August 2020, and with that financing had paid US$50.77 million in low-income family allowances to more than 1,000,000 families and US$0.65 million in unemployment benefits to 19,700 people by 1 January 2021.

Published number
1,000,000 families (more than)families paid low-income family allowances under the emergency project, 2021-01-0119,700 people people paid unemployment benefits under the emergency project, 2021-01-01
Mechanism
written

Housing recovery after the Sardoba reservoir dam failure, 2020

After the Sardoba reservoir dam broke on 1 May 2020 in Syrdarya region, Uzbekistan's government evacuated about 90,000 people from 24 mahallas of three districts, and by October 2020 had built 37 five-storey blocks with 1,480 flats in Sardoba district's Dustlik mahalla, given free to flood victims, and 86 five-storey buildings in Sardoba and Mirzaabad districts.

Published number
90,000 peoplepeople evacuated to safe areas from 24 mahallas of sardoba, akaltyn and mirzaabad districts (about), 2020-05-051,480 flats flats in 37 five-storey blocks built in dustlik mahalla, sardoba district, 2020-10-13
Mechanism
written

SECP Regulatory Sandbox, four cohorts and an open window

Pakistan's Securities and Exchange Commission approved 31 business models for testing in its Regulatory Sandbox across four annual cohorts from 2020 to 2023, out of 125 fintech applicants, with intake rising from six selected in the first cohort to 11 in the fourth.

Published number
31 business modelsbusiness models approved for testing in the secp regulatory sandbox, four cohorts, cumulative, 2024-06-3011 applicants applicants selected in cohort iv, 2023
Mechanism
written

Bank of Jamaica FinTech Regulatory Sandbox

The Bank of Jamaica's FinTech Regulatory Sandbox, effective from March 2020, had received 50 applications and approved 29 of them for testing by the end of 2025, including four new applications from three entities in 2025.

Published number
29 applicationssandbox applications approved for testing since march 2020, cumulative, 2025-12-3150 applications sandbox applications received since march 2020, cumulative, 2025-12-31
Mechanism
written

Long-term Insights Briefings under the Public Service Act 2020

New Zealand's Public Service Act 2020 required every departmental chief executive to publish a Long-term Insights Briefing on future trends, risks and opportunities at least once every three years, and nineteen were published in the first round, which concluded in mid-2023, four of them produced jointly by several agencies.

Published number
19 briefingslong-term insights briefings published in the first round, 2023 (mid-year)
Mechanism
written

COVID-19 Wage Subsidy Scheme

Cabinet agreed a 12-week wage subsidy on 16 March 2020, the Government announced it on 17 March, and the Ministry of Social Development paid employers on average within three and a half days of an application, paying more than NZ$13 billion across three stages by the end of December 2020.

Published number
3.5 daysaverage time from application to payment, 202013 billion NZ$ wage subsidy paid, march to december 2020 (more than), 2020-12
Mechanism
written

COVID-19 Allocation of Resources for Employees (CARE) programme

From March 2020 the Government of Jamaica built the CARE programme on its PATH cash transfer and tax registration systems, paying cash transfers to 458,295 beneficiaries (183,326 men and 274,969 women) for job and income losses and a COVID-19 PATH grant to about 266,100 PATH beneficiaries within the first year of the pandemic.

Published number
458,295 beneficiariesbeneficiaries receiving care cash transfers (sum of the published male and female counts), 2022-05266,100 beneficiaries path beneficiaries receiving the care covid-19 path grant (125,700 male, 140,400 female), 2022-05
Mechanism
written

COVID-19 frontloading of old age, widow and disability allowances

Bangladesh's Department of Social Services paid old age, widow and disability allowance entitlements early from 25 March 2020 to 30 June 2020, reaching about 4.36 million beneficiaries through its digital government-to-person payment system, and the World Bank reimbursed US$165.84 million within 16 days of the government's July 2020 request.

Published number
4.36 million beneficiariesbeneficiaries receiving cash transfers financed under the covid-19 contingent emergency component, 2020-0616 days days from the government's request to full disbursement of the emergency financing, 2020-08-12
Mechanism
written

COVID-19 Economic Relief Plan household transfers, and their halt after the 2021 coup

Under its COVID-19 Economic Relief Plan, Myanmar's government distributed food to about 5.4 million households in April 2020 and cash transfers that had reached about 6 million vulnerable households by November 2020, and the World Bank reported in July 2021 that these transfers had come to a sudden halt after the military takeover of 1 February 2021.

Published number
6 million householdsvulnerable households reached by covid-19 cash transfers by november 2020, before the transfers halted (about), 2020-11
Mechanism
written

Social insurance contribution exemption, April to September 2020

Mongolia's parliament passed the Law on Exemptions for Social Insurance Contributions and Assistance from the Unemployment Insurance Fund on 9 April 2020, waiving contributions retroactively from 1 April to 30 September 2020 for voluntary contributors and affected employers and workers, and 152,475 workers had received relief under the World Bank-financed part of the measure by 31 December 2020.

Published number
152,475 workersworkers under the mandatory scheme receiving at least one month of contribution relief under the world bank-financed part, 2020-12-318 days (law passed 9 April 2020, relief from 1 April 2020) days from the start of the relief period to the law's passage, 2020-04-09
Mechanism
written

Nepal Rastra Bank COVID-19 refinance and loan relief

Nepal Rastra Bank's monetary policy of 17 July 2020 expanded its subsidised refinance facility to five times the available fund for COVID-19 affected businesses, and by mid-July 2021 Rs 148.75 billion had been approved to 48,890 borrowers, against Rs 7.49 billion of refinance outstanding a year earlier.

Published number
148.75 billion Nepalese rupees (48,890 borrowers)covid-19 refinance approved, cumulative, 2021-077.49 billion Nepalese rupees refinance outstanding before the expansion, 2020-07
Mechanism
written

COVID-19 Salary Relief Grant and income support

After restricting non-essential activity in March 2020, the Government of Trinidad and Tobago paid a Salary Relief Grant of TT$1,500 a month for three months through the National Insurance Board, spending TT$226.3 million on it in fiscal 2020 against a TT$490 million allocation, and the Ministry of Social Development and Family Services paid income support to 46,533 people outside the national insurance scheme.

Published number
46,533 personspersons receiving covid-19 income support (ministry of social development and family services), 2020-09226.3 million TT$ salary relief grants paid in fiscal 2020 (october 2019 to september 2020), of a tt$490 million allocation, 2020-09
Source
Ministry of Finance, Trinidad and Tobago, Review of the Economy 2020official statistical, retrieved 2026-10-02
Mechanism
written

GIGA School, one learning device per student

Japan's MEXT GIGA School programme reached a one-device-per-student environment in 1,810 of 1,812 local school authorities (99.9%) by the end of fiscal 2022, with the remaining two scheduled to finish during fiscal 2023.

Published number
1,810 local school authoritieslocal school authorities with one-device environment, FY202299.9 % of local school authorities local school authorities complete, FY2022
Mechanism
written

National Broadband Plan rural fibre rollout

Ireland's National Broadband Plan combined commercial investment with a state intervention contract for rural areas covering more than 560,000 premises; by October 2024 the government reported over 102,600 premises connected to the National Broadband Ireland network.

Published number
102,600 premises (over)state-intervention premises connected, 2024-10560,000 premises (over) premises in the state-intervention area, 2020
Mechanism
written

Korean regulatory-sandbox system across eight sectors

South Korea expanded its regulatory-sandbox system from ICT and industrial-convergence fields in January 2019 to eight sectoral regimes by 2024, adding finance, regulatory-free zones, smart cities, R&D zones, mobility and circular economy testing.

Published number
8 regimessectoral regulatory-sandbox regimes operating, 2024-01
Source
Government of the Republic of Korea, Regulatory Sandbox portalofficial statistical, retrieved 2026-08-31
Mechanism
written

Jóvenes Construyendo el Futuro, government-workplace training

Mexico's labour ministry linked young people to more than half a million registered workplaces for on-the-job training, reporting 2.95 million beneficiaries nationwide after five years of Jóvenes Construyendo el Futuro in February 2024.

Published number
2,950,000 peopleyoung people benefited, 2024-02500,000 workplaces workplaces registered to host training, 2024-02
Source
Secretaría del Trabajo y Previsión Social, Government of Mexicoofficial statistical, retrieved 2026-09-02
Mechanism
written

CFE Telecomunicaciones e Internet para Todos

Mexico's state telecom operator CFE Telecomunicaciones e Internet para Todos installed 113,683 free public internet sites by September 2024, reaching 81.2 percent of its stated 140,000-site 2025 goal.

Published number
113,683 sitesfree public internet sites installed, 2024-0981.2 % of goal share of the 2025 site goal reached, 2024-09
Source
CFE Telecomunicaciones e Internet para Todos, Government of Mexicoofficial statistical, retrieved 2026-09-02
Mechanism
written

Capital Markets Authority regulatory sandbox

Kenya's Capital Markets Authority opened a regulatory sandbox under a 2019 policy guidance note and by January 2024 had let 11 firms exit it after live testing, with new admissions continuing into January 2025.

Published number
11 firmsfirms that successfully exited the cma regulatory sandbox, 2024-01
Mechanism
written
2019CubaBuildingLarge project deliveryoperating below its peak

Programa Nacional de la Vivienda, and its collapse

Cuba's national housing programme, run by the Ministry of Construction under the housing policy presented in 2018 to close a deficit of 929,695 homes in ten years, completed 20,232 homes in 2022 and 5,493 in 2025, of which the state built 1,791.

Published number
5,493 homeshomes completed in the year, state and self-build, 202520,232 homes homes completed in 2022, 2022
Mechanism
written

Vistula Spit shipping canal (Przekop Mierzei Wiślanej)

Poland's Maritime Office in Gdynia signed the first construction contract for the Vistula Spit waterway on 4 October 2019 and opened the canal on 17 September 2022. The Supreme Audit Office found that by April 2023 the programme's value had risen 125 percent, from PLN 880 million to over PLN 1,984 million, and that its completion deadline had slipped two years to the end of 2024.

Published number
125 % overrun (PLN 880 million to over PLN 1,984 million)cost overrun of the vistula spit waterway programme against its original value, 2023-042 years (to end of 2024) extension of the programme's completion deadline, 2023-05
Mechanism
written

Vocational skills upgrading action, 2019-2021

Under a State Council plan funded with 100 billion yuan from the unemployment insurance fund surplus, China's human resources ministry organised 32.184 million person-times of subsidised vocational skills training in 2021 alone, the final year of a three-year action that targeted more than 50 million.

Published number
32,184,000 person-timessubsidised vocational skills training delivered in the year, 202192,000,000 person-times (more than) subsidised vocational skills training since the start of the 14th five-year plan, cumulative, 2025-09
Mechanism
written

Olmeca refinery at Dos Bocas

Pemex built the Olmeca refinery at Dos Bocas, authorized in December 2018 and fully operational from February 2025, under an authorized budget of US$15,963.0 million, 79 percent above the US$8,918.5 million Class IV estimate stated when its board authorized the FEL II phase in July 2020.

Published number
15,963 US$ million including VATauthorized project budget after the august 2022 rebaseline, excluding us$853.3 million for start-up, 20228,918.5 US$ million class iv cost estimate approved at fel ii, 2020-07
Mechanism
written

CFPB Compliance Assistance Sandbox, rescinded in 2022 and withdrawn again in 2025

The Consumer Financial Protection Bureau opened a national Compliance Assistance Sandbox in September 2019, issued two sandbox approval orders in December 2020, terminated one of them in June 2022 and rescinded the policy with effect from 30 September 2022; a reissued version of January 2025 was withdrawn in May 2025.

Published number
2 approval orderscompliance assistance sandbox approval orders listed as granted, 2020-12
Source
Consumer Financial Protection Bureau, Innovation: granted applicationsofficial statistical, retrieved 2026-10-02
Mechanism
written

Secretaría de Emergencia Nacional response to the 2019 floods

By 29 May 2019, Paraguay's Secretaría de Emergencia Nacional had assisted 62,521 of the 65,000 families affected by the flash floods of March to May 2019 across 14 departments, delivering 1.5 million kg of food, 150,000 roofing sheets and 110,000 plywood boards.

Published number
62,521 families, of 65,000 affectedflood-affected families assisted, 2019-05-29
Mechanism
written

Competitive renewable IPP programme, from Navoi Scaling Solar

Uzbekistan's government signed its first competitively tendered solar PPP in November 2019 at US¢2.679 per kWh, the 100 MW Navoi plant began commercial operation in December 2021, and by January 2024 operational solar PV capacity in the country stood at 1,497 MW, with agreements for a further 5,677 MW of solar and 5,100 MW of wind by 2030.

Published number
1,497 MWtotal operational solar pv generation capacity in uzbekistan, 2024-012.679 US cents per kWh winning fixed offtake tariff in the first competitive solar ppp (navoi, 25 years), 2019
Mechanism
written

Beitbridge Border Post modernisation (Zimborders build-operate-transfer concession)

Zimbabwe's government contracted the Zimborders consortium under a build-operate-transfer concession to rebuild the Beitbridge Border Post with a US$300 million investment; works began in March 2019 and the President commissioned the modernised post in September 2022.

Published number
300 US$ millioninvestment in the beitbridge border post upgrade, 2021-02
Mechanism
written

Shock-responsive social cash transfers and the Cat DDO

From 2019 the Government of Malawi identified every household it registered for shock-responsive cash transfers through its Unified Beneficiary Registry. It expanded the Social Cash Transfer Programme to give drought and COVID-19 aid to more than 300,000 rural households, and it drew US$30 million of pre-arranged contingent financing on 10 April 2020, three weeks after declaring a state of disaster.

Published number
300,000 households (more than)rural households given drought and covid-19 aid through shock-responsive expansions of the social cash transfer programme, identified through the unified beneficiary registry, 2019 to 202330 million USD catastrophe deferred drawdown option disbursed after the covid-19 state of disaster, 10 April 2020
Mechanism
written

MauCAS Instant Payment System, run by the Bank of Mauritius with banks and non-banks

The Bank of Mauritius launched the Mauritius Central Automated Switch in August 2019 as a central hub through which banks and non-bank payment providers route instant payments, and its Instant Payment System grew from 126,000 transactions in FY2019-20 to 19.4 million transactions worth Rs63.0 billion in FY2024-25, with 11 banks and 4 non-banks participating.

Published number
19.4 million transactionsmaucas instant payment system transactions in the financial year, FY2024-25126,000 transactions maucas instant payment system transactions in its first financial year, FY2019-20
Source
Bank of Mauritius, Annual Report for the year ended 30 June 2025official statistical, retrieved 2026-10-02
Mechanism
written

Banjul Rehabilitation Project (roads, drainage and sewage), and its delay

The Gambia's Ministry of Transport, Works and Infrastructure contracted the US$35.7 million (D1.8 billion) Banjul roads, drainage and sewage rehabilitation in May 2019 without tender, for completion by November 2021; by August 2021 12,953 m of the 15,216 m of roads, 85 percent, were built and 63 percent of the contract price paid, the pumping and lifting stations were outstanding, and the completion date had been extended to November 2022.

Published number
12,953 metresroad length completed as at august 2021 (85 percent of 15,216 m), 2021-0835.7 million US dollars contract sum of the epc contract, 2019-05
Mechanism
written

Innovation Fund Collaborative Grant Scheme (Program saradnje nauke i privrede)

Serbia's Innovation Fund financed 79 joint research and development projects of private small and medium firms with public research organisations across eight calls of its Collaborative Grant Scheme, the eighth call, decided in 2024, funding eight.

Published number
79 consortium projectscollaborative grant scheme projects listed as funded, all eight cycles (counted from the fund's per-cycle lists), cycles one to eight, to 20248 consortium projects projects funded in the eighth cycle, 2024
Mechanism
written

Innovation Consortia Matching Grant Program (Fostering Productive Innovation Project)

Kazakhstan's innovation ministry (MDDIAI), through the Innovation Consortia Matching Grant Program of the World Bank financed Fostering Productive Innovation Project, had supported 33 technology consortia of research teams and firms, including 12 competence centres, by September 2024, whose first sales and signed contracts totalled about 17 billion tenge.

Published number
33 consortiatechnology consortia supported under the innovation consortia matching grant program, September 202417,000,000,000 tenge first sales and signed contracts of productive sector consortia subprojects, September 2024
Mechanism
written

Federal project Sodeystvie zanyatosti (Employment Promotion) vocational training of adults

Under the federal project Sodeystvie zanyatosti of the national project Demography, which paid for vocational training and further professional education of selected groups of adults, more than 80,000 citizens had started training and 21,125 had completed it by the end of the third quarter of 2024.

Published number
21,125 peoplecitizens who completed training under the federal project, January to September 202480,000 people (stated as 'over 80 thousand') citizens who had started training under the federal project, January to September 2024
Mechanism
written

Faster Payments System (SBP), run by the Bank of Russia with the banks

The Bank of Russia's Faster Payments System, which commercial banks connect to so that customers can pay any account by phone number or QR code, processed more than 3 billion operations worth 14.4 trillion rubles in 2022 with 213 banks connected, and 18.3 billion operations worth 103 trillion rubles in 2025.

Published number
18.3 billion operationsoperations made through the faster payments system in the year, 20253 billion operations (more than) operations made through the faster payments system in the year, with 213 banks connected, 2022
Source
Bank of Russia, Faster Payments System key indicators, Q4 2025official statistical, retrieved 2026-10-02
Mechanism
written

Housing reconstruction after the February 2019 Shamakhi earthquake

Azerbaijan's Minister of Emergency Situations reported on 5 December 2019, ten months after the February 2019 Shamakhi earthquake, that 580 houses had been built and 1,175 houses restored in Shamakhi district with state funds, while three apartment buildings with 174 flats were, by the President's account on the same page, still under construction.

Published number
1,175 houseshouses restored in shamakhi district, 2019-12-05580 houses new houses built in shamakhi district (three apartment buildings with 174 flats still under construction), 2019-12-05
Mechanism
written

PhilSys foundational national ID rollout

The Philippine Statistics Authority reported 90,017,565 people registered to PhilSys by 19 September 2024, or 97.8% of the year's 92 million registration target, with the ID designed for government and private-sector transactions.

Published number
90,017,565 peoplepeople registered to philsys, 2024-09-1992,000,000 people 2024 registration target, 2024
Mechanism
written

Baltic Pipe gas interconnection

Poland's Gaz-System, Denmark's Energinet and Norway's Gassco coordinated the Baltic Pipe cross-border gas corridor; the interconnection launched on 1 October 2022 and reached its target technical parameters by November, allowing up to 10 billion cubic metres per year toward Poland.

Published number
10,000,000,000 cubic metres per yearbaltic pipe capacity toward poland, 2022-11-303 operators transmission-system operators coordinating the interconnection, 2022
Mechanism
written

Alert RCB national emergency SMS channel

Poland's Government Security Centre launched Alert RCB as an opt-out-free emergency SMS channel in 2018; in its first year it activated the system 23 times and, working with mobile operators, sent about 200 million warning messages to phones in threatened areas.

Published number
200,000,000 SMS messages (about)warning sms messages sent in alert rcb's first year, 2019-0623 alerts alert rcb activations in its first year, 2019-06
Mechanism
written

Ostrołęka C coal block, and its abandonment

Poland began the 1,000-MW Ostrołęka C coal-block project in 2018 without full financing, suspended construction in 2020 and demolished the built elements in 2021; the Supreme Audit Office later found that the unfinished investment consumed more than PLN1.5 billion.

Published number
1,500,000,000 Polish złoty (more than)cost of the unfinished ostrołęka c investment, 20251,000 megawatts (about) planned electrical capacity of the abandoned coal block, 2018
Mechanism
written

UAE Pass, the shared digital identity layer

The UAE Telecommunications and Digital Government Regulatory Authority reported that UAE Pass had 6.84 million registered users accessing more than 15,000 digital services from government and private-sector providers in 2023.

Published number
6,840,000 usersregistered uae pass users, 202315,000 services digital services available through uae pass, 2023
Mechanism
written

British Patient Capital, a public venture-capital catalyst

The British Business Bank reported that government-owned British Patient Capital had committed £2.287 billion through 80 fund commitments, 10 co-investments and 18 Future Fund deals by 31 March 2024, with an underlying portfolio of 1,350 companies.

Published number
2,287,000,000 GBPbritish patient capital commitments since inception, 2024-03-311,350 companies underlying portfolio companies, 2024-03-31
Mechanism
written

Sistema de Gestão Integrada de Fogos Rurais

Portugal's integrated rural-fire system reported 85 of 97 national-action projects in progress and 48 percent cumulative execution in 2024; €638 million was spent that year, with 55 percent on prevention, even as 137,651 hectares burned.

Published number
85 projectsnational-action projects in progress, 2024638,000,000 EUR sgifr expenditure, 2024
Mechanism
written

OJK regulatory sandbox for financial-sector technological innovation

Indonesia's Financial Services Authority (OJK), running a regulatory sandbox since 2018 and under POJK 3/2024 since February 2024, had received 26 applications and approved 9 sandbox participants by December 2025, four of which had completed testing and been declared passed.

Published number
9 participantssandbox participants approved under pojk 3/2024, 2025-1226 applications applications to join the sandbox, 2025-12
Mechanism
written

DuitNow on the Real-time Retail Payments Platform

Bank Negara Malaysia merged its clearing subsidiary with the banks' payment consortium into PayNet, jointly owned by the central bank and the financial industry, which rolled out the Real-time Retail Payments Platform with DuitNow from December 2018; BNM statistics record 5,438.6 million RPP transactions worth RM3,638.1 billion in 2025, up from 109.3 million in 2019.

Published number
5,438.6 million transactionsrpp (duitnow) transaction volume, 2025109.3 million transactions rpp (duitnow) transaction volume in the first full year, 2019
Mechanism
written

Project-based regulatory sandbox (new technology demonstration scheme)

Japan's cross-government regulatory sandbox, created in 2018 under the Productivity Improvement Act and made permanent in 2021 under the Industrial Competitiveness Enhancement Act, had approved 33 demonstration plans involving 152 businesses by 19 March 2025, across mobility, IoT, fintech and healthcare.

Published number
33 plansdemonstration plans approved under the regulatory sandbox, cumulative, 2025-03-19152 businesses businesses in approved plans, cumulative, 2025-03-19
Mechanism
written

Innosuisse innovation projects with implementation partners

Innosuisse, the Swiss federal innovation agency, recorded CHF 113.95 million of contributions in 2025 to innovation projects in which a Swiss research institution works with a company or other implementation partner that bears 40 to 60 percent of the project cost, and held CHF 144.3 million of further commitments to such projects at the end of the year.

Published number
113,950,000 Swiss francscontributions to innovation projects with implementation partner, 2025144,311,000 Swiss francs commitments to innovation projects with implementation partner outstanding at year end, 2025-12-31
Mechanism
written

National Assembly Futures Institute

Korea's National Assembly enacted the National Assembly Future Institute Act on 12 December 2017 and opened the institute on 28 May 2018 with a statutory duty to predict and analyse changes in the future environment and derive mid to long term national development strategies; its English-language research report archive listed 203 reports in 2026.

Published number
203 reportsresearch reports listed in the institute's english-language report archive, 2026-10-02
Source
National Assembly Futures Institute, Archive, Research Reportsacademic survey, retrieved 2026-10-02
Mechanism
written

MAI/DAI, innovation scholarships for research with partner companies

Brazil's research council CNPq, with CAPES co-funding the 2024 call, has run four calls of its Mestrado e Doutorado Acadêmico para Inovação programme (2018, 2020, 2022 and 2024), in which about 80 science and technology institutions and more than 200 companies had taken part and at least 5,000 scholarships had been granted by 2024 for undergraduate and graduate student research on projects defined with partner firms.

Published number
5,000 scholarships (at least)scholarships granted across mai/dai calls, 2018 to 2024, cumulative200 companies (more than) companies that have taken part in mai/dai, 2018 to 2024, cumulative
Mechanism
written

Inland Rail, and its consolidation at Parkes

The Australian Government began building Inland Rail, a Melbourne to Brisbane freight railway, in 2018 through the Australian Rail Track Corporation, which passed delivery to its subsidiary Inland Rail Pty Ltd in May 2024; a verification report delivered to the infrastructure department in November 2025 reported the company's estimate at completion of A$45.6 billion (P90, Target scenario, estimate current as of December 2024) with completions finalised in May 2036, and the 2026-27 Budget then consolidated the project at Parkes and returned $4.4 billion in equity.

Published number
45.6 billion Australian dollarsestimate at completion of the full inland rail programme, target scenario (p90), 2024-122,036 year (May 2036) month in which completions are finalised under the target scenario schedule, 2024-12
Mechanism
written
2018NigeriaBuildingLarge project deliveryoperating below its peak

Abuja-Kaduna-Zaria-Kano dual carriageway, and the termination of its 2017 contract

Nigeria's Federal Ministry of Works awarded the rehabilitation of the Abuja-Kaduna-Zaria-Kano dual carriageway to Julius Berger on 20 December 2017 at an initial N155.7 billion with a 36-month completion period; after repeated variations and augmentations, the Federal Executive Council cut the contract sum under Section I from N797.3 billion to N740.8 billion on 23 September 2024, and the ministry issued a 14-day termination notice on 4 November 2024 after the contractor rejected the reviewed sum and stopped work.

Published number
797.26 billion nairacontract sum (contract no. 6350) before the september 2024 downward review, 2024-09155.75 billion naira initial contract sum at award, 2017-12
Mechanism
written

Disaster Recovery Funding Arrangements

The Australian Government paid $3.1 billion to state and territory governments through the Disaster Recovery Funding Arrangements between 1 June 2018 and 30 June 2022, and the arrangements were activated for 49 disaster events that occurred in 2021–22.

Published number
3.1 AUD billiondrfa payments to states and territories, 2018-06-01 to 2022-06-3049 events disaster events that occurred in 2021–22 with drfa activations, 2021–22
Mechanism
written

New Payments Platform, the shared fast-payment rail

The New Payments Platform, whose payments the Reserve Bank of Australia settles one by one in central bank money through the Fast Settlement Service of its RITS system, settled a daily average of 3.6 million transactions in 2024/25, almost 19 percent more than in 2023/24, worth A$4.7 billion a day.

Published number
3,600,000 transactions per dayfast settlement service (npp) daily average transactions settled, 2024/254,700,000,000 Australian dollars per day fast settlement service (npp) daily average value settled, 2024/25
Source
Reserve Bank of Australia, Annual Report 2025official statistical, retrieved 2026-10-02
Mechanism
written

InstaPay under the National Retail Payment System

InstaPay, the real-time automated clearing house organized under the Bangko Sentral ng Pilipinas' National Retail Payment System framework, in which banks and e-money issuers take part, processed 4.7 billion transfers worth ₱11.6 trillion in 2025, up from 232.9 million in 2020, with 95 participating institutions in July 2026.

Published number
4,700,000,000 transactionsinstapay transactions in the year, 202511,600,000,000,000 Philippine pesos instapay transaction value in the year, 2025
Source
Bangko Sentral ng Pilipinas, Payments Bulletin (data as of July 2026)official statistical, retrieved 2026-10-02
Mechanism
written

Julius Nyerere Hydropower Project

TANESCO contracted the 2,115 MW Julius Nyerere hydropower dam on the Rufiji in December 2018 for TZS 6.56 trillion over 42 months to June 2022. The contractor completed it on 31 March 2025, and claims settled in the contractor's favour raised the cost to TZS 7.44 trillion.

Published number
7.44 trillion TZSadjusted cost of the julius nyerere hydropower project after usd 400 million of contractor claims, 2024/256.56 trillion TZS original epc contract price of the julius nyerere hydropower project, 2018
Mechanism
written

Sankofa Gas Project (Offshore Cape Three Points)

Ghana structured the Sankofa offshore gas development as a public-private deal in which Eni and Vitol invested and the state oil company GNPC bought the gas under take-or-pay terms backed by an IDA payment guarantee, mobilising US$4,653 million of private capital and bringing first gas to power plants in 2018.

Published number
4,653 US$ millionprivate sector capital mobilized for the sankofa gas field development, 201890 million standard cubic feet per day average daily gas off-take in 2019, against take-or-pay volume of 170 mmscfd, 2019
Mechanism
written

AFSA FinTech Lab at the Astana International Financial Centre

The Astana Financial Services Authority granted five FinTech Lab sandbox licences in 2022, saw the first participant graduate to a full licence that year, and had 18 licensed firms in its sandbox at the end of 2022.

Published number
5 firmsfintech lab licences granted (firms admitted to the sandbox) in 2022, 202218 firms licensed companies in the fintech lab at end of year, 2022
Source
Astana Financial Services Authority, 2022 Annual Reportofficial statistical, retrieved 2026-10-02
Mechanism
written

Sandbox Regulatório do Banco de Moçambique

Banco de Moçambique admitted 11 participants, chosen from 19 applicants, to the sixth edition of its regulatory sandbox in March 2025, and at the same ceremony gave participation certificates to the five fintechs that had completed the fifth edition.

Published number
11 participantsparticipants admitted to the sixth edition of the regulatory sandbox, 2025-03-285 firms fintechs completing the fifth edition and receiving participation certificates, 2025-03-28
Mechanism
written

Regulatory Sandbox Licence of the Economic Development Board

Mauritius's Economic Development Board, operating a regulatory sandbox licence regime for innovative financial projects since September 2018 by the World Bank's dating, had nine firms in its sandbox when the World Bank compiled its global database of sandboxes in 2020.

Published number
9 firmsfirms in the sandbox (edb regulatory sandbox licence), 2020 (database published November 2020)
Mechanism
written

Response to the 2018 to 2020 North Kivu and Ituri Ebola outbreak

The Democratic Republic of the Congo's Ministry of Health, supported by WHO and partners, ran the response to the North Kivu and Ituri Ebola outbreak from August 2018 until it was declared over on 25 June 2020, vaccinating more than 303,000 people, registering 250,000 contacts and testing 220,000 samples, in an outbreak that counted 3,481 cases and 2,299 deaths.

Published number
303,000 people (stated as 'over 303 000')people vaccinated with the rvsv-zebov-gp ebola vaccine during the response, 2020-06-253,481 cases total ebola cases (3,323 confirmed and 158 probable), of whom 2,299 died, 2020-07-03
Mechanism
written

Bank of Lithuania regulatory sandbox, with one test in seven years

The Bank of Lithuania opened its regulatory sandbox to applications on 15 October 2018 and, by the page's last update on 27 June 2025, listed one innovation ever tested in it: UAB Workpower's peer-to-peer insurance platform, authorised on 13 June 2019 and tested from 24 October 2019 to 23 October 2020, which led the bank to draft proportionate rules for P2P insurance.

Published number
1 firmsinnovations listed as tested in the regulatory sandbox since applications opened, 2025-06-27
Mechanism
written

Pelješac Bridge, the first stage of the road connection to South Dalmatia

Croatia's road authority awarded the 2,440-metre Pelješac Bridge to China Road and Bridge Corporation in 2018 for HRK 2.081 billion excluding VAT with a 36-month completion deadline, works started on 31 July 2018, the last steel segment was installed by 28 July 2021, and the government expected the bridge and access roads to open in June 2022, in a project whose eligible costs of 420 million euros were 85 percent financed by an EU grant of 357 million euros.

Published number
2.081 billion Croatian kunacontract price for the bridge, excluding vat, 201836 months contracted completion period from the start of works on 31 july 2018, 2018
Mechanism
written

Regional and Local Roads Connectivity Project

Albania's Albanian Development Fund rehabilitated about 70 km of regional and local roads under a US$50 million loan approved in April 2018, against 55 km planned, after civil works were awarded at up to 48 percent below estimate, with the closing date extended by 18 months to June 2024.

Published number
70 kmregional and local roads rehabilitated, 2024-06-3055 km regional and local roads to be rehabilitated, original target, 2018-04-25
Mechanism
written

Bank of Russia regulatory sandbox (regulativnaya pesochnitsa)

The Bank of Russia decided in 2025 to create the legal conditions for introducing 4 digital financial services piloted in its regulatory sandbox, out of 10 pilot applications it considered that year in identification, artificial intelligence, insurance, distributed ledgers and other areas.

Published number
4 applicationssandbox applications for which the bank decided to create legal conditions for introduction (the step its sandbox page says follows a successfully completed pilot), 202510 applications applications to pilot services considered in the regulatory sandbox, 2025
Mechanism
written

Short-term vocational training of the unemployed in monocentres and district vocational training centres

Uzbekistan's Ministry of Poverty Reduction and Employment expanded short-term vocational skill training of unemployed people from 20,000 in 2018 to 110,000 in 2022, counting graduates of the regional monocentres and district vocational training centres, according to ministry data reported by the World Bank.

Published number
110,000 peopleunemployed people covered by short-term vocational skill training (graduates of regional monocentres and district vocational training centres), 202220,000 people same coverage in the base year, 2018
Mechanism
written

Enhanced Vocational Education and Training (EVENT II) short-term training

Nepal's Ministry of Education, Science and Technology, through the EVENT II project secretariat, put 111,062 people aged 16 to 40 through market-relevant short-term vocational training between 2018 and 2023, delivered by 142 private and public training providers in 68 of the 77 districts and paid partly on trainees' employment six months after completion.

Published number
111,062 traineesyouth (16 to 40) who enrolled in and completed project-supported short-term training, 2018-02/2023-07 (project period)23,735 trainees of which trained with vouchers redeemed at a provider of their choice, 2018-02/2023-07
Mechanism
written
2017PeruBuildingLarge project deliveryoperating below its peak

Reconstrucción con Cambios, a delayed recovery portfolio

A 2023 Contraloría control report found the education portfolio of Peru's Reconstrucción con Cambios programme at 36.6% implementation by July 2023 against a 78% milestone expected in the earlier baseline, with the corresponding target date already expired.

Published number
36.6 % implementededucation-portfolio implementation in july 2023, 2023-0778 % expected earlier baseline milestone for education portfolio, 2021-12
Mechanism
written

Ruta PY02 public-private road concession

Paraguay's public-works balance records the Ruta PY02 duplication and expansion as a 149.5-kilometre public-private partnership, awarded under the 2013 APP law with a USD 507 million construction contract and a concession running to 2046.

Published number
149.5 kilometresroad length under the ruta py02 app contract, 2024507,000,000 US dollars construction contract value, 2017 contract
Mechanism
written

Met Éireann national weather-warning service

Ireland's national meteorological service uses a standard Yellow–Orange–Red warning system and briefs the National Emergency Coordination Group so government departments and agencies can coordinate ahead of severe weather; warnings are issued up to 48 hours before anticipated conditions.

Published number
48 hours (up to)forecast lead time for severe-weather warnings, 20253 levels (Yellow, Orange, Red) warning severity levels, 2025
Source
Met Éireann, Irish Meteorological Service, warning-system guidanceofficial statistical, retrieved 2026-08-31
Mechanism
written

Portugal's CoLAB applied-research network

Portugal's Agência Nacional de Inovação reported 41 recognized Collaborative Laboratories (CoLABs), and its 2024 innovation report recorded 639 highly qualified staff contracted by CoLABs, 32 percent of them PhDs.

Published number
41 CoLABsrecognized collaborative laboratories, 2024639 staff highly qualified staff contracted by colabs, 2024
Source
Agência Nacional de Inovação, Relatório Nacional de Inovação 2024official statistical, retrieved 2026-08-31
Mechanism
written

Programa Qualifica and Portugal's adult-learning network

Portugal's ANQEP reported 1,025,569 cumulative Qualifica registrations by December 2023; 90 percent received a training or recognition, validation and certification referral, and 510,113 registrants obtained some certification.

Published number
1,025,569 registrationscumulative qualifica registrations, 2023-12510,113 people registrants receiving a certification, 2023-12
Source
ANQEP, Plano de Atividades 2024official statistical, retrieved 2026-08-31
Mechanism
written

Orçamento Participativo Portugal

Portugal's first national participatory-budget cycle drew almost 80,000 votes and committed €3.18 million to winning projects, which were written into the 2018 state budget.

Published number
80,000 votesvotes cast in the first opp cycle (approximately), 20173,180,000 EUR investment committed to winning projects, 2017
Source
Presidência e Modernização Administrativa, OPP 2017 resultsofficial statistical, retrieved 2026-08-31
Mechanism
written

Pradhan Mantri Gramin Digital Saksharta Abhiyan

India's PMGDISHA rural digital-literacy scheme enrolled 73,571,965 people, trained 63,941,718 and certified 47,836,188 by July 2024 through 20 hours of instruction in five digital-task modules.

Published number
63,941,718 peoplecandidates trained under pmgdisha, 2024-07-2647,836,188 people candidates certified under pmgdisha, 2024-07-26
Mechanism
written

SWAYAM national online-course platform

India's SWAYAM platform offered more than 20,370 courses and recorded more than 65 million enrolments by 12 August 2026 as a national channel for flexible higher-education and skills learning.

Published number
65,000,000 enrolmentsswayam enrolments, 2026-08-1220,370 courses swayam courses offered, 2026-08-12
Mechanism
written

YEKA RES-1 renewable tender, and its cancellation

Türkiye signed the 1,000 MWe YEKA RES-1 wind contract in February 2018 and completed its factory and R&D centre in 2019, but the Energy Ministry records that the contract was cancelled under a 2024 law.

Published number
1,000 MWewind capacity under the cancelled yeka res-1 contract, 2024-05-112 milestones factory and r&d-centre milestones completed before cancellation, 2019
Source
Ministry of Energy and Natural Resources, Government of Türkiyeofficial statistical, retrieved 2026-09-03
Mechanism
written

Doktorat wdrożeniowy (implementation doctorate) programme

Poland's science ministry opened the implementation doctorate in the 2017/2018 academic year, funding doctoral candidates to do their research inside a firm or institution. In its first five editions 2,293 projects were approved, 479 people qualified for the sixth edition in 2022/2023, and 69.6 percent of the doctorates ran in the private sector.

Published number
2,293 approved doctoral projectsimplementation doctorate projects approved in the first five editions, 2022479 doctoral candidates candidates qualified for the sixth edition, 2022/2023
Mechanism
written

National Social Safety Nets Project and the COVID-19 Rapid Response Register

Nigeria's National Social Safety Nets Coordinating Office built a National Social Register of 15,673,296 households and, during COVID-19, a new Rapid Response Register that captured 2.7 million households, while the project paid targeted cash transfers to 9,666,420 direct beneficiaries in 37 states between 2017 and its close in December 2022.

Published number
2,700,000 householdshouseholds captured by the covid-19 rapid response register, 2022-1215,673,296 households households included in the national social register, 2022-12
Mechanism
written

UDAN regional air connectivity scheme, and its lapsed routes

India's Ministry of Civil Aviation paid viability-gap funding to private airlines to fly underserved regional routes from April 2017. Of the 774 routes awarded in the first three rounds, 371 commenced, and only 174 were still flying in March 2023; only 54 of the 112 routes that completed their three-year concession kept operating afterwards.

Published number
174 routesudan 1 to 3 routes in operation, 2023-03371 routes (cumulative) udan 1 to 3 routes that commenced operations, 2023-03
Mechanism
written

SINTEG-Verordnung, the energy-transition experimentation clause

Germany's federal government ran a time-limited regulatory experimentation clause for the SINTEG smart-energy showcases from June 2017 to June 2022, under which the Federal Network Agency received 49 notifications of experiments but only two claims for compensation of regulatory costs.

Published number
49 notificationsnotifications to the bundesnetzagentur under § 3 sinteg-v, 2017-06/2022-062 applications applications for compensation of economic disadvantages under the clause, 2017-2022
Mechanism
written

CRADLE, DOST's collaborative R&D grant for academe and companies

From 2017 the Department of Science and Technology's CRADLE programme funded 82 projects in which a university or research institute did R&D on a problem set by a Filipino company, worth 373.6 million pesos and involving 36 HEIs or RDIs and 83 companies by early 2022.

Published number
82 projectscradle projects funded since 2017, 2022373,600,000 Philippine pesos value of cradle projects funded since 2017, 2022
Mechanism
written

Hurricane Otto priority reconstruction works

In the 17 months to September 2018, the Instituto Costarricense de Electricidad, under an agreement with the national emergency commission (CNE), completed 64 of the 65 priority reconstruction works after Hurricane Otto of November 2016, rebuilding 20 bridges and 211 km of rural roads for ₡18,500 million.

Published number
64 works, of 65 programmedpriority reconstruction works concluded, 2018-09-1218,500 ₡ million investment in the priority works, 2018-09-12
Mechanism
written

Finnish Trust Network for strong electronic identification

From May 2017 Finland's Trust Network obliged banks and mobile operators issuing strong electronic identification to let brokers resell their authentications at a regulated maximum price, cut to 3 cents in 2019, and mediated authentication events rose from an estimated 20 million in the second half of 2019 to about 60 million in the first half of 2020.

Published number
60,000,000 authentication events in the half-yearauthentication events mediated through trust network brokers (estimate), 2020-H13 euro cents maximum regulated wholesale price per mediated authentication (from 2019), 2020
Mechanism
written

Routine immunization through the 2023 war, and its erosion

WHO and UNICEF estimated that Sudan's national DTP3 coverage among one-year-olds fell from 95 percent in 2017 and 84 percent in 2022 to 51 percent in 2023 and 39 percent in 2024, after war broke out in April 2023, before recovering to 71 percent in 2025.

Published number
71 % of one-year-oldsestimated dtp3 coverage among one-year-olds (wuenic), 202595 % of one-year-olds estimated dtp3 coverage at its recent peak, 2017
Mechanism
written

Mācības pieaugušajiem, the ESF training programme for employed adults 2017 to 2023

Latvia's State Education Development Agency (VIAA) trained almost 77,000 employed adults aged 25 and over through its ESF-funded 'Mācības pieaugušajiem' project between 2017 and 2023, in ten rounds and 2,309 programmes offered by 124 education institutions, with 90 to 100 percent of fees covered.

Published number
77,000 personsemployed persons aged 25 and over who improved their competence in the project ('teju 77 000', almost 77,000), 2017 to 20232,309 programmes education programmes offered in the project, 2017 to 2023
Mechanism
written

Federation Road Sector Modernization Project, and its shrunken rehabilitation scope

The Federation of Bosnia and Herzegovina's public road company PC Roads FBH delivered 76.9 km of road works, including a 35 km upgrade of the Neum to Stolac road, under a project approved in August 2016, but rehabilitated only 41.75 km of main roads against an appraisal target of 178 km, which was cut to 42.23 km in 2021, and the closing date moved from December 2021 to September 2023.

Published number
41.75 kmroads rehabilitated, non-rural, achieved at closing, 2023-09-30178 km target for roads rehabilitated, non-rural, at appraisal, 2016-08-02
Mechanism
written

Flood and Landslide Emergency Recovery Project, and its slow delivery

Myanmar's Ministry of Construction and rural roads department had used US$37.2 million of a US$200 million IDA credit approved in July 2016 for recovery from the 2015 floods and landslides, rehabilitating 60 km of rural roads, 10 percent of the target, and starting no national road works in Chin State, when disbursements stopped after the military takeover of February 2021, and the project closed on its original December 2021 date with an Unsatisfactory outcome rating.

Published number
37.15 million US dollarsactual disbursement at closing, 2021-12-31200 million US dollars original ida financing at approval, 2016-07-14
Mechanism
written

Second Energy Sector Project, distribution rehabilitation and the 10 MWp western solar plant

Mongolia's Ministry of Energy and its distribution companies rehabilitated the Baganuur and Erdenet-Bulgan distribution networks and built a 10 MWp solar plant in the Western Energy System under the Second Energy Sector Project, spending US$53.35 million against a US$55.40 million appraisal estimate but closing in August 2024, 25 months after the original September 2022 closing date.

Published number
53.35 million US dollarsactual disbursement at closure, 2024-08-3155.4 million US dollars appraisal cost estimate, 2017-06-15
Mechanism
written

BE-Alert

The National Crisis Centre of the Federal Public Service Interior has run BE-Alert, the national system that lets municipalities and provinces alert the population by SMS, including location-based SMS, and information screens, since 2017. By 1 September 2025, 537 of 565 municipalities, covering 95 percent of Belgian territory, were affiliated, 1,369,659 citizen addresses were registered, and the system had been used 273 times in 2025.

Published number
537 municipalities of 565municipalities affiliated to be-alert, September 20251,369,659 addresses citizen addresses registered in be-alert, 1 September 2025
Mechanism
written

The FCA regulatory sandbox

The United Kingdom's financial regulator built the first regulatory sandbox in 2016, and by the end of 2022 had accepted 168 firms and products to test with real customers under supervision.

Published number
168 firmsfirms and products accepted for testing since launch, 2022
Source
Financial Conduct Authority, Innovation Hub market insightsofficial statistical, retrieved 2026-08-27
Mechanism
written
2016CanadaBuildingLarge project deliveryoperating below its peak

Phoenix pay system, and its prolonged failure

Canada rolled out the Phoenix federal pay system in 2016, then spent more than C$2.6 billion by April 2022 to support and stabilise it and correct pay-file errors, with a further roughly C$1 billion allocated through the 2024-25 fiscal year.

Published number
2,600,000,000 Canadian dollarssupport and correction spending by april 2022, 2022-041,000,000,000 Canadian dollars further funding allocated through fiscal year 2024-25, 2023
Mechanism
written

My Number Card, a national identity rail extended into services

By July 2024 Japan reported 93.08 million My Number Cards held, about 75% of the population; 73.71 million had valid health-insurance-card registrations in June 2024, while 566 businesses used the public-key identity infrastructure.

Published number
93,080,000 cardsmy number cards held, 2024-0773,710,000 registrations valid health-insurance-card registrations, 2024-06
Source
Digital Agency of Japan, digital utilisation progress reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Invierte.pe, a national multi-year investment-management system

Peru's Invierte.pe system tracks public investment across national, regional and local governments; by 25 July 2024 the three levels had executed S/25.939 billion of a S/67.797 billion investment budget, a reported 38.3% advance.

Published number
25,939,000,000 Peruvian solespublic investment executed by 25 july, 2024-07-2567,797,000,000 Peruvian soles 2024 public investment budget, 2024-07-25
Mechanism
written

2016 earthquake national emergency coordination

After Ecuador's 7.8-magnitude earthquake in April 2016, the national emergency committee reported 17 shelters and 59 temporary shelters active, assisting 25,931 people while mobile health units and security forces were deployed across affected provinces.

Published number
25,931 peoplepeople in activated shelters and temporary shelters, 2016-04-2259 shelters temporary shelters activated, 2016-04-22
Mechanism
written

DPWH national infrastructure delivery and transparency portal

The Philippine Department of Public Works and Highways' live transparency portal records 209,419 completed contracts and 997 terminated contracts out of 258,645 contracts from 2016 to 2026, against ₱6.4 trillion of listed investment.

Published number
209,419 contractscompleted dpwh contracts, 2026997 contracts terminated dpwh contracts, 2026
Mechanism
written

Kuala Lumpur–Singapore high-speed rail, terminated before construction

Malaysia allowed the bilateral Kuala Lumpur–Singapore high-speed rail agreement to terminate on 31 December 2020 and paid Singapore SGD102,815,576 in March 2021 for verified costs incurred on the project and for extending its suspension.

Published number
102,815,576 Singapore dollarscompensation paid after hsr agreement termination, 2021-03-29
Mechanism
written

PromptPay national instant-payment rail

Thailand's central bank and commercial-bank network have run PromptPay as a shared instant-payment rail since 2016; by December 2024, 87.5 million proxy numbers were registered and average daily volume reached 66.4 million transactions, with a one-day peak of 89.2 million in September.

Published number
87,500,000 registered numberspromptpay registered proxy numbers, 2024-1266,400,000 transactions per day average daily promptpay transactions, 2024
Source
Bank of Thailand, Annual Report 2024official statistical, retrieved 2026-08-31
Mechanism
written

Rodzina 500+ and 800+ child-benefit delivery

Poland's ZUS-administered child-benefit system has paid support since 2016 and moved applications and payments online; by November 2023, the government reported nearly seven million children reached and almost PLN255 billion transferred, before the monthly benefit rose from 500 to 800 złoty in January 2024.

Published number
7,000,000 children (nearly)children reached by rodzina 500+ since launch, 2023-11255,000,000,000 Polish złoty (nearly) support transferred through the programme since launch, 2023-11
Mechanism
written
2016IrelandBuildingLarge project deliveryoperating below its peak

New Children's Hospital cost escalation

Ireland's New Children's Hospital project saw its approved budget rise from €1.73 billion to €2.24 billion by February 2024 after an independent review recorded €450 million of earlier escalation and weaknesses in set-up, planning, execution and governance.

Published number
2,240,000,000 euroscurrent approved budget for the hospital project and programme, 2024-021,730,000,000 euros previously approved budget, 2022
Mechanism
written

MAS FinTech Regulatory Sandbox variants

Singapore's Monetary Authority operates three FinTech Regulatory Sandbox variants—Sandbox, Sandbox Express and Sandbox Plus—giving firms distinct routes to test regulated products with real customers under defined safeguards.

Published number
3 sandbox variantsmas fintech regulatory sandbox variants, 2022
Mechanism
written

Singapore's national ICT-skills measurement and baseline

Singapore's Department of Statistics ICT-skills table reports 99.0% in the total row for residents aged 16–74 in 2025, while 55.2% could use a basic arithmetic formula in a spreadsheet; the government uses the series to track SDG 4.4.1 and its Digital Skills for Life framework.

Published number
99 % of residents aged 16-74residents with an ict skill in the total row, 202555.2 % of residents aged 16-74 basic spreadsheet arithmetic skill, 2025
Mechanism
written

Unified Payments Interface, the bank-and-app network

NPCI's UPI rail connected 731 live banks and settled 22,716.07 million transactions worth ₹28,92,138.67 crore in June 2026 through participating banks and payment apps.

Published number
22,716,070,000 transactionsupi transactions settled in the month, 2026-06731 banks banks live on upi, 2026-06
Source
National Payments Corporation of India, UPI Product Statisticsofficial statistical, retrieved 2026-09-02
Mechanism
written

Government of Rwanda and Zipline drone delivery network

From 2016 the Government of Rwanda contracted Zipline to fly blood and later other medical products to health facilities, and by 2024 the Rwanda Biomedical Centre reported deliveries to 624 sites across 27 districts and over 12,000 packages in a single month.

Published number
624 sites across 27 districtsdelivery sites served by drone, 202412,000 packages per month (lower bound) packages delivered in a single month, 2024
Mechanism
written

Empresa Energía Honduras loss-reduction partnership, and its reversal

Honduras's state utility ENEE awarded Empresa Energía Honduras a public-private partnership contract in December 2015, with service starting in 2016, to run national distribution and cut technical and non-technical losses by 17%. Distribution losses fell from 33.38% to 27.11% by February 2018, rose to 35.37% by December 2020 and stood at 30.77% in December 2021. The state intervened the contract and took distribution back when it ended in August 2023.

Published number
30.77 % of energyelectricity distribution losses, december 2021 (technical and non-technical), 2021-1227.11 % of energy lowest distribution losses under the partnership (february 2018), the gain that was lost, 2018-02
Mechanism
written

Aeropuerto Internacional de Palmerola

Honduras's Infrastructure Secretariat concessioned the Palmerola international airport to Palmerola International Airport S.A., with a USD 87.1 million reference investment. Works began on 5 December 2016 and operations on 11 December 2021, about 60 months after works began, against a 61-month contracted works period (start of operation is not necessarily completion of works).

Published number
60 monthsmonths from start of works (2016-12-05) to start of operation (2021-12-11), computed, 2021-1261 months contracted works execution period, 2016
Mechanism
written

Foresight Centre at the Riigikogu (Arenguseire Keskus)

Estonia's parliament set up a statutory Foresight Centre within the Chancellery of the Riigikogu under the Foresight Act of 2016. In 2025 the centre published four research-direction reports and 17 short reports, drawing on more than 30 researchers and experts.

Published number
4 reportsresearch-direction reports published by the foresight centre, 202517 reports short reports (lühiraportid) published by the foresight centre, 2025
Mechanism
written

Grand Paris Express

The Société du Grand Paris, the state's public builder, renamed Société des grands projets by the law of 27 December 2023, has been building the Grand Paris Express automatic metro since works began in June 2016. The project's estimated total cost rose from 22.6 billion euros in March 2013 to 36.1 billion euros from October 2021, about 60 percent above the 2013 estimate.

Published number
36.1 billion EURupdated total cost estimate of the grand paris express, 2021-1022.6 billion EUR (2012 euros) cost estimate of the grand paris express when the route was set, 2013-03
Mechanism
written

ADGM RegLab, the first fintech sandbox in the region

The Financial Services Regulatory Authority of Abu Dhabi Global Market opened its RegLab fintech sandbox to applications on 2 November 2016 and by August 2019 had admitted 32 firms from 83 applications from 20 countries, of which two had graduated to the live market.

Published number
32 firmsfintech firms admitted to the adgm reglab since may 2017, 2019-08-252 firms reglab firms graduated and deployed into the marketplace, 2019-08-25
Mechanism
written
2016BoliviaBuildingLarge project deliveryoperating below its peak

El Mutún steel complex, inaugurated in 2025 and found never to have operated

Bolivia's Empresa Siderúrgica del Mutún, whose turnkey contract with Sinosteel was awarded in 2016 and whose complex the President inaugurated in February 2025, reported in its 2026 initial accountability review that the project stood at 92% physical progress against 100% accumulated financial execution, that its own supervision found the complex had never entered operation, and that it had served notice of intent to terminate the contract in January 2026.

Published number
92 %physical progress of the mutún steel project, 2026 (initial accountability review)100 % accumulated financial execution of the eximbank and treasury financed contract, 2026 (initial accountability review)
Mechanism
written

Bank Negara Malaysia Fintech Regulatory Sandbox

Bank Negara Malaysia has operated a fintech regulatory sandbox since October 2016 and added an accelerated Green Lane for financial institutions in February 2024; as of June 2026 it reported 139 Standard and Green Lane applications submitted to date and five solutions in live testing.

Published number
5 countsolutions currently in testing in the sandbox, 2026-06139 count standard and green lane applications submitted since 2016, 2026-06
Source
Bank Negara Malaysia, Regulatory Sandbox page (Activities in the Sandbox)official statistical, retrieved 2026-10-01
Mechanism
written

Bank of Thailand regulatory sandbox

The Bank of Thailand, which opened a fintech regulatory sandbox in late 2016, listed 10 sandbox project tracks as of April 2026, whose participant counts sum to 90, from QR payment (14) and biometrics (19) to letters of guarantee (18), the National Digital ID (12) and programmable payment.

Published number
10 sandbox project tracksproject tracks listed under the bank of thailand regulatory sandbox, 2026-0490 participants participants summed across the listed sandbox project tracks, 2026-04
Source
Bank of Thailand, Regulatory Sandbox pageofficial statistical, retrieved 2026-10-01
Mechanism
written

CSA Regulatory Sandbox, succeeded by the Financial Innovation Hub

Canada's provincial securities regulators, acting jointly as the Canadian Securities Administrators, authorised 13 firms through the CSA Regulatory Sandbox between 2016 and 2021, before it was succeeded by the CSA Financial Innovation Hub and its decision list stopped being updated in December 2023.

Published number
13 firmsfirms listed as authorised in the former csa regulatory sandbox, 2023-12-18
Mechanism
written

FID crisis response transfers, including Fiavota

Madagascar's Fonds d'Intervention pour le Developpement turned its safety net project into a shock-response channel from December 2016, delivering crisis-response unconditional cash transfers to 622,961 people and crisis cash-for-work to 155,649 people after droughts in the South and the 2022 cyclones, by the project's close in October 2024.

Published number
622,961 peoplepeople who benefited from crisis response unconditional cash transfers, 2024-10155,649 people people who benefited from cash-for-work under the crisis response mechanism, 2024-10
Mechanism
written

Earthquake housing reconstruction programme (National Reconstruction Authority)

After the April 2015 Gorkha earthquake, Nepal's National Reconstruction Authority ran an owner-driven housing grant programme that, by 23 September 2021, had paid the third and final tranche of the reconstruction grant to 704,341 of 866,207 eligible households across 32 districts, with the World Bank-financed share revised to 309,335 houses.

Published number
704,341 householdseligible beneficiary households that had received the third tranche of the housing reconstruction grant, 2021-09-23309,335 houses houses whose safer reconstruction was supported by the ida-financed earthquake housing reconstruction project, final revised count, 2023-05
Mechanism
written
2016ZambiaBuildingLarge project deliveryoperating below its peak

Solar powered milling plants contract, and its erosion

Zambia's government contracted Shandong Dejian Group for a fixed-price US$200 million national programme of solar powered milling plants, financed in 2016 and due 24 months after the March 2016 deposit. The Auditor General found it still incomplete at 31 March 2022, 38 months after the scheduled completion date, and found 555 of the completed plants non-functional at audit in January 2024.

Published number
555 plantssolar powered milling plants found non-functional at audit, January 20241,583 units units contracted (1,553 solar powered milling plants plus 30 solar powered rice mills), 2016
Mechanism
written

SPID, the public digital identity issued by accredited private providers

Italy's Agency for Digital Italy runs SPID, the public digital identity system in which accredited identity providers, private firms such as Aruba, InfoCert, Namirial and Register alongside state-controlled Poste Italiane and public companies such as Lepida and InfoCamere, issue the credentials under agreements with the agency, and by 8 October 2025 41 million SPID identities had been issued, when the agency extended the providers' agreements to 2027.

Published number
41,000,000 identitiesspid digital identities issued, 2025-10-0855,000,000 cards electronic identity cards (cie) issued, the state-only alternative (of which 9 million cie credentials activated), 2025-10-08
Mechanism
written

D4/R7 Bratislava bypass PPP

Slovakia built the D4 motorway and R7 expressway around Bratislava, 59.0 km at EUR 1,670 million, as a public-private partnership between 2016 and 2021, the only PPP among the major road projects the Supreme Audit Office listed in its 2025 audit of road investment.

Published number
59 kmlength of the d4/r7 ppp project, 20211,670 EUR million cost of the d4/r7 ppp project as listed by the audit office, 2025
Mechanism
written

Rail Baltica in Latvia, and its cost and schedule overrun

The Latvian State Audit Office found in June 2024 that the estimated construction cost of Rail Baltica's main line in Latvia had risen sevenfold since 2017 to about 8.7 billion euros, that design work due by the end of 2021 was only 54 percent complete and now planned to finish by the end of 2027, and that the Riga Central Station works contracted in 2019 at 430 million euros had risen to 565 million euros.

Published number
8.7 billion euros (about)estimated construction cost of the rail baltica main line, latvian section, 2024-0654 % share of main line design work completed, against an original deadline of end 2021, 2024-06
Mechanism
written

Reconstruction after the 2016 and 2017 Central Italy earthquakes

Italy's Extraordinary Commissioner for reconstruction after the 2016 Central Italy earthquakes reported that by 31 May 2026 private reconstruction had received 36,149 grant applications for 17.82 billion euros, approved 24,650, granted 12.59 billion and paid 7.99 billion, and that 14,968 of 23,361 authorised building sites had been completed across the 138 municipalities of the crater.

Published number
14,968 building sitesprivate reconstruction building sites completed (cantieri conclusi), 2026-05-3123,361 building sites private reconstruction building sites authorised (cantieri autorizzati), 2026-05-31
Mechanism
written

Road Sector Development Project on the M-03 and M-12, and its cut scope

Ukraine's road agency Ukravtodor rehabilitated or upgraded 156.3 km of the M-03 Kyiv to Kharkiv and M-12 corridors under a US$560 million loan approved in November 2015, after slow progress led the government in 2017 to cancel US$222.2 million of the loan, dropping three M-03 bypasses and two long-term maintenance contracts, so the loan closed at US$337.8 million in September 2022, nine months after its original date.

Published number
337.8 million US dollarsloan amount after cancellation, fully disbursed, 2022-09-30560 million US dollars original loan amount at approval, 2015-11-03
Mechanism
written

M6 Minsk to Grodno transit corridor upgrade

Belarus's Ministry of Transport and Communications widened 154 km of the M6 Minsk to Grodno highway to dual carriageway under a loan approved in December 2014, against 86 km planned, after civil works for the planned sections were awarded for less than half the estimate; the corridor component cost US$242.15 million against US$259.28 million at entry, and the loan closed in June 2022 against an original June 2020.

Published number
154 kmlength of single carriageway reconstructed and widened to dual carriageway, 2022-06-1586 km length planned at entry, 2014-12-19
Mechanism
written

Local Roads Improvement Project, and its halved scope

Moldova's State Roads Administration upgraded 149.3 km of unpaved local roads to paved standard under a project approved in October 2015, after unit costs doubled from US$230,000 to about US$415,000 per km and contracts on 42.3 km were terminated, so a 2019 restructuring cut the target from 300 km to 150 km and the project closed in July 2023 instead of March 2021.

Published number
149.3 kmrural roads rehabilitated, 2023-07-31300 km rural roads to be rehabilitated, target at appraisal, 2015-10-30
Mechanism
written

East-West Highway Corridor Improvement Project (Rikoti Pass sections)

Georgia's Roads Department completed most civil works on the Zemo Osiauri to Chumateleti and Chumateleti to Khevi sections of the East-West Highway across the Rikoti Pass by the project's closing on 30 June 2025, four and a half years after the original loan closing date of 31 December 2020, and the government's own financing rose to US$91.03 million against US$44 million planned for the enlarged project (US$24 million at approval plus US$20 million under the 2017 additional financing).

Published number
91.03 million US dollarsborrower co-financing actually disbursed, 2025-06-3044 million US dollars borrower co-financing planned, parent project (us$24 million) plus 2017 additional financing (us$20 million), my sum of table 2, 2017-12
Mechanism
written

City Rail Link, Auckland, and its cost and time overrun

City Rail Link Limited, owned by the Crown and Auckland Council, achieved practical completion of Auckland's 3.45 km underground City Rail Link on 30 June 2026 against a target delivery cost of NZ$5,493 million, up from a NZ$3.4 billion estimate made in 2014, and the line opened to the public on 13 September 2026, after its company had planned completion for late 2024.

Published number
5,493 million NZ dollarstarget delivery cost in the project delivery agreement, 2026-06-303,400 million NZ dollars project cost estimate made in 2014, 2014
Source
City Rail Link Limited, Annual Report 2025/26 (accessible Word version)official statistical, retrieved 2026-10-02
Mechanism
written

Work permits for Syrian refugees under the Jordan Compact, and the end of the fee waiver

After the February 2016 London conference, Jordan's Ministry of Labour opened formal work permits to Syrian refugees and waived their fees. Annual permits issued rose from 36,788 in 2016 to a peak of 90,152 in 2023. In July 2024 the waiver was not extended for flexible or employer-sponsored permits, and issuance fell to 54,586 in 2024.

Published number
54,586 permits per yearwork permits issued to syrian refugees in jordan, 202490,152 permits per year work permits issued to syrian refugees in jordan at the 2023 peak, 2023
Mechanism
written

SkillsFuture Credit

Singapore gave every citizen aged 25 and over an individual training account in 2016 and keeps topping it up, and in 2024 260,000 Singaporeans spent credit on courses, up 35 percent on the year before.

Published number
260,000 peoplesingaporeans who used skillsfuture credit in the year, 2024
Mechanism
written

Programmatic Approach to Nitrogen, and the permitting reversal

The Netherlands operated the Programmatic Approach to Nitrogen (PAS) from July 2015 until the Council of State invalidated its legal basis in May 2019; by the end of 2023, 2,557 affected PAS reporters had sought permits and only 115 had a recorded solution.

Published number
2,557 reportspas reporters seeking a permit after the legal reversal, 2023115 reports pas reporters with a recorded solution, 2023
Source
Netherlands Court of Audit, 2023 accountability audit for LNVofficial statistical, retrieved 2026-08-31
Mechanism
written

SECOP II, a transaction platform for public procurement

Since March 2015, Colombia Compra Eficiente has used SECOP II to move public contracting from publication to online transactions; in 2024 the platform managed COP117.642 trillion, 84.4% of the value managed across the three SECOP platforms.

Published number
117,642,419,358,639 Colombian pesosvalue managed through secop ii, 202484.4 % of value managed secop ii share of value managed across secop platforms, 2024
Source
Colombia Compra Eficiente, 2024 institutional management reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Metrobús, an unfinished bus rapid transit project

Paraguay's planned Asunción Metrobús corridor ended with an incomplete and unviable works package: in April 2024 the Public Prosecutor's Office said the state had paid certificates for works that did not meet the programme's purpose and alleged a G.180.03 billion patrimonial loss.

Published number
180,030,528,699 Paraguayan guaraniespatrimonial harm alleged in the metrobús prosecution, 2024-04
Source
Paraguay Public Prosecutor's Office, Metrobús prosecution noticeofficial statistical, retrieved 2026-08-31
Mechanism
written

ARSAT-3 satellite programme suspended before launch

Argentina's government review found that the ARSAT-3 construction programme, approved in 2015 with a 2019 launch plan, was suspended in 2016–17; the unbuilt satellite forced two later orbital-protection operations and left the original nationwide broadband objective undelivered.

Published number
1 satellitethird satellite left unbuilt after programme suspension, 20212 operations orbital-protection operations needed after suspension, 2018–2020
Source
Argentina Secretariat of Public Innovation, 2020–2021 management reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Palapa Ring national fibre network

Indonesia delivered the three-package Palapa Ring fibre network to connect 57 kabupaten/kota; the communications ministry reported average utilisation of 54.35% in 2024, with the western, central and eastern packages carrying different loads.

Published number
54.35 % of network capacityaverage palapa ring utilisation, 202457 districts and cities kabupaten/kota connected by palapa ring, 2024
Source
Ministry of Communication and Digital, Strategic Plan 2025-2029official statistical, retrieved 2026-08-31
Mechanism
written

Trans-Sumatra toll-road programme, still short of its planned network

Indonesia's public-works ministry reported in January 2024 that the Trans-Sumatra toll-road programme had 596 kilometres operating against a 2,749-kilometre planned network, with another 361 kilometres under construction and later phases still in planning.

Published number
596 kilometrestrans-sumatra toll road operating, 2024-012,749 kilometres trans-sumatra toll-road network planned, 2024-01
Source
Badan Pengatur Jalan Tol, Ministry of Public Works and Housingofficial statistical, retrieved 2026-08-31
Mechanism
written

MRT Putrajaya Line

Malaysia completed and opened the 57.7-kilometre MRT Putrajaya Line in two phases, with 36 operational stations serving a corridor of about two million people; full operations began on 16 March 2023.

Published number
57.7 kilometresputrajaya line length, 202336 stations operational putrajaya line stations, 2023
Source
Mass Rapid Transit Corporation Malaysia, Putrajaya Line project pageofficial statistical, retrieved 2026-08-31
Mechanism
written

mObywatel digital ID wallet

Poland made the mDowód digital identity document in the mObywatel app legally equivalent to the physical identity card inside Poland; the Ministry of Digital Affairs reports that eight million people use the document, which can also support PESEL blocking and other public-service interactions.

Published number
8,000,000 peoplepeople using the mdowód digital identity document, 2026-081 nationally recognised digital identity document legal status of mdowód inside poland, 2026-08
Source
Polish Ministry of Digital Affairs, mObywatel usage updateofficial statistical, retrieved 2026-08-31
Mechanism
written

MyGovID single sign-on for public services

Ireland built MyGovID as a reusable online identity for welfare, tax, transport, education and childcare services; the 2025 Digital Decade country report records more than 2.7 million verified accounts in December 2024, close to 65% of adults.

Published number
2,700,000 accounts (over)verified mygovid accounts, 2024-1265 % of adults (close to) verified accounts as share of adults, 2024-12
Source
European Commission, Digital Decade 2025 Ireland country reportinternational organization, retrieved 2026-08-31
Mechanism
written

Sistema Nacional de Emergencias 911

Honduras's Sistema Nacional de Emergencias 911 coordinated and attended 762,601 of 788,573 emergency tickets in 2024, reporting 96.71% efficacy through five regional coordination centres.

Published number
96.71 % of emergency tickets coordinated and attendedemergency-ticket coordination and attendance efficacy, 2024762,601 tickets emergency tickets coordinated and attended, 2024
Source
Sistema Nacional de Emergencias 911 de Honduras, Memoria Anual 2024official statistical, retrieved 2026-08-31
Mechanism
written

Compte personnel de formation

France's Compte personnel de formation generated 1,387,500 training starts in 2024, with 1,232,100 people entering a CPF-funded course through the national account and platform.

Published number
1,387,500 training startscpf-funded training starts, 20241,232,100 people people entering cpf-funded training, 2024
Mechanism
written

Puntos México Conectado, national digital learning centres

Mexico's communications ministry operated Puntos México Conectado centres in all 32 states, reporting more than 410,000 enrolled members and over 260,000 course enrolments by June 2017.

Published number
410,000 memberspunto méxico conectado enrolled members, 2017-06260,000 enrolments course enrolments reported by the network, 2017-06
Mechanism
written

Tel Aviv light rail Red Line

Israel's government approved the Red Line in December 2010 at an estimated NIS 10.7 billion, and NTA, the state-owned company delivering it, began the main construction works in 2015. By October 2021 the cost estimate had reached NIS 18.71 billion, about 75% above the original, and the completion date had been postponed six times, by about five years in total. The 24 km line opened in August 2023, and in December 2025 the State Comptroller put its construction cost at NIS 18.8 billion.

Published number
75 % overrunincrease in the red line cost estimate over the december 2010 government estimate of nis 10.7 billion, 2021-105 years cumulative postponement of the red line completion date across six postponements, 2021-10
Mechanism
written

Modjo-Hawassa expressway, World Bank-financed Lot 3

The Ethiopian Roads Administration built the 57.4 km Batu/Zeway-Arsi Negele section (Lot 3) of the 202 km Modjo-Hawassa expressway under a project that became effective in 2015. The civil works were substantially complete by mid-2026, but only after cumulative extensions of 57 months to the project's closing date.

Published number
57 monthscumulative extension of the project closing date, 2026-0657.4 km expressway constructed on lot 3 (asphalt concrete completed), 2026-02-25
Mechanism
written

Gasoducto Sur Peruano, a terminated pipeline concession

Peru's Gasoducto Sur Peruano concession, signed in July 2014 for a US$7.328 billion gas pipeline due in commercial operation by March 2019, stood at 37.32% overall progress against 76.49% scheduled in December 2016, according to the energy regulator Osinergmin, and the Ministry of Energy and Mines terminated the concession in January 2017 after the consortium failed to reach financial close.

Published number
37.32 % completeactual overall project progress, 2016-12-2576.49 % complete scheduled overall project progress at the same date, 2016-12-25
Mechanism
written

Program 35.000 MW power generation programme, and its schedule slip

Indonesia's Ministry of Energy and Mineral Resources launched the 35,000 MW generation programme in May 2015 to be completed by 2019; by December 2022, 415 units with 16,596 MW, 47 percent of the programme, had reached commercial operation.

Published number
16,596 MW (47 percent of 35,000 MW)capacity at commercial operation, share of the 35,000 mw programme, 2022-1235,000 MW original programme target completed by 2019, 2019 target, restated by the minister on 2018-03-06
Mechanism
written

Catastrophe risk insurance through CCRIF

Nicaragua's Ministry of Finance joined the CCRIF regional catastrophe insurance pool in 2015, renewed every year to at least 2021, raised its cyclone cover ahead of the 2020 season, and received five payouts totalling US$32.25 million, including US$30.6 million after hurricanes Eta and Iota.

Published number
32.25 million USDccrif payouts received since joining, 2015 to 202130.6 million USD payouts after hurricanes eta and iota, 2020-11
Source
World Bank, Results Brief on the Nicaragua Catastrophe Risk Insurance Projectinternational organization, retrieved 2026-10-01
Mechanism
written

Community Education and Training colleges, and their erosion

South Africa's Department of Higher Education and Training merged the public adult learning centres into nine Community Education and Training colleges on 1 April 2015; the colleges enrolled 273,431 people in 2016 and 120,081 in 2023, against a National Development Plan target of one million by 2030.

Published number
120,081 studentsstudents enrolled in public cet colleges, 2023273,431 students students enrolled in public cet colleges in the first year after the merger reported by dhet, 2016
Mechanism
written

Samuel De Champlain Bridge corridor

Infrastructure Canada delivered the Samuel De Champlain Bridge corridor in Montreal as a public-private partnership signed in 2015, opening the bridge in July 2019 against a contractual in-service date of December 1, 2018, at a total project cost the department reports as C$4.2 billion, after a C$235 million settlement in 2018 that paid for delay-recovery measures and oversized-part transport issues.

Published number
4,200,000,000 Canadian dollarstotal cost of the project as reported by the department, 2019235,000,000 Canadian dollars settlement paid to the private partner for delay recovery and oversized-part transport, 2018-04
Mechanism
written

National PPP programme and project library, and its dismantling

China's Ministry of Finance ran a national government and social capital cooperation (PPP) programme under the 2015 State Council guidance, whose management library held 10,332 projects with 16.6 trillion yuan of investment by the end of October 2022; in November 2023 the State Council ended the 2015 regime for every project not yet procured and replaced it with a concession-only, user-fee mechanism that bars availability payments.

Published number
10,332 projectsprojects in the national ppp management library, cumulative, 2022-101,695 projects projects removed from the library in the 2017-2018 clean-up, 2018-04-23
Mechanism
written

Experimenten Elektriciteitswet 2015-2018, and its erosion

The Dutch economy ministry let energy cooperatives and owners' associations deviate from the Electricity Act 1998 through 19 exemptions granted in four rounds between 2015 and 2018, then closed the scheme to new entrants; by 2024 only 10 of the experiments were operational.

Published number
10 experimentsexperiments operational under the exemption scheme, 202419 exemptions exemptions granted 2015 to 2018 (peak), 2018
Mechanism
written

Public-Private Research Network (PPRN) matching grants

Malaysia's Ministry of Higher Education approved 680 Public-Private Research Network projects involving 634 companies by the end of 2022, with a total allocation of RM27.7 million, and 469 of them had closed as successfully completed.

Published number
680 projectspprn projects approved, cumulative, 2022634 companies companies involved in approved pprn projects, cumulative, 2022
Mechanism
written

KMA earthquake early warning service

The Korea Meteorological Administration expanded the national seismic network from 195 stations when its earthquake early warning service started in January 2015 to 550 stations, and by May 2026 issued early warnings within 5 to 10 seconds of first detection.

Published number
550 stationsseismic observation stations in the national network, 2026-05195 stations seismic observation stations when the early warning service started, 2015-01
Mechanism
written

Plan Nacional de Relocalizaciones, moving households out of flood-prone land

Uruguay's national housing directorate relocated 2,618 households from flood-prone or contaminated land between 2015 and 2020 under the Plan Nacional de Relocalizaciones and related agreements with departmental governments, against a target of 3,500 to 6,000 households by 2025.

Published number
2,618 householdshouseholds relocated (cumulative), 20202,245 households households relocated (cumulative, previous reported value), 2019
Mechanism
written

Takaful and Karama cash transfer programme

Egypt's Ministry of Social Solidarity launched the Takaful and Karama cash transfers in early 2015 and expanded coverage from an initial 1.5 million to 4.675 million households (about 17 million people) by project close in 2024, revising the eligibility threshold and adding top-ups in response to COVID-19 and later inflation, while the cash transfer budget rose from EGP 3.5 billion in 2015 to EGP 41 billion in 2024.

Published number
4.675 million householdshouseholds receiving takaful and karama cash transfers, 2023-1241 EGP billion, nominal budget allocation for cash transfers in 2024 (from egp 3.5 billion in 2015), 2024
Mechanism
written

Renewable energy feed-in tariff programme and Benban

Egypt's Ministry of Electricity and Renewable Energy took private sector-owned renewable generation from 0 MW in October 2015 to 1,500 MW at financial closure by the end of FY2017/18 under its feed-in tariff programme, with about US$2 billion of private investment, much of it in the Benban solar park.

Published number
1,500 MWprivate sector-owned renewable energy capacity reaching financial closure, FY2017/18 (reported at June 2019)
Mechanism
written

Emergency Operation for Development, reconstruction of areas affected by terroristic operations

From September 2015 Iraqi ministries, governorates and the Reconstruction Fund for Areas Affected by Terroristic Operations used two World Bank loans totalling US$750 million (IBRD-85200, US$350 million, and IBRD-87930, US$400 million), of which US$610 million was disbursed by 30 November 2024, to rebuild water, power, roads, bridges and railway in five governorates, reaching 5 million direct beneficiaries by March 2024, with the first loan's closing date pushed six years past the original June 2020.

Published number
5,000,000 peopledirect project beneficiaries, 2024-0372 months extension of the first loan's closing date beyond the original (30 june 2020 to 30 june 2026), computed, 2025-01
Mechanism
written

Fuel subsidy removal, and its erosion

Angola's government removed gasoline and diesel subsidies by raising retail prices at the end of 2015, but subsidies returned as costs rose, reaching 3.7 percent of GDP in 2023 from 1.5 percent in 2019. A second reform raised gasoline prices 87.5 percent in June 2023, but the kwanza's depreciation took the gasoline subsidy from 39 percent of the market price in June back to 65 percent by October 2023.

Published number
65 % of market pricegasoline subsidy as a share of the market price, after depreciation, 2023-1039 % of market price gasoline subsidy as a share of the market price, after the june 2023 price rise, 2023-06
Mechanism
written

Decommissioning of the Bohunice V1 nuclear power plant, and its four-year slip

Slovakia's state decommissioning company JAVYS, which the European Court of Auditors reported in 2016 as holding the Bohunice V1 decommissioning end date at 2025 with a cost estimate of 1,239 million euros, reported in its 2025 annual report that the final decontamination and demolition contract signed on 18 December 2024 runs 60 months, putting the end of decommissioning at the end of 2029, at a total estimated cost of 1,220 million euros, with 66 decommissioning projects completed by 31 December 2025.

Published number
1,220 million eurostotal estimated cost of decommissioning bohunice v1, 2025-12-312029 year expected year of completion of the whole v1 decommissioning process, against 2025 in the plan the eca reviewed in 2016, 2025-12-31
Mechanism
written

Agence Nationale de Lutte contre l'Analphabetisme literacy and post-literacy programmes

Morocco's national literacy agency (ANLCA) and its partners registered 763,744 adults in literacy programmes in 2023-2024, 570,507 at level 1 literacy and 193,237 in post-literacy, with about 81 percent of level 1 registrants women and 62 percent rural.

Published number
763,744 registrantsregistrants in literacy programmes (level 1 literacy plus level 2 post-literacy), 2023-2024 programme year570,507 registrants registrants in level 1 literacy programme (alpha) only, 2023-2024 programme year
Mechanism
written

Utility-scale renewable power through direct proposals and IPP rounds, and the stop after 2021

Jordan's Ministry of Energy and Mineral Resources added utility-scale solar and wind plants selling to the grid every year from 2015 to 2021, mostly private projects under direct proposals and competitive rounds, peaking at 345 MWac commissioned in 2020, and then added none: its annual reports put grid-selling renewable capacity at 1,498 MW in 2022 and 2023 and 1,478 MW in 2024.

Published number
0 MW (stock 1,498 MW in 2022 and 2023, 1,478 MW in 2024)utility-scale renewable capacity selling to the grid added from 2022 to 2024 (computed from the reported stock), 2024345 MWac utility-scale renewable capacity added in 2020, the peak year, 2020
Source
Ministry of Energy and Mineral Resources of Jordan, Annual Report 2024official statistical, retrieved 2026-10-02
Mechanism
written

National and local PPP and concession contracts

By the end of 2025 Kazakhstan's central and local governments had signed 1,257 PPP and concession contracts worth 3.6 trillion tenge, of which 697 were in implementation, 1,240 were local projects mostly in social services, health, education, energy and utilities, and 17 national projects accounted for more than 1.8 trillion tenge.

Published number
1,257 contractsppp and concession contracts signed, cumulative, 2025697 projects ppp and concession projects in implementation, 2025
Mechanism
written

NL-Alert, a tested multi-channel emergency warning system

The Netherlands tests NL-Alert twice a year and, in the 1 December 2025 national test, 92 percent of residents aged 12 and over said they received the message on their mobile phone; 90 percent received it only on that channel and 2 percent received it on mobile plus public digital signs.

Published number
92 % of residents aged 12+residents receiving the nl-alert test message, 2025-1290 % of residents aged 12+ residents receiving the message only on mobile, 2025-12
Source
Ministry of Justice and Security, NL-Alert test-message reach measurementofficial statistical, retrieved 2026-08-31
Mechanism
written

Mi Teleférico urban cable-car network

Bolivia's Mi Teleférico network carried 78,715,401 passenger trips in 2024; its management report compared that result with a 97.7 million annual volume required for budget balance, or roughly 80% of the target while the system remained in service.

Published number
78,715,401 tripspassenger trips on the mi teleférico network, 202497,700,000 trips annual passenger volume required for budget balance, 2024 target
Source
Mi Teleférico, 2024 management reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Jaminan Kesehatan Nasional, a near-universal health-insurance pool

Indonesia's Jaminan Kesehatan Nasional (JKN) health-insurance system had 275,413,133 registered participants, 97.50% of the population, by 31 July 2024; 219,263,970 participants were active.

Published number
275,413,133 peoplejkn registered participants, 2024-07-31219,263,970 people jkn active participants, 2024-07-31
Source
Dewan Jaminan Sosial Nasional, Monthly Report Monitoring JKNofficial statistical, retrieved 2026-08-31
Mechanism
written

InaRISK national disaster-risk information platform

Indonesia's disaster agency runs InaRISK as an open, integrated risk-management platform; its 2024 national dashboard covered about 7,100 kecamatan and combined BNPB, geospatial, statistical, health and education data for exposure and risk mapping.

Published number
7,100 subdistrictssubdistricts covered in the national inarisk dashboard, 2024
Source
Badan Nasional Penanggulangan Bencana, InaRISK national platformofficial statistical, retrieved 2026-08-31
Mechanism
written

Cl@ve shared digital identity

Spain built Cl@ve as a common public-sector platform for identification, authentication and electronic signatures; the Spanish Tax Agency reported 20.867 million taxpayer identifiers enrolled in Cl@ve Móvil by 31 December 2024, including 12.323 million citizens active in the app.

Published number
20,867,000 identifierstaxpayer identifiers enrolled in cl@ve móvil, 2024-12-3112,323,156 citizens citizens active in the cl@ve app, 2024-12-31
Source
Agencia Estatal de Administración Tributaria, 2024 annual reportofficial statistical, retrieved 2026-08-31
Mechanism
written

National 9-1-1 emergency-response system

The Dominican Republic expanded its National 9-1-1 Emergency and Security System to 27 provinces by July 2026, covering 94.64% of the population, or more than 9.6 million people.

Published number
94.64 % of populationpopulation covered by the national 9-1-1 system, 2026-07-0427 provinces provinces integrated into the 9-1-1 system, 2026-07-04
Mechanism
written

ICURe, from university research to spinouts

UK Research and Innovation's ICURe impact report says spinout companies from the programme secured £326 million in investment funding and created more than 1,400 jobs from 2014 onward, after research teams were trained and funded to test markets before deciding whether to spin out.

Published number
326,000,000 GBPinvestment secured by icure spinouts, 20241,400 jobs jobs created by icure spinouts, 2024
Source
UK Research and Innovation, ICURe impact reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Chave Móvel Digital and Portugal's digital identity layer

Portugal's digital-government platform reported 4.4 million active Chave Móvel Digital credentials and 141 million authentications by 23 October 2025, with 490 entities using Autenticação.gov.

Published number
4,400,000 active digital identitiesactive chave móvel digital credentials, 2025-10-23141,000,000 authentications authentications through autenticação.gov, 2025-10-23
Source
Portugal Digital / ARTE, Identidade Digital statisticsofficial statistical, retrieved 2026-08-31
Mechanism
written

MeerKAT radio telescope, a delivered national research facility

South Africa's National Research Foundation and SARAO completed the 64-dish MeerKAT radio telescope in March 2018 on schedule and on budget, then began science operations as a precursor to the Square Kilometre Array.

Published number
64 dishesmeerkat dishes completed, 2018-03
Source
South African Radio Astronomy Observatory, National Research Foundationofficial statistical, retrieved 2026-09-02
Mechanism
written

PROSPERA, and its replacement by a new scholarship authority

Mexico abolished the 2014 decree creating PROSPERA on 31 May 2019 and ordered its people, assets and budget to transfer to the new Benito Juárez scholarship coordination within 90 days.

Published number
90 dayslegal transition window for prospera assets and staff, 2019-05-311 decree prospera founding decree abrogated, 2019-05-31
Source
Diario Oficial de la Federación, Government of Mexicoofficial statistical, retrieved 2026-09-02
Mechanism
written

New International Airport of Mexico, and its cancellation

Mexico cancelled the partially built Texcoco airport after construction and contracts had begun; the government's 2019 cancellation paper estimated a 100 billion peso cancellation cost, including 60 billion pesos already spent and 40 billion in non-recoverable commitments.

Published number
100,000,000,000 Mexican pesosgovernment estimate of cancellation cost, 2019-04-2660,000,000,000 Mexican pesos construction expenditure already incurred at cancellation, 2019-04-26
Source
Grupo Aeroportuario de la Ciudad de México, Government of Mexicoofficial statistical, retrieved 2026-09-02
Mechanism
written

Standard Gauge Railway, Mombasa to Naivasha

Kenya Railways began building the Standard Gauge Railway in financial year 2014/15, completed the 472 km Mombasa to Nairobi Phase I in 2017, and opened the 120 km Phase 2A to Naivasha in September 2019 against a September 2017 start and an 18-month plan, about six months late; the line hauled 7.33 million tonnes of freight in 2025.

Published number
18 monthsplanned construction period of sgr phase 2a (sept 2017 start, ksh 155.5 billion), against which the line opened in september 2019, about six months (a third) late, 20177,332 thousand tonnes freight hauled on the sgr, 2025
Source
Kenya National Bureau of Statistics, Economic Survey 2018official statistical, retrieved 2026-10-01
Mechanism
written

Nigeria's 2014 Ebola containment

After an infected traveller brought Ebola virus into Lagos on 20 July 2014, Nigeria's government set up an emergency operations centre with WHO country office support, traced contacts in Lagos and Port Harcourt, and held the outbreak to 19 cases and 7 deaths before WHO declared the country free of transmission on 20 October 2014.

Published number
19 casesebola cases in the nigerian outbreak, 2014-10-207 deaths ebola deaths in the nigerian outbreak, 2014-10-20
Mechanism
written

Talara refinery modernisation, delivered late and over cost

Petroperú's Talara Refinery Modernisation Project, begun with the May 2014 EPC contract, reached full operation in 2023 after Peru's Contraloría found its estimated investment had risen from US$1.3 billion to more than US$5 billion by October 2020, about 400%, and a cumulative schedule slippage of more than three years in the project's execution schedule, traced to the auxiliary-units contracting.

Published number
400 % increaseincrease in estimated investment from feasibility estimate (us$1.3bn) to october 2020 (over us$5bn), 2020-103 years (more than) cumulative schedule slippage, auxiliary units and complementary works, 2021-09-09
Mechanism
written

Doctorados Industriales (State Research Agency industrial doctorates)

Spain's State Research Agency funds four-year contracts for doctoral candidates employed in firms and other entities to write a thesis on an industrial research or experimental development project; in the 2024-2 call, resolved in October 2025, it awarded 65 grants worth 7.6 million euros.

Published number
65 grantsindustrial doctorate grants awarded, call din 2024-2, 2025-107,600,000 euros funding awarded, call din 2024-2, 2025-10
Mechanism
written

Noor-Ouarzazate solar complex

Morocco's solar agency MASEN had the Noor-Ouarzazate I, II and III concentrated solar plants (510 MW) built, grid-connected and fully operational by October 2018, at a completed capital cost of US$1,962 million, about 7 percent below the appraisal estimate of US$2,093 million. Noor II and III then generated an average of 739 GWh a year in 2019 to 2023, against the 1,144 GWh expected at appraisal.

Published number
1,962 US$ millioncompleted capital cost of the noor-ouarzazate complex (appraisal estimate us$2,093 million), 2024739 GWh per year average annual generation of noor-ouarzazate ii and iii, against 1,144 gwh expected at appraisal, 2019-2023
Mechanism
written

Urban Water Supply Project (PEMU), part of the Kabala programme for Bamako

Mali's water assets company SOMAPEP-SA built the reservoirs, transmission mains and 1,016 km of distribution networks that brought water services to 803,000 people in Bamako and six other towns, alongside the Kabala treatment plant that came into service in June 2019. Of the US$130 million approved, US$119.6 million was spent, and the project closed in December 2022 against an original closing date of December 2018.

Published number
119.57 million US$actual project cost disbursed at closing, 31 Dec 2022130 million US$ approved project cost, original 2013 credit plus 2016 additional financing, 2016
Mechanism
written

Collaborative Research and Innovation Grant Scheme (CRIGS)

The Mauritius Research and Innovation Council's Collaborative Research and Innovation Grant Scheme, which co-funds projects led by a local company with a local academic or research institution, had completed 17 projects and had 14 more under way as at 30 June 2020, with 61.5 million rupees of private contribution to the completed ones.

Published number
17 projectscrigs projects completed (project value rs 115.9 m, private sector contribution rs 61.5 m, mric amount rs 53.4 m), cumulative to 30 June 202014 projects crigs projects ongoing (project value rs 102.18 m, private sector contribution rs 57.22 m), 30 June 2020
Mechanism
written

Mali's 2014 Ebola containment

After Mali confirmed an imported Ebola case on 23 October 2014 and a second, unrecognised imported case started a chain of seven further cases in a Bamako clinic, the government with WHO and partners identified and followed 433 contacts for 21 days, set up a hotline receiving about 6,000 calls a day, built isolation and treatment facilities, and ended monitoring of the last contacts on 15 December 2014.

Published number
433 contactscontacts identified and followed up for the 21-day incubation period, 2014-12-156,000 calls per day calls per day to the ebola telephone hotline (approximate), 2014-11
Mechanism
written

Public vocational training centres of the National Agency for Employment and Skills

Albania's National Agency for Employment and Skills (AKPA) registered 11,250 trainees in 2021 in vocational courses at its ten regional public vocational training directorates, 7,052 of them on free places for registered jobseekers and other priority groups by the bulletin's text, after 15,143 in 2019 and 7,427 in the pandemic year 2020.

Published number
11,250 traineestrainees registered in public vocational training centres (drofpp) during the year, 20217,052 trainees of whom on free places (registered unemployed jobseekers and priority groups), 2021
Mechanism
written

Proiect de transfer la operatorul economic (PTE) research-to-firm transfer grants

Romania's research funding agency UEFISCDI accepted 35 firm-led projects with research organisation partners for funding in the 2024 PTE (transfer to the economic operator) competition, plus one more on a second list, after 47 in the 2021 competition.

Published number
35 projectspte 2024 projects on the list accepted for funding, PTE 2024 competition47 projects pte 2021 projects on the list accepted for funding, PTE 2021 competition
Mechanism
written

Kicevo to Ohrid motorway, and its cost and time overrun

North Macedonia's Public Enterprise for State Roads contracted Sinohydro in November 2013 to build the 56.7 km Kicevo to Ohrid section of motorway A2 for EUR411 million by January 2018; by December 2021 five annexes had moved completion to December 2023 and raised the contract value by EUR187 million (45 percent) to EUR598 million, and the State Audit Office found works 72 percent complete by value in August 2023.

Published number
598 million euroscontract value after annexes, 2021-12411 million euros contract value at signing (contracted completion january 2018), 2013-11
Mechanism
written

Recovery from the May 2014 floods: power supply and flood defences

After the May 2014 floods evacuated about 32,000 people and flooded the Kolubara open-pit mines that fuel 40 percent of Serbia's generating capacity, the state utility EPS dewatered the Tamnava West mine by the first quarter of 2015 and kept supply at pre-flood levels with no recorded shortages, and the Directorate of Water Management rebuilt or upgraded 71 km of flood protection that by October 2019 covered 24,944 households against a target of 9,000.

Published number
24,944 householdshouseholds receiving improved flood protection, 2019-1071 km length of flood protection works reconstructed or rehabilitated, 2019-10
Mechanism
written

Floods Emergency Recovery Project after the May 2014 floods

After the May 2014 floods displaced about 90,000 people and directly affected about a million in Bosnia and Herzegovina, the two entities' agriculture and water ministries and Brcko District distributed US$27 million of emergency goods and restored 446 public service facilities to pre-flood condition against a target of 200, including more than 260 km of rural roads and 53,460 m of flood defences, by the project's June 2019 closing.

Published number
446 facilitiespublic service infrastructure facilities recovered to pre-flood condition, 2019-06-30200 facilities target for facilities recovered, 2014-06-30
Mechanism
written

Roshydromet modernization: accuracy of hazard warnings to emergency agencies

Russia's federal hydrometeorological service Roshydromet raised the accuracy of its warnings on hazardous hydrometeorological events delivered to regional emergency agencies from 81 to 83 percent to 91 percent, and of its warnings on natural hazards from 88 to 95.8 percent, between 2014 and the end of 2022 under its second national modernization project.

Published number
91 %accuracy of warnings on hazardous hydromet events delivered to regional emergency agencies (wmo standards), 2022-12-3195.8 % accuracy of warnings on natural hazards, perfect warnings as share of warnings issued (baseline 88 percent in 2014), 2022-12-31
Mechanism
written

Central Ring Road around Moscow (TsKAD), audited by the Accounts Chamber

Russia's Accounts Chamber found in June 2020 that the state company Avtodor's Central Ring Road project, whose first stage was originally to be built in 2014 to 2018 and was now scheduled for 2014 to 2021, had risen in cost by 2.6 billion roubles in 2019 to 315.9 billion roubles, and that launch complexes 1 and 5 were only 49 and 61 percent complete on 1 January 2020.

Published number
315.9 billion roublesproject cost after the 2019 increase, 201949 % technical readiness of launch complex no. 1, 2020-01-01
Mechanism
written

EMBRAPII, industry-led applied research

Created in 2013, EMBRAPII funds industrial research that companies contract with accredited public and private research units, and it contracted a record 811 new projects in 2025, 25.35% more than in 2024.

Published number
811 projectsnew projects contracted in the year, 2025
Mechanism
written

National Police, one corps from twenty-five regional forces

On 1 January 2013 the Netherlands merged 25 autonomous regional police corps and the national KLPD into one organisation with ten regional units, a national unit and a shared Police Services Centre, centralising specialist capacity while retaining local teams.

Published number
10 regional unitsregional units after national police reform, 201325 regional corps regional corps replaced by the national police, 2012
Source
Dutch police, history of the national police organisationofficial statistical, retrieved 2026-08-31
Mechanism
written

4G road concessions, a national infrastructure portfolio

By September 2024, Colombia's 4G road programme comprised 30 concessions at 86.99% aggregate progress, with 14 in operation, 13 under construction, two in pre-construction and one in early termination.

Published number
30 concessions4g road concessions in the national portfolio, 2024-0986.99 % aggregate progress aggregate progress of 4g road programme, 2024-09
Source
Agencia Nacional de Infraestructura (ANI), 2024 accountability reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Metro de Quito, a cross-administration urban rail delivery

Quito opened the first line of its metro in December 2023 after a multi-administration build, and the operator reported more than 54 million passenger trips during 2024 with uninterrupted service.

Published number
54,000,000 tripspassenger trips in the first full year, 202423 % above projection reported demand above projection, 2024
Source
Empresa Pública Metropolitana Metro de Quito, 2024 accountability reportofficial statistical, retrieved 2026-08-31
Mechanism
written
2013BoliviaBuildingLarge project deliveryoperating below its peak

Industrial lithium carbonate plant below design capacity

Bolivia's state lithium company doubled lithium-carbonate output to 2,064 tonnes in 2024 after its industrial plant began operating, but the Ministry of Economy reported that technical problems with evaporation ponds and the water-treatment plant kept production below the project's projected capacity of 15,000 tonnes a year.

Published number
2,064 metric tonneslithium carbonate produced, 202415,000 metric tonnes projected annual plant capacity, 2024
Source
Bolivia Ministry of Economy and Public Finance, Economic Bulletin 2024official statistical, retrieved 2026-08-31
Mechanism
written

Typhoon Yolanda shelter and recovery programme

After Typhoon Yolanda, the Philippines' recovery programme had provided shelter assistance to about 1.14 million families by September 2016; the National Housing Authority had completed 29,661 permanent units while 102,240 more were under construction across six regions, 14 provinces and 115 cities and municipalities.

Published number
1,140,000 familiesfamilies receiving emergency shelter assistance, 2016-0929,661 units permanent housing units completed, 2016-09
Mechanism
written

Civil-court clearance and the CEPEJ monitoring series

The CEPEJ Portugal country fiche records a 96.1% clearance rate for civil and commercial litigious cases at first instance in 2023, alongside 101.1% at second instance and 105.5% at the Supreme Court; first-instance disposition time was 267 days.

Published number
96.1 % of incoming casesfirst-instance civil and commercial clearance rate, 2023267 days first-instance disposition time, 2023
Source
European Commission for the Efficiency of Justice (CEPEJ), Portugal country ficheinternational organization, retrieved 2026-09-02
Mechanism
written

Gauteng e-tolls, and their cancellation after public resistance

South Africa operated Gauteng's e-toll system from December 2013 until the government withdrew the toll declaration effective 11 April 2024, ending urban e-toll charging after roughly 10.4 years.

Published number
10.36 yearsyears of e-toll collection before cancellation, 2024-04-11
Source
Department of Transport, Government of South Africaofficial statistical, retrieved 2026-09-02
Mechanism
written

National cholera elimination drive, and the return of cholera

After Haiti's Ministry of Public Health (MSPP) and water directorate DINEPA launched the National Plan for the Elimination of Cholera in 2013, the country reported no confirmed cholera case from January 2019 to January 2022, but transmission returned in October 2022 and the MSPP epidemiology directorate had reported 76,675 suspected cases in all 10 departments by 18 December 2023.

Published number
76,675 suspected cases (cumulative)suspected cholera cases reported since the october 2022 re-emergence, 2023-12-183 years consecutive years with no confirmed cholera case before re-emergence, 2019-01 to 2022-01
Mechanism
written

Punta Catalina thermoelectric plant, and its cost overrun

The Dominican state electricity holding CDEEE awarded the Punta Catalina coal plant in November 2013 and agreed a final contract price of US$1,945.0 million after the award, including the unloading port; after construction delays and a March 2020 dispute settlement with the contractor, the value carried into the plant's 2022 public trust was US$2,340.54 million, about 20 percent above the contract price.

Published number
2,340.54 US$ millionvalue of punta catalina stated in the 2022 public-trust contract, per the epc contract and the march 2020 dispute settlement, 2020-03-031,945 US$ million epc contract price finally agreed after award, including the unloading port, 2013
Mechanism
written

Plan France Très Haut Débit

Under the Plan France Très Haut Débit, defined by the government in February 2013, private operators and local-authority public initiative networks built fibre so that 43.1 million of France's 45.2 million premises, 95.3 percent, were connectable to fibre at the end of June 2026.

Published number
43,100,000 premisespremises connectable to fibre to the home, 2026-06-30970,000 premises premises still to be made connectable in public initiative network zones, 2026-06-30
Mechanism
written
2013UruguayBuildingLarge project deliveryoperating below its peak

Línea Rivera rail rehabilitation, and its decay

Uruguay's transport ministry signed a FOCEM-funded contract in November 2013 to rehabilitate 422 km of the Pintado to Rivera line within 36 months, cut the scope to the 310 km between Paso de los Toros and Rivera in January 2017, took the last provisional handover in May 2019, and by June 2025 reported the line in a degraded state with freight limited to 10 to 25 km/h against its set maximum of 40 km/h and no freight carried in recent years.

Published number
10 km/hlowest freight speed under the line's standing speed restrictions, 2025-0640 km/h maximum freight speed set for the rehabilitated rivera line, 2025-06
Mechanism
written

Tuaspring desalination partnership, and its collapse

PUB contracted Hyflux's Tuaspring Pte Ltd under a water purchase agreement for Singapore's largest desalination plant, opened in 2013, then terminated the agreement on 17 April 2019 after the operator failed to keep the plant reliably operational, took the plant into public ownership in May 2019 and spent around $80 million on repairs due for completion in mid-2021.

Published number
80 million SGDpub repair cost after taking over the failed partnership plant, 2021-02
Mechanism
written

SFI Research Centres programme

Science Foundation Ireland funded a network of 16 university-based research centres from 2013, whose cumulative SFI investment of €684 million was matched by €638 million of industry commitment by 2021 (Annual Report 2021), and which by the end of 2022 had signed 1,426 collaborative research agreements with 688 companies, 366 of them in Ireland.

Published number
1,426 agreementscumulative collaborative research agreements signed by sfi research centres with companies, end of 2022688 companies companies party to those agreements, end of 2022
Source
Science Foundation Ireland, Annual Report 2022official statistical, retrieved 2026-10-01
Mechanism
written

Pap-Angren railway and Kamchik tunnel

Uzbekistan's government and its state railway UTY began building the 124 km Pap-Angren line with a 19 km tunnel in mid-2013 and finished the works within nine months of the World Bank loan's 2015 effectiveness, with the main infrastructure costing US$1,475.68 million against an estimate of US$1,438.75 million, about 2.6 percent over, and benefits flowing about 18 months earlier than appraisal assumed.

Published number
1,475.68 US$ millionactual cost of railway main infrastructure (line and tunnel), 2020 (project close)1,438.75 US$ million original estimated cost of railway main infrastructure, 2015 (appraisal)
Mechanism
written

Karuma Hydropower Project

Uganda began building the 600 MW Karuma hydropower station in August 2013 against a 60-month plan. By the end of June 2023 the Auditor General reported it 54 months late at 99.9 percent physical progress, and UEGCL records commercial operation from 12 June 2024.

Published number
54 monthsschedule overrun of karuma hpp at the end of fy2022/23 (actual duration 114 months against a 60-month plan), 2023-0660 months planned construction duration of karuma hpp, 2013
Mechanism
written

Funding for Growth Scheme (Novekedesi Hitelprogram), central bank refinancing lent by commercial banks

Hungary's central bank refinanced commercial banks at zero interest on condition that they lent to small and medium firms at a capped margin under the Funding for Growth Scheme, and across its phases from June 2013 to 2022 some 75 thousand enterprises received about HUF 6,400 billion of loans, more than half of them investment loans.

Published number
75,000 enterprises (some)enterprises that gained access to fgs loans across all phases, 2013-20226,400 HUF billion (approximately) loans granted under all fgs phases, 2013-2022
Mechanism
written

Chisinau International Airport concession, and its rescission in 2020

Moldova's Public Property Agency concessioned the assets of Chisinau International Airport and its land to Avia Invest under contract 4/03 of 30 August 2013, with investment obligations of EUR 244 million over the life of the concession, and in 2020 notified the concessionaire that the contract was rescinded for failing to post the performance guarantee, while Avia Invest claimed EUR 900 million from the state at arbitration in Stockholm.

Published number
244 million EURtotal investment the concessionaire was to make over the life of the concession, 2013-08-30900 million EUR damages avia invest claimed from the state at arbitration in stockholm, 2020-07-22
Mechanism
written

Modernizace dálnice D1 (D1 motorway modernisation, Mirošovice to Kývalka)

Czechia's Road and Motorway Directorate (ŘSD) rebuilt 160.8 km of the D1 motorway between Mirošovice and Kývalka in 20 sections from April 2013, reopening the last sections in October 2021, three years later than the 2012 schedule, with costs projected at CZK 29.844 billion including the Šmejkalka bridge against CZK 28.208 billion planned.

Published number
3 yearsslip in reopening the whole modernised motorway, measured against the 2012 schedule, August 2021 schedule update, audited to November 202229.844 CZK billion, including VAT, nominal projected total cost including the šmejkalka bridge, against czk 28.208 billion in the 2012 investment plan, 31 May 2022
Mechanism
written

Defence against the June 2013 Danube flood

During the June 2013 Danube flood, which crested at a record 891 cm in Budapest, the government declared an emergency and Hungary's national disaster management directorate ran six days of intensive defence along 807.4 km of levees; of 206,000 people the flood directly endangered, 1,570 had to be evacuated.

Published number
206,000 peoplepeople directly endangered by the flood, 2013-061,570 people people evacuated, 2013-06
Mechanism
written

Belarusian nuclear power plant (BelAES), delivered behind schedule

Belarus started building its first nuclear power plant at Ostrovets in November 2013, a two-unit WWER-1200 plant totalling 2,400 MW. Its regulator's 2019 report scheduled unit 1 for 2019 and unit 2 for 2020. Unit 1 was commissioned in 2021 and unit 2 in October 2023, three years after the 2019 schedule.

Published number
2023 yearyear power unit no. 2 entered commercial operation, 2023-102020 year year power unit no. 2 was scheduled for commissioning in the 2019 national report, 2019
Mechanism
written

SRI electronic invoicing at economy-wide scale

Ecuador's tax authority received approximately 3.299 billion electronic receipts from January through December 2024, using a legally mandated, digitally signed rail that connects private taxpayers to the public tax system.

Published number
3,299,680,838 receiptselectronic receipts received by sri, 2024
Source
Servicio de Rentas Internas, 2024 accountability reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Vaca Muerta unconventional energy build-out

Argentina's energy ministry reported that Vaca Muerta supplied 54.9% of national oil output and 50.1% of national gas output in December 2024, within a year in which national oil production reached its highest level since 2003 and gas its highest since 2006.

Published number
54.9 %vaca muerta share of national oil production, 2024-1250.1 % vaca muerta share of national gas production, 2024-12
Source
Argentina Secretariat of Energy, 2024 hydrocarbon production reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Swish mobile instant payments

Sweden's six-bank-owned Getswish consortium built Swish into a national mobile payment rail: in 2023 it served just over 8.7 million private users and about 335,000 merchant or business users, processing approximately 977 million payments worth SEK 480 billion.

Published number
977,000,000 paymentsswish payments, 20238,700,000 users (over) swish private users, 2023
Source
Sveriges Riksbank, The Swedish Financial Market 2024official statistical, retrieved 2026-08-31
Mechanism
written

Portugal Ventures, a public venture-capital bridge

Portugal Ventures, the public venture-capital company in the Banco Português de Fomento group, reports €233.2 million invested in 256 new companies since 2012 and €283 million under management.

Published number
233,200,000 EUR investedinvested since launch, 2026-08-31256 companies new companies backed since launch, 2026-08-31
Source
Portugal Ventures, institutional performance figuresofficial statistical, retrieved 2026-08-31
Mechanism
written

Labour Market Intelligence Programme and forward skills planning

South Africa's Department of Higher Education and Training ran a Labour Market Intelligence Programme from 2012, published the fifth iteration of its national occupations-in-high-demand list by April 2024, and identified 138 occupations for the emerging hydrogen-economy value chain.

Published number
5 iterationsnational occupations-in-high-demand list iterations, 2024-04-16138 occupations occupations identified for the hydrogen-economy value chain, 2024-04-16
Source
Department of Higher Education and Training, Government of South Africaofficial statistical, retrieved 2026-09-02
Mechanism
written

Hokuriku Shinkansen Kanazawa to Tsuruga extension, and its overrun

Japan's Railway Construction, Transport and Technology Agency built the 125 km Kanazawa to Tsuruga extension of the Hokuriku Shinkansen from 2012; its authorised cost rose from 1.1858 trillion yen in 2017 to 1.6779 trillion yen after a second increase of 265.8 billion yen in March 2021, completion slipped one year to the end of fiscal 2023, and the line opened on 16 March 2024.

Published number
16,779 100 million yen (oku-yen)authorised project cost after the march 2021 revision, 2021-032,658 100 million yen (oku-yen) cost increase approved in the march 2021 revision, 2021-03
Source
Board of Audit of Japan, fiscal 2020 audit report, chapter 4 item 11official statistical, retrieved 2026-10-01
Mechanism
written

Senate Commission on Future Challenges, Science, Technology and Innovation

Chile's Senate created the Commission on Future Challenges, Science, Technology and Innovation in April 2012, modelled on Finland's Committee for the Future, with the Academy of Sciences, National Prize winners and university rectors as permanent members; by July 2024 more than 700 scientists had worked in more than 20 of its expert tables.

Published number
700 scientistsscientists who worked in the commission's expert tables (lower bound, as stated), 2024-07-0220 expert tables expert tables convened by the commission (lower bound, as stated), 2024-07-02
Mechanism
written

Manufacturing USA innovation institutes

In fiscal 2023 the 16 reporting Manufacturing USA institutes, public-private consortia sponsored by the Departments of Commerce, Defense and Energy, managed 929 applied research and development projects and held 2,921 memberships, 655 of them universities, community colleges and other academic members alongside 1,315 small and 493 large manufacturers.

Published number
929 projectsongoing applied research and development projects across the institutes, FY 2023655 memberships academic members (universities, community colleges, etc.) of the institutes, FY 2023
Mechanism
written

Tarbela Fourth Extension Hydropower Project

WAPDA built a 1,410 MW powerhouse on Tarbela Dam's fourth tunnel, effective April 2012 and commissioned in 2018; the World Bank recorded it as completed on time and below its estimated cost, with a capital cost expected at US$749 million.

Published number
749 US$ millionexpected capital cost of t4hp, physical works and supervision excluding interest during construction, 2019-0921,000 GWh electricity generated since commissioning, 2023-09
Mechanism
written

Energy Sector Support Project (substations and distribution lines)

Malawi's electricity utility ESCOM completed and energised all 10 substations and seven of nine planned distribution lines under the Energy Sector Support Project approved in 2011, closing on 15 October 2018 against an original closing date of 30 October 2016, having disbursed US$72.1 million of US$84.7 million.

Published number
10 substationssubstations completed, energised and loaded, 2018-107 lines distribution lines completed out of nine planned, 2018-10
Mechanism
written

Centra kompetence, the Technology Agency's competence centres programme 2012 to 2019

The Technology Agency of the Czech Republic funded 34 competence centres under its Centra kompetence programme from 2012, joining 334 participants, 115 research organisations, 118 SMEs and 101 large firms, against a planned 31 centres and 248 participants.

Published number
34 centresprojects (centres) supported, realised against the programme's planned 31 (table 2), 2015-06-30334 participants supported participants in total (115 research organisations, 118 smes, 101 large enterprises), table 2, 2015-06-30
Mechanism
written

Inočekiai LT, innovation vouchers for SMEs to buy research services from universities and institutes

Lithuania's Agency for Science, Innovation and Technology (MITA) funded 815 innovation-voucher projects in three calls from 2012 to 2014, in which small firms bought applied research, experimental development or feasibility services from universities and research institutes, and 776 of them were completed successfully.

Published number
815 projectsinočekiai lt projects funded across three calls, 2012 to 2014, 2012 to 2014776 projects projects completed successfully, 2015
Mechanism
written
2012LebanonBuildingLarge project deliveryoperating below its peak

Greater Beirut Water Supply Project (Awali to Beirut conveyor), and its unfinished delivery

Lebanon's Council for Development and Reconstruction and the Beirut Mount Lebanon Water Establishment built most of a system to bring 250,000 cubic metres a day from the Awali to 1.2 million people in Greater Beirut, but when the World Bank loan closed on 30 April 2025, 106 months after the original June 2016 closing date, no additional water had been delivered, the 24/7 supply reached in a 20,000-customer pilot zone in 2018 had not been maintained, and component costs had risen from US$370 million at approval to US$561.7 million.

Published number
0 customerscustomers in the achrafieh pilot zone receiving 24/7 water supply at closing, 2025-04-3020,000 customers customers in the achrafieh pilot zone receiving 24/7 water supply when the target was reached, 2018
Mechanism
written

Adult and community education at tertiary providers, and its halving

New Zealand's adult and community education (ACE) delivered by universities, polytechnics, wānanga and private training establishments enrolled 23,610 domestic students in 2021, down from 49,365 in 2012, according to the Ministry of Education's Education Counts tables.

Published number
23,610 studentsdomestic students in adult and community education, all tertiary sub-sectors (table ace.3), 202149,365 students same count, first year of the published series, 2012
Mechanism
written

Lae Port Development Project (Lae Tidal Basin, phase 1)

Papua New Guinea's Independent Public Business Corporation, using ADB and OPEC Fund loans, built the first phase of the Lae tidal basin, a new berth and container terminal at the port of Lae, between April 2012 and December 2014. It was about four years later than planned and cost $310.4 million, against a $154 million project at the 2007 approval.

Published number
310.4 USD milliontotal project cost at completion, Project completion report 2017, validated December 20174 years, approximately delay in completing the civil works against the appraisal schedule, December 2014 completion, validated December 2017
Mechanism
written

Victims' reparations, a long-running administrative response to conflict

In 2024 Colombia's Unidad para las Víctimas ordered 307,619 administrative indemnifications benefiting 285,537 victims, approved 79 collective reparation plans and closed three plans for communities affected by the armed conflict.

Published number
307,619 indemnificationsadministrative indemnifications ordered, 2024285,537 victims victims benefiting from administrative indemnifications, 2024
Source
Unidad para las Víctimas, 2024 accountability reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Fondo Adaptación, recovery and safer resettlement after La Niña

After the 2010–11 La Niña floods, Colombia's Fondo Adaptación had advanced resettlement, reconstruction and improvement for more than 39,000 households by its 2021–23 evaluation, presenting the work as reducing climate exposure and fiscal risk.

Published number
39,000 householdshouseholds reached by fondo adaptación recovery and resettlement, 2023
Mechanism
written

Tōhoku reconstruction, a decade-long recovery programme

After the 2011 earthquake and tsunami, Japan completed the planned 29,654 public-housing units by December 2020, completed 18,226 higher-ground residential-land units, opened about 570 kilometres of reconstruction roads by December 2021 and restored all damaged railways by March 2020.

Published number
29,654 housing unitspublic-housing units completed in the reconstruction plan, 2020-12570 kilometres reconstruction roads opened to traffic, 2021-12
Source
Reconstruction Agency of Japan, progress to dateofficial statistical, retrieved 2026-08-31
Mechanism
written

Fukushima decommissioning roadmap, a 30–40-year risk-reduction horizon

After the 2011 Fukushima Daiichi accident, Japan adopted a government-led mid-and-long-term decommissioning roadmap and set completion at roughly 30–40 years after cold shutdown, treating the work as continuous risk reduction rather than a one-off rebuild.

Published number
30 yearslower bound of planned decommissioning horizon, 201140 years upper bound of planned decommissioning horizon, 2011
Mechanism
written

Gran Misión Vivienda Venezuela's five-million-home milestone

Venezuela's Gran Misión Vivienda Venezuela reported delivery of its five-millionth home on 7 June 2024, with the programme saying that community self-construction supplied 75% of its construction in the preceding four years.

Published number
5,000,000 homeshomes delivered by gran misión vivienda venezuela, 2024-06-0775 % of construction reported share of construction through self-construction, 2024-06-07
Mechanism
written

Routine immunization coverage, and its erosion

WHO and UNICEF estimated Haiti's national DTP3 routine-immunization coverage at 51% in 2022, down from 68% in 2011, while documenting vaccine and syringe stockouts and weak administrative reporting in the national programme.

Published number
51 % of children receiving three DTP dosesestimated dtp3 coverage, 202268 % of children receiving three DTP doses estimated dtp3 coverage at the start of the comparison, 2011
Mechanism
written

Renewable Energy Independent Power Producer Procurement Programme

South Africa's IPP Office reported 95 independent power producers operational with 7,335 MW online by 31 March 2025, alongside 9,618 MW procured from 116 projects at financial close and R292.2 billion attracted for energy infrastructure.

Published number
7,335 MWoperational ipp capacity, 2025-03-31292,200,000,000 South African rand investment attracted by projects at financial close, 2025-03-31
Mechanism
written

FATİH education technology infrastructure

Türkiye's Ministry of National Education reported that the FATİH project had installed 620,000 interactive classroom boards by 2023 and signed a five-year TÜRKSAT service contract covering about 2,000 schools.

Published number
620,000 boardsinteractive boards installed under fati̇h, 20232,000 schools schools covered by the continuing service contract, 2023
Source
Ministry of National Education, Government of Türkiyeofficial statistical, retrieved 2026-09-03
Mechanism
written

SINARAME national weather radar network

The national water resources secretariat contracted the state technology firm INVAP in 2011 to build Argentine weather radars, and by December 2024 the network operated 14 radars feeding an operations centre at the national weather service, after 11 had covered 40 percent of the territory together with three INTA radars in 2023.

Published number
14 radarsweather radars (rma) in the sinarame network, 2024-1240 % of territory share of national territory covered by 11 sinarame radars plus 3 inta radars, 2023-03
Mechanism
written

Springboard+ upskilling programme

Ireland's Higher Education Authority has run Springboard+ since 2011, funding free or heavily subsidised higher education places for unemployed people, returners and employed adults, with over €400 million spent and over 110,000 people benefiting by 2025, when 7,719 places were offered on 249 courses at 37 institutions.

Published number
110,000 people (lower bound, 'over')people who have benefited from springboard+ since 2011, cumulative, 20257,719 places springboard+ places offered in the 2025 call (offered, not taken up), 2025
Source
Higher Education Authority (Ireland), Springboard+ 2025 launchofficial statistical, retrieved 2026-10-01
Mechanism
written

NIBSS Instant Payment (NIP)

NIBSS Instant Payment, run since 2011 by the interbank settlement company jointly owned by the Central Bank of Nigeria and the banks, grew from 2 billion transactions in 2020 to 11 billion in 2024, with values rising from US$457 billion to US$1.1 trillion, and had 57.7 million unique users.

Published number
11,000,000,000 transactionsnip transactions in the year, 202457,700,000 users nip unique users (52 percent of adults), 2024
Mechanism
written

Framtidskommissionen, the Prime Minister's time-limited future commission

The Swedish government appointed Framtidskommissionen, chaired by Prime Minister Fredrik Reinfeldt, in November 2011 to identify the societal challenges Sweden faces in the longer term, and by its final report in March 2013 it had held eight meetings, organised 40 open meetings, seminars and workshops, published twelve background reports and an anthology, and carried out four sub-inquiries.

Published number
12 reportsbackground reports (underlagsrapporter) published by the commission, 2013-0340 events open meetings, seminars and workshops organised by the commission, 2013-03
Mechanism
written

Henri Konan Bédié toll bridge

The Ivorian government let a third Abidjan lagoon crossing as a toll-bridge concession to SOCOPRIM, the project company formed in 1997, whose investors include Bouygues Travaux Publics, after a 1996 tender. It funded initial works from October 2011 after the conflict. Private equity and loans, insured by MIGA guarantees of $145 million, built the 1.5 km bridge and 6.7 km road at a cost of about $282 million, and the bridge opened on 16 December 2014.

Published number
282 US$ millionapproximate construction cost of the bridge, 2014145 US$ million miga guarantees covering the private investment, 2015
Mechanism
written

Metolong Dam and Water Supply Programme

Lesotho's Metolong Authority built the Metolong Dam and raw water pump station near Maseru, starting impoundment on 15 February 2014 against a contract date of 31 October 2012 and delivering 93 megalitres a day on 8 October 2014 against a contract date of 1 July 2013, with every component of the programme overrunning its cost.

Published number
15.2 monthsdelay in reaching water delivery of 93 ml/day (contract date 1 july 2013, achieved 8 october 2014), 2014-10-0815.5 months delay in starting impoundment (contract date 31 october 2012, achieved 15 february 2014), 2014-02-15
Mechanism
written

Kompetences centri, the industry competence centres programme

Latvia's six industry competence centres, funded through the Investment and Development Agency with 53.2 million euros of ERDF money, had run 231 research projects involving 164 companies and 33 scientific partners by 31 December 2014, of which 78 were completed and 44 percent involved cooperation with scientific institutions.

Published number
231 research projectsresearch projects supported in the six competence centres (table 3, total), 2014-12-31164 companies industry partners in the six competence centres (table 3, total), 2014-12-31
Mechanism
written

Earthquake Commission Canterbury Home Repair Programme

New Zealand's Earthquake Commission had practically completed 66,252 home repairs under its Canterbury Home Repair Programme by 30 June 2015, after the 2010 and 2011 earthquakes damaged about 180,000 homes, missing the December 2014 completion target it had brought forward from December 2015, with about 8 to 10 percent of repairs needing additional work after completion.

Published number
66,252 repairsrepairs practically completed by the canterbury home repair programme, 2015-06-3040,000 homes (more than) homes repaired by june 2013, 2013-06
Mechanism
written

Electricity supply rebuilt on renewable sources

Uruguay rebuilt its electricity supply between 2010 and 2017 through public tenders and long-term contracts, and in 2025 fossil fuels produced 293 GWh of the 15,855 GWh generated, so 98.2 percent came from hydro, wind, biomass and solar.

Published number
98.2 % of generationrenewable share of electricity generation, 2025
Source
Ministry of Industry, Energy and Mining, national energy balanceofficial statistical, retrieved 2026-08-26
Mechanism
written

The Delta Programme and its fund

The Netherlands legislated a standing programme against flooding and fresh-water shortage, run by an independent Delta Commissioner and paid from a dedicated Delta Fund that expects 27.4 billion euros to be available through 2050.

Published number
27,400,000,000 eurosdelta fund resources available to 2050, 2025
Source
Delta Programme Commissioner, Delta Fundofficial statistical, retrieved 2026-08-27
Mechanism
written

Start-Up Chile, a public accelerator for global startups

Since 2010, Start-Up Chile has supported more than 2,500 startups from Chile and abroad through an equity-free public accelerator that connects founders with investors, mentors and corporates.

Published number
2,500 startups supportedstartups supported by start-up chile, 2026
Source
Start-Up Chile (CORFO), portfolioofficial statistical, retrieved 2026-08-31
Mechanism
written

27F reconstruction, a nationwide recovery programme after the 2010 earthquake

After the 2010 earthquake and tsunami, Chile's reconstruction programme repaired or replaced more than 223,000 homes across seven regions; MINVU reported 99.93% progress by February 2020 and changed protocols, seismic standards and risk-mitigation requirements.

Published number
223,000 homes repaired or replacedhomes repaired or replaced in 27f reconstruction, 202099.93 % of reconstruction programme reported progress of 27f reconstruction programme, 2020
Source
Ministry of Housing and Urbanism (MINVU), 27F reconstruction reportofficial statistical, retrieved 2026-08-31
Mechanism
written

REDCUDI childcare network and SINIRUBE referrals

Costa Rica's IMAS reported that its national Childcare and Early Development benefit reached 25,704 children in 2024 with an investment of ₡13.2 billion, while interinstitutional referrals used SINIRUBE to match eligible families to available places.

Published number
25,704 childrenchildren receiving the childcare and development benefit, 202413,200,000,000 Costa Rican colones social investment in the benefit, 2024
Mechanism
written

Metro de Panamá network operations

Panama's public metro network, inaugurated in 2014 and expanded with Line 2, transported 118,351,007 passengers in the twelve-month operating period reported in its 2024 institutional memory.

Published number
118,351,007 passengerspassengers transported in the reported year, 2023-11 to 2024-10321,519 passengers in one day peak daily passengers on line 1, 2024-04-30
Source
Metro de Panamá, Institutional Memory 2024official statistical, retrieved 2026-08-31
Mechanism
written

SUBE national electronic fare and subsidy rail

Argentina's SUBE system distributed more than five million cards and recorded about 6.7 million new cards in 2024, while expanding the network to more than 30,000 recharge points and making SUBE Digital available in every locality.

Published number
6,700,000 cardsnew sube cards in 2024, 202430,000 points sube recharge points, 2024
Source
Argentina Secretariat of Transport, SUBE 14-year system reportofficial statistical, retrieved 2026-08-31
Mechanism
written
2010VietnamBuildingLarge project deliveryoperating below its peak

Cat Linh–Ha Dong metro, a delayed and over-budget delivery

Vietnam's State Audit reported in 2019 that the Cat Linh–Ha Dong metro's approved investment had risen from VND8,700 billion to VND18,000 billion and that a line originally due in November 2013 was still unfinished after repeated schedule changes.

Published number
18,000 billion Vietnamese dongapproved investment after revision, 20198,700 billion Vietnamese dong original approved investment, 2009
Source
State Audit of Vietnam, findings reported by the Government News portalofficial statistical, retrieved 2026-08-31
Mechanism
written

Nya Karolinska Solna public–private hospital project

Stockholm delivered Nya Karolinska Solna through a 30-year public–private partnership: the official inquiry reports SEK 22.8 billion for construction and equipment, a projected SEK 57 billion total through 2040 including operation and maintenance, and an external comparison that found construction 53% more expensive per square metre than Scandinavian hospitals.

Published number
22,800,000,000 Swedish kronornya karolinska construction and equipment investment, 202053 % above Scandinavian comparison hospitals estimated construction cost premium per square metre, 2020
Mechanism
written

Lisbon–Madrid high-speed rail concession, formally abandoned

Portugal's 2011 Council of Ministers formally abandoned the previous Lisbon–Madrid high-speed rail project, replacing its passenger priority with a freight connection through Sines, Lisbon, Setúbal, Poceirão and Madrid.

Published number
1 projecthigh-speed rail projects formally abandoned, 2011-11-10
Source
Diário da República, Resolução do Conselho de Ministros n.º 45/2011official statistical, retrieved 2026-09-02
Mechanism
written

Barakah Nuclear Energy Plant

The UAE, through the Emirates Nuclear Energy Corporation and under licences from the Federal Authority for Nuclear Regulation issued from 2010, built four APR-1400 reactors at Barakah that ENEC reported in September 2024 were all in commercial operation and providing up to 25 percent of the UAE's electricity; Unit 1 entered commercial operation on 6 April 2021, about four years after the 2017 date the regulator recorded in its 2012 construction licence review.

Published number
25 % of UAE electricity (up to, as reported)share of uae electricity supplied by barakah, all four units operating, 20244 years (about) unit 1 commercial operation delay against the 2012 licensing plan (computed: april 2021 against a planned 2017), 2021
Mechanism
written

Integrated Functional Adult Education, and its erosion

Ethiopia's Ministry of Education rolled out Integrated Functional Adult Education nationally from 2010/11 and enrolled 6,903,065 adults in 2015/16, but its successor Adult Basic Education Program enrolled 1,392,635 adults in 2024/25, about a fifth of the peak.

Published number
1,392,635 adultsadults enrolled in the adult basic education program, 2024/256,903,065 adults adults enrolled in integrated functional adult education at the 2015/16 peak, 2015/16
Mechanism
written

Project 1956 vocational training for rural workers

Vietnam's General Department of Vocational Education reported that, by the end of 2019, about 9.6 million rural workers had received vocational training at various levels under the Prime Minister's Project 1956, 87.2% of its 11 million target, including 5.59 million whose elementary and under-three-month courses the project subsidised, 85.5% of a 6.54 million target for 2010 to 2020.

Published number
9,600,000 peoplerural workers who received vocational training at various levels, end 20195,590,000 people rural workers supported for elementary or under-three-month training under project 1956 policy, end 2019
Mechanism
written

National literacy campaigns, 2010-2015

Haiti's national literacy campaigns trained about 250,000 adults between 2010 and 2015, about 10 percent of the illiterate population, according to the education ministry's ten-year plan.

Published number
250,000 adults (approximate)adults trained in literacy campaigns, 2010-2015
Mechanism
written

Government Resolution 218 complex projects for high-tech production

Under Government Resolution 218 of 9 April 2010, Russia's Ministry of Science and Higher Education subsidised 41 joint firm-university complex projects in their R&D stage in 2024, from the 14th and 15th selection rounds. Federal funding was 2.708 billion rubles, and firms put in 4.14 billion rubles of their own (156 percent of the budget funds). The ministry reports 161 technologies developed and handed over to production by January 2025.

Published number
41 projectscomplex projects receiving state support in the year (14th and 15th selection rounds), 20244.14 billion rubles extrabudgetary funds raised from participating firms (156% of budget funds), 2024
Mechanism
written

Targeted Subsidy Reform cash transfer, and its erosion

Iran's government replaced universal fuel and bread subsidies with a universal cash transfer of 455,000 rials (about US$40) per person per month from late 2010, then left the transfer unindexed, so that by 2019 its purchasing power had fallen to less than US$6 per person before a top-up was added in late 2019.

Published number
6 US$ per person (upper bound)purchasing power of the per-person cash transfer, 2019 (published as 'less than'), 201940 US$ per person per month (about 455,000 rials) cash transfer per person per month at launch, 2010
Mechanism
written

Reseau Ferroviaire Rapide de Tunis, lines D and E, and its overruns

Tunisia's transport ministry and the Societe du RFR built the first two lines of the Tunis rapid rail network, about 18 km plus 28 trains, financed from December 2010; the EIB's approximate total cost for the same scheme rose from EUR 550 million at the 2009 appraisal to EUR 653 million at the 2017 appraisal, Line E opened in March 2023 and Line D on 25 January 2025, against a 2015 project study that scheduled construction of the Line E viaduct for 2014 to 2017.

Published number
653 million EURapproximate total cost of rfr lines d and e (eib appraisal, operation 2015-0288), 2017550 million EUR approximate total cost of rfr lines d and e (eib appraisal, operation 2009-0154), 2009
Mechanism
written

B6 Belle Rive to Quartier Militaire road upgrade

Mauritius's Ministry of Public Infrastructure upgraded the 12.1 km B6 Belle Rive to Quartier Militaire road under the World Bank Infrastructure Project approved in 2009, at a cost of US$33.88 million against an appraisal estimate of US$21.60 million, 157 percent of the estimate.

Published number
33.88 million US dollarscost of upgrading works on the belle rive to quartier militaire road, actual, 2014-1221.6 million US dollars cost of upgrading works, appraisal estimate, 2009
Mechanism
written

Decommissioning of the Ignalina nuclear power plant, and its delays

The European Court of Auditors found in 2016 that Lithuania's Ignalina nuclear power plant decommissioning had pushed its end date back by a further nine years since 2011 to 2038, that the interim spent fuel storage facility was ten years behind the 2005 decommissioning plan, and that the estimated decommissioning cost had risen 15 percent from 2,930 million euros in 2011 to 3,376 million in 2015, and 67 percent since the 2010 estimate.

Published number
3,376 million eurosestimated total cost of decommissioning ignalina, 20152,930 million euros estimated total cost of decommissioning ignalina, 2011
Mechanism
written

Corridor X motorway sections (E-75 and E-80)

Serbia's state road company Koridori Srbije built 45.5 km of Corridor X motorway on the E-75 towards North Macedonia and the E-80 Dimitrovgrad bypass towards Bulgaria under a loan approved in July 2009, finishing at a total project cost of EUR316.2 million against an appraisal estimate of EUR318.2 million, but taking about 10 years from approval to full completion against a planned 6.5, with the loan closing in September 2019 instead of December 2015.

Published number
316.2 million eurosfinal project cost including government counterpart funds, 2019-09318.2 million euros project cost estimated at appraisal, including contingencies, 2009-07
Mechanism
written

State Hydrometeorological Service severe weather warning upgrade

Moldova's State Hydrometeorological Service, with the emergency situations department, installed a Doppler radar by June 2014 and extended the lead time of severe weather warnings from 10 minutes to 1 hour at baseline to 3 to 6 hours by 2016, against an original target of 12 hours, under a project approved in August 2010 that closed in September 2016, two years late.

Published number
6 hourslead time for severe weather warnings, upper bound achieved, 2016-09-1512 hours lead time for severe weather warnings, original target, 2010-08-05
Mechanism
written

Hartha power station units 2 and 3 rehabilitation, and its halt

Iraq's Ministry of Electricity set out in 2007 to restore 400 MW at Hartha power station units 2 and 3 by December 2010 under the Emergency Electricity Reconstruction Project, but when the project closed on 30 June 2015 no capacity had been restored, the works were about 70 percent complete, the cost estimate had risen from US$150 million to US$187.62 million with a US$98.97 million financing gap, and the contractor withdrew from the site.

Published number
0 MWgenerating capacity of hartha units 2 and 3 restored at project close (target 400 mw), 2015-06-30187.62 million US dollars latest estimate of total project cost, against us$150 million at appraisal, 2015-06-30
Mechanism
written

North-South Road Corridor Investment Program, Tranche 1

Armenia's Ministry of Transport, Communication and Information Technologies reconstructed about 30 km of the M1 Yerevan to Ashtarak and M2 Yerevan to Artashat roads under the first tranche of the ADB-financed North-South Road Corridor programme for an implementation cost of US$68.70 million against US$68.0 million at appraisal, but completed the project on 16 June 2016 against a planned 31 December 2013, after one round of bids was rejected and the M1 section was cut from 18.4 km to about 10 km.

Published number
68.7 million US dollarstotal implementation cost, actual, 2018-02-2368 million US dollars total implementation cost at appraisal, 2009-09
Mechanism
written

National Road Rehabilitation (Osh-Batken-Isfana) Project

The Kyrgyz Ministry of Transport and Communications rehabilitated 50 km of the Osh-Batken-Isfana road corridor, against about 30 km planned at approval in 2009, for a total project cost of US$52.46 million against US$30.72 million estimated, over four years and ten months instead of three, closing on 31 December 2014 instead of 30 June 2013.

Published number
52.46 million US dollarstotal project cost, actual, with scope increased through two additional financings, 2014-12-3130.72 million US dollars total project cost at appraisal, for about 30 km, 2009
Mechanism
written

Ultra-Fast Broadband programme

The Crown's infrastructure investment company, now National Infrastructure Funding and Financing, co-funded a fibre network built and owned by Chorus, Northpower, Enable and Tuatahi First Fibre, which was completed in December 2022 covering 87 percent of the population in 412 towns and cities, with NZ$1.75 billion of government funding in a programme costing more than NZ$5.5 billion.

Published number
87 % of populationpopulation covered by the ufb fibre network at completion, 2022-121.75 billion NZ$ government funding invested in ufb since 2010, of a total cost exceeding nz$5.5 billion, 2025
Mechanism
written

Public Private Partnership Authority project portfolio

Bangladesh's Public Private Partnership Authority listed 81 projects in its portfolio as last updated on 19 August 2026, of which four were in operation (including Patenga Container Terminal, the NIKDU and Chittagong haemodialysis centres and two Info-Sarkar 3 rural broadband components), three were partly operating while still under construction (among them the Dhaka Elevated Expressway), and 10 were under construction.

Published number
7 of 81 portfolio projects (4 operational, 3 partial operation and construction)ppp projects in operation, fully or partly, 2026-08-1910 projects ppp projects under construction, 2026-08-19
Source
Public Private Partnership Authority Bangladesh, PPP projects listofficial statistical, retrieved 2026-10-02
Mechanism
written

Typhoon Ketsana road recovery under the Road Sector Project

Laos's Ministry of Public Works and Transport repaired about 1,100 km of roads, including small and wooden bridges, damaged by Typhoon Ketsana in September 2009 across five southern provinces, out of about 1,842 km the post-disaster assessment found damaged, through a recovery component budgeted at US$8.8 million, and in 2011 used the contingency fund the project created to spend US$3.63 million repairing 28.6 km of National Road 13 North after Typhoons Haima and Nock Ten.

Published number
1,100 kmketsana-damaged roads repaired and improved as per specifications, 2017-02-221,842 km roads severely or partially damaged by typhoon ketsana (post-disaster damage, loss and need assessment), 2009
Mechanism
written

Third Highway Project: M4 Baku-Shamakhi and M3 Yenikend-Shorsulu motorways

Azerbaijan's road administration upgraded 94 km of the M4 Baku-Shamakhi highway to a four-lane road and built 48 km of new M3 motorway under the World Bank-financed Third Highway Project, at US$2.47 million per km against US$2.96 million estimated at appraisal, with the loan closing in March 2021 instead of March 2015.

Published number
2.47 US$ million per kmactual cost per km of the upgraded m4 baku-shamakhi highway (appraisal estimate us$2.96 million per km), 202172 months slip of the actual loan closing date against the original closing date, 2021-03
Mechanism
written

Centre for Strategic Futures, foresight inside government

Singapore established the Centre for Strategic Futures in 2009 inside the Prime Minister's Office strategy system to study blind spots, run long-term futures research and develop foresight methods.

Published number
2009 yearyear the centre for strategic futures was established, 2009
Source
Centre for Strategic Futures, Who we areofficial statistical, retrieved 2026-08-30
Mechanism
written

Korea Internet and Security Agency, a consolidated digital authority

Korea established the Korea Internet and Security Agency in July 2009 by integrating three predecessor organisations, giving the country one public body for internet development, security and international information technology cooperation.

Published number
2009 yearyear the korea internet and security agency was established, 2009
Source
Korea Internet and Security Agency, historyofficial statistical, retrieved 2026-08-30
Mechanism
written

eHerkenning, a public-private business identity framework

The Netherlands developed eHerkenning with commercial identity providers so businesses could use one trusted login across public services; in 2024 the framework recorded 1,140,751 authentication means and 639 connected organisations.

Published number
1,140,751 meanseherkenning authentication means, 2024639 organisations connected organisations, 2024
Source
Logius, 2024 service figuresofficial statistical, retrieved 2026-08-31
Mechanism
written

Obras por Impuestos, firms financing public infrastructure

Peru's Obras por Impuestos scheme lets private firms finance public projects against future tax liabilities; the finance ministry recorded S/5.504 billion in certificates issued from 2009 through January 2024 and six projects identified as physically and financially complete in 2024.

Published number
5,504,000,000 Peruvian solescertificates issued through obras por impuestos, 2024-016 projects projects identified as complete in 2024, 2024
Source
Ministry of Economy and Finance, Obras por Impuestos detailed reportofficial statistical, retrieved 2026-08-31
Mechanism
written

120 a los 65 social pension

Panama's 120 a los 65 programme paid a non-contributory pension to an average of about 123,000 older people per payment during July 2019–June 2024, with B/.890.835 million programmed over the period and a national beneficiary register used to target eligibility.

Published number
123,000 peopleaverage beneficiaries per payment, 2019-07 to 2024-06890,834,970 Panamanian balboas programmed investment in the period, 2019-07 to 2024-06
Source
Ministerio de Desarrollo Social, management report 2019–2024official statistical, retrieved 2026-08-31
Mechanism
written

Bono Juana Azurduy maternal and child health transfer

Bolivia's Bono Juana Azurduy opened its 2024 payment round through 47 authorised financial institutions in all 340 municipalities and six Indigenous territories, tying the transfer to prenatal, delivery and early-childhood health checks; the programme reported 1,525,566 pregnant women and 1,783,936 children reached between 2009 and 2023.

Published number
340 municipalitiesmunicipalities covered by the 2024 payment round, 2024-0147 institutions authorised financial institutions, 2024-01
Mechanism
written

Asignación Universal por Hijo child benefit

Argentina's Asignación Universal por Hijo (AUH) reached 4,083,987 children and adolescents in June 2024, with 2,324,716 adult titulars receiving the benefit through the national social-security administration and its health, vaccination and education conditions.

Published number
4,083,987 peoplechildren and adolescents covered by auh, 2024-062,324,716 people auh titulars, 2024-06
Source
ANSES, Social Security Statistics report, second quarter 2024official statistical, retrieved 2026-08-31
Mechanism
written

National Asset Management Agency crisis workout

Ireland created NAMA in response to the property and banking crisis, acquired distressed loans and worked them down through asset sales and development; by the end of 2023 it had generated €47.7 billion in cash and transferred more than €4.25 billion to the Exchequer while preparing an orderly wind-down.

Published number
47,700,000,000 euroscash generated by nama since inception, 2023-124,250,000,000 euros (over) cumulative transfers to the exchequer, 2023-12
Source
National Asset Management Agency, 2023 year-end reviewofficial statistical, retrieved 2026-08-31
Mechanism
written

INEFOP, the tripartite national training institute

Uruguay's Instituto Nacional de Empleo y Formación Profesional, created by Law 18.406 in 2008 and governed by government, employers and workers, grew from 9,696 training, guidance and technical-assistance places in 2009 to 114,364 in 2019, and its director reported that more than 50,000 people took its training in 2023.

Published number
50,000 peoplepeople who took inefop training (more than), 2023114,364 places inefop training, guidance and technical-assistance places, national total, 2019
Mechanism
written

ANII Alianzas para la Innovación

Uruguay's national research and innovation agency ANII began co-funding joint academia-firm projects through Alianzas para la Innovación in 2009 and had signed 29 such contracts, committing US$3.85 million and drawing US$1.71 million from firms, by 30 June 2016; in 2023 it approved 23 projects joining the productive sector and academia, matching the 2022 record.

Published number
29 projectsalianzas para la innovación contracts signed since 2009, 2016-06-3023 projects projects approved in the year involving the productive sector with academia, 2023
Mechanism
written

Coca Codo Sinclair hydroelectric plant

Ecuador contracted the 1,500 MW Coca Codo Sinclair plant in October 2009 for USD 1,979.7 million with a 60-month term ending 5 October 2014; the plant entered commercial operation in November 2016, and a National Assembly oversight report found it had cost USD 2,712.5 million by August 2021, about 37 percent above the contract price, excluding a USD 599 million transmission line.

Published number
2,712.49 USD millioncost of the project to the state by august 2021, 2021-081,979.7 USD million epc contract price at signature, 2009-10
Mechanism
written

PPP Canada and the P3 Canada Fund, and its dissolution

Canada's federal Crown corporation PPP Canada, operational from 2009, committed over C$1.3 billion through the P3 Canada Fund to 25 public-private partnership projects across the country before the government dissolved it, with operations ceasing at the end of 2017 and the corporation dissolved effective March 31, 2018.

Published number
1,300,000,000 Canadian dollars (committed, 'over')p3 canada fund investments committed over the corporation's life, 2018-0325 projects projects in the p3 canada fund portfolio at dissolution, 2018-03
Mechanism
written

Crossrail, the Elizabeth line

The Department for Transport and Transport for London built Crossrail through Crossrail Ltd from 2009. The NAO put its forecast cost at 28% above the 2010 budget of £14.8 billion and its opening at up to three and a half years past the original December 2018 date. The central section opened in 2022 and carried 257.4 million journeys between April 2025 and March 2026.

Published number
28 % overrun (nominal)nominal cost increase to build the railway over the 2010 budget of £14.8 billion, 2021-05257,400,000 journeys passenger journeys on the elizabeth line, 2025-04 to 2026-03
Mechanism
written

Senate foresight delegation (Délégation sénatoriale à la prospective)

The Bureau of the French Senate created a foresight delegation in April 2009, succeeding the planning delegation set up by the 1982 planning reform law, with a mandate to study changes in society and the economy and to build scenarios; it has 36 senators appointed in proportion to the political groups and adopted reports in every year from 2010 to 2022 listed on its page.

Published number
36 senatorsmembers of the senate foresight delegation, 2026-10-02
Source
Sénat (France), Présentation de la délégation à la prospectiveofficial statistical, retrieved 2026-10-02
Mechanism
written

Kehärata airport rail loop, and its cost overrun

The Finnish state, with the City of Vantaa paying part of the cost, began building the Kehärata (Ring Rail Line) through Helsinki Airport in Vantaa in 2009; construction costs came in above estimate, a glycol leak found at the airport took a year to resolve and reset the schedule, passenger service began on 1 July 2015, and the construction cost finally came to 770 million euros.

Published number
770 million eurosfinal construction cost of kehärata, 2020-071 year delay attributed to resolving the glycol leak at the airport, 2020-07
Mechanism
written

Hunger Safety Net Programme, a shock-responsive cash transfer for drought

Kenya's National Drought Management Authority expanded the shock-responsive Hunger Safety Net Programme from four to eight arid counties, enrolling 32,000 new households paid from the government's own budget by December 2024, while 100 percent of regular transfers in the original four counties were financed by the government.

Published number
32,000 householdsnew regular hsnp households enrolled and paid through the government budget in expansion counties, 2024-128 counties counties covered by the shock-responsive hsnp, 2025
Mechanism
written

Contingent disaster credit with a Catastrophe Deferred Drawdown Option

On 21 April 2020, five days after its second World Bank disaster-risk loan with a Catastrophe Deferred Drawdown Option became effective, Guatemala's government decided to withdraw the entire US$200 million to meet the fiscal shock of COVID-19, and the loan was fully disbursed. A first such credit of US$85 million, approved in 2009, had been drawn in 2010 after the Pacaya eruption and Tropical Storm Agatha.

Published number
200 US$ millioncontingent credit withdrawn in full (cat ddo ii), 2020-04-215 days days from loan effectiveness to the decision to withdraw the full loan, 2020-04-21
Mechanism
written

Padma Multipurpose Bridge

Bangladesh's Bridge Authority completed the 6.15 km Padma road-rail bridge with government funds. It opened to traffic on 26 June 2022 at a reported actual cost of Tk 30,770 crore, six and a half years after the 31 December 2015 completion date in the 2010 Asian Development Bank appraisal, which had costed the project at $2,915 million.

Published number
30,770.14 Tk crore (published as 3,077,013.55 lakh taka)actual project cost reported by the bangladesh bridge authority, 2024-062,915 US$ million, August 2010 prices appraised total project cost and completion date, adb report and recommendation of the president (completion 31 dec 2015), 2010-11
Mechanism
written

A1 motorway, Bucharest to Nadlac

Romania's national road administration has built the 582 km A1 motorway in sections, and construction of the sections the auditors timed began in 2009, and in November 2025 the European Court of Auditors found its latest cost estimate 11 percent below the original estimate in real terms, while one EU co-funded section had run 79 months, or 263 percent of its planned time, late.

Published number
-11 % changechange in the a1 motorway's latest cost estimate against the original estimate, 2019 prices, 2025-1179 months longest delay on an eu co-funded a1 motorway action against its planned completion, 2020
Mechanism
written

South-West Roads: Western Europe-Western China corridor (CAREC 1b and 6b)

Kazakhstan's Committee for Roads upgraded 1,281 km of the Western Europe-Western China corridor and connecting roads under a US$2.5 billion programme between 2009 and 2024, for an actual cost of US$2,468.6 million against US$2,500 million appraised, but over 15 years against a planned four and a half.

Published number
15 yearsimplementation duration, actual (planned at appraisal: 4.5 years), 20242,468.6 US$ million actual total project cost (appraised: us$2,500 million), 2024
Mechanism
written

Mauritius Institute of Training and Development part-time training

The Mauritius Institute of Training and Development, the state technical and vocational training body, enrolled 3,352 trainees on part-time courses across its training centres between July 2022 and June 2023, out of 8,668 people it trained that year in full-time, part-time and apprenticeship modes.

Published number
3,352 traineespart-time enrolment, all mitd training centres, July 2022 to June 20238,668 people people trained by mitd in full-time, part-time or apprenticeship mode, July 2022 to June 2023
Mechanism
written

Morupule B coal power station, and its underperformance

Botswana Power Corporation built the 600 MW Morupule B coal power station under an EPC contract appraised in 2009, taking the plant over with known defects on 4 May 2014 against a target of 31 December 2013, after which it ran at a capacity factor of 52 percent from April 2015 to January 2016 against the 80 percent projected at appraisal.

Published number
52 percentplant gross capacity factor, measured (table 2), 2015-04 to 2016-0180 percent capacity factor projected at appraisal, 2009
Mechanism
written

Public-private partnership contracts monitored by CPVA

Lithuania's state and municipal institutions had concluded 76 public-private partnership contracts by 31 December 2025, 49 of them in force at the end of 2025 across culture and sport, waste, energy, law enforcement, education, transport and defence, with only one new contract signed in 2025.

Published number
76 contractsppp contracts concluded, cumulative, 2025-12-3149 contracts ppp contracts in force, 2025-12-31
Mechanism
written

National Employment Service labour market training, and its 2025 non-delivery

Serbia's National Employment Service put 1,613 unemployed people into labour market training (obuke za trziste rada) in 2024, but in 2025 it delivered none of the 1,100 places planned for that year for lack of accredited providers, and only 626 people trained under contracts carried over from the 2023 and 2024 plans.

Published number
626 peopleunemployed people included in labour market training in the year (table 6, 5.4), all from earlier years' plans, 20251,613 people unemployed people included in labour market training, previous year (table 6, 5.4, report for 2024), 2024
Mechanism
written

Prima Casa / Noua Casa state-guaranteed mortgages through banks, and their wind-down

Romania's Prima Casa programme, renamed Noua Casa in 2020, had the National Credit Guarantee Fund for SMEs (FNGCIMM) issue 334,048 state guarantees and guarantee promises worth RON 31.68 billion on mortgages made by participating banks between 2009 and December 2024, but only 811 guarantees in 2024, and the ratio of guaranteed lending to banks' unguaranteed housing loans fell from about 70 percent in 2017 to about 10 percent in 2023.

Published number
10 % (circa)ratio of prima casa / noua casa guaranteed lending to banks' unguaranteed housing loans to individuals, 202370 % (approx.) same ratio in 2017, the first year of the 2017-2021 strategy and the earliest year the source gives, 2017
Mechanism
written

Ain Sokhna supercritical power plant

The Egyptian Electricity Holding Company built the 1,300 MW Ain Sokhna supercritical thermal power plant, with its first unit entering commercial operation on 3 March 2015 and the second on 4 June 2015, at a final cost of US$1,159.4 million against a base cost of US$2,139.6 million estimated at appraisal in 2009.

Published number
1,159.4 million US dollarsfinal cost of the ain sokhna power plant component, 2019-032,139.6 million US dollars base cost of the power plant component at appraisal (pad), excluding us$50.2 million contingencies, 2009
Mechanism
written

Second National Water Supply and Sanitation Project (rayon centres), and its downsizing

Azerbaijan's water agencies built water supply and sanitation systems in eight regional (rayon) centres under the Second National Water Supply and Sanitation Project, after a 2012 restructuring cut the scope from 21 rayons to 8 because of cost increases, while the total project cost rose from US$560 million to US$641.8 million and the loan closed on 30 June 2019 instead of 28 February 2013.

Published number
641.8 million US dollarstotal project cost, actual disbursed (world bank us$407.8 million plus government us$234 million), 2019-06-30560 million US dollars total project cost at approval, for 21 rayons, 2008-05
Mechanism
written

Kurzarbeit in the 2008-2009 crisis

Germany answered the 2008-2009 collapse in manufacturing orders by paying firms to cut hours instead of jobs, and short-time work covered 1.44 million workers at the May 2009 peak, about 5 percent of insured employment, while unemployment barely rose.

Published number
1,440,000 workersworkers in cyclical short-time work at the peak, 2009-05
Mechanism
written

Legally binding carbon budgets

The United Kingdom's 2008 Climate Change Act made five-year emissions budgets a standing legal cycle set twelve years ahead, and by July 2026 seven budgets covered 2008 through 2042 while the first three had been met.

Published number
7 five-year budgetscarbon budgets set in law, 2026-073 five-year budgets completed carbon budgets met, 2024
Source
UK Department for Energy Security and Net Zero, carbon budgets guidanceofficial statistical, retrieved 2026-08-30
Mechanism
written

MijnOverheid, a shared citizen mailbox and data portal

The Netherlands runs MijnOverheid as one portal for government mail and personal data; in 2024 it carried 103,429,342 messages through 11,015,895 accounts with reported availability of 99.99 percent against a 99 percent norm.

Published number
103,429,342 messagesmessages delivered through mijnoverheid, 202411,015,895 accounts mijnoverheid accounts, 2024
Source
Logius, 2024 service figuresofficial statistical, retrieved 2026-08-31
Mechanism
written

Pantawid Pamilyang Pilipino Program (4Ps)

The Philippines' 4Ps conditional cash-transfer programme reached 4,064,354 households by 30 June 2024 across 41,746 barangays, 148 cities and 1,485 municipalities, with beneficiaries linked to health, education and nutrition conditions.

Published number
4,064,354 households4ps households reached, 2024-06-3041,746 barangays barangays covered by 4ps, 2024-06-30
Mechanism
written

Castor underground gas storage, and its closure

Spain extinguished the Castor underground gas-storage concession in October 2014 after seismic events halted operation; the state transferred administration to Enagás and the decree recognised €1.350729 billion in compensation for the former concessionaire, with recovery structured over 30 years.

Published number
1,350,729,000 euroscompensation recognised for the extinguished castor concession, 201430 years recovery period authorised through the gas-system charge, 2014
Mechanism
written

e-Devlet Gateway, a shared public-service front door

Türkiye's e-Devlet Gateway ended 2024 with 66,753,526 users, 8,309 online services and 1,080 participating institutions, including 127 private providers alongside central government, universities and municipalities.

Published number
66,753,526 usersregistered e-devlet gateway users, 20241,080 institutions institutions offering services through the gateway, 2024
Source
Digital Transformation Office / e-Devlet Gateway, Government of Türkiyeofficial statistical, retrieved 2026-09-03
Mechanism
written

El Chaparral (3 de Febrero) hydroelectric plant

El Salvador's state hydro commission CEL financed the El Chaparral hydroelectric plant on the Torola River through a BCIE loan arranged in September 2008, with four planned years of construction, and inaugurated it as the 3 de Febrero plant on 19 October 2023 at an approximate cost of US$800 million; CEL gives the initial investment as US$207.8 million, so the final cost is about 3.8 times the initial figure, some 15 years after the 2008 loan.

Published number
800 US$ millionapproximate final cost of the 3 de febrero (el chaparral) hydroelectric plant, stated at inauguration, 2023-10-19207.8 US$ million initial investment of the el chaparral project, as stated by cel in 2022, 2022
Mechanism
written

PetroCaribe-financed public investment programme, and its audited failure

From September 2008 to September 2016, Haiti's Council of Ministers allocated PetroCaribe oil-credit revenue to 409 public projects, and the state fuel monetisation bureau BMPAD disbursed US$1,605,905,287.84 (92.4% of the revised budget), but the Superior Court of Auditors (CSCCA) found cost and schedule overruns across the audited works, including a Cap-Haïtien street rehabilitation that ran 18% over budget and took 21 months against an eight-month contract term.

Published number
1,605,905,287.84 US dollars (cumulative, 92.4% of revised budget of US$1,738,691,909.70)petrocaribe project funds disbursed by bmpad across 409 council-of-ministers projects, 2008-09 to 2016-0918 % over contract amount budget overrun on the audited cap-haïtien street rehabilitation, phase 1 (mtptc), 2010-03-18 start, completed in 21 months
Mechanism
written

VET FEE-HELP, and its abolition

Australia's VET FEE-HELP loan scheme, introduced in 2008 to fund higher-level vocational courses, grew from fewer than 3,500 loans in 2009 to 196,108 in 2015, and was abolished and replaced from 1 January 2017 by VET Student Loans, which reached 53,892 students in 2019.

Published number
196,108 loansvet fee-help loans at the scheme's peak, 201553,892 students vet student loans recipients under the replacement scheme, 2019
Mechanism
written

Bildungsprämie training voucher, and its end

The federal education ministry paid half the cost of job-related further training for lower-income workers through a voucher from December 2008, issued more than 400,000 vouchers, and stopped issuing them on 31 December 2021.

Published number
400,000 vouchers (lower bound, 'über 400.000')training vouchers (prämiengutscheine) issued over the life of the programme, 2008-12/2021-12
Mechanism
written

Dedicated Freight Corridors, Eastern and Western

Indian Railways, through the Dedicated Freight Corridor Corporation, built two freight-only corridors approved by Cabinet in 2008 at ₹28,181 crore and reassessed in 2015 at ₹81,459 crore, and by March 2025 had commissioned 2,741 of their 2,843 route kilometres.

Published number
189 % overrun (nominal, computed)increase of the 2015 revised project cost over the 2008 cabinet-approved estimate, computed from cag figures, 20152,741 route km dedicated freight corridor route kilometres commissioned and operational, of 2,843, 2025-03-19
Mechanism
written

Strategic Centres for Science, Technology and Innovation (SHOKs), terminated in 2015

Finland ran six Strategic Centres for Science, Technology and Innovation from 2008, company-form consortia of firms, universities and research institutes funded about 60 percent by Tekes, with funding of EUR 88 million in 2014; the Sipilä government's austerity programme ended the earmarked funding at the end of 2015 and the programme was closed, with the last Tekes-funded projects wound down between 2016 and 2018.

Published number
88,000,000 eurosshok funding for industry-academia knowledge transfer, 20146 centres shok companies operating before termination, 2014
Mechanism
written

Neelum-Jhelum Hydropower Project, and its shutdown

WAPDA's subsidiary NJHPC's 969 MW Neelum-Jhelum project, under construction from January 2008 and substantially completed in 2018, had cost Rs 423,446 million by June 2023 against Rs 84,502 million in the 2002 revised PC-I, nine years late; it peaked at 4,940.67 GWh in 2020 and was forced into complete shutdown by a head race tunnel failure on 2 April 2024 (the auditor counts 1,797.704 million units lost in FY2023-24), after an earlier tail race tunnel collapse in July 2022.

Published number
338,944 Rs millioncost overrun against the 1st revised pc-i (2002), actual expenditure to june 2023, 2023-064,940.67 GWh peak annual generation, before the 2022 and 2024 tunnel collapses, 2020
Mechanism
written

Pro-Routes high-priority road reopening and maintenance

Between October 2008 and June 2020 the Ministry of Infrastructure's Cellule Infrastructure reopened 2,752 of a targeted 2,762 km of high-priority earth roads across five provinces and maintained 3,335 km, finishing 3.6 percent over the financing-agreement total and 28 months behind the combined original schedule.

Published number
3.6 % overruntotal project cost at closure against the values in the financing agreements (parent project plus two additional financings), 202028 months implementation delay against the combined original timeline of the three financings (113 months planned, about 141 actual), 2020
Mechanism
written

Šoštanj thermal power plant unit 6 (TEŠ 6), and its cost overrun

Slovenia's state-owned power holding HSE and its subsidiary TEŠ raised the estimated cost of the 600 MW Šoštanj unit 6 from 1,302,747 thousand euros in the August 2011 investment programme, the ceiling written into the 2012 law guaranteeing its 440 million euro EIB loan, to 1,428,457 thousand euros in the February 2014 programme, breaching the condition on which the state guarantee was given, according to the Court of Audit.

Published number
1,428,457 thousand eurosestimated investment value of unit 6, revised investment programme no. 6 (nip 6), 2014-021,302,747 thousand euros estimated investment value in revised investment programme no. 4 (nip 4), the ceiling set as a condition of the state guarantee, 2011-08
Mechanism
written

Road Infrastructure Rehabilitation Project, and its cut after the 2009 budget squeeze

Bulgaria's Road Infrastructure Agency rehabilitated national roads under a EUR144 million project approved in June 2007, but after budget cuts in 2010 cancelled three lots on about 87 km where works had not started, reducing the length from 450 km to 307 km, and closed in June 2013, two years late, at EUR97.1 million, 67 percent of the appraisal estimate.

Published number
97.146 million eurostotal project cost, actual, 2013-06-30144 million euros total project cost, appraisal estimate, 2007-06-26
Mechanism
written

Second-wave motorway concessions (Central E-65, Olympia Odos, Moreas), and their reset

Greece procured 744 km of motorway as three PPP concessions that commenced in 2008; after works were suspended in 2011 and the contracts were renegotiated in 2013 and 2015, the European Court of Auditors found the three projects delayed by four years on average, their combined cost per km up 36 percent, from 9.1 to 12.4 million euro, and the planned road length cut to 486 km.

Published number
36 % overrun (cost per km)increase in total project cost per km across the three audited motorway concessions, initial plan to post-reset, Post-reset position as audited in 2017, published March 20184 years average construction delay of the three motorways against their initial completion dates, Estimated/actual completion dates as audited, 2016-2017
Mechanism
written

Belene nuclear power plant, and its cancellation

Bulgaria's state utility NEK ordered long-lead reactor equipment for the Belene nuclear plant from Atomstroyexport in 2008. The project was cancelled before any unit was completed, and on 6 December 2016 the Ministry of Energy transferred 601,617,133 euros to NEK so it could pay the damages awarded against it in ICC arbitration case 18086/GZ/MHM.

Published number
601,617,133 EURstate financial assistance transferred to nek to pay the belene arbitration award to atomstroyexport, 2016-12-061,400,000,000 BGN costs incurred on the belene construction to date, as stated by the minister of energy, 2016
Mechanism
written

Plan Ceibal, one connected laptop per child

Uruguay gave a connected laptop to every child in public primary school from 2007, the first country to do it nationally, and the household survey found a Ceibal computer in the homes of 35.8 percent of the population in 2018.

Published number
35.8 % of peoplepeople with a plan ceibal computer in the household, 2018
Source
Ministry of Social Development, from the national household surveyofficial statistical, retrieved 2026-08-26
Mechanism
written

M-Pesa, and the regulator that let it run

Kenya's central bank let a phone company build a national payments system in 2007 and supervised it into ubiquity, and by June 2026 Kenya had 94.2 million registered mobile money accounts and 572,104 agents, in a population of about 55 million.

Published number
94,200,000 accountsregistered mobile money accounts, 2026-06
Source
Central Bank of Kenya, mobile payments statisticsofficial statistical, retrieved 2026-08-27
Mechanism
written

Umuganda community work

Rwanda requires a morning of community work on the last Saturday of each month, and the government's own assessment reports average participation of 91.3 percent of adults countrywide in fiscal year 2015-2016, up from 87.8 percent two years earlier.

Published number
91.3 % of adults 18-65umuganda participation rate, 201687.8 % of adults 18-65 umuganda participation rate two years earlier, 2014
Mechanism
written

SIBRATEC, the national technology networks

To foster university-firm interaction, the Federal Government set up SIBRATEC, coordinated by the Ministry of Science and Technology with FINEP, BNDES and INMETRO taking part, as a national system of 56 research and development networks by 2010: 14 innovation-centre networks, 20 technological-service networks and 22 state-level extension networks.

Published number
56 networkssibratec national r&d networks reported, 2010
Mechanism
written
2007FranceBuildingLarge project deliveryoperating below its peak

Flamanville 3 EPR, and the erosion of nuclear new-build delivery

France's Flamanville 3 EPR took about 16.5 years from construction beginning in September 2007 to completion in early 2024, and its commissioning was the country's first new nuclear reactor since Civaux 2 in 1999, a 25-year gap.

Published number
16.5 yearsconstruction duration, 202425 years gap since the previous french reactor commissioning, 2024
Source
French Nuclear Safety Authority, oversight of the Flamanville EPRofficial statistical, retrieved 2026-08-31
Mechanism
written
2007ChileBuildingLarge project deliveryoperating below its peak

Transantiago, an integrated transport reform with rising subsidy dependence

Chile launched the integrated Transantiago bus–metro system in 2007; an independent 2016–19 evaluation found the state subsidy per passenger fare rose from CLP 640 per CLP 1,000 paid in 2016 to CLP 790 in 2019 even as passenger production rose 7%.

Published number
790 CLP subsidy per CLP 1,000 passenger farestate subsidy per clp 1,000 passenger fare, 2019640 CLP subsidy per CLP 1,000 passenger fare state subsidy per clp 1,000 passenger fare, 2016
Source
DIPRES, independent evaluation of the National Public Transport Subsidyofficial statistical, retrieved 2026-08-31
Mechanism
written

Reficar, a refinery modernization with a fiscal-liability finding

A 2021 Contraloría fiscal-responsibility ruling on Colombia's Reficar modernization held COP2.945 trillion in damage after finding USD997 million in additional investments that added no value to the project.

Published number
2,945,410,000,000 Colombian pesosfiscal damage upheld in the reficar modernization case, 2021997,000,000 US dollars additional investments found not to add project value, 2021
Mechanism
written

Crédito de Desarrollo Humano for beneficiary-led businesses

Ecuador's Ministry of Economic and Social Inclusion reported delivering 44,622 Crédito de Desarrollo Humano loans in 2024, including 6,622 to Indigenous people, turning a social-transfer registry into small-enterprise finance and market-access support.

Published number
44,622 creditsdevelopment credits delivered, 20246,622 credits development credits delivered to indigenous people, 2024
Source
Ministerio de Inclusión Económica y Social, 2024 accountability reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Panama Canal expansion and self-financing operations

After the third set of locks opened in 2016, the Panama Canal Authority handled 9,944 deep-draft transits and 423 million tonnes of cargo in fiscal year 2024, reporting B/.4.986 billion in total revenue despite climate constraints.

Published number
9,944 transitsdeep-draft vessel transits, FY2024423,000,000 tonnes cargo tonnage through the canal, FY2024
Source
Autoridad del Canal de Panamá, fiscal year 2024 resultsofficial statistical, retrieved 2026-08-31
Mechanism
written

Renta Dignidad non-contributory old-age pension

Bolivia's Renta Dignidad, created by Law 3791 in 2007 and paid since 2008, reached 1,241,440 beneficiaries in 2024 with Bs5.289 billion disbursed through the national social-security administration.

Published number
1,241,440 peoplerenta dignidad beneficiaries, 20245,289,000,000 Bolivian bolivianos renta dignidad disbursement, 2024
Mechanism
written

Rural electrification and near-universal grid coverage

Nicaragua's Ministry of Energy and Mines reported national electricity coverage of 99.575% in December 2024 after public electrification projects brought power to 732,427 homes and 3,853,005 people.

Published number
99.575 % of households with electricitynational electricity coverage, 2024-12732,427 homes homes electrified through the reported programme, 2024-12
Source
Nicaragua Ministry of Energy and Mines, Electricity Coverage 2024official statistical, retrieved 2026-08-31
Mechanism
written

e.escola, a national laptop-and-broadband push

The European Commission's eSchool case study records more than 1.3 million people requesting laptops and broadband through Portugal's e.escola programme and more than one million laptops delivered in its first two years; the Portuguese government suspended the programme in 2011.

Published number
1,300,000 peoplepeople requesting laptops and broadband (more than), 2007-20091,000,000 laptops laptops delivered in the first two years (more than), 2007-2009
Source
European Commission Interoperable Europe, eSchool Programme (Portugal case)international organization, retrieved 2026-08-31
Mechanism
written

Seawater desalination under private concessions

Israel's Water Authority contracted private operators to build and run large seawater desalination plants under long-term concessions, and by 2022 the five largest held concessions for about 596 million cubic metres a year and supplied 33 percent of the country's fresh water, with the state buying 540 million cubic metres from them that year for about NIS 1.5 billion.

Published number
33 % of fresh watershare of fresh water supplied from desalination, 2022596.4 million cubic metres a year production capacity in the concessions of the five largest plants, 2022
Mechanism
written

Federal Chancellery situation and environment analysis (Perspektivstab)

Switzerland's Federal Chancellery runs a long-term, continuous situation and environment analysis for the Federal Council that looks 10 to 15 years ahead; it produced Herausforderungen in 2007 with expertise from 30 federal offices, Perspektiven 2025 in 2011, Perspektiven 2030 in 2014, the Schweiz 2030 and Schweiz 2035 reports and the scenario report Perspektiven Schweiz 2040, which feed the Federal Council's legislature planning.

Published number
6 reportsreports in the chancellery situation and environment analysis series named on the page, 2026-10-0230 federal offices federal offices whose expertise fed the 2007 report herausforderungen, 2007
Source
Swiss Federal Chancellery, Lage- und Umfeldanalyseofficial statistical, retrieved 2026-10-02
Mechanism
written

Accra bus rapid transit under the Ghana Urban Transport Project, and its cancellation

Ghana's Department of Urban Roads, joined in 2012 by the Ministry of Local Government and Rural Development, set out in 2007 to build Sub-Saharan Africa's first bus rapid transit corridor in Accra for an estimated US$46 million of infrastructure, but after a design review raised that estimate to US$100.7 million and counterpart funds did not arrive, the BRT was dropped in the 2014 restructuring without its 9.1 km of dedicated lanes being built, and the project closed in December 2015, 35.5 months after its original December 2012 closing date.

Published number
100.7 million US dollarsrevised cost estimate for the brt infrastructure after the 2013 design review, 201346 million US dollars original cost estimate for the brt infrastructure (component 3), 2007
Mechanism
written

COMET, Competence Centers for Excellent Technologies

Austria's COMET programme, run by the FFG for the federal ministries and co-funded by the Länder, had approved 81 competence centres and K-projects with eligible costs of 1,669.80 million euros by 30 March 2017, in which about 450 scientific partners and about 1,000 company partners cooperated, according to the Court of Audit.

Published number
81 centres and projectscomet centres and projects approved since programme start (21 k1 centres, 5 k2 centres, 55 k-projects), table 2, 2017-03-301,000 company partners company partners cooperating within comet (rounded), 2017
Mechanism
written

Senter for forskningsdrevet innovasjon (SFI), Centres for Research-based Innovation

The Research Council of Norway allocated 354 million kroner in 2025 to its Centres for Research-based Innovation, eight-year consortia of research institutions, companies and public bodies whose business and public-sector partners must co-finance at least half the cost, and in December 2025 named eight new centres with 98 business partners and 22 public-sector partners.

Published number
354 million Norwegian kronerfunding allocated to the sfi centres, 202598 business partners business partners in the eight sfi centres announced in december 2025, 2025-12-15
Mechanism
written

Institut Royal des Etudes Stratégiques (IRES)

Morocco's Royal Institute for Strategic Studies, announced in the 2003 Throne Speech to strengthen the country's capacities for analysis, adaptation and anticipation and created by Dahir No 1-07-183 of 30 November 2007, published the twelfth edition of its strategic dashboard on Morocco's international positioning on 28 November 2024 and was still issuing general reports in 2025.

Published number
12 editionseditions of the strategic dashboard 'tableau de bord stratégique: évolution du positionnement international du maroc', 2024-11-28
Mechanism
written

Central railway concession to the RITES-led Tanzania Railways Limited, and its collapse in 2011

Tanzania concessioned the central railway network for 25 years to Tanzania Railways Limited, 51 percent owned by a consortium led by Rail India Technical and Economic Services, which took over operations in October 2007; freight fell from 470,000 tons in 2008 to 237,000 tons in 2010, and after a dispute the RITES shares were transferred to the government in 2011, leaving the operator fully state owned four years into the term.

Published number
237,000 tonsfreight carried by tanzania railways limited on the central (metre gauge) network, 2010470,000 tons freight carried by tanzania railways limited in its first full year of concession operation, 2008
Mechanism
written

Rogun hydropower plant

The Government of Tajikistan resumed construction of the Soviet-era Rogun hydropower plant in 2007 from the state budget, signed the main dam contract in 2016 and commissioned two temporary units (400 MW) in 2018 and 2019. It invested about US$3.3 billion in 2007 to 2022, and in November 2024 the World Bank put the cost to complete the plant at US$6.29 billion, with construction completion moved to 2033 and full reservoir impoundment not before 2039, 63 years after construction first began in 1976.

Published number
6.29 billion USDestimated cost to complete the rogun hpp programme, November 20243.3 billion USD (about) government of tajikistan investment in rogun hpp, 2007 to 2022, 2007-2022
Mechanism
written

Kvalitetsfonden hospital building programme (supersygehuse), and its overruns

Denmark set up Kvalitetsfonden in 2007 to fund a new hospital structure. Through it the regions are building or rebuilding 16 hospitals with a combined investment frame of about DKK 57 billion (2023 prices). Rigsrevisionen reported in November 2023 that the programme's largest overrun, Nyt Hospital Nordsjælland, had its budget raised by DKK 2.3 billion, or 44 percent, and was expected six years later than planned.

Published number
44 % overrunbudget increase over the grant frame, nyt hospital nordsjælland (largest overrun in the programme), 20236 years schedule delay, nyt hospital nordsjælland, expected completion end of 2026 against plan, 2023
Mechanism
written

SNIG, universal individual cattle traceability

Uruguay required producers to register every calf in a national traceability system from 2006, and by October 2011 the registry covered 100 percent of the herd, 11.75 million live cattle, while identification tags reached more than 45,000 producers each year.

Published number
11,750,000 cattlelive cattle registered and individually identified, 2011-1045,000 producers producers receiving identification tags each year, 2011
Source
Presidency of Uruguay, SNIG traceability reportofficial statistical, retrieved 2026-08-30
Mechanism
written

Room for the River, flood safety delivered across the Rhine branches

The Netherlands ran Room for the River from 2006 to 2019, delivering 39 measures at 34 locations along the IJssel, Waal, Nederrijn and Lek for about four million residents at a total cost of €2.3 billion.

Published number
39 measuresflood-safety measures delivered, 201934 locations locations receiving measures, 2019
Source
Rijkswaterstaat, Room for the River programmeofficial statistical, retrieved 2026-08-31
Mechanism
written

Singapore Courts' case-clearance discipline

Singapore's State Courts disposed of 21,816 civil cases against 20,358 filings in 2023, a 107% civil clearance rate; its Community Justice and Tribunals courts recorded a 99% clearance rate in the same year.

Published number
107 % of incoming civil casesstate courts civil-case clearance rate, 202399 % of incoming cases community justice and tribunals clearance rate, 2023
Source
Singapore Judiciary, Caseload statistics 2023official statistical, retrieved 2026-08-31
Mechanism
written

Novas Oportunidades, and the qualification-policy interruption

ANQEP's national review records 1,568,490 adult enrolments in Novas Oportunidades between 2006 and July 2011; after the initiative's peak and a period of disinvestment, Portugal launched Qualifica in 2017 and rebuilt a network of more than 300 Centros Qualifica.

Published number
1,568,490 adult enrolmentsadult enrolments in novas oportunidades, 2011-07300 centres (more than) centros qualifica in the replacement network, 2017
Source
ANQEP, Plano Nacional de Literacia de Adultosofficial statistical, retrieved 2026-08-31
Mechanism
written

Simplex and LabX, a standing simplification-and-experimentation loop

AMA's 2022 activity report records 48 Simplex administrative-simplification measures, 24 PRR and modernisation milestones executed, and 62 innovation, participation and simplification activities across the agency's portfolio.

Published number
48 measuressimplex measures in the 2022 edition, 202262 activities innovation, participation and simplification activities, 2022
Source
Agência para a Modernização Administrativa, Activity Report 2022official statistical, retrieved 2026-10-02
Mechanism
written

INADEH national vocational training

Panama's national vocational training institute, INADEH, restructured by Decree Law 8 of 2006, recorded 156,032 course graduates in 2021, against 90,107 in 2019 and 38,628 in the pandemic year 2020.

Published number
156,032 graduatesinadeh course, workshop and programme graduates, 202190,107 graduates inadeh graduates before the pandemic, 2019
Mechanism
written

Yo, sí puedo national literacy campaign and post-literacy programme

Bolivia's Ministry of Education reports that its national literacy programmes, run as 'Yo, sí puedo' from 2006 to 2008 and continued as a post-literacy programme from 2009, taught more than one million people over 15 to read and write between 2006 and 2017, 74% of them women.

Published number
1,000,000 peoplepeople made literate by the national literacy and post-literacy programmes (more than), 2006-2017
Mechanism
written

NWO Perspectief, ended by the 2026 spring budget

NWO's Perspectief programme, funded mainly by the Ministry of Economic Affairs, awarded 12 public-private technology consortia in 2025 with 46.4 million euros of subsidy, each joining at least three knowledge institutions with at least four companies or other users paying at least 30 percent of costs; the ministry's own page records that the last Perspectief round started in July 2026.

Published number
12 consortium projectsperspectief projects awarded, 202546,400,000 euros perspectief subsidy awarded, 2025
Mechanism
written

Public-private partnership contracts in Croatia's PPP register, and their dwindling

Croatia's register of public-private partnership contracts lists 17 contracts with an estimated capital value of EUR 338.3 million, 13 of them signed between 2006 and 2008, mostly Varaždin county schools, one in 2013 for Zagreb Airport, one in 2016 and two street lighting contracts in 2018, and none since October 2018.

Published number
0 contractsppp contracts entered in the register with a signature date after october 2018, 2026-1013 contracts ppp contracts signed 2006 to 2008, the peak, 2008
Mechanism
written

Greece's PPP programme under the 2005 PPP law

Greece's Inter-Ministerial PPP Committee and the finance ministry's PPP Unit have taken 33 public-private partnerships to signed contracts since 2006, from Attica school buildings and fire stations to waste plants, the Kalamata to Rizomylos and Crete northern road sections and ultrafast broadband, with another 34 projects listed in procurement or preparation in 2026.

Published number
33 contractsppp contracts signed since 2006, 2026-1034 projects projects in the ppp unit's list still in preparation or procurement, 2026-10
Mechanism
written

Budapest metro line 4, first section, and its cost and time overrun

Hungary's State Audit Office reported in September 2010 that the first section of Budapest metro line 4, approved by the capital in September 2004 at a cost of HUF236.5 billion with a deadline of end 2009, was forecast to cost HUF370 billion, 56.4 percent more, and to open in the second half of 2013.

Published number
370 billion forintsforecast investment cost of the first section, current prices, 2010236.5 billion forints investment cost in the 2004 permit document, current prices, 2004-09
Mechanism
written

Rural housing reconstruction after the 2005 Kashmir earthquake

Pakistan's Earthquake Reconstruction and Rehabilitation Authority inspected all 463,243 houses due for reconstruction in Azad Jammu and Kashmir and Khyber Pakhtunkhwa after the October 2005 earthquake and certified 438,789 of them, 95 percent, as compliant with seismic-resistant standards by the time the World Bank credit closed in May 2011.

Published number
438,789 housesreconstructed houses certified compliant with erra's seismic standards, 2011-05-31463,243 houses houses to be reconstructed (ajk and kp), 2011-05-31
Mechanism
written

Federal strategic stock of protective masks, and its dismantling

The Federal Public Service Public Health held a strategic stock of masks for pandemic influenza in military warehouses in Namur from 2006, sized at 32 million surgical masks when the Bioethics Committee reviewed the pandemic plan in 2009. It destroyed the expired masks in operations in late 2015 and late 2018 without replacing them, so Belgium entered the COVID-19 crisis in early 2020 with no strategic mask stock.

Published number
0 masksfederal strategic stock of masks at the start of the covid-19 crisis, early 202032,000,000 surgical masks strategic stock of surgical masks referred to in the 2009 review of the pandemic plan, 2009
Mechanism
written

Internet voting in national elections

Estonia has run legally binding internet voting since 2005, and at the 2023 Riigikogu election 312,182 votes, 51.1 percent of all votes cast, came in online, the first national election anywhere in which more than half the vote was digital.

Published number
51.1 % of votesshare of votes cast online, 2023 riigikogu election, 20239,287 votes internet votes at first use, 2005 local elections, 2005
Source
State Electoral Office of Estonia, internet voting statisticsofficial statistical, retrieved 2026-08-27
Mechanism
written

DigiD, a shared digital identity rail for public services

The Netherlands has run DigiD as a shared login for public services since 2005; in 2024 it recorded 550,153,271 successful authentications across 16,829,696 accounts and reported 99.94 percent availability against a 99.5 percent norm.

Published number
550,153,271 authenticationssuccessful digid authentications, 202416,829,696 accounts digid accounts, 2024
Source
Logius, 2024 service figuresofficial statistical, retrieved 2026-08-31
Mechanism
written

iDEAL, interoperable online payments through Dutch banks

The Netherlands built iDEAL as a shared bank-connected online payment rail; in 2024 it processed 1.47 billion payments worth €141 billion, almost matching the €147 billion spent through debit cards at the point of sale.

Published number
1,470,000,000 paymentsideal payments, 2024141,000,000,000 euros ideal turnover, 2024
Source
Dutch Payments Association, payment traffic factsheet 2024official statistical, retrieved 2026-08-31
Mechanism
written

DigiD Machtigen, delegated access to public services

The Netherlands built delegated authority into its public-service login so a family member, carer or adviser can act for someone else without taking their password; in 2024 DigiD Machtigen handled 15,563,897 queries from 798 connected services at 99.84 percent availability against a 99.5 percent norm.

Published number
15,563,897 queriesdigid machtigen queries by connected services, 2024798 services connected services, 2024
Source
Logius, 2024 service figuresofficial statistical, retrieved 2026-08-31
Mechanism
written

Juntos, a conditional-transfer system at national scale

Peru's Juntos conditional cash-transfer programme, created in 2005 and placed under MIDIS in 2012, operated in 1,885 districts and benefited 793,623 households by August 2024 through SISFOH-targeted support.

Published number
793,623 householdshouseholds benefiting from juntos, 2024-081,885 districts districts where juntos operates, 2024-08
Mechanism
written

Certified digital signature across public services

Costa Rica's MICITT reported in October 2023 that more than 60 public institutions used certified digital signatures across more than 100 citizen services, with almost 75,000 certificates issued during that year.

Published number
100 servicespublic services using certified digital signature, 2023-1075,000 certificates digital certificates issued during the year, 2023
Mechanism
written

Tekoporã Mbarete family-support programme

Paraguay's Tekoporã Mbarete social-protection programme protected more than 175,000 families nationwide in 2024, paid monthly after a 2023 redesign and reported 95% bankarisation plus georeferencing of 11,316 participating homes.

Published number
175,000 familiesfamilies protected by tekoporã mbarete, 202495 % of families participating families with a bank payment channel, 2024
Source
Government of Paraguay, Presidential Management Report 2024official statistical, retrieved 2026-08-31
Mechanism
written

Productive Safety Net Programme for drought resilience

Ethiopia's government-run Productive Safety Net Programme reached about 8 million people, while 6.8 million received short-term employment in public-works activities that support household income and community resilience.

Published number
8,000,000 peoplepeople benefiting from the productive safety net programme, 2026-02-286,800,000 people people receiving short-term public-works employment, 2026-02-28
Source
World Bank Group, Ethiopia country programme overviewinternational organization, retrieved 2026-08-31
Mechanism
written

Empresa na Hora and the one-stop company registry

Portugal's IRN reports 369,447 societies created through Empresa na Hora over its first 20 years; the service is available at more than 200 posts and averages 41 minutes from formation to registration.

Published number
369,447 companiescompanies created through empresa na hora, 2025-0841 minutes average service time, 2025-08
Source
Instituto dos Registos e do Notariado, Empresa na Hora 20-year resultsofficial statistical, retrieved 2026-08-31
Mechanism
written

Strategic stock of pandemic masks, and its erosion

France's health ministry and its stockpile agency built a strategic pandemic stock of about 1.7 billion FFP2 and surgical masks by 2009, but by the start of the covid-19 crisis it held only about 100 million valid masks, according to the Senate commission of inquiry.

Published number
100,000,000 masksvalid ffp2 and surgical masks in the strategic stock at the start of the covid-19 crisis, 2019-121,700,000,000 masks ffp2 and surgical masks in the strategic stock at the 2009 peak, 2009
Mechanism
written

Private-led coffee sector governance through InterCafe, and its dismantling

Burundi had run its coffee value chain through a public regulator, ARFIC, beside private-led bodies: InterCafe, whose members were producers, millers, roasters and exporters, and the growers' consortium CNAC with about 109,000 members. The government named all three as joint implementing agencies of the Coffee Sector Competitiveness Project. In January 2020 it replaced them by decree with ODECA, an office under state control. The project closed early in 2021, and 44 percent of the grant was cancelled.

Published number
44 % of grant fundingshare of the ida coffee sector competitiveness grant cancelled after the government returned the coffee sector to state control, 2021109,000 members individual members of cnac, the national coffee growers' consortium, one of the three private-led implementing bodies, project appraisal (c. 2016)
Mechanism
written

Private electricity distribution concessions, and the 2022 decision to end them

Uganda ran most of its electricity distribution through private concessions, with Umeme selling about 96 percent of grid energy to end users in 2024, but a Cabinet directive of October 2022 approved the non-renewal of all expiring concessions, and in 2024 the state utility UEDCL took over the assets of two private distributors whose licences were not renewed.

Published number
2 licencesprivate distribution licences not renewed and taken over by uedcl in 2024 (kil and krecs), 202496 % umeme's share of grid energy sold to end users, the private concession at its peak (about), 2024
Mechanism
written

OPS road projects of the Norwegian Public Roads Administration

The Norwegian Public Roads Administration has delivered four road sections as public-private partnerships (OPS) now in operation, opened in 2005, 2006, 2009 and July 2020, each run by a private company for 20 to 25 years, and had two more under planning or construction in 2026, Rv. 555 Sotrasambandet and E10/Rv. 85 Tjeldsund to Langvassbukt.

Published number
4 projectsops road projects completed and in operation, 2026-102 projects ops road projects in planning or under construction, 2026-10
Source
Statens vegvesen, Våre OPS-prosjekterofficial statistical, retrieved 2026-10-02
Mechanism
written

Nam Theun 2 hydropower concession

The Government of Lao PDR granted a build-operate-transfer concession for the 1,070 MW Nam Theun 2 plant to the Nam Theun Power Company, in which it held 25 percent through Lao Holding State Enterprise; the plant was completed in 2010 in 58.5 months, 4.5 months over plan, at US$1,308 million against a US$1,250 million base estimate (US$1,450 million with contingencies), and paid the government US$180 million in net revenues from 2010 to 2017.

Published number
180 million US$net revenues from nt2 to the government of lao pdr, 2010 to 2017, 20171,070 MW installed capacity delivered (995 mw for export to thailand, 75 mw for the lao grid), 2010
Mechanism
written

Owner-driven housing reconstruction after the 2004 tsunami

Sri Lanka's government paid owner-driven cash grants through two state banks, with IDA refinancing, to 47,864 Phase I beneficiaries after the December 2004 tsunami, of whom a 100 percent audit found 44,944 eligible, and the physical completion rate for Phase I houses was 94 percent when the programme closed in September 2008.

Published number
47,864 beneficiariesphase i homeowner-driven beneficiaries supported with ida financing, 2008-09-3094 % physical completion rate for phase i houses, 2008-09-30
Mechanism
written

Dual-track vocational training

Switzerland runs most upper-secondary education through firms: of 218,259 students enrolled in vocational education and training in 2020, 90.6 percent, 197,782, were apprentices trained inside companies under federal law.

Published number
197,782 apprenticesapprentices in dual-track training, 202090.6 % of VET students share of vet students in the dual track, 2020
Mechanism
written

Childcare benefits administration, and the recovery after institutional failure

The Netherlands' tax administration put tens of thousands of childcare-benefits parents into debt between 2004 and 2019; by February 2026 the recovery operation had recognized more than 43,000 parents as harmed among about 69,000 applicants and guaranteed each recognized parent at least €30,000.

Published number
43,000 parentsparents recognized as harmed, 2026-0269,000 people people who applied for recovery, 2026-02
Source
Rijksoverheid, recovery operation for childcare benefitsofficial statistical, retrieved 2026-08-31
Mechanism
written

Digipoort, an electronic post office for government–business data

The Netherlands runs Digipoort as a central gateway that receives, validates and routes secure messages between businesses and public agencies; in 2024 it handled 75,433,353 messages, including a channel with 3,075 connected organisations for financial and social reporting.

Published number
75,433,353 messagesmessages handled by digipoort, 20243,075 organisations connected organisations in sbr financial & social, 2024
Source
Logius, 2024 service figuresofficial statistical, retrieved 2026-08-31
Mechanism
written

DigiNotar, a certificate breach that forced a trust-chain reset

The Netherlands ended DigiNotar's PKIoverheid service after the 2011 breach generated at least 531 forged certificates; 333 could be revoked and the government tightened certificate requirements, role division and supervision after the incident.

Published number
531 certificatesforged certificates generated during the breach, 2011333 certificates forged certificates that could be revoked, 2011
Source
Dutch Safety Board, DigiNotar incident investigationofficial statistical, retrieved 2026-08-31
Mechanism
written

Marmaray, the Bosphorus rail crossing

Türkiye opened the Marmaray rail tunnel between Europe and Asia in October 2013 and the transport ministry reported 196 million passenger journeys in 2024, with 1.226 billion cumulative journeys since opening.

Published number
196,000,000 journeysmarmaray passenger journeys in 2024, 20241,226,000,000 journeys cumulative passenger journeys since opening, 2024-12-20
Source
Ministry of Transport and Infrastructure, Government of Türkiyeofficial statistical, retrieved 2026-09-03
Mechanism
written

Formación programada por las empresas (FUNDAE training credit)

Spain finances employer-organised training through rebates on firms' social security vocational-training contributions, managed by the state foundation FUNDAE. In 2024, 347,442 firms trained 3,378,343 workers, 22.7 percent of private-sector employees, across 5,824,016 participations.

Published number
22.7 % of private-sector employeespopulation coverage: workers trained in employer-programmed courses as a share of private-sector employees (epa annual average), 202429.7 % of contributing firms firms training their workers as a share of firms paying the vocational-training contribution (peak), 2014
Mechanism
written

CORFO Programas y Consorcios Tecnológicos

Chile's development agency CORFO had 49 technology programmes and consortia in execution during 2024, 38 technology programmes and 11 technology consortia, the consortia joining firms with universities and technology centres in multi-year R&D portfolios, after awarding six new consortia in 2023 with 1,500 million pesos of co-financing each.

Published number
49 programmes and consortiatechnology programmes and consortia in execution, 20246 consortia new technology consortia funded in the 2023 call, 2023
Mechanism
written

Beira railways concession, and its termination

Mozambique's government concessioned the Sena and Machipanda railways for 25 years in 2004 to a joint company in which the state rail enterprise CFM held 49 percent; the Sena line reopened to Moatize more than two years late, carried 266,000 tonnes against a target of one million, and the government terminated the concession on 7 December 2011.

Published number
266,000 metric tonsfreight carried on the sena line by the end of the project, 20111,000,000 metric tons per annum target freight on the sena line by the end of the project, 2009
Mechanism
written

Transport Infrastructure Investment Project (national roads, ports and the Northern Railway)

Madagascar's road authority and transport agencies delivered road, port, airport and Northern Railway works under the Transport Infrastructure Investment Project from 2004, cutting travel time on the RN44 from 24 to 6 hours, with the closing date extended four years from 30 June 2008 to 30 June 2012 and IDA-financed costs of US$169.39 million against US$150.00 million at appraisal plus US$15.60 million of additional financing added in 2007.

Published number
169.39 million US dollarstotal project costs, actual or latest estimate, 2012-06150 million US dollars total project costs, appraisal estimate, 2003
Mechanism
written

Hazard Risk Mitigation and Emergency Preparedness Project: seismic retrofitting and the emergency information system

Romania's Ministry of Administration and Interior and Ministry of Regional Development completed seismic retrofitting of 44 high-risk public buildings, where about 23,350 people worked, and rolled out a modernised emergency communication system to 48 sites under a project approved in May 2004, after cutting the retrofit target from 84 buildings to 40 in 2010 and closing in June 2012 instead of December 2009.

Published number
44 buildingspublic buildings with seismic retrofitting completed, 2012-10-3084 buildings high-risk public buildings selected for retrofitting at appraisal, 2004-05-20
Mechanism
written

Amman Development Corridor (Amman Ring Road phase 1), and its overrun

Jordan's Ministry of Public Works and Housing built the 40 km first phase of the Amman Ring Road under the Amman Development Corridor Project, whose estimated total cost rose from US$160.6 million at appraisal in 2004 to US$455.97 million in March 2013, with the road works alone rising from US$106.92 million to US$279.87 million, while the loan closing date moved from June 2009 to December 2012 and one of three sections was 65 percent complete at closing.

Published number
455.97 million US dollarsactual or latest estimated total project cost (15 march 2013), 2013-03-15160.6 million US dollars total project cost estimated at appraisal, 2004
Mechanism
written

Bolsa Familia and the single registry behind it

Brazil built one national registry of low-income households and paid conditional transfers through it, going from 6.6 million benefits in December 2004 to a peak of 21.0 million in 2022 and 18.6 million in December 2025.

Published number
18,618,236 benefitsbenefits paid in december, 2025
Source
Ministry of Social Development, via IPEADATAofficial statistical, retrieved 2026-08-26
Mechanism
written

Seguro Popular, and its abolition

Mexico built public health insurance for people outside social security from 2003 and abolished it in 2020, and CONEVAL measured the share of the population without access to health services rising from 16.2 percent in 2018 to 39.1 percent in 2022.

Published number
39.1 % of populationpopulation lacking access to health services after abolition, 202216.2 % of population population lacking access to health services before abolition, 2018
Source
CONEVAL, comunicado no. 7, medicion multidimensional de la pobreza 2022official statistical, retrieved 2026-08-27
Mechanism
written

ChileCompra, a national public-procurement marketplace

Chile runs Mercado Público as a shared e-procurement platform; in 2024 it transacted US$17.643 billion through 2,031,670 purchase orders involving 110,255 participating suppliers.

Published number
17,643,000,000 US dollarsmercado público transaction value, 20242,031,670 orders mercado público purchase orders, 2024
Source
ChileCompra, 2024 Mercado Público transactions reportofficial statistical, retrieved 2026-08-31
Mechanism
written

BankID federated electronic identity

Sweden's bank-issued BankID became a shared identity layer for public and private services: in 2024 it handled 7.6 billion identification or signature transactions for 8.6 million users across 7,500 connected services, with 99.99% availability.

Published number
7,600,000,000 transactionsbankid identification and signature transactions, 20248,600,000 users (over) bankid users, 2024
Source
Finansiell ID-Teknik BID AB (BankID), 2024 statisticsofficial statistical, retrieved 2026-08-31
Mechanism
written

1177 national health portal and helpline

Sweden's regions and municipalities run the 1177 national health hub through Inera, combining a common website, logged-in care services and the nationwide nurse helpline; 1177.se recorded just over 260 million visits in 2021.

Published number
260,000,000 visits (over)1177.se visits, 2021
Mechanism
written

Guatecompras, the national procurement marketplace

Guatemala's Ministry of Finance reported 152,676 enabled Guatecompras users in April 2023, including 137,950 registered suppliers alongside public buyers, auditors and oversight bodies using the national procurement system.

Published number
152,676 usersenabled guatecompras users, 2023-04137,950 users enabled supplier users, 2023-04
Mechanism
written
2003IndiaBuildingLarge project deliveryoperating below its peak

Delhi Commonwealth Games, and the cost-estimate escalation

India and Delhi hosted the Commonwealth Games in October 2010, but the Comptroller and Auditor General recorded the total estimate rising from ₹1,200 crore in the May 2003 bid to ₹18,532.31 crore by October 2010.

Published number
18,532.31 INR croretotal estimated expenditure by october 2010, 2010-101,200 INR crore initial bid estimate, 2003-05
Mechanism
written

Rwanda's adult literacy centres, and their decline

Rwanda's Ministry of Education reports 93,548 learners in adult literacy centres in 2024/25, down from 152,015 in 2017.

Published number
93,548 learnerslearners in adult literacy centres, 2024/25152,015 learners learners in adult literacy centres at the 2017 high of the five-year table, 2017
Mechanism
written

National high-speed rail network

China's railway authorities built a high-speed rail network that the National Railway Administration put at about 47,000 km in operation in December 2024, from a programme that began in 2003; a World Bank review of the 27 lines in operation at the end of 2013 found a weighted average approved unit cost of RMB 129m per km for 350 km/h lines, which it put at no more than two-thirds of costs elsewhere.

Published number
47,000 km (about)high-speed rail track in operation, 2024-12129 RMB million per km weighted average unit cost of 350 km/h lines, approved estimates, lines in operation at end 2013, 2013
Mechanism
written

Mitacs Accelerate research internships

Mitacs, the federally and provincially funded not-for-profit, placed 4,859 students, recent graduates and postdoctoral fellows in Accelerate research internships with 2,314 host organisations under 2,406 professors in 2024-25, out of 20,885 internships across all its programmes that year.

Published number
4,859 internsinterns in the accelerate program, 2024-252,314 organisations host organisations in the accelerate program, 2024-25
Mechanism
written

Educación Básica Alternativa (EBA), and its erosion

Peru's Educación Básica Alternativa, the second-chance basic education modality for youths and adults, enrolled 226,500 students in 2016, the highest year of the 2014 to 2023 table, and 190,700 in 2023, according to INEI's Compendio Estadístico 2024 citing the Ministry of Education's school census.

Published number
190.7 thousand studentsenrolment in educación básica alternativa, 2023226.5 thousand students enrolment in educación básica alternativa at the 2016 peak of the 2014 to 2023 series, 2016
Mechanism
written

Ministry of Labour Vocational Training Division adult courses

Israel's Vocational Training Division, in the labour ministry, trained about 61,000 people in 2022, against about 55,000 in 2019 and 59,000 in 2021, according to the Knesset Research and Information Center.

Published number
61,000 people (rounded)people trained through the vocational training division, 202255,000 people (rounded) people trained through the vocational training division, pre-pandemic year, 2019
Mechanism
written

MOSE, the Venice lagoon flood barrier

Works on MOSE, Italy's system of 78 mobile gates at Venice's three lagoon inlets, began in 2003. All the gates were first raised on 10 July 2020, and 6,689.07 million euros had been appropriated by mid-2022 with the works about 95 percent complete and still unfinished past their planned 2021 completion.

Published number
6,689.07 EUR milliontotal funds appropriated for mose by the end of the first half of 2022, 2022-0695 % complete share of the infrastructure completed at 17 june 2022, against a completion planned for 2021, 2022-06-17
Mechanism
written

Southern Expressway (Southern Transport Development Project)

Sri Lanka's Road Development Authority built the country's first access-controlled expressway, about 126 km from Kottawa to Godagama. Sections I to III opened on 26 November 2011 and section IV on 15 March 2014. The project took 13 years against a planned six. Its total cost rose from US$295.9 million at the 1999 appraisal to US$906.5 million at completion in 2014, partly because it was widened from two to four lanes.

Published number
906.5 US$ millionactual total project cost at completion, 2014295.9 US$ million total project cost estimated at the 1999 appraisal (two-lane design), 1999
Mechanism
written

Transrail concession of the Dakar to Bamako railway, and its collapse

Mali and Senegal concessioned the 1,288 km Dakar to Bamako railway to Transrail in 2003 for 25 years, terminated the concession on 5 December 2015 after it failed, and rail traffic, which at its peak had carried about 1.5 million tons of freight a year, stopped completely in 2018.

Published number
0 tons (traffic stopped completely)freight and passenger rail traffic on the dakar to bamako line after the concession's termination, 20181.5 million tons freight carried by the dakar to bamako railway at its peak (about), peak (year not stated)
Mechanism
written

Road Maintenance and Rehabilitation Project

Papua New Guinea's Department of Works restored or maintained 600 km of national roads against a 640 km target under the Road Maintenance and Rehabilitation Project, closing in June 2012 five and a half years after the original December 2006 closing date, with national road works under the original loan costing US$35.62 million, 158 percent of their US$22.52 million appraisal estimate.

Published number
35.62 million US dollarsactual cost of maintenance and rehabilitation of national roads, 2012-06-3022.52 million US dollars appraisal estimate for maintenance and rehabilitation of national roads, 2002
Mechanism
written

Zambia Railways concession to Railway Systems of Zambia, and its cancellation in 2012

Zambia concessioned its national railway, after a decade in which traffic halved from 1,072 million net ton kilometres in 1993 to 540 million in 1999, to the private operator Railway Systems of Zambia, which took over on 3 December 2003 and raised traffic by about 30 percent in net ton kilometres in 2004 against 2003; the World Bank later reported that the network and service kept deteriorating and that the concession was cancelled in September 2012.

Published number
30 %increase in rail freight traffic (net ton kilometres) in the first year of the concession, 2004 against 2003, 20043.7 million US dollars concession fees paid to government by the concessionaire since takeover, per the concessionaire's auditors, 2005 (third quarter)
Mechanism
written

Fyra V250, a high-speed service withdrawn after a failed launch

The V250 trains for the Netherlands–Belgium Fyra service entered operation six years late and the service was cancelled after only 40 days, leaving the intended passenger service on the HSL-Zuid unrealised and triggering a parliamentary inquiry.

Published number
40 daysdays of international fyra service before cancellation, 2013-01-186 years years late at entry into service, 2012
Source
Dutch House of Representatives, Fyra parliamentary inquiryofficial statistical, retrieved 2026-08-31
Mechanism
written

Universal Coverage Scheme and the 30-baht health system

Thailand's National Health Security Office has sustained the tax-funded Universal Coverage Scheme since 2002; in fiscal 2023 it covered more than 47.2 million people and contracted 17,247 public and private health units to provide care.

Published number
47,200,000 peopleuniversal coverage scheme beneficiaries, 202317,247 health units public and private health units serving ucs beneficiaries, 2023
Mechanism
written

National eID ecosystem with private trust-service partners

Estonia's state eID ecosystem, in which the state issues ID cards with certificates from a private trust-service partner and accepts the privately issued Smart-ID in its authentication service TARA, handled 27,094,512 Smart-ID authentications through TARA in 2023, 57 percent of the total, beside 22,351,282 by state ID card and Mobile-ID.

Published number
27,094,512 authenticationssmart-id authentications through the state authentication service tara, 202322,351,282 authentications id card and mobile-id authentications through tara, 2023
Mechanism
written

Earthquake Emergency Recovery after the 2002 Changureh-Avaj earthquake

After the April 2002 earthquake in Kermanshah and the June 2002 earthquake in Qazvin, Zanjan and Hamedan, Iran's Ministry of Interior project unit and the Housing Foundation repaired or rebuilt about 24,000 damaged houses to seismic standards by June 2009, using government funds and a US$180 million World Bank loan, of which US$174.9 million was disbursed.

Published number
24,000 housing unitsdamaged housing units repaired and reconstructed in compliance with seismic standards, 2009-06-3040,727 houses houses damaged by the june 2002 earthquakes, 2002
Mechanism
written

Adult literacy centres financed through FONAENF, and their erosion

Burkina Faso's adult literacy and non-formal education centres, financed through FONAENF and run by contracted operators under the faire-faire strategy, enrolled 178,021 adult learners in 2015. Enrolment fell to 113,721 in 2018 and 86,405 in 2021, when 1,885 adult centres opened against 3,094 in 2018.

Published number
86,405 learnersyoung people and adults enrolled in non-formal education centres (apprenants jeunes et adultes), 2021178,021 learners adults enrolled in non-formal education centres at the 2015 high point of the 2015 to 2019 series (enf des adultes), 2015
Mechanism
written

Grunnskoleopplæring for voksne, municipal primary and lower secondary education for adults

Norway's municipalities, delivering the statutory right of adults to primary and lower secondary education, taught 10,223 adult participants in 2025, 7,588 in ordinary basic education, 2,435 in special education and 200 in both, against a high of 13,946 in 2019.

Published number
10,223 participantsnumber of participants in adult training (primary and lower secondary education and special education for adults), the whole country, 202513,946 participants same count in the highest year of the series, 2019
Mechanism
written

Employment Agency adult training, including the DI-GI digital skills vouchers

Bulgaria's Employment Agency (Agentsia po zaetostta) included more than 155,450 unemployed and employed adults in training in 2025, against just over 87,540 in 2024, with 97,911 people certified through digital skills vouchers financed under the national Recovery and Resilience Plan.

Published number
155,450 peopleunemployed and employed people included in adult training by the employment agency ('over 155 450'), 202587,540 people same count for the previous year ('just over 87 540'), 2024
Mechanism
written

ANOFM national vocational training plan, and its fall after 2023

Romania's National Employment Agency (ANOFM) enrolled 15,634 people in vocational training courses, skills assessment and apprenticeships under its national training plan in 2025, down from 27,843 in 2023, with unemployed trainees falling from 25,420 to 11,082 while the registered unemployment rate rose.

Published number
15,634 peoplepeople included in vocational training, skills assessment or apprenticeship programmes organised by anofm, 202527,843 people same count two years earlier (anofm activity report for 2023), 2023
Mechanism
written

NCHD Adult Literacy Programme, and its collapse after 2013

Pakistan's National Commission for Human Development opened 19,399 adult literacy centres enrolling 482,295 learners in 2009-10, but its literacy programme 'came to a halt since 2013 due to scarcity of funds', and in 2021 it ran a phase of 1,490 centres, financed by the Pakistan Human Development Fund, that enrolled 36,529 learners, mostly women aged 15 to 45.

Published number
36,529 learnerslearners enrolled in the 1,490 adult literacy centres of the project 'promoting literacy in rural communities of pakistan', 2021482,295 learners peak: learners enrolled in 19,399 adult literacy centres, nchd annual report 2012, year-wise table, 2009-10
Mechanism
written

Bishkek-Osh road rehabilitation, third phase

The Kyrgyz Ministry of Transport and Communications completed the third and final phase of the Bishkek-Osh road rehabilitation in July 2007, bringing the rehabilitated length of the only internal surface connection between Bishkek and Osh to 463 km, with a 31.7 percent cost overrun on base cost items and civil works finished 33 months after the October 2004 appraisal schedule.

Published number
31.7 % overruncost overrun on base cost items, third road rehabilitation project, 200733 months civil works completion delay (appraisal schedule october 2004, actual july 2007), 2007-07
Mechanism
written

X-Road national data exchange layer

Estonia has run one data exchange layer for the whole state since 2001, and in July 2026 it carried 374.9 million queries between 1,000 connected organizations, 251 of them government bodies, across 3,785 services.

Published number
374,921,341 queriesx-road queries in the month, 2026-07
Source
Estonian Information System Authority, X-tee factsheetofficial statistical, retrieved 2026-08-26
Mechanism
written

The 2001 stabilisation, and its unwinding

Turkey answered its 2001 banking collapse with central bank independence, bank restructuring and fiscal rule, taking inflation from 54.4 percent in 2001 to 8.6 percent in 2004, and after 2018 the same framework was overridden until inflation reached 72.3 percent in 2022.

Published number
72.3 % per yearconsumer price inflation after the framework was overridden, 20228.6 % per year consumer price inflation at the stabilisation's best, 2004
Source
World Bank, World Development Indicators, series FP.CPI.TOTL.ZGinternational organization, retrieved 2026-08-27
Mechanism
written

CGEE, the strategic studies center

Created in 2001, the Centro de Gestão e Estudos Estratégicos was designed to produce prospective studies and long-term recommendations for Brazilian science, technology and innovation policy, with 273 researchers and specialists signing its creation record.

Published number
273 researchers and specialistsparticipants signing the creation record, 2001
Source
Ministry of Science, Technology and Innovation, CGEE reportofficial statistical, retrieved 2026-08-29
Mechanism
written

Adult education allowance (aikuiskoulutustuki), and its abolition

Finland paid an earnings-related adult education allowance from 2001 so that working adults could take leave to study, reaching 30,124 recipients in 2022 and 32,518 in 2023, until Parliament abolished it in May 2024 with a transition under which the allowance could be granted until 31 December 2025.

Published number
30,124 personsadult education allowance recipients in 2022, the year before the abolition decision, 202232,518 persons adult education allowance recipients in 2023, the last full year before the abolition took effect, 2023
Mechanism
written

TIA Technology Stations Programme, and its erosion

South Africa's Technology Innovation Agency runs a network of university-based Technology Stations that gave 2,907 small firms science, engineering and technology services in 2024/25, against 3,167 at the five-year high in 2021/22, while the programme's budget fell from R105.9 million in 2020 to R93.98 million in 2025 and only 80 percent of the stations were operational.

Published number
2,907 SMMEssmmes accessing set services through the technology stations network, 2024/253,167 SMMEs smmes accessing set services through the technology stations network, five-year peak, 2021/22
Source
Technology Innovation Agency (TIA), Annual Report 2024/25official statistical, retrieved 2026-10-02
Mechanism
written

South African Weather Service radar network, and its erosion

The South African Weather Service reported that the availability of its weather radar infrastructure fell from 73.83 percent in 2021/22 to 52.23 percent in 2022/23 and 44.25 percent in 2023/24, against a 75 percent target, as load shedding, missing spares and ageing C-band radars took sites down.

Published number
44.25 %availability of radar infrastructure, average of quarterly performance, 2023/2473.83 % availability of radar infrastructure, 2021/22
Mechanism
written

Kolej Komuniti part-time and lifelong-learning (Pembelajaran Sepanjang Hayat) courses

Malaysia's public community colleges, run by the Ministry of Higher Education, counted 259,788 part-time students, including participants in Pembelajaran Sepanjang Hayat lifelong-learning courses, in 2024, against 259,810 in 2023, according to the ministry's Statistik Pendidikan Tinggi 2024.

Published number
259,788 studentspart-time students in community colleges, total, part-time including psh programme (table 5.4), 2024259,810 students same count for the previous year, same table, 2023
Mechanism
written
2001NepalBuildingLarge project deliveryoperating below its peak

Melamchi Water Supply Project, and its erosion after the 2021 flood

Nepal's government built the Melamchi River diversion tunnel and headworks to pipe an additional 170 million litres a day into the Kathmandu Valley, closing the project in June 2021, more than 14 years after its original March 2007 closing date; the 2021 flood then damaged the headworks, and water has since been diverted for about eight months a year.

Published number
14 yearsdelay of project closing beyond the originally planned closing date (march 2007 planned, june 2021 actual), 2021-068 months per year months per year melamchi water could be diverted after the 2021 flood damaged the headworks, 2025-08
Mechanism
written

Ouagadougou Water Supply Project (Ziga)

Between 2001 and 2007, ONEA, Burkina Faso's national water utility, delivered the Ziga project through a dedicated project unit. The project built the Ziga earth dam and its transmission main to Ouagadougou, plus 56,000 subsidised connections and 400 standpipes. Eleven external financiers and the government paid US$269.37 million, 131 percent of the US$205.88 million estimated at appraisal, and the project closed on its original date of 31 December 2007.

Published number
269.37 million US$actual total financing of the ouagadougou water supply project, all financiers, 2007-12-31205.88 million US$ total financing estimated at appraisal, 2000-07
Mechanism
written

Measles elimination, and its erosion

The United States eliminated endemic measles transmission by 2000 through school-entry vaccination requirements, and falling coverage brought 2,777 confirmed cases by August 2026, the most since 1991, against 285 in all of 2024.

Published number
2,777 casesconfirmed measles cases in 2026, to 20 august, 2026-08285 cases confirmed measles cases in the last pre-outbreak year, 2024
Mechanism
written

Dollarization as an emergency monetary redesign

Ecuador adopted the US dollar as legal tender in January 2000 during a banking and currency crisis; a Central Bank review reports inflation falling from 96.1% in 2000 to below 8% in 2003 while the new regime removed the exchange-rate tool.

Published number
96.1 %annual inflation in the crisis year, 20008 % or lower annual inflation after the transition, 2003
Source
Banco Central del Ecuador, 20 years of dollarization sector-real analysisofficial statistical, retrieved 2026-08-31
Mechanism
written

SETAs and workplace-based learning delivery

South Africa's Sector Education and Training Authorities reported 45,146 learnership completions, 83,578 skills-programme completions and 99,778 workplace-based learning opportunities for the 2024 post-school education and training intake.

Published number
45,146 completionslearnerships completed, 2024-01-2299,778 opportunities workplace-based learning opportunities created, 2024-01-22
Source
Department of Higher Education and Training, Government of South Africaofficial statistical, retrieved 2026-09-02
Mechanism
written

SINAPRED evacuation for hurricanes Eta and Iota

Nicaragua's national disaster system, SINAPRED, evacuated 160,597 people and sheltered 59,964 ahead of hurricanes Eta and Iota in November 2020, when about 3 million people were exposed, and 21 lives were reported lost.

Published number
160,597 peoplepeople evacuated in nicaragua for hurricanes eta and iota, 2020-1121 deaths lives lost in nicaragua to hurricanes eta and iota, 2020-11
Mechanism
written

Israel Railways electrification and the Jerusalem express line, and their delays

Israel Railways began electrifying the national network in 2000 and opened the electric express line to Jerusalem in September 2018, but by May 2020 only about 64 of 480 planned route kilometres were electrified, and the forecast completion date had moved from 2019, set in 2013, to the end of 2025, on an estimated cost of ILS 12.1 billion.

Published number
2025 yearforecast completion year of the electrification project, as updated in march 2020, 2020-032019 year forecast completion year defined in 2013, 2013
Mechanism
written

DASK compulsory earthquake insurance

After the 1999 Marmara earthquake, Turkey's government created the Turkish Catastrophe Insurance Pool (DASK) in 2000 to provide compulsory earthquake insurance, and coverage rose from 23 percent of dwellings as reported by the World Bank in January 2011 to 57.7 percent, or 11.6 million insured homes, by October 2025.

Published number
57.7 % of dwellingsshare of dwellings covered by compulsory earthquake insurance, 2025-1023 % of dwellings share of dwellings covered, world bank reading, 2011-01
Mechanism
written

Programme national d'enseignement des adultes (national adult education programme)

Tunisia's Ministry of Social Affairs, through its national adult education centre and regional coordinations, taught 16,560 adult learners in the 2021-2022 school year, 10,320 in the basic cycle and 6,240 in the completion and intensive cycles, 9,799 of them women, against a forecast of 22,710.

Published number
16,560 learnersadult learners in the national adult education programme, all governorates and cycles (annex 5), 2021-2022 school year22,710 learners forecast number of learners for 2022 in the same report, 2022 (forecast)
Mechanism
written

Water management contracts and leases, and the national lease from 2017

Armenia ran a sequence of water public-private partnerships from 2000, a Yerevan management contract, a 2006 to 2016 Yerevan lease and management contracts for the national and three regional utilities, which raised daily supply from about 6 hours in 1998 to 24 hours in most of Yerevan by 2015, and from January 2017 consolidated them into a single 15-year national lease covering about 2.2 million people.

Published number
2,200,000 people (about two-thirds of the population)people in the area covered by the 15-year national water lease from january 2017, 20176 hours per day (24 in most of Yerevan by 2015) average daily water supply in most parts of the country, including yerevan, before the ppps, 1998
Mechanism
written

Tehran Sewerage Project (first phase: interceptors, trunk main and southern treatment plant)

The Tehran Sewerage Company built interceptors, trunk mains, tunnels and a wastewater treatment plant under the first phase of the Tehran Sewerage Project at a latest estimated cost of US$359.22 million against US$341.45 million at appraisal in 2000, with the treatment works costing 189 percent of their estimate and the loan closing on 30 June 2008, two years late, before the plant and the eastern trunk main were finished.

Published number
359.22 million US dollarsactual or latest estimated total project cost, 2008-06-30341.45 million US dollars total project cost estimated at appraisal, 2000
Mechanism
written

Maputo water lease to Aguas de Mocambique, and the public buyout of the operator in 2010

Mozambique's water asset fund FIPAG leased Maputo's water service from 2000 to the private operator Aguas de Mocambique, whose lead shareholder SAUR pulled out in December 2001 and offered its stake to Aguas de Portugal for one euro; under the lease Maputo connections rose from 77,793 at the end of 2000 to 109,932 in March 2009, and in 2010 FIPAG bought out the Portuguese shareholder, leaving the operator primarily publicly owned.

Published number
109,932 connectionsmaputo water connections served by the lease operator at project completion, 2009-03-3177,793 connections maputo water connections at the start of the lease (baseline), 2000-12-31
Mechanism
written

Employer and in-work training under Employment Insurance, and its erosion

Korea's Employment Insurance-funded employer and in-work training reached 4,916 thousand training participations in 2018, then fell to 2,410 thousand in 2025 after the Ministry of Employment and Labor withdrew support for statutory common training in 2019, COVID closed classrooms in 2020 and a cap on outsourced remote training took effect in late 2023.

Published number
2,410 thousand participationsemployer and in-work training participations (사업주 및 재직자훈련), 20254,916 thousand participations employer and in-work training participations at the 2018 peak, 2018
Mechanism
written

Botniabanan coastal railway

Sweden built the Botniabanan railway between Nyland on the Ångermanälven and Umeå through the state and municipally owned company Botniabanan AB, starting construction in 1999 and opening it in August 2010, four years after the original 2006 schedule, at a final cost of almost SEK 16 billion in 2010 prices, which the national audit office calculated as 73 percent above the original estimate.

Published number
73 % overrunfinal construction cost increase over the original cost estimate, 2010 prices, 2010140 % above the pre-decision estimate total cost of delivering the planned botniabanan traffic, including follow-on investments on connecting lines, above the estimate before the decision, 2011
Mechanism
written

FONDEN, the natural disaster fund, and its abolition

Mexico's federal government ran FONDEN from 1999 as a pre-arranged national fund for post-disaster reconstruction, allocating a record US$833 million to it in 2011 and insuring it with catastrophe bonds, and abrogated the FONDEN trust by the decree of 6 November 2020, moving disaster spending onto ordinary budget lines.

Published number
833 US$ millionfonden annual federal budget allocation, the highest to that date, 2011
Mechanism
written

PFI Act projects and concessions

Under the 1999 PFI Act, Japanese national and local governments had published implementation policies for a cumulative 1,219 PFI projects by 31 March 2026, 80 of them public facility operating concessions, with a cumulative initial contract value of ¥10.47 trillion (104,730 hundred-million yen).

Published number
1,219 projectscumulative pfi projects with a published implementation policy since fy1999, 2026-03-31104,730 hundred million yen (oku-en) cumulative pfi contract value (initial contract amounts), 2026-03-31
Mechanism
written

County and city general secondary schools for adults (licea ogólnokształcące dla dorosłych)

Poland's county governments and cities with county rights ran general secondary schools for adults whose enrolment rose from 26,443 pupils in 2010 to 47,584 in 2013, fell to 16,470 in 2021 and recovered to 26,734 in 2024, according to Statistics Poland's Local Data Bank.

Published number
26,734 pupilspupils in general secondary schools for adults governed by country powiats and by cities with powiat rights (sum of bdl variables 473647 and 8836), 202447,584 pupils same sum at its 2013 high, the largest value since the country-powiat series begins in 2010, 2013
Mechanism
written

Instituto Nacional de Gestao de Calamidades (INGC)

Mozambique's National Disaster Management Institute, created in 1999 after a new national disaster policy, evacuated around 150,000 people with two days of warning in the 2007 floods, and by 2011 had ten days of warning for an event of similar scale and spent under US$1 million on evacuation, against about US$5 million in 2007.

Published number
150,000 peoplepeople evacuated by ingc ahead of the 2007 floods, 200710 days advance warning ingc had before a 2011 flood event similar in scale to 2007/2008, 2011
Mechanism
written

Teknologiraadet, the Norwegian Board of Technology

Norway's Board of Technology, an independent public advisory body created in 1999 on the Storting's initiative that also serves as secretariat for the Storting's technology group, delivered eight publications and held eleven meetings, four of them for the Storting's technology group, in 2025 on operating income of NOK 13.8 million.

Published number
8 publicationspublications delivered, 202513.8 million NOK operating income, 2025
Mechanism
written

Flood Emergency Project after the 1998 southern floods

After record floods in southern Kyrgyzstan in 1998 damaged about 1,000 houses, the Department of Water Resources rebuilt or built 27.4 km of river protection embankments against 8.8 km planned, directly protecting about 40,000 people, and in 2003 a flood greater than that of 1998 passed the new embankments without significant damage or overtopping.

Published number
27.4 kmriver protection embankments rehabilitated or constructed, 2004-03-3140,000 people (about) people living in flood zones protected directly, 2004-03-31
Mechanism
written

Sure Start children's centres, and their erosion

England built a national network of early-childhood centres reaching 3,632 sites by August 2009, then closed or hollowed out a large part of it after funding was cut, with the official count at 3,123 by October 2017 and independent estimates near 1,000 closures.

Published number
3,123 centreschildren's centres open, official count, 2017-103,632 centres children's centres open at the peak, 2009-08
Source
The Sutton Trust, Stop Start report summaryacademic survey, retrieved 2026-08-27
Mechanism
written

Gotthard Base Tunnel

Switzerland built the 57 km Gotthard Base Tunnel under the voter-approved NEAT programme and opened it to commercial traffic on 11 December 2016, on the date set, at a final cost forecast of CHF 9.541 billion against a 1998 cost basis of CHF 6.323 billion, both in 1998 prices.

Published number
51 % overrun, 1998 pricescost growth against the 1998 cost basis, gotthard axis including connections, 20160 months late commercial opening against the scheduled timetable change, 2016
Mechanism
written

Canadian long-gun registry, its information system overrun and its dismantling

Canada began registering all firearms under the 1995 Firearms Act from December 1998. The registry's first information system, CFIS I, had an initial estimate of $13 to 20 million and had cost $190 million by March 2005. Its successor CFIS II rose from $32 million to at least $87 million and was halted. In 2012 Parliament ended long-gun registration and ordered the destruction of about 7.5 million non-restricted registration records, which the RCMP deleted from CFIS in October 2012.

Published number
190,000,000 Canadian dollarscost of the canadian firearms information system (cfis i), against an initial estimate of $13 to 20 million, 2005-037,500,000 registration records non-restricted firearms registration records in cfis when parliament ordered their destruction, 2012-04
Mechanism
written

The 1997 Canada Pension Plan financing reform

In December 1993 the Chief Actuary projected that the pay-as-you-go contribution rate would reach 14.2% by 2030 and that the fund would run out by 2015. The federal and provincial governments agreed a reform package in 1997. It took effect on 1 January 1998, raised the combined contribution rate in steps to 9.9% by 2003, replaced pay-as-you-go financing with steady-state funding and invested net cash flows through the CPP Investment Board. The 2024 valuation puts the minimum sustaining rate at 9.19% from 2034, below the legislated 9.9%, with assets of $651 billion.

Published number
9.9 % of contributory earningscombined employee-employer base cpp contribution rate reached under the reform, legislated since 2003, 200314.2 % of contributory earnings pay-as-you-go contribution rate projected for 2030 without reform (15th actuarial report, december 1993), 1993-12
Mechanism
written

Educación Permanente para personas jóvenes y adultas (MEC)

Paraguay's Ministry of Education and Sciences enrolled 94,436 young people and adults in its four formal and non-formal Educación Permanente programmes in 2025, as reported in the Ministry of Economy and Finance's budget evaluation for that year.

Published number
94,436 studentsstudents enrolled in the four formal and non-formal educación permanente programmes for young people and adults, 2025
Mechanism
written

NAMCOL secondary education programme for out-of-school learners

The Namibian College of Open Learning, a state-owned distance education college, registered 27,242 learners in its Grade 11 and 12 secondary programme in 2025, against a peak of 30,999 in 2017 and a low of 23,258 in 2022.

Published number
27,242 learnerslearners enrolled in namcol secondary education programmes (nssco and nsscas), 202530,999 learners same count at its peak year, 2017
Mechanism
written

Koralmbahn Graz to Klagenfurt, opened seven years after its contracted completion date

Austria's federal rail infrastructure company ÖBB-Infrastruktur AG forecast the Koralmbahn's total cost at 6.139 billion euros at the end of 2023, 282.4 million euros or 5 percent above the 2012 baseline, but missed both the 2018 completion date in the 2004 Koralmbahn contract and the 2023 opening date in the 2012 to 2017 framework plan, according to the Court of Audit, and the line entered passenger service on 14 December 2025.

Published number
6.139 billion eurosforecast total cost of the koralmbahn project, 2023-12282.4 million euros (5 percent) cost increase against the 2012 baseline, including the later addition of the airport branch, 2023-12
Mechanism
written

Emergency Flood Assistance Project after the 1998 and 1999 floods

After floods in 1998 caused damage estimated at US$40 million, about 2 percent of GDP, Tajikistan's Republican Project Coordination Unit for Liquidation of Consequences of Natural Disasters had repaired about 210 km of roads and fully completed seven bridges and structures by the credit's closing on 31 December 2001, with about 80 km of road repairs and three bridges unfinished, and the World Bank rated the outcome unsatisfactory.

Published number
210 kmroad repairs completed at closing (about 80 km more unfinished), 2001-12-3140 million US dollars damage from the 1998 floods as estimated, 1998
Mechanism
written

Bildungskarenz with Weiterbildungsgeld, and its abolition

Austria's Public Employment Service (AMS) paid Weiterbildungsgeld from 1998 to employees taking up to a year of educational leave, an average of about 14,000 recipients in 2021 at a cost that rose from 236 million euros in 2019 to 646 million in 2024, until the Nationalrat ended the benefit on 31 March 2025 in a budget consolidation law.

Published number
14,000 persons (annual average)average weiterbildungsgeld recipients on educational leave, 2021646 million EUR total spending on bildungskarenz in its last full year before abolition, 2024
Mechanism
written

FONAFIFO Payment for Environmental Services

Costa Rica's FONAFIFO Payment for Environmental Services programme paid contracts covering 208,089 hectares in 2024, disbursing ₡9.234 billion while using public, donor and market-linked finance to keep private land in forest uses.

Published number
208,089 hectareshectares under payment for environmental services contracts, 20249,234,000,000 Costa Rican colones payments disbursed through the programme, 2024
Source
FONAFIFO, Board meeting record and 2024 programme accountsofficial statistical, retrieved 2026-08-31
Mechanism
written

Civil Defence hurricane evacuation system

Cuba's Civil Defence system and the provincial and municipal Defence Councils it activates evacuated and protected more than 735,000 people across eastern Cuba ahead of Hurricane Melissa, which struck as a Category 3 storm on 29 October 2025, according to UN OCHA.

Published number
735,000 people (more than)people evacuated and protected before hurricane melissa's landfall, 2025-10-2953,000 people people still evacuated about two weeks after landfall, 2025-11-14
Mechanism
written

Kunskapslyftet adult education initiative

Sweden's government funded municipalities to expand upper secondary adult education from autumn 1997 until 2002, and in spring 1999 municipal adult education produced about 157,000 places, of which about 120,000 full-year places were counted within Kunskapslyftet.

Published number
120,000 full-year placesfull-year places in municipal upper secondary adult education counted within kunskapslyftet, spring 1999
Mechanism
written

Road No. 13 South upgrading under the Third Highway Improvement Project

Laos's Ministry of Communication, Transport, Post and Construction upgraded about 200 km of Road No. 13 between Banlak 35 and Pakse to a bituminous standard, completed in March 2002, at US$157,785 per km against an appraisal estimate of US$209,670 per km, and the project closed on its original June 2003 date at US$63.78 million against US$68.92 million appraised.

Published number
157,785 US dollars per kmactual unit cost of upgrading road no. 13 south (calendar 2002 dollars), 2002209,670 US dollars per km appraisal unit cost estimate (sar), 1997
Mechanism
written

Aufstiegs-BAföG, upgrading training support

Federal and state governments paid grants and loans to 186,100 people taking vocational upgrading courses such as master craftsman or certified educator in 2025, 3.8 times the 49,300 supported in 1997, with 1.1 billion euros approved.

Published number
186,100 peoplepeople receiving aufstiegs-bafög support, 202549,300 people people receiving aufstiegs-bafög support in the first complete survey year, 1997
Mechanism
written

Rządowe Centrum Studiów Strategicznych, liquidated in 2006

Poland's Government Centre for Strategic Studies, attached to the Prime Minister, with tasks of strategic programming and forecasting of economic and social development set in article 14k of the Act of 8 August 1996 on the Council of Ministers, was liquidated as of 31 March 2006 by the Act of 17 February 2006, in the year its budget had been planned at PLN 10,016 thousand.

Published number
10,016 thousand zlotyplanned 2006 expenditure in budget part 47, government centre for strategic studies, 2006 (draft budget)
Mechanism
written

Educação de Jovens e Adultos (EJA), and its erosion

Brazil's Educação de Jovens e Adultos, the second-chance basic education modality delivered mostly by public school networks, enrolled 2,962,322 students in 2021 and 2,252,069 in 2025, a fall of about 24 percent in four years, according to INEP's School Census.

Published number
2,252,069 enrolmentsenrolments in educação de jovens e adultos (eja), total of public and private networks, 20252,962,322 enrolments enrolments in eja in 2021, the highest year of the 2021 to 2025 series in this release, 2021
Mechanism
written

Skills Development under the Labour Market Development Agreements, and its 2024-25 funding cut

Canada's provinces and territories delivered 154,892 employment-benefit services under the federally funded Labour Market Development Agreements in 2024-25, 92 percent of them Skills Development training, in a year when Part II funding fell by $425 million as a temporary top-up in place since 2016-17 ended and Skills Development spending fell 19.7 percent to $798.9 million.

Published number
154,892 servicesemployment benefits services delivered under the lmdas (92 percent skills development), 2024-25 (fiscal year April 2024 to March 2025)798.9 million Canadian dollars expenditure on skills development under the lmdas, down 19.7 percent from 2023-24, 2024-25
Mechanism
written

Policy Horizons Canada, the federal foresight unit, and its 2024 disruption scan

Policy Horizons Canada, which describes itself as the Government of Canada's centre of excellence in foresight and reports through the Deputy Minister of Employment and Social Development Canada, published Disruptions on the Horizon 2024, which identified and assessed 35 possible disruptions using survey input from around 500 stakeholders, colleagues and foresight experts across the Government of Canada and beyond.

Published number
500 respondentsstakeholders, colleagues and foresight experts whose survey input assessed the disruptions (approximate, as stated), 202435 disruptions possible disruptions identified and assessed in the report, 2024
Mechanism
written

Centres d'alphabétisation, and their erosion

Côte d'Ivoire's education ministry ran a national network of literacy centres. It counted 75,275 learners in 2,828 centres in 2015-16 and 53,311 learners in 2,707 centres in 2024-25, a fall of about 29 percent in learners over the decade.

Published number
53,311 learnerslearners enrolled in literacy centres, all levels, 2024-2025 school year, 2024-202575,275 learners learners enrolled in literacy centres, all levels, 2015-2016 school year, the highest of the years checked, 2015-2016
Mechanism
written

Betuweroute, a freight railway that missed its operating promise

The Netherlands opened the Betuweroute freight railway in 2007, but the Auditor General found that state operating support in 2006–2013 reached €170 million against a €76 million maximum subsidy and required another €152 million through 2015; the line was not cost-covering and its promised environmental gain was never measured.

Published number
170,000,000 eurosstate operating support in 2006–2013, 201376,000,000 euros maximum subsidy agreed for 2006–2013, 2013
Source
Netherlands Court of Audit, exploitation of the Betuwerouteofficial statistical, retrieved 2026-08-31
Mechanism
written

Vietnam Social Security health-insurance expansion

Vietnam Social Security reported 95.523 million people enrolled in health insurance in 2024, covering 94.29% of the population and approaching the country's 95% universal-coverage target for 2025.

Published number
95,523,000 peoplehealth-insurance participants, 202494.29 % of population population covered by health insurance, 2024
Source
Vietnam Social Security, coverage progress reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Competence Centres Programme (Kompetenscentrumprogrammet) 1995 to 2005

Sweden's NUTEK, and later Vinnova and the Swedish Energy Agency, ran a ten-year programme from 1995 that built 28 competence centres at eight universities, each founded on a three-party contract between a university, a group of firms and the agency; more than 300 companies joined as contracting parties and industry put in 1.7 billion kronor between 1995 and 2005.

Published number
300 companies (more than)companies participating as contracting parties, 1995-20051,700,000,000 Swedish kronor industry contribution to centre research, 1995-2005
Mechanism
written

Teknologiraadet, the Danish Board of Technology, abolished in 2012

Denmark's parliament abolished the statutory Board of Technology, set up by Act no. 375 of 14 June 1995 to assess technology and report to the Folketing, by Act no. 559 of 18 June 2012, after an all-party budget agreement of 15 November 2011 withdrew its annual grant, which had been DKK 10.5 million in 2011, to fund the research reserve.

Published number
10.5 million DKKannual grant to the board of technology in the finance act, 2011
Mechanism
written

Grid power, and load shedding

South Africa ran one of the world's cheapest reliable grids and extended it to most of the population after 1994, then under-invested and lost the surplus, reaching 335 days of load shedding in 2023 before recovering to 83 days in 2024.

Published number
335 daysdays with load shedding in the worst year, 202383 days days with load shedding after the partial recovery, 2024
Source
CSIR, utility-scale power generation statistics in South Africa 2024official statistical, retrieved 2026-08-27
Mechanism
written

Monju, a fast-breeder programme ended before commercial operation

Japan decided in December 2016 not to restart the Monju prototype fast-breeder reactor and moved to decommissioning after a 1995 sodium leak, a 2010 restart followed by equipment trouble and 2012 inspection failures; the approved plan targets roughly 30 years of decommissioning.

Published number
22 yearsyears from first criticality to decommissioning decision, 201630 years planned monju decommissioning period, 2018
Source
Agency for Natural Resources and Energy, Monju decommissioning planofficial statistical, retrieved 2026-08-31
Mechanism
written

TESDA technical-vocational training at national scale

The Philippines' Technical Education and Skills Development Authority, created in 1994, recorded 1,633,393 enrollees and 1,428,724 graduates in technical-vocational education and training across all regions in 2023, with enrollment 29.61% above 2022.

Published number
1,633,393 peopletvet enrollees, 202329.61 % increase in tvet enrollees compared with 2022, 2023
Mechanism
written

AMS training measures (Schulungen) for jobseekers

Austria's Public Employment Service (AMS) had on average 76,496 people a day enrolled in its training measures in 2025, up 1.3 percent on 2024, against an annual average of 65,126 in 2015.

Published number
76,496 people in training (annual average)schulungsteilnehmer_innen gesamt, annual average stock, 202565,126 people in training (annual average) same annual average ten years earlier (übersicht jahr 2015), 2015
Mechanism
written

Earthquake Reconstruction Project in the Spitak earthquake zone

Armenia's Ministry of Economy, through a project implementation unit, restarted reconstruction in the zone of the December 1988 Spitak earthquake that had stopped when Soviet work crews withdrew in 1991, and by April 1997 had provided 2,857 housing units against 2,069 planned, completed 10 factories against 7 and laid 41 km of water pipes against about 27 km, under an IDA credit closed in June 1997.

Published number
2,857 housing unitshousing units provided (completed unfinished apartments and repaired or strengthened units), 1997-042,069 housing units housing units planned at appraisal, 1993
Mechanism
written

Yozma, the venture capital catalyst

Israel put 100 million dollars of public money into ten hybrid venture funds from 1993, with foreign partners and a buy-out option, and by 2002 the country had 131 venture funds with around 10 billion dollars under management.

Published number
10,000,000,000 US dollarscapital under management by israeli venture funds, 2002100,000,000 US dollars government capital that started yozma, 1993
Source
OECD, Venture Capital Policies in Israel, STI working paper 2003/3international organization, retrieved 2026-08-27
Mechanism
written

INSAFORP tripartite training institute, and its dissolution

El Salvador ran its national vocational training system from 1993 through INSAFORP, an institute funded by a 1% employer payroll levy and governed by a tripartite council of four government, four employer and four worker representatives; a 2021 reform gave the President the choice of the employer seats, and Decree 893 of 14 November 2023 dissolved INSAFORP and handed its functions to INCAF, whose council holds only the institute's president and four ministries.

Published number
0 seatsemployer-sector seats on the governing council of the national training institute under the 2023 incaf law, 2023-11-144 seats (of 12, four per sector) employer-sector seats on the insaforp consejo directivo under the 1993 ley de formación profesional (peak structure, as read from the recital of the 2021 reform), 2021-06-03
Mechanism
written

Government Report on the Future and the parliamentary Committee for the Future

Every Finnish government since 1993 has submitted a Report on the Future to Parliament, answered by a standing Committee for the Future; Part I of the Orpo government's report, a 20-year scenario process prepared jointly by all ministries and informed by 40 dialogues on Finland's future, was submitted on 18 September 2025.

Published number
20 years aheadscenario horizon of part i of the government report on the future, 2025-09-1840 dialogues dialogues on finland's future organised for the report, 2025
Mechanism
written

Sistema de Concesiones de Obras Públicas

Chile's Ministry of Public Works has delivered public infrastructure through private concession contracts since 1993; in April 2026 its Concessions Directorate reported 81 contracts in force with US$29.615 billion of committed investment across motorways, airports, hospitals, prisons, a reservoir, a desalination plant and a cable car.

Published number
29,615 million US dollarscommitted investment in concession contracts in force (materialised plus pending), 2026-0481 contracts concession contracts in force, 2026-04
Mechanism
written

Department of Skill Development skill-upgrading training

Thailand's Department of Skill Development, through 86 national institutes and provincial offices, trained 91,911 workers in skill-upgrading courses in fiscal year 2023, of whom 88,656 completed, according to its open-data release.

Published number
88,656 peopleworkers completing skill-upgrading training (sum of male and female completers across all units), fiscal year 2566 (October 2022 to September 2023)88,602 people workers completing skill-upgrading training in fiscal year 2564, fiscal year 2564 (October 2020 to September 2021)
Mechanism
written

Integrated Community-Based Adult Education (MEMKWA), and its decline

Tanzania's Ministry of Education ran Integrated Community-Based Adult Education in all 25 mainland regions from 1993. Enrolment peaked at 1,900,255 learners in 2005 and fell to 786,602 by 2014.

Published number
786,602 learnerslearners enrolled in icbae learning centres, 20141,900,255 learners learners enrolled in icbae learning centres at the 2005 high of the 2000-2014 table, 2005
Mechanism
written

AVE high-speed rail network

Spain expanded high-speed rail from the first Madrid–Seville line in 1992 to more than 4,000 kilometres of high-speed track by 2024; the Transport Ministry reported that the service reached 70 percent of the population.

Published number
4,000 kilometres (more than)high-speed rail tracks, 202470 % of population population reached by high-speed trains, 2024
Mechanism
written

Gyeongbu high-speed railway (KTX), and its cost and schedule overrun

Korea built the Seoul to Busan high-speed line planned in 1990 at 5,846.2 billion won for opening in early 1999; by 1993 the Ministry of Transportation re-estimated the cost at 12,174.3 billion won, the first phase opened in April 2004 and the whole line opened in 2010.

Published number
12,174.3 billion won1993 re-estimated project cost of the gyeongbu high-speed railway, 19935,846.2 billion won original project cost in the 1990 basic plan (1989 prices), 1990
Mechanism
written

Government-funded adult further education in England, and its erosion

Participation of adults aged 19 and over in government-funded further education and skills in England fell from a recent peak of nearly 3.3 million learners in 2012/13 to 1.6 million in 2020/21, and stood at 1,798,970 in 2024/25, according to the Department for Education.

Published number
1,798,970 learnersadult (19+) further education and skills participation, education and training plus adult apprenticeships, england, 2024/25 academic year3,300,000 learners adult (19+) further education and skills participation at the most recent peak, as published (rounded, 'nearly 3.3 million'), 2012/13 academic year
Mechanism
written

Private Finance Initiative and PF2, and their abolition

HM Treasury's Private Finance Initiative signed on average 55 contracts a year between 1997 and 2010 and left 704 current PFI and PF2 projects with a capital value of £57 billion at 31 March 2018, after signings fell to an average of nine a year after May 2010 and the Chancellor announced at Budget 2018 that the government would no longer use PF2 for new projects.

Published number
704 projectscurrent pfi and pf2 projects (in operation or construction), 2018-03-3155 contracts per year average pfi contracts signed per year, 1997 to 2010 (peak era; 9 a year after may 2010), 1997-2010
Mechanism
written

Functional Adult Literacy programme, and its decline

Uganda's Ministry of Gender, Labour and Social Development enrolled 434,664 adult learners in its government-funded Functional Adult Literacy programme in 2004, and enrolment fell to 88,533 by 2007.

Published number
88,533 learnerslearners enrolled in government-funded functional adult literacy (fal), 2007434,664 learners learners enrolled in government-funded fal in 2004, the high of the 1997-2007 table, 2004
Mechanism
written

National Functional Literacy Programme, and its erosion

Ghana's Non-Formal Education Division enrolled 312,907 adults in a single National Functional Literacy Programme batch in 2003-2005, and after donor funding ended in 2006 the government-funded batches shrank to 14,029 learners in the 2014-2016 batch.

Published number
14,029 learners enrolled per batchlearners enrolled in nflp local-language batch 19 (2014/16), 2014-2016312,907 learners enrolled per batch learners enrolled in nflp batch 9 (feb 2003/2005), the largest single batch, 2003-2005
Mechanism
written

The Convertibility Plan, and its collapse

Argentina ended hyperinflation by fixing the peso to the dollar by law in April 1991, taking annual inflation from 4,923 percent in 1989 to 3.9 percent in 1994, and the regime held until it collapsed in the 2001-2002 crisis.

Published number
3.9 % per yearconsumer price inflation under convertibility, 19944,923.3 % per year consumer price inflation at the hyperinflationary peak, 1989
Mechanism
written

Lei de Informática, a sectoral industrial policy

Law 8.248/1991 tied information-technology incentives to annual research, development and innovation investment of at least 5 percent of eligible domestic gross revenue, creating a predictable regime for sectoral capability.

Published number
5 % of eligible domestic gross revenueminimum annual r&d and innovation investment, 1991
Source
Presidência da República, Lei 8.248/1991official statistical, retrieved 2026-08-29
Mechanism
written

Hopewell elevated road-and-rail concession, and its termination

Thailand approved Hopewell's 60-kilometre Bangkok Elevated Road and Train System concession in 1991, but work stalled at 14 percent completion for more than nine months during the 1997 property-market collapse and the government terminated the concession in spring 1998.

Published number
14 % completehopewell project construction progress when work stood still, 199760 kilometres planned multimodal hopewell system length, 1991
Source
World Bank, Cities on the Move: an urban transport strategy reviewinternational organization, retrieved 2026-08-31
Mechanism
written

Cooperative Research Centres programme

Australia's Department of Industry reported that its Cooperative Research Centres portfolio facilitated 304 businesses establishing research-focused collaborations in 2023–24, across 114 CRC and 190 CRC Projects partners, above the year's target of 248.

Published number
304 businessesbusinesses establishing research-focused collaborations, 2024248 businesses portfolio target, 2024
Mechanism
written

Civil defence shelters

Finland requires a shelter in every building above a size threshold, nationwide since 1991, and by 2023 had about 50,500 shelters with places for about 4.8 million people, in a country of about 5.6 million.

Published number
4,800,000 placescivil defence shelter places, 202350,500 shelters civil defence shelters, 2023
Source
Finnish Government, Ministry of the Interiorofficial statistical, retrieved 2026-10-01
Mechanism
written

National adult literacy projects of the Bureau of Non-Formal Education, and their erosion

Bangladesh's Bureau of Non-Formal Education ran national adult literacy projects that reached 9.23 million learners aged 11 to 45 under the Total Literacy Movement project of 1997 to 2003, then 4.46 million aged 15 to 45 under the Basic Literacy Project (64 districts) of 2014 to 2022. Its only programme for learners above school age the bureau lists after June 2022 is a pre-vocational course that reached 4,198 people aged 14 to 24 in 2025-26.

Published number
4,459,000 learners (published as 44.59 lakh)learners reached, basic literacy project (64 districts), feb 2014 to jun 2022, 2014-02/2022-069,225,000 learners (published as 92.25 lakh) peak: learners reached, non-formal education project-4 (total literacy movement), apr 1997 to jun 2003, 1997-04/2003-06
Mechanism
written

Upper secondary education for adults (srednješolsko izobraževanje odraslih)

Slovenia's publicly accredited upper secondary programmes for adults, run by schools and adult education centres, enrolled 17,858 adults in the 2024/25 school year, up from a low of 13,851 in 2020/21 but below the 20,580 enrolled in 2015/16.

Published number
17,858 adult studentsadults in upper secondary education, all types of education, both sexes, all ages, 2024/25 school year20,580 adult students same count, first year of the current series, 2015/16 school year
Mechanism
written

SUS health councils, permanent public participation

Since Law 8.142 established them in 1990, Brazil's SUS has required permanent, deliberative health councils at the national, state and municipal levels, with users holding 50 percent of seats and health workers and government or providers holding 25 percent each.

Published number
50 % of seatsuser share of health council seats, current
Source
Ministry of Health, SUS councils, with Law 8.142/1990official statistical, retrieved 2026-08-30
Mechanism
written

Estonian Defence League, national defence rebuilt after independence

The Estonian Defence League was re-established in February 1990, before the country regained independence, and operates as a voluntary national defence organisation under the Ministry of Defence with territorial units and its own training structure.

Published number
1990 yearyear the defence league was re-established, 1990
Source
Estonian Defence League, historyofficial statistical, retrieved 2026-08-30
Mechanism
written

Office of Technology Assessment at the German Bundestag (TAB)

Since 1990 the German Bundestag has kept an Office of Technology Assessment, run under contract by the Karlsruhe Institute of Technology, whose tasks include horizon scanning of scientific and technological trends at early stages; by 2026 it reported more than 200 projects and over 400 publications.

Published number
200 projectsprojects carried out by tab since 1990 (lower bound, as stated), 2026-10-02400 publications publications of tab results since 1990 (lower bound, as stated), 2026-10-02
Mechanism
written

Upper secondary education for adults in non-stationary study

Estonia's secondary schools for adults and the non-stationary departments of other schools enrolled 7,866 learners in upper secondary education in 2025, the highest number in the Statistics Estonia series that starts in 1990, while the number of dedicated adult secondary schools fell from 16 in 2016 to nine.

Published number
7,866 enrolmentsenrolments in upper secondary education in non-stationary general education, 20259 schools secondary schools for adults, 2025
Mechanism
written

Adult literacy education under the National Commission for Mass Literacy, Adult and Non-Formal Education

Enrolment in adult literacy education in Nigeria, reported by the National Commission for Mass Literacy, Adult and Non-Formal Education, rose from 322,288 in 2020 to 2,152,146 in 2021 and 2,915,453 in 2022, according to the National Bureau of Statistics.

Published number
2,915,453 enrolmentstotal enrolment in adult literacy education, 2022322,288 enrolments total enrolment in adult literacy education in 2020, 2020
Mechanism
written

State medical emergency stockpiles, and their dismantling

Sweden's civil defence agency ÖCB began procuring long-term stocks of medical consumables for wartime care in 1989, and the national build-up by ÖCB and Socialstyrelsen was completed in 1995 to 1996; the stocks were run down from the late 1990s, ÖCB's stockpiles ended entirely in 2001, and by the start of the COVID-19 pandemic in 2020 Socialstyrelsen held no personal protective equipment in its emergency stockpile.

Published number
0 itemspersonal protective equipment held in socialstyrelsen's national emergency stockpile before the pandemic, 2020150,000 patients (peak; reduced to 5,000) patients covered by socialstyrelsen's emergency stockpile, peak versus after the 1996/1997 defence decision, 1996/1997
Mechanism
written

Fourth Highway Project: paving of the Mamou-Kankan and Dubreka-Kolaboui roads

Guinea's Ministry of Transport and Public Works paved the Dubreka-Kolaboui (196.5 km) and Mamou-Kankan (401 km) national roads under the Fourth Highway Project, approved in June 1988, at a latest estimated cost of US$207 million against an appraisal estimate of US$200 million, with the IDA credit closing on 31 December 1996, three years late, and the last 94 km of Mamou-Kankan still under construction in 1997.

Published number
207 million US dollarslatest project cost estimate at completion, 1997-06200 million US dollars project cost estimated in the staff appraisal report, 1988
Mechanism
written

Urban water lease (affermage) with SEEG, and the return to public management after 2000

Guinea ran its urban water service from 1989 under a ten-year lease in which the public asset company SONEG owned and financed the network and the privately led operator SEEG ran it, but after renegotiation failed the private operator withdrew in December 2000, the government decided in July 2003 to keep the service public, and revenue collected from private customers fell from US$5.8 million in 1998 to US$1.7 million in 2005.

Published number
1.7 million US dollarsrevenue collection from private customers, urban water services, 20055.8 million US dollars revenue collection from private customers in the last full years of the lease, 1998
Mechanism
written

Sistema Unico de Saude, universal public health system

Brazil wrote a right to health into the 1988 constitution and built a single public system that covers everybody in the country, and the WHO service coverage index for Brazil rose from 71 in 2000 to 84 in 2023.

Published number
84 index 0-100uhc service coverage index, 2023
Source
World Health Organization, Global Health Observatoryinternational organization, retrieved 2026-08-26
Mechanism
written

Youth Training and Employment Partnership Programme (YTEPP), and its shrinking enrolment

Trinidad and Tobago's YTEPP Limited, the state company that trains people aged 15 to 35 who are out of work or school, enrolled 1,601 persons in October 2024 to June 2025, 61 percent of its target, against 2,301 trainees in the Youth Training Programme over the same October to June window of 2019-20, according to the Ministry of Finance's Social Sector Investment Programme reviews.

Published number
1,601 personspersons enrolled in ytepp youth training and employment programmes, October 2024 to June 20252,301 trainees trainees enrolled in the ytepp youth training programme, same months five years earlier (ssip 2021), October 2019 to June 2020
Mechanism
written

VMA multi-channel public warning system

Sweden's Viktigt meddelande till allmänheten (VMA) system combines radio, television, mobile messages, apps and outdoor sirens; SOS Alarm's 2025 report records 37 VMA alerts issued in 2024, alongside the four scheduled annual siren tests.

Published number
37 alertsvma alerts issued, 20244 tests per year scheduled outdoor-warning tests, 2024
Source
SOS Alarm, 112 Report 2025official statistical, retrieved 2026-08-31
Mechanism
written

Kamu-Özel İşbirliği, the national public-private partnership programme

Turkey's central government signed 277 public-private partnership contracts from 1986 to September 2025, worth US$112.09 billion in September 2025 prices across transport, energy and health, with 262 in operation, including 18 PPP city hospitals holding 29,325 registered beds.

Published number
112.09 US$ billion, September 2025 pricestotal investment size of signed ppp contracts since 1986, 2025-0929,325 beds registered beds in the 18 city hospitals completed under ppp, 2025
Mechanism
written

National Adult Literacy Programme

Malawi's Ministry of Gender, Community Development and Social Welfare has run the National Adult Literacy Programme since 1986 through volunteer-taught community classes. Enrolment in Adult Literacy and Education reached 171,434 learners in the 2024/25 financial year, against about 82,000 participants in 2006.

Published number
171,434 learnerslearners enrolled in adult literacy and education, 2024/25 financial year82,312 learners adult literacy participants, public and ngo classes combined, 2006
Mechanism
written

Itaipú binational hydropower operations

Itaipú supplied Paraguay's grid with 20,383 GWh in 2024, 4.5% more than in 2023, while the binational plant generated 67,089 GWh in total and continued operating after four decades of service.

Published number
20,383 GWhenergy supplied to paraguay, 202467,089 GWh total itaipú generation, 2024
Source
Itaipú Binacional, 2024 production and supply reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Bissau Port Project, delivered two and a half years late

Guinea-Bissau's port authority (JAPG) rehabilitated the old commercial wharf of Bissau Port, built river ports and ferry ramps and, with a new deepwater wharf financed in parallel by four Arab funds, completed the IDA-financed Bissau Port Project on 30 June 1990 against a planned 31 December 1987, at a final cost of US$20.0 million against an appraisal estimate of US$17.36 million.

Published number
20 million US dollarsfinal cost of the ida-financed bissau port project, 1990-0617.36 million US dollars cost of the project estimated at appraisal, 1983
Mechanism
written

Sfax flood protection (belt canal) after the 1982 flood

After the October 1982 flood in Sfax killed at least 70 people and destroyed about 700 houses, Tunisia's Urban Hydraulics Directorate built an eight-km belt canal and rehabilitated the city's wadi channels and dikes, completing the works in June 1988 as scheduled, and the January 1990 floods that damaged much of central and southern Tunisia did not damage the protected area.

Published number
8 kmbelt canal built around greater sfax, 1988-0670 people lives lost in the october 1982 sfax flood (at least), 1982-10
Mechanism
written

HEART/NSTA Trust training enrolment

Jamaica's HEART/NSTA Trust, the national training agency financed by a 3 percent payroll levy, enrolled 116,918 people in its own technical and vocational, work-based and second-chance programmes in the 2022-23 financial year, including 13,918 in the High School Diploma Equivalency programme, and 129,957 when Ministry of Education and private providers are counted.

Published number
116,918 enrolmentsheart total enrolment, own programmes and interventions (excludes moey cap schools and private providers), 2022-23 (financial year April 2022 to March 2023)13,918 persons enrolled in the high school diploma equivalency (hsde) programme at end of financial year, March 2023
Mechanism
written

Atucha II nuclear plant, and its 33-year build

Argentina's state nuclear operator connected Atucha II to the grid in June 2014, almost 33 years after construction began in July 1981, and began commercial operation in May 2016, after a build halted in 1994 and restarted in 2006.

Published number
32.9 years (computed from IAEA dates)time from construction start (1981-07) to first grid connection (2014-06), 2014-0652.59 % energy availability factor, 2015 to 2025, 2015-2025
Mechanism
written

Cifre industrial doctorates

France's research ministry has funded Cifre industrial doctorates since 1981, paying an employer 42,000 euros over three years to hire a doctoral candidate whose thesis research is run in partnership with an academic laboratory; ANRT, which operates the scheme for the ministry, accepted 1,700 new Cifre in 2025 across 1,029 distinct employers.

Published number
1,700 doctoral contractsnew cifre industrial doctorates accepted, 20251,029 organisations distinct beneficiary employers, 2025
Mechanism
written

INEA adult basic education

Mexico's Instituto Nacional para la Educación de los Adultos certified 651,473 young people and adults as having completed a level of literacy, primary or secondary education in 2024, with 352,600 learners in its services at the close of the year.

Published number
651,473 peoplepeople who completed a level (literacy, primary or secondary) with inea, 2024352,600 learners ('352.6 mil') learners in inea services at the close of the year, 2024-12
Mechanism
written

INFOTEP national technical and vocational training

The Dominican Republic's tripartite training institute INFOTEP, created by Law 116-80 in 1980, registered 1,027,791 participants in training actions nationwide in 2025 and 3,613,098 participants between August 2020 and August 2025.

Published number
1,027,791 participantsparticipants in infotep training actions nationwide, 20253,613,098 participants participants trained by infotep, august 2020 to august 2025, 2020-08 to 2025-08
Mechanism
written

Programa Ampliado de Inmunizaciones, and its erosion

WHO and UNICEF estimated Venezuela's national DTP3 coverage among one-year-olds at 50 percent in 2025, down from 87 percent in 2015, and coverage has not returned above 66 percent in any year since 2017.

Published number
50 % of 1-year-oldsestimated dtp3 coverage among 1-year-olds, 202587 % of 1-year-olds estimated dtp3 coverage at the 2015 peak, 2015
Mechanism
written

Human Resource Development Authority (HRDA) subsidised training programmes

Cyprus's Human Resource Development Authority subsidised more than 106,000 participations in 11,064 single-company and multi-company training programmes in 2024, at a cost of 35.9 million euros, including 68,064 participations of employed persons in standard single-company programmes against 32,987 in 2023.

Published number
106,000 participationsparticipations in single-company and multi-company training programmes ('more than 106.000'), 202468,064 participations participations of employed persons subsidised in standard single-company training programmes, 2024
Mechanism
written

Kenya's adult education centres, and their halving

Kenya's state adult education programme, run since the 1978 presidential literacy decree through adult education centres in every county, enrolled 330,340 learners in 2014 and 165,552 in 2025, after a low of 125,402 in 2023, according to the Kenya National Bureau of Statistics.

Published number
165,552 learnerslearners enrolled in adult education centres, 2025330,340 learners learners enrolled in adult education centres at the 2014 peak of the published series, 2014
Mechanism
written

Federal funding gaps and the 2019 shutdown

The Congressional Research Service records 20 federal funding-gap shutdowns with at least one full day between FY1977 and FY2019, including the 35-day partial shutdown from 21 December 2018 to 25 January 2019, the longest in the period it surveys.

Published number
35 dayslongest partial federal shutdown, 2019-01-2520 shutdowns funding-gap shutdowns with at least one full day, 1977-2019
Source
Congressional Research Service, Past Government Shutdowns: Key Resourcesofficial statistical, retrieved 2026-08-31
Mechanism
written

Chixoy hydroelectric project, and its cost and time overrun

Guatemala's state electricity institute INDE built the 300 MW Chixoy hydroelectric project under contracts signed in 1977 and 1978; after the power-tunnel lining collapsed in late 1983 it entered commercial operation in November 1985, 41 months later than originally planned, at a final cost of US$823.1 million excluding finance charges against an appraisal estimate of US$372.7 million, an increase of 120 percent.

Published number
823.1 million US dollarsfinal project cost excluding finance charges, as estimated by inde, 1991-12372.7 million US dollars appraisal cost estimate excluding finance charges, 1977
Mechanism
written

Bataan Nuclear Power Plant, a mothballed megaproject

The Philippine Department of Energy's 2017 annual report describes the Bataan Nuclear Power Plant as mothballed and records its reassessment as part of a proposed national nuclear programme, after the original plant failed to become an operating power asset.

Published number
1 plantmothballed nuclear power plants reassessed, 2017
Source
Philippine Department of Energy, 2017 Energy Annual Reportofficial statistical, retrieved 2026-08-31
Mechanism
written

Franquicia Tributaria SENCE, and its erosion

Chile's SENCE training tax credit, running since 1976, financed 999,732 training participations and 653,939 unique trainees in 2024, down from 1,355,430 participations and 740,152 unique trainees in 2016, while public spending on it nearly doubled in nominal pesos; in July 2026 a Senate committee agreed to cut its ceiling from 1% to 0.7% of payroll.

Published number
999,732 participations (a person counted once per course)training participations financed by the franquicia tributaria, 20241,355,430 participations (a person counted once per course) training participations financed by the franquicia tributaria in 2016, the highest year in the evaluation's 2016-2024 table, 2016
Mechanism
written

PUB drainage programme and the shrinking of flood-prone land

Singapore's drainage authorities, the Drainage Department and later PUB, expanded the national drainage system under a drainage master plan, with a development drainage code from 1976, and reduced flood-prone areas from about 3,200 hectares in the 1970s to less than 25 hectares by 2025, with about $2.5 billion spent on drainage upgrades since 2011.

Published number
25 hectares (upper bound, 'less than')flood-prone area remaining, 2025-023,200 hectares flood-prone area in the 1970s, 1970s
Mechanism
written

Realignment of the Congo-Ocean Railway through the Mayombe, and its overruns

The Republic of the Congo's transport agency ATC rebuilt an 88 km section of the Brazzaville to Pointe-Noire railway through the Mayombe range, with 19 bridges, three tunnels including one of 4.6 km and 17 million m3 of earthworks, completing it in mid-1985 against an expected end of 1979 at a cost of US$399 million against an estimate of US$149 million, an overrun of 168 percent.

Published number
399 million US dollarstotal cost of the cfco realignment at completion, 1985149 million US dollars cost of the cfco realignment estimated at appraisal, 1976
Mechanism
written

Proalcool, the fuel substitution after the oil shock

Brazil answered the 1973 oil shock by mandating ethanol blending and building a national fuel alcohol industry, taking production from 580 thousand cubic metres in 1975 to 38,199 in 2025, and from 2003 flex-fuel engines moved the choice to the driver.

Published number
38,199.192 thousand cubic metresethanol production, 2025
Source
National Petroleum Agency, via IPEADATAofficial statistical, retrieved 2026-08-26
Mechanism
written

Knowledge Transfer Partnerships

UKRI reported more than 1,000 Knowledge Transfer Partnerships running at one time and more than 1,100 Associate projects in May 2026, joining businesses with universities or other research organisations through jointly supervised innovation work.

Published number
1,000 partnershipsknowledge transfer partnerships running, 2026-05-081,100 projects ktp associate projects, 2026-05-08
Source
UK Research and Innovation, Knowledge Transfer Partnerships overviewofficial statistical, retrieved 2026-08-31
Mechanism
written

France's long-term unemployment decline

France's national statistics office Insee reported that people unemployed for at least one year represented 23.3% of all unemployed people in 2024, while the long-term unemployment rate was 1.7% of the active population, down from 3.1% in 2015.

Published number
23.3 % of unemployedlong-term unemployed as share of all unemployed, 20241.7 % of active population long-term unemployment rate, 2024
Source
Insee, Evolution du chômage / Employment Survey 2024official statistical, retrieved 2026-08-31
Mechanism
written

Alfabetização e Educação de Adultos (public adult literacy and adult primary education), and its decline

Mozambique's education ministry counted 243,655 learners in its public adult literacy and adult primary education classes in the April 2025 school survey (169,341 in literacy and 74,314 in primary education for young people and adults), against 302,207 in 2024 and 529,314 in the March 2014 survey.

Published number
243,655 learnerslearners in public literacy and adult education (alfabetizacao e educacao de adultos), annual school survey 30 april, 2025529,314 learners learners in adult education (educacao de adultos), annual school survey 15 march, 2014
Mechanism
written

Itaipu Binacional, the treaty-built power system

Brazil and Paraguay built and operate Itaipu through a treaty-based binational entity, which reached 14,000 megawatts of installed capacity and has supplied both countries since the first unit entered operation in 1984.

Published number
14,000 MWinstalled generating capacity, 2007
Source
Itaipu Binacional, institutional informationofficial statistical, retrieved 2026-08-29
Mechanism
written
1973BrazilBuildingLarge project deliveryoperating below its peak

Programa Nacional de Imunizacoes, and its erosion

Brazil's national immunisation programme reached 99 percent DPT coverage in 2003 and held above 95 percent for a decade, then fell to 68 percent by 2021 and had recovered to 91 percent by 2024.

Published number
91 % of childrendpt immunisation coverage, children aged 12-23 months, 202499 % of children dpt immunisation coverage at its 2003 peak, 2003
Source
World Bank, from WHO and UNICEF estimatesinternational organization, retrieved 2026-08-26
Mechanism
written

Embrapa, a fifty-year bet on tropical agriculture

Brazil created a public agricultural research corporation in 1973 to make acidic tropical soils productive, kept it funded across every change of government since, and cereal production rose from 46.5 million tonnes in 2000 to 155.9 million in 2023.

Published number
155,877,082 tonnescereal production, 2023
Source
World Bank, from FAOinternational organization, retrieved 2026-08-26
Mechanism
written

The Fraunhofer contract-research model

Germany funds the Fraunhofer-Gesellschaft's institutes in proportion to what they earn from industry, and in 2025 the society performed 3.2 billion euros of contract research, 966 million euros of it paid by industry.

Published number
966,000,000 eurosindustrial revenue, 20253,200,000,000 euros contract research volume, 2025
Source
Fraunhofer-Gesellschaft, facts and figuresacademic survey, retrieved 2026-08-27
Mechanism
written

Cyclone Preparedness Programme

Before Cyclone Remal made landfall on 26 May 2024, Bangladesh's government-run cyclone early warning and evacuation system moved about 0.8 million people into 9,424 evacuation shelters across 19 districts. The UN-coordinated response plan records 16 deaths among 4.6 million people affected.

Published number
800,000 peoplepeople pre-emptively evacuated to shelters ahead of cyclone remal landfall, 2024-0516 deaths lives lost in cyclone remal (government assessment as reported in the plan), 2024-05
Mechanism
written

Bureau National de la Prospective et de la Veille Stratégique and the national prospective studies

Côte d'Ivoire's Ministry of Planning and Development completed its fourth national prospective study, Côte d'Ivoire 2040, under the technical responsibility of the Bureau National de la Prospective et de la Veille Stratégique, after earlier national studies in 1973 to 1974, 1983 to 1984 and 1993 to 1995, and built eighteen thematic and three global scenarios to the 2040 horizon.

Published number
4 studiesnational prospective studies completed (côte d'ivoire 2000, 2010, 2025 and 2040), 2017-0318 scenarios thematic scenarios built in the côte d'ivoire 2040 study, 2017-03
Mechanism
written

Rahad Irrigation Project, and its cost and time overrun

Sudan's government and the Rahad Corporation (RAHCO) built the Rahad irrigation scheme, 300,000 feddans east of the Rahad River, a tributary of the Blue Nile, with a main pumping station, a siphon under the Dinder River and a barrage on the Rahad River, under credits approved in March 1973; the physical works were completed in December 1982 against a planned June 1978, at a final cost of US$395.6 million against an appraisal estimate of US$125.0 million.

Published number
395.6 million US dollarsfinal estimated total project cost at completion, 1983125 million US dollars total project cost estimated at appraisal, 1973
Mechanism
written

Yabayo-Gagnoa road under the Fourth Highway Project, and its cost and time overrun

Côte d'Ivoire's Ministry of Public Works built the 70 km Yabayo-Gagnoa road and rebuilt the bridge over the N'Zi River under the Fourth Highway Project (Credit 406-IVC, approved June 1973), completing it in September 1978 against a planned June 1976, at a cost of US$24.7 million against an appraisal estimate of US$12.3 million, an overrun of 101 percent.

Published number
24.7 million US dollarsactual total project cost (fourth highway project), 197812.3 million US dollars appraisal estimate of total project cost, 1973
Mechanism
written

Telebras, the telecom system that was dismantled

Created in 1972, Telebras coordinated Brazil's state telecom system until its 1998 privatisation, when 54 concessionaires were split out and the state moved from operating the network to regulating and universalising service.

Published number
54 companiesconcessionaires controlled before the split, 1998
Source
Telebras, historical financial reportofficial statistical, retrieved 2026-08-29
Mechanism
written

Instituto Técnico de Capacitación y Productividad (INTECAP)

Guatemala's employer-levy-funded training institute INTECAP reported 490,280 participants in 26,387 vocational training events in 2025, 99.72% of its operating-plan target, through centres in all 22 departments.

Published number
490,280 participants (event enrolments)participants in vocational training events (total formación profesional), 202526,387 events vocational training events delivered, 2025
Mechanism
written

Office of Technology Assessment, defunded and closed in 1995

Congress gave the Office of Technology Assessment, created under the Technology Assessment Act of 1972, the statutory function to provide early indications of the probable impacts of technology; it appropriated $21,970,000 for the office with a cap of 143 staff for fiscal year 1995, then appropriated $3,615,000 for fiscal year 1996 to carry out its orderly closure, with no more than 17 employees paid except for severance.

Published number
3,615,000 US dollarsappropriation for the orderly closure of the office of technology assessment, FY199621,970,000 US dollars appropriation for office of technology assessment salaries and expenses, the last operating year, FY1995
Mechanism
written

Instituto Nacional de Formación Profesional (INFOP)

Honduras's national vocational training institute INFOP trained or certified 326,161 people in 2024 across six programmes and about 12,552 courses, figures the Tribunal Superior de Cuentas checked against instructors' start and end reports.

Published number
326,161 peoplepeople trained or certified by infop across its six programmes (sum of six programme totals), 2024135,430 people people certified in the largest programme, tourism, commerce and services, 2024
Mechanism
written

Barsebäck nuclear plant closure and decommissioning

Sweden permanently shut Barsebäck 1 in 1999 and Barsebäck 2 in 2005; the national nuclear-safety report lists each reactor at 615 MWe and records the site as undergoing decommissioning, a 1,230-MWe asset retirement completed by political decision rather than construction failure.

Published number
1,230 megawatts electrical (2 × 615 MWe)net electrical capacity permanently retired at barsebäck, 20052 reactors barsebäck reactors permanently shut, 2005
Mechanism
written

Disaster Financial Assistance Arrangements

Public Safety Canada's Disaster Financial Assistance Arrangements paid $1.84 billion in contributions to provinces and territories between 2011–12 and 2015–16, almost 45 percent of everything paid since the programme began in 1970, while 53 disaster events were approved by the Governor in Council between 2011 and 2016.

Published number
1,843,527,158 CADdfaa contributions paid, 2011-12 to 2015-1653 events disaster events approved by the governor in council, 2011-2016
Mechanism
written

Erhvervsforsker, the Industrial PhD and Industrial Postdoc programme

Denmark's innovation fund (Danmarks Innovationsfond, formerly Innovationsfonden) awarded 138 Industrial Researcher grants in 2025, from 252 applications and for 147.4 million kroner, each funding a researcher employed by a company and enrolled at or supervised by a university.

Published number
138 grantsgrants awarded for industrial researcher (industrial phd and industrial postdoc), 2025147.4 million Danish kroner amount invested in the programme, 2025
Mechanism
written

Dual vocational training (duale Ausbildung), and its contraction

Germany's dual training system, in which firms employ apprentices under contracts registered by the chambers while state vocational schools teach them, recorded 475,950 new training contracts in the year to 30 September 2025, down from 569,379 in 2011, while 54,372 offered places stayed unfilled.

Published number
475,950 contractsnew dual training contracts (bibb survey, 1 october to 30 september), 2025-09-30569,379 contracts new dual training contracts at the series peak (2009 to 2025), 2011-09-30
Mechanism
written

National Flood Insurance Program coverage, and its erosion

OpenFEMA's records of National Flood Insurance Program contracts in force fell from 4,667,875 on 31 December 2009 to 3,589,275 on 31 December 2025, a fall of about 23 percent in the federal flood insurance base over 16 years.

Published number
3,589,275 contractsnfip policy contracts in force (openfema records active on the date), 2025-12-314,667,875 contracts nfip policy contracts in force at the first complete year-end in the dataset, 2009-12-31
Source
FEMA, OpenFEMA NFIP Redacted Policies dataset (v3)official statistical, retrieved 2026-10-02
Mechanism
written

State-administered adult education under the Adult Education and Family Literacy Act, and its erosion

Federally funded, state-administered adult basic, adult secondary and English language programmes served 2,629,643 participants in fiscal year 2000, and by fiscal year 2021 served 770,179, after a fall through every year the table shows up to fiscal year 2020 (627,728) and a partial rebound in 2021.

Published number
770,179 participantsparticipants in state-administered adult basic, adult secondary and english language acquisition programmes, FY20212,629,643 participants participants in the same programmes in fiscal year 2000, the highest year the table shows, FY2000
Mechanism
written
1965JapanShared PurposeVolunteeringoperating below its peak

Volunteer fire corps, and its membership erosion

Japan's Fire and Disaster Management Agency reported 732,223 volunteer fire-corps members on 1 April 2025, a fall of 14,458 in one year in the local disaster-response corps that it describes as a core of community resilience.

Published number
732,223 membersvolunteer fire-corps members, 2025-04-0114,458 members lost one-year membership decline, 2025-04-01
Mechanism
written

Programa Nacional de Vacinação and seasonal immunisation

Portugal's DGS reported 86 percent immunisation of eligible infants in the first RSV campaign, 98–99 percent first-year coverage for the universal childhood schedule, and nearly four million seasonal vaccines administered in 2024–2025.

Published number
86 %eligible infants immunised against rsv, 2024-202598 % universal-schedule first-year coverage (lower bound), 2024
Mechanism
written

Public civil defence shelters, and their dismantling

Germany held 1,967 public shelters with about 1.6 million places in 2008, decided with the states to abandon them, and decommissioned them until March 2022, leaving 579 shelters with 477,593 places, none of them functional or operational.

Published number
477,593 placespublic shelter places still designated, 20251,600,000 places public shelter places at the start of the run-down, 2008
Mechanism
written

INA national vocational training, and its contraction

Costa Rica's Instituto Nacional de Aprendizaje (INA) recorded 204,773 training enrolments in 2024, down from 313,276 in 2015 at the high point of its 2010 to 2019 plateau, a fall of about 35 percent that the 2020 to 2024 recovery did not reverse.

Published number
204,773 enrolmentsina total enrolments (gestión total matrículas), current, 2024313,276 enrolments ina total enrolments at the high point of the 2010 to 2019 plateau, 2015
Mechanism
written

Institut National de Préparation Professionnelle (INPP)

The Democratic Republic of the Congo's Institut National de Préparation Professionnelle recorded 34,376 learners in initial and continuing vocational training in the first half of 2026, against a semester forecast of 42,850, according to the mid-term review of its 2026 performance contract.

Published number
34,376 learnersapprenants en formation initiale et continue, premier semestre, first half of 202642,850 learners semester forecast of people to train under the 2026 performance contract, first half of 2026
Mechanism
written

Groningen gas system, and its closure after induced earthquakes

The Netherlands ended roughly sixty years of Groningen gas extraction with the permanent closure of all production locations on 19 April 2024; by the end of 2024 the response system had handled more than 500,000 damage reports and paid over €2.5 billion in compensation.

Published number
500,000 reportsdamage reports handled after the extraction period, 20242,500,000,000 euros compensation paid for gas-extraction damage, 2024
Mechanism
written

Civil protection shelters

Under the shelter-building duty introduced with Switzerland's 1963 civil protection legislation, the Federal Office for Civil Protection reported about nine million shelter places in some 370,000 private and public shelters in 2023, a national coverage rate above 100 percent of the resident population.

Published number
9,000,000 shelter places (rounded, about)shelter places in private and public shelters, 2023-08-22100 % of permanent resident population (publisher states 'over 100') national shelter coverage rate, 2023-08-22
Mechanism
written

Economic Planning Board, long-run industrial coordination

South Korea's Economic Planning Board operated from 1961 to 1994 as the government body responsible for economic development planning and budget planning before its functions moved through later finance ministries.

Published number
1961 yearyear the economic planning board was established, 1961
Source
Ministry of Strategy and Finance, ministry historyofficial statistical, retrieved 2026-08-30
Mechanism
written

Campaña Nacional de Alfabetización

In 1961 Cuba's national literacy campaign mobilized volunteer teachers, student brigades and worker brigades to teach adults to read across the country. By 30 August 1961, 593,651 people were learning and 64,253 had already been made literate, and the government reported illiteracy reduced to 3.92 percent of the population when the campaign closed.

Published number
593,651 peoplepeople enrolled and learning in the literacy campaign, reported at the iv national literacy meeting, 1961-08-303.92 % of population illiteracy rate reported after the campaign, share of total population, 1961
Mechanism
written

Arbejdsmarkedsuddannelser (AMU), adult vocational training courses, and their decline

Statistics Denmark counted 386,879 participations in Denmark's state-funded adult vocational training courses (AMU) in 2024, about 7,056 full-time equivalents, down from 1,050,944 participations and 15,307 full-time equivalents in 2010.

Published number
386,879 participants (course participations)participants in labour market educations (amu), all denmark, calendar year, 20241,050,944 participants (course participations) same series at its peak year, 2010
Mechanism
written

Bureau federal du Plan

Belgium's Federal Planning Bureau, which produces the government's economic forecasts and long-term demographic, ageing, energy and transport outlooks, published 34 publications in 2025 and employed 91 full-time equivalents at the end of the year, down from 96 at the end of 2023, after it stopped replacing departing staff in 2024 to meet savings targets.

Published number
91 FTEstaff, full-time equivalents at 31 december, 2025-12-3196 FTE staff, full-time equivalents at 31 december (earlier level, not shown to be a peak), 2023-12-31
Source
Bureau federal du Plan, Rapport d'activite 2025official statistical, retrieved 2026-10-02
Mechanism
written

Hello Training, public vocational training

Japan's national and prefectural governments trained 225,176 people through public vocational training in fiscal year 2023, 95,752 of them jobseekers and 114,552 people in work, and a further 44,699 through job-seeker support training.

Published number
225,176 traineestrainees in public vocational training (national and prefectural), FY202344,699 trainees trainees in job-seeker support training, FY2023
Mechanism
written

SENA complementary training (formación complementaria)

Colombia's Servicio Nacional de Aprendizaje, created by decree in 1957, recorded 5,469,951 learners in short complementary training courses in 2023 (7,035,749 course places), and certified 3,661,218 completions in that strand the same year.

Published number
5,469,951 learnerslearners (aprendices) in sena complementary training, 2023-123,661,218 certifications complementary training certifications, 2023-12
Mechanism
written

Interstate Highway System

Under the Federal-Aid Highway Act of 1956, the federal government and the states built the Interstate System. In nominal dollars, the estimated federal cost to complete it rose from $34 billion in the 1958 Interstate Cost Estimate to $114 billion in the final estimate of 1991.

Published number
114 USD billionestimated federal cost to complete the interstate system, final (1991) interstate cost estimate, nominal, 199134 USD billion estimated federal cost to complete the interstate system, first (1958) interstate cost estimate, nominal, 1958
Mechanism
written

Federal siren warning network, and its dismantling

West Germany built a federal warning service after 1955; after the Cold War the federally owned service was dissolved, its ten warning offices were abandoned and the nationwide siren alarm network was dismantled or transferred to municipalities, ending a system that had relied on about 1,700 volunteer helpers.

Published number
10 officesfederal warning offices abandoned, 19971,700 people volunteer helpers in the former warning service, 1997
Source
German Bundestag, report on civil-protection structuresofficial statistical, retrieved 2026-08-31
Mechanism
written

Delta Works, a 43-year national flood-defence programme

After the 1953 flood, the Netherlands built 13 Delta Works between the first project in 1954 and the completion of the Maeslant Barrier in 1997, creating a long-lived national defence system of dams, sluices and storm-surge barriers.

Published number
13 major flood-defence worksdelta works delivered, 199743 years programme duration to final delivery, 1997
Source
Rijkswaterstaat, institutional historyofficial statistical, retrieved 2026-08-31
Mechanism
written
1952UruguayBuildingLarge project deliveryoperating below its peak

AFE passenger rail and network contraction

Uruguay's state railway suspended passenger service in January 1988 to focus on freight; by 1990 about half of the national network had been declared non-operational, leaving 1,484 kilometres active from a 2,998-kilometre network, before passenger services returned only partially in 1993.

Published number
1,484 kilometresrail network remaining active after the contraction, 19902,998 kilometres rail network before the contraction, 1985
Mechanism
written

THW, volunteer civil protection as a federal institution

Germany's federal civil-protection agency trains and equips a volunteer force that reached about 88,000 people across 669 local units in May 2025, supported by about 2,200 paid staff.

Published number
88,000 peoplevolunteer thw members, 2025-05669 local units local thw units, 2025-05
Source
Bundesanstalt Technisches Hilfswerk, agency overviewofficial statistical, retrieved 2026-08-30
Mechanism
written

Social and Economic Council, the institutionalised polder bargain

The Netherlands established the Social and Economic Council (SER) by law in 1950, giving employers, trade unions and independent Crown-appointed experts a standing forum for social and economic policy; the current council has 36 members and collective agreements cover more than 84 percent of employees.

Published number
36 membersser council members, 202684 % of employees employees covered by collective agreements, 2026
Mechanism
written

Civil defence public warning sirens (tyfoner) and their twice-yearly test

The Norwegian Civil Defence tested 1,130 public warning sirens in its national warning test on 14 January 2026 and reported an uptime of 89 percent, which it called a clear improvement on the January 2025 test and a slight fall from the June 2025 test.

Published number
89 %uptime of public warning sirens in the national warning test, 2026-01-141,130 installations public warning siren installations tested, 2026-01-14
Mechanism
written

Civil defence shelters and protective trenches, and their erosion

Denmark's Emergency Management Agency counted about 4,693,000 places in public shelters, protective concrete trenches and building shelters at the end of 2001, and the municipal count it collected in 2022, the first since then, recorded about 3.54 million, with places in concrete trenches down from 152,335 to 107,658 and in building shelters (sikringsrum) from 3,743,822 to 3,307,400, after municipalities had stopped requiring shelters in new buildings.

Published number
3,538,595 placesplaces in concrete trenches, other public shelters, building shelters and supplementary rooms, sum of the four national totals in the 2022 count, 2022-06-274,693,000 places (about) places in shelters (concrete trenches, combined public shelters, supplementary public shelters and building shelters), 2001-12-31
Mechanism
written

ICE and a mostly renewable national electricity system

Costa Rica's integrated electricity system generated 89.4% of its electricity from renewable sources in 2024, while ICE reported electrical coverage reaching 98.7% of households despite one of the country's driest years on record.

Published number
89.4 % of generationrenewable share of electricity generation, 202498.7 % of households households with electricity coverage, 2024
Source
Instituto Costarricense de Electricidad, 2024 renewable-generation reportofficial statistical, retrieved 2026-08-31
Mechanism
written

CCSS universal health-insurance reach

Costa Rica's Caja Costarricense de Seguro Social reported health-insurance coverage of 92.92% of the national population in 2024, using household-survey and administrative records to include contributors, dependents, pensioners and state-covered households.

Published number
92.92 % of populationpopulation covered by the ccss health insurance, 2024360,124 people population recorded as uninsured, 2024
Source
Caja Costarricense de Seguro Social, Institutional Memory 2024official statistical, retrieved 2026-08-31
Mechanism
written

INEP, the standing education statistics institution

Created in 1937, INEP built a standing education statistics and census system that lets federal, state and municipal actors see schools, students and policy results across Brazil, while its historical archive now spans 218.68 linear metres.

Published number
218.68 linear metreshistorical archive, 2022
Source
INEP, institutional history and historical archiveofficial statistical, retrieved 2026-08-29
Mechanism
written

The public library system

Finland runs the world's most used public library system under a statutory duty dating to 1928, and in 2024 Finns borrowed 85.4 million items, 15.3 per inhabitant, and visited libraries 50.7 million times.

Published number
15.3 loans per personlibrary loans per inhabitant, 202450,700,000 visits library visits in the year, 2024
Mechanism
written

Compulsory voting

Australia has required citizens to vote since 1924 and turnout at the 2025 federal election was 90.7 percent of enrolled voters, a level no large voluntary-voting democracy reaches.

Published number
90.7 % of enrolled votershouse of representatives turnout, 2025 federal election, 2025
Mechanism
written