How easily can new approaches be attempted, tested, abandoned, and improved?
Capability agenda
Ghana
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Ghana stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 26.2 | 0.46 | +7 over 10 years using 2 indicators |
| Agency | 39.1 | 0.49 | no trend |
| Coordination | 72.9 | 0.45 | +9.1 over 10 years using 2 indicators |
| Trust | 64.8 | 0.33 | +5.1 over 10 years using 2 indicators |
| Learning | 52.9 | 0.54 | +11.9 over 10 years using 2 indicators |
| Experimentation | 8.4 | 0.46 | -1.3 over 10 years using 3 indicators |
| Adaptability | 52.4 | 0.62 | -2.9 over 10 years using 4 indicators |
| Building | 20.0 | 0.62 | -0.8 over 10 years using 3 indicators |
| Shared Purpose | 38.5 | 0.20 | no trend |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Ghanaโs comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 โ 2026: 64.7 to 64.2 (-0.5) over 30 years using 2 indicators
Agenda items on this timeline
- 2022Domestic Debt Exchange Programme, December 2022 to February 2023
- 2022Ghana's 2022 Marburg virus disease response
Historical values use todayโs frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How capable is the country of turning plans and knowledge into functioning systems?
+201
How capable is the country of identifying and preparing for emerging change?
+35
How able are individuals and organizations to turn an intention into action?
What to measure first
The evidence is too thin to manage these dimensions confidently.
Shared Purpose
0.20To what extent can people imagine themselves as participants in a common project?
Trust
0.33How much cooperation is possible beyond immediate personal networks?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Coordination | 72.9 | 0.45 |
| Learning | 52.9 | 0.54 |
| Adaptability | 52.4 | 0.62 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of oneโs life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Ghana
What the indicators miss about Ghana
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- National Functional Literacy Programme, and its erosion (Learning)
Ghana's Non-Formal Education Division enrolled 312,907 adults in a single National Functional Literacy Programme batch in 2003-2005, and after donor funding ended in 2006 the government-funded batches shrank to 14,029 learners in the 2014-2016 batch.
- Sankofa Gas Project (Offshore Cape Three Points) (Coordination)
Ghana structured the Sankofa offshore gas development as a public-private deal in which Eni and Vitol invested and the state oil company GNPC bought the gas under take-or-pay terms backed by an IDA payment guarantee, mobilising US$4,653 million of private capital and bringing first gas to power plants in 2018.
- Bank of Ghana Regulatory Sandbox (Experimentation)
The Bank of Ghana, which launched a regulatory and innovation sandbox pilot in 2021, admitted six firms into its Regulatory Sandbox for one year in January 2026 to test the exchange, custody, administration and issuance of virtual assets.
- Domestic Debt Exchange Programme, December 2022 to February 2023 (Adaptability)
After losing market access and requesting IMF support in July 2022, Ghana's government launched a domestic debt exchange on 5 December 2022 covering all medium- and long-term local-currency government, Daakye and ESLA bonds, and settled it on 21 February 2023 with 85 percent of the face value of bonds held by investors other than pension funds exchanged, giving almost GHS 50 billion of cash debt relief in 2023.
- Accra bus rapid transit under the Ghana Urban Transport Project, and its cancellation (Building)
Ghana's Department of Urban Roads, joined in 2012 by the Ministry of Local Government and Rural Development, set out in 2007 to build Sub-Saharan Africa's first bus rapid transit corridor in Accra for an estimated US$46 million of infrastructure, but after a design review raised that estimate to US$100.7 million and counterpart funds did not arrive, the BRT was dropped in the 2014 restructuring without its 9.1 km of dedicated lanes being built, and the project closed in December 2015, 35.5 months after its original December 2012 closing date.
- Ghana's 2022 Marburg virus disease response (Adaptability)
Ghana's Ministry of Health declared the country's first Marburg virus disease outbreak on 7 July 2022, identified and monitored 198 contacts through 42 days, and declared the outbreak over on 16 September 2022 after three confirmed cases, all from one household, and two deaths.
- National Health Insurance Scheme (Building)
Ghana's National Health Insurance Authority, set up under the 2003 National Health Insurance Act, had 18.47 million active members at the end of 2024, 56.26 percent of the population, up from 16.31 million in 2020.
- e-zwich national biometric smart card, and its falling use (Building)
Ghana's central bank, through its wholly owned subsidiary GhIPSS, built the e-zwich interoperable biometric card system that held 4.31 million issued cards in 2025, but e-zwich transactions fell 44.9 percent that year to 5.31 million from 9.63 million in 2024, which the Bank of Ghana attributes to a significant reduction in government payments.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.