Canada
Strongest usable evidence: Anticipation, at 78.7. Raise Experimentation first, at 48.2. Coordination needs more evidence: confidence is 0.29.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- ExperimentationPeers 56.30.47 usable-10.4(3)
Measure before managing, thinnest first
- CoordinationPeers 88.70.29 thinno trend
- Shared purposePeers 70.80.29 thin+3.4(2)
- TrustPeers 90.60.34 thinno trend
Keep watching, highest first
- AnticipationPeers 72.90.46 usable+3.9(2)
- LearningPeers 76.40.55 usableno trend
- AdaptabilityPeers 69.40.62 usable-0.9(4)
- AgencyPeers 62.90.46 usableno trend
- BuildingPeers 53.60.61 usable-1.1(3)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Canada beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Resource-rich federal democracy with persistent productivity questions.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
78.70.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationCanada beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3.9 over 10 years (2016 to 2026), band +3.9 to +3.9. Median change: all countries +11.2, Income quartile 4 of 4 in 2000, highest +8.4.
+6.5 over 20 years (2006 to 2026), band 0 to +14.6, which includes no change. Median change: all countries +13.4, Income quartile 4 of 4 in 2000, highest +12.4.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+3.9 over 10 years, from 74.8 in 2016 to 78.7 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 1,591articles per million peoplefrom 63,719.9 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 92.4index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity (1 case below), Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2024
1.8 % of GDP, rank 22 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2022
5,624 per million people, rank 14 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
39,738 per million people, rank 23 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
1996CanadaPolicy Horizons Canada, the federal foresight unit, and its 2024 disruption scanstill operating
Policy Horizons Canada, the federal foresight unit, and its 2024 disruption scan
Policy Horizons Canada, which describes itself as the Government of Canada's centre of excellence in foresight and reports through the Deputy Minister of Employment and Social Development Canada, published Disruptions on the Horizon 2024, which identified and assessed 35 possible disruptions using survey input from around 500 stakeholders, colleagues and foresight experts across the Government of Canada and beyond.
500 respondents, stakeholders, colleagues and foresight experts whose survey input assessed the disruptions (approximate, as stated), 2024. 35 disruptions, possible disruptions identified and assessed in the report, 2024. Policy Horizons Canada, Government of Canada, Disruptions on the Horizon 2024 (PH4-198/2024E-PDF), retrieved 2026-10-02.
How it worked: A small dedicated foresight unit inside the federal public service, governed by a deputy minister steering committee, runs recurring horizon scans and surveys hundreds of officials and outside experts to rate disruptions by likelihood, impact and timing, and trains and networks foresight practitioners across departments.
Limits: The unit is reporting on its own work, and the 500 is stated as 'around 500', an approximate count of survey inputs rather than a measure of whether any department used the scan; the report itself says its content does not necessarily represent the views of the Government of Canada. The description as centre of excellence is in the report's disclaimer; the reporting line through the Deputy Minister of Employment and Social Development Canada is stated on the unit's about page (https://horizons.service.canada.ca/en/about-us/index.shtml), not in the report. Both figures appear on the web version at the source URL and in the PDF edition (pages 5 and 7 of https://horizons.service.canada.ca/en/2024/disruptions/Disruptions_on_the_Horizon_2024_report.pdf). No published budget, staff count or uptake figure was found: Employment and Social Development Canada's 2024-25 Departmental Results Report does not mention the unit, so the record evidences a standing federal function producing a dated whole-of-government scan with a deputy minister steering committee named in its acknowledgements, not the influence of that scan on policy. Whether the Disruptions report is annual was not verified: no 2023 or 2025 edition was found at the corresponding addresses. Started is 1996, when secondary histories place the unit's predecessor, the Policy Research Secretariat, in the Privy Council Office, renamed Policy Research Initiative in 2000 and Policy Horizons Canada around 2011 to 2012; that lineage was not verified on an official page today and the foresight mandate as now worded dates from the later renaming. The unit sits inside a line department rather than at the centre of government, which limits its reach.
Panel median72.0-6.7 against the indicators
Round 2. How this layer works
- 76.0 institutionalist@claude-opus-5-5, self-confidence 0.65
I hold at 76: panelist C says federal foresight is limited, but Policy Horizons Canada is a standing federal foresight organisation, which few in the frame have; panelist B's point on budget influence is fair but already priced in.
- 72.0 bottom_up@claude-opus-5-5, self-confidence 0.55
I hold at 72: top statistics and research plus Policy Horizons Canada, a standing federal foresight unit; panelist A's 76 assumes its outputs reach budgets, and I have not seen evidence of that.
- 70.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Moved from 68 to 70. Policy Horizons Canada is a standing foresight unit, which answers my doubt about federal foresight; I still discount for income-linked publication volume.
Agency
How able are individuals and organizations to turn an intention into action?
70.60.46 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.81About AgencyCanada beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+10 over 10 years (2016 to 2026), band +4.9 to +14.9. Median change: all countries +1.9, Income quartile 4 of 4 in 2000, highest +0.8.
+11.9 over 20 years (2006 to 2026), band +7.3 to +16.7. Median change: all countries +9.3, Income quartile 4 of 4 in 2000, highest +6.8.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2017, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 5.2per 1,000 aged 15-64 | 2022. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 89.6score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 2count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
94.4 % of population, rank 19 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
98.4 % aged 15+, rank 14 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2008
124 % of GDP, rank 14 of 134. Domestic credit provided to the private sector by financial corporations.
The value is from 2008, more than 15 years old.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median72.0+1.4 against the indicators
Round 2. How this layer works
- 72.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Hold at 72. Two procedures and entry efficiency of 89.6 fit a strong registry, and density of 5.2 dates from 2022. The panel range of 70 to 72 is narrow. Panelist C's productivity and housing points concern outcomes more than this question. Inter-provincial barriers and slow major-project approvals (own knowledge) are why I stay close to 70.6 and not above.
- 72.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Held at 72. Two procedures, entry of 89.6 and density of 5.2 from 2022 give 70.6, and the panel agrees closely. From my own knowledge credit unions, co-ops and immigrant small business give ordinary people working levers, while inter-provincial licensing and slow major-project approvals, as A and C note, limit large organisations. No point moves this.
- 71.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Raised from 70. Panel at 72 and 72 matches. Entry efficiency 89.6 and two procedures are strong; density 5.2 is 2022. Slow major-project approval, housing starts, and interprovincial trade barriers limit execution. Own knowledge.
Coordination
How effectively can independent actors organize around shared objectives?
90.10.29 thin2 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 1.00About CoordinationCanada beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3 over 10 years (2016 to 2026), band -4.9 to +10.2, which includes no change. Median change: all countries -1.7, Income quartile 4 of 4 in 2000, highest -3.2.
+4.5 over 20 years (2006 to 2026), band -2.4 to +12.7, which includes no change. Median change: all countries -2.7, Income quartile 4 of 4 in 2000, highest -3.4.
The model fills at least one of the 2 indicators in 25 of 27 years, at most 1, last in 2024. The replay starts in 2025, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 79.8score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| Budget execution fidelitydirect capability measureWorld Bank (GF.XPD.BUDG.ZS) | no datapercentage points from approved budget | no data | no data |
| direct capability measureV-Dem (v2x_cspart) | 0.94index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration (1 case below), Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2024
3.29 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2009CanadaPPP Canada and the P3 Canada Fund, and its dissolutiondismantled
PPP Canada and the P3 Canada Fund, and its dissolution
Canada's federal Crown corporation PPP Canada, operational from 2009, committed over C$1.3 billion through the P3 Canada Fund to 25 public-private partnership projects across the country before the government dissolved it, with operations ceasing at the end of 2017 and the corporation dissolved effective March 31, 2018.
1,300,000,000 Canadian dollars (committed, 'over'), p3 canada fund investments committed over the corporation's life, 2018-03. 25 projects, projects in the p3 canada fund portfolio at dissolution, 2018-03. PPP Canada Inc., Annual Report 2017-18 (published by Housing, Infrastructure and Communities Canada), retrieved 2026-10-01.
How it worked: The federal government created a Crown corporation with a dedicated fund that paid up to a quarter of eligible costs to provinces, municipalities and Indigenous communities that procured infrastructure as public-private partnerships, plus template contracts and screening of federal projects; once it judged the market mature, it folded the corporation into the infrastructure department.
Limits: This is a dismantling by decision, not a collapse. The government's stated reason was that PPP Canada had 'successfully fulfilled its mandate', and its files were transitioned to Infrastructure Canada. The corporation carried performance-based payment liabilities of approximately C$1.3 billion over five years. A hostile reviewer would say the record shows a federal agency closing, not a national capability lost. The C$1.3 billion is commitments rather than disbursements (the audited statements show far smaller annual payments to recipients) and is a federal top-up of up to 25% of eligible costs, so it does not measure the scale of the joint delivery, its value for money or whether the 25 assets performed. The narrative and the figure are the corporation's own annual report; only the financial statements carry an Auditor General audit opinion.
2003CanadaMitacs Accelerate research internshipsstill operating
Mitacs Accelerate research internships
Mitacs, the federally and provincially funded not-for-profit, placed 4,859 students, recent graduates and postdoctoral fellows in Accelerate research internships with 2,314 host organisations under 2,406 professors in 2024-25, out of 20,885 internships across all its programmes that year.
4,859 interns, interns in the accelerate program, 2024-25. 2,314 organisations, host organisations in the accelerate program, 2024-25. Mitacs, 2024-2025 Annual Report for Innovation, Science and Economic Development Canada, retrieved 2026-10-02.
How it worked: A national intermediary splits the cost of a graduate student's or postdoc's research project inside a firm with the firm, using federal and provincial money, and uses the student's supervisor as the university link.
Limits: This is Mitacs reporting on itself to its federal funder: the Accelerate counts are on PDF page 28 and the 20,885 total on PDF page 2. Mitacs is a not-for-profit rather than a government body; ISED funding was 48 percent of its income in 2024-25 and the rest came from provinces and partners. Host organisations include not-for-profits, hospitals and municipalities as well as firms, so 2,314 overstates the firms involved. An internship is a funded unit of four to six months and one intern can hold several, so internships and interns are different counts; the 20,885 total also includes Globalink internships that bring international students to Canadian labs with no firm involved. The next report (2025-26, July 2026) gives 20,819 internships in total, against 21,432 in 2022-23. The capacity is now shrinking by plan: in 2024-25 Mitacs capped Accelerate units per university for lack of federal money, and its 2026-27 corporate plan (PDF page 9) foresees 12,540 internships on a 120 million dollar ISED grant, against more than 200 million of federal support in 2022-23. If that plan is delivered this record becomes an erosion. The 2003 start year, the first Mitacs research internship program, comes from ISED's evaluation of its funding to Mitacs, not from the cited report.
Panel median72.0-18.1 against the indicators
Round 2. How this layer works
- 72.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 72. B at 78 and C at 66 cite the same limits I do: interprovincial trade barriers and federal-provincial friction, and budget fidelity is missing.
- 74.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised down from 78: interprovincial trade barriers and missing budget data, as all panelists say.
- 68.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised 66 to 68, between my previous number and A (72). Civil society at 95.4 and trade compliance at 84.9 are strong, but interprovincial trade barriers and federal-provincial friction on health care are visible coordination failures, and budget execution is missing.
Trust
How much cooperation is possible beyond immediate personal networks?
74.20.34 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 1.00About TrustCanada beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.4 over 10 years (2016 to 2026), band -6.8 to +5.9, which includes no change. Median change: all countries +1.9, Income quartile 4 of 4 in 2000, highest +0.1.
+0.1 over 20 years (2006 to 2026), band -6.3 to +7, which includes no change. Median change: all countries +2.1, Income quartile 4 of 4 in 2000, highest +0.1.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2024, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 58.2score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 5.8% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 3scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median72.0-2.2 against the indicators
Round 2. How this layer works
- 74.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Revised from 77 to 74. I sat above the 74.2 derived score without a fact to justify it. Panelists B and C both cite the Jordan ruling on court delay (own knowledge), a real institutional cost that fits dispute resolution of 58. Bribery of 5.8% and compliance of 2.97 are solid, so I land at the derived score. Slow compliance with First Nations rights rulings also counts.
- 72.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at 72. Compliance of 2.97 and bribery of 5.8% are strong, dispute efficiency of 58.2 middling. From my own knowledge the Jordan ruling shows court delay and First Nations rights rulings often get slow compliance, as A notes, yet A stays at 77 by treating this as minor. I think it deserves a small discount below the 74.2 derived score.
- 72.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Raised from 70. Compliance 2.97 and bribery 5.8% are solid. The Jordan ruling shows courts dismissing cases for delay, and First Nations rulings see slow compliance. Panelists at 72 and 77 are within a few points of mine; I accept a small raise.
Learning
How effectively does the country acquire, distribute, and update knowledge?
77.20.55 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.81About LearningCanada beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-1 over 10 years (2016 to 2026), band -6.5 to +4.5, which includes no change. Median change: all countries -1.3, Income quartile 4 of 4 in 2000, highest +0.8.
+4.7 over 20 years (2006 to 2026), band -1 to +12, which includes no change. Median change: all countries +0.8, Income quartile 4 of 4 in 2000, highest +1.9.
The model fills at least one of the 3 indicators in 24 of 27 years, at most 2, last in 2023. The replay starts in 2010, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.8index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 55.9% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 1.6ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2023
76.3 % gross, rank 33 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2022
4.8 % of GDP, rank 48 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2018
4.6 % of secondary, rank 99 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
1996CanadaSkills Development under the Labour Market Development Agreements, and its 2024-25 funding cutoperating below its peak
Skills Development under the Labour Market Development Agreements, and its 2024-25 funding cut
Canada's provinces and territories delivered 154,892 employment-benefit services under the federally funded Labour Market Development Agreements in 2024-25, 92 percent of them Skills Development training, in a year when Part II funding fell by $425 million as a temporary top-up in place since 2016-17 ended and Skills Development spending fell 19.7 percent to $798.9 million.
154,892 services, employment benefits services delivered under the lmdas (92 percent skills development), 2024-25 (fiscal year April 2024 to March 2025). 798.9 million Canadian dollars, expenditure on skills development under the lmdas, down 19.7 percent from 2023-24, 2024-25. Employment and Social Development Canada for the Canada Employment Insurance Commission, Employment Insurance Monitoring and Assessment Report 2024-25, Chapter 3, retrieved 2026-10-02.
How it worked: The federal government channels Employment Insurance Part II money to provinces and territories through bilateral agreements, and each province buys or delivers skills training and apprenticeship support for EI-eligible workers, reporting to a common monitoring framework.
Limits: The counts are services (interventions), not people: one client can hold several, and the department reports 502,007 clients across all LMDA services, most of them in employment assistance rather than training. The erosion rests on money, not on a measured fall in training: the chapter's introduction says Part II received $425 million less in 2024-25 because the temporary additional funding in place since 2016-17 sunset, and Skills Development spending fell 19.7 percent. Employment Benefits services also fell, from 192,365 in 2023-24 (Table 3.1.2.3) to 154,892, but nearly all of that is Skills Development Regular falling 37.8 percent to 62,084, which the table note attributes to a coding correction that moved provincial workshops out of that category; the services fall is therefore not counted as the loss here, and apprenticeship services rose 3.2 percent to 80,376. 2023-24 is the previous year, not a demonstrated all-time peak. The programme reports on itself, and the 92 percent share is stated by the department (62,084 plus 80,376 of 154,892). The started year is the date the first bilateral agreements were signed (Alberta and New Brunswick, December 1996, per the LMDA page on canada.ca), not stated in this chapter. The training is for EI-eligible workers, a subset of all adults, and the record says nothing about outcomes.
Panel median76.0-1.2 against the indicators
Round 2. How this layer works
- 78.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Held at 78. C trims because Canada selects immigrants; the points-based selection system is itself a durable institution for acquiring knowledge, so it supports the score rather than discounting it.
- 76.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Held near 78: C's immigrant-selection point is valid, but selecting and integrating immigrants is itself learning capacity.
- 72.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Revised 66 to 72 toward A and B at 78. HCI at 86.1 and firm training at 69.6 are direct capability measures, and my previous trim for immigrant selection was an endowment argument I can only apply in part; I hold under 78 because selection of immigrants by education is partly policy, but it also makes the stock less of a domestic learning system.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
48.20.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationCanada beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-6.3 over 10 years (2016 to 2026), band -9.5 to -2.8. Median change: all countries 0, Income quartile 4 of 4 in 2000, highest -4.2.
-11.9 over 20 years (2006 to 2026), band -16.8 to -7.4. Median change: all countries +0.1, Income quartile 4 of 4 in 2000, highest -5.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 3, last in 2025. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-10.4 over 10 years, from 41.3 in 2016 to 30.9 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 104per million peoplefrom 4,304 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 1,134per million peoplefrom 46,808 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 17per million peoplefrom 703 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 30,449per million peoplefrom 1,268,237 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 93.2score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes (1 case below), University spinouts.
This project retired one row: Business share of R&D.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2016CanadaCSA Regulatory Sandbox, succeeded by the Financial Innovation Hubdelivered and closed
CSA Regulatory Sandbox, succeeded by the Financial Innovation Hub
Canada's provincial securities regulators, acting jointly as the Canadian Securities Administrators, authorised 13 firms through the CSA Regulatory Sandbox between 2016 and 2021, before it was succeeded by the CSA Financial Innovation Hub and its decision list stopped being updated in December 2023.
13 firms, firms listed as authorised in the former csa regulatory sandbox, 2023-12-18. Canadian Securities Administrators, Former CSA Regulatory Sandbox decisions, retrieved 2026-10-02.
How it worked: Thirteen provincial and territorial securities regulators agreed to process fintech registrations and exemptive relief faster and on a time-limited basis through a shared sandbox, then folded it into a broader innovation hub once crypto platforms moved to their own registration track.
Limits: The 13 is ours, counted from the firms the page lists under 'Former CSA Regulatory Sandbox'; the crypto trading platform decisions on the same page belong to a separate pre-registration process and are not counted. Most authorisations were crypto funds and token offerings from 2017 to 2019, and the page says nothing about outcomes. The sandbox was succeeded by the CSA Financial Innovation Hub, whose page lists research, workshops and 'testing environments' among possible activities, so the testing function may not be wholly gone; what ended is the named regime and its public register, which is why the record is concluded rather than dismantled. The earliest listed decision (AngelList, October 2016) predates the sandbox's 2017 start and is listed under it by the CSA. The site sits behind a JavaScript challenge that blocks simple scripted fetches.
Panel median54.0+5.8 against the indicators
Round 2. How this layer works
- 57.0 institutionalist@claude-opus-5-5, self-confidence 0.55
I move from 60 to 57 because panelist B is right that I have no throughput counts for the CSA sandbox; insolvency efficiency at 94.5 still keeps me above the 50 to 52 of the others.
- 53.0 bottom_up@claude-opus-5-5, self-confidence 0.45
I move up to 53: panelist A is right that insolvency efficiency at 94.5 is a strong exit regime, which is direct capability; low trademarks and designs and no sandbox throughput keep me below 60.
- 54.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Moved from 52 to 54. Insolvency 94 and a published CSA sandbox participant list are direct capability, as panelist A argues; commercialisation weakness remains.
Adaptability
How effectively can the system respond when circumstances change?
71.80.62 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 1.00About AdaptabilityCanada beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.9 over 10 years (2016 to 2026), band -0.9 to -0.9. Median change: all countries -0.8, Income quartile 4 of 4 in 2000, highest -0.9.
-3.3 over 20 years (2006 to 2026), band -6.9 to +0.5, which includes no change. Median change: all countries -1, Income quartile 4 of 4 in 2000, highest -1.9.
The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-0.9 over 10 years, from 72.7 in 2016 to 71.8 on 4 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 6.9% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 7.6% of unemployed | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.17index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 3.2% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
80 % aged 15+, rank 15 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
42.5 per 100 people, rank 12 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2025
4.4 % of output, rank 12 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT)
No value for this country. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
1998CanadaThe 1997 Canada Pension Plan financing reformstill operating
The 1997 Canada Pension Plan financing reform
In December 1993 the Chief Actuary projected that the pay-as-you-go contribution rate would reach 14.2% by 2030 and that the fund would run out by 2015. The federal and provincial governments agreed a reform package in 1997. It took effect on 1 January 1998, raised the combined contribution rate in steps to 9.9% by 2003, replaced pay-as-you-go financing with steady-state funding and invested net cash flows through the CPP Investment Board. The 2024 valuation puts the minimum sustaining rate at 9.19% from 2034, below the legislated 9.9%, with assets of $651 billion.
9.9 % of contributory earnings, combined employee-employer base cpp contribution rate reached under the reform, legislated since 2003, 2003. 14.2 % of contributory earnings, pay-as-you-go contribution rate projected for 2030 without reform (15th actuarial report, december 1993), 1993-12. Office of the Chief Actuary, Office of the Superintendent of Financial Institutions, Actuarial Report (32nd) on the Canada Pension Plan (revised version), valuation as at 31 December 2024, retrieved 2026-10-01.
How it worked: The Chief Actuary's statutory triennial reports put a dated number on the funding gap. Federal and provincial finance ministers then negotiated one package that raised contributions, trimmed benefit growth and moved new money into market investment under an arm's-length board, and wrote into the statute that any future benefit increase must be fully funded.
Limits: The construct is speed, and this reform was not fast. Four years passed between the December 1993 warning and the amendments taking effect in January 1998, and the rate took until 2003 to reach 9.9%. Whether that counts as responsive depends on a comparison the record cannot supply: it shows a rule changed in time, before the projected 2015 exhaustion, and not that it changed quickly. The headline numbers are a legislated rate and a projection, not an observed outcome. The evidence that the reform held, a 9.19% minimum rate against 9.9%, is the Chief Actuary's model under his own assumptions. That office sits inside OSFI, so this is a federal body assessing a federal-provincial plan. The fix was paid for mostly by workers and employers through a contribution rate up about 70% from 1997, plus slower benefit growth, which a reader may count as a cost of the delay as much as a sign of capability. Quebec runs its own plan, so the CPP covers the rest of Canada. The amendment formula requires the agreement of provinces holding most of the population, and that slows any reform as well as stabilising it.
1970CanadaDisaster Financial Assistance Arrangementsstill operating
Disaster Financial Assistance Arrangements
Public Safety Canada's Disaster Financial Assistance Arrangements paid $1.84 billion in contributions to provinces and territories between 2011โ12 and 2015โ16, almost 45 percent of everything paid since the programme began in 1970, while 53 disaster events were approved by the Governor in Council between 2011 and 2016.
1,843,527,158 CAD, dfaa contributions paid, 2011-12 to 2015-16. 53 events, disaster events approved by the governor in council, 2011-2016. Public Safety Canada, 2016โ2017 Evaluation of the Disaster Financial Assistance Arrangements (final report, 2017-03-14), retrieved 2026-10-02.
How it worked: Ottawa cost-shares provincial and territorial response and recovery spending on a sliding scale above a per-capita threshold, triggered by an order in council, so that a single large disaster does not fall on one province's budget.
Limits: This is the department evaluating its own programme. Payments follow disaster losses, so a high figure is partly a record of bad luck: the 2013โ14 year alone (about $1.02 billion) carries more than half the five-year total. The same evaluation shows the money arrives slowly: for the 53 events approved in 2011โ2016 the estimated federal share was $3.8 billion against $1.6 billion actually issued, because provinces have up to five years after approval to request final payment, and before 2008 there was no time limit at all. The figures are nine years old; a 2025 parliamentary briefing note on the Public Safety site puts the cumulative total since 1970 at $8.9 billion, and the programme was redesigned from April 2025, so this record documents the arrangement as it stood in the evaluation period. Provinces and territories design and run the assistance; DFAA reimburses part of it.
Panel median68.0-3.8 against the indicators
Round 2. How this layer works
- 68.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 68. C raises the 2025 tariff response as the live test; it is not yet resolved, so I do not mark down on it, and long-term unemployment at 7.6 percent is very low.
- 68.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised slightly down from 70: C's point that the 2025 tariff response is the live test is fair.
- 65.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised 62 to 65. Long-term unemployment at 97 normalised and diverse exports are real, but the dependence on one trade partner and the 2025 tariff response are the live test I cannot yet score; A and B at 68 to 70 treat that test as already passed.
Building
How capable is the country of turning plans and knowledge into functioning systems?
56.10.61 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 0.96About BuildingCanada beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.8 over 10 years (2016 to 2026), band -4.7 to +3, which includes no change. Median change: all countries -0.3, Income quartile 4 of 4 in 2000, highest +0.3.
-3.2 over 20 years (2006 to 2026), band -7.9 to +1.6, which includes no change. Median change: all countries -0.5, Income quartile 4 of 4 in 2000, highest -0.2.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-1.1 over 10 years, from 50.1 in 2016 to 49.0 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 9.3% of GDP | 2022. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 16.1% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 81.7score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 2.8index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (3 cases below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
113,563 constant 2021 PPP $, rank 16 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2016CanadaPhoenix pay system, and its prolonged failureoperating below its peak
Phoenix pay system, and its prolonged failure
Canada rolled out the Phoenix federal pay system in 2016, then spent more than C$2.6 billion by April 2022 to support and stabilise it and correct pay-file errors, with a further roughly C$1 billion allocated through the 2024-25 fiscal year.
2,600,000,000 Canadian dollars, support and correction spending by april 2022, 2022-04. 1,000,000,000 Canadian dollars, further funding allocated through fiscal year 2024-25, 2023. Office of the Auditor General of Canada, Modernizing Information Technology Systems, retrieved 2026-08-31.
How it worked: A central agency replaced a complex government-wide payroll system through a schedule-driven rollout with insufficient independent oversight; once errors spread across departments, the state converted the project into a permanent stabilisation operation while designing a successor.
Limits: Spending on stabilisation and correction measures shows the scale of a delivery failure, not the total social cost of late or incorrect pay, nor whether a replacement will perform better. The Auditor General notes that the total implementation cost was still not known, and the figures combine technical support, error correction and later stabilisation rather than one clean project budget. The system continued to operate while the government explored its replacement.
1998CanadaCanadian long-gun registry, its information system overrun and its dismantlingdismantled
Canadian long-gun registry, its information system overrun and its dismantling
Canada began registering all firearms under the 1995 Firearms Act from December 1998. The registry's first information system, CFIS I, had an initial estimate of $13 to 20 million and had cost $190 million by March 2005. Its successor CFIS II rose from $32 million to at least $87 million and was halted. In 2012 Parliament ended long-gun registration and ordered the destruction of about 7.5 million non-restricted registration records, which the RCMP deleted from CFIS in October 2012.
190,000,000 Canadian dollars, cost of the canadian firearms information system (cfis i), against an initial estimate of $13 to 20 million, 2005-03. 7,500,000 registration records, non-restricted firearms registration records in cfis when parliament ordered their destruction, 2012-04. House of Commons of Canada, Standing Committee on Public Accounts, Report 10 (39th Parliament, 1st Session), on Chapter 4 of the May 2006 Report of the Auditor General, Canadian Firearms Program, retrieved 2026-10-01.
How it worked: The Department of Justice, and later the Canada Firearms Centre, built a universal national registry through contracted IT development while the regulations it had to implement were still changing, and reported the rising cost to ministers before Parliament. In 2012 Parliament ended the long-gun part by statute and had the RCMP destroy its records.
Limits: The cost figure is a Commons committee's summary of the Auditor General's 2006 follow-up. The Auditor General's own 2002 and 2006 chapters no longer open at their published OAG URLs, so the record rests on Parliament's restatement of them. The $190 million covers CFIS I, the information system, and is not the cost of the whole programme. The often quoted figure of roughly $1 billion for the programme could not be verified at an official URL today and is not used. The baseline is a range of $13 to 20 million given at an early stage, so any overrun ratio, roughly ten times, depends on which end is chosen and on how far the scope of that early estimate matched the system that was built. The committee itself attributes part of the growth to things outside the project team's control: requirements kept changing, and Bill C-10 and its regulations were delayed by more than two years. The dismantling in 2012 was a political decision by a new parliamentary majority. It was not a collapse caused by the delivery, so the status records a policy reversal rather than a technical failure. Licensing and the registry of restricted and prohibited firearms kept running, Quebec residents' records were held back pending litigation, and public agencies still register. The 7.5 million records show the scale the registry reached and say nothing about their accuracy, which the 2006 audit questioned. Like can-phoenix, this is a public IT system rather than physical infrastructure.
2015CanadaSamuel De Champlain Bridge corridordelivered and closed
Samuel De Champlain Bridge corridor
Infrastructure Canada delivered the Samuel De Champlain Bridge corridor in Montreal as a public-private partnership signed in 2015, opening the bridge in July 2019 against a contractual in-service date of December 1, 2018, at a total project cost the department reports as C$4.2 billion, after a C$235 million settlement in 2018 that paid for delay-recovery measures and oversized-part transport issues.
4,200,000,000 Canadian dollars, total cost of the project as reported by the department, 2019. 235,000,000 Canadian dollars, settlement paid to the private partner for delay recovery and oversized-part transport, 2018-04. Housing, Infrastructure and Communities Canada (formerly Infrastructure Canada), Samuel De Champlain Bridge project story, retrieved 2026-10-01.
How it worked: Infrastructure Canada replaced a failing federal bridge through a design-build-finance-operate-maintain contract with liquidated damages for late opening, then bought back schedule with a negotiated settlement when transport restrictions and disputes threatened the date.
Limits: No published figure states the outturn against the baseline, so overrun has to be pieced together by the reader. The value-for-money report gives a 2015 total of C$4.239 billion and a contractual in-service date of December 1, 2018; the department's own story page gives a rounded C$4.2 billion total and a July 2019 opening; the 2018 settlement adds C$235 million and moved the delivery date to December 21, 2018, which was itself missed. The C$4.2 billion therefore cannot include the settlement and appears to restate the original envelope, so the true outturn is at least about 5.5% above it (a computed figure, not published) and the bridge opened about seven months after the contract date. Costs also bundle a 30-year operation and maintenance period and financing, so the number is not a construction cost. All figures are the department's own; the Auditor General's 2018 doubts about the schedule are reported only in the press here. The canada.ca news release refused a scripted curl request and was read through a browser-like fetch. This is one megaproject, not a national portfolio.
Panel median47.0-9.1 against the indicators
Round 2. How this layer works
- 48.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Revised down from 50 to 48. B and C both point to housing supply lag, which I had not weighed beside Phoenix, Trans Mountain and transit overruns; economic fitness at 96 keeps me above them.
- 46.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 45-46: economic fitness is high, but Phoenix pay system and Trans Mountain show weak state delivery.
- 47.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised 44 to 47, between my previous and A (50). Economic fitness of 96.1 and utility connection at 77.2 are strong, but large public projects (Phoenix pay system, Trans Mountain, transit overruns) and slow housing supply are direct delivery failures that the indicators cannot see.