Skip to content
NCBNational Capability Benchmark
Navigate with โ†‘ โ†“Enter to openEsc to close

Challenge the benchmark

Choose a score and give the benchmark a specific reason to reconsider it.

When you submit, the form attaches the current score and confidence for the country and capability you chose.

Submissions are public and start as awaiting review. A maintainer can add a response and signature after review.

United States

Strongest usable evidence: Adaptability, at 72.4. Coordination needs more evidence: confidence is 0.29.

A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.

Measure before managing, thinnest first

  • Coordination

    Coordination

    How effectively can independent actors organize around shared objectives?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 95.10.29 thinno trend
  • Agency

    Agency

    How able are individuals and organizations to turn an intention into action?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 57.30.30 thinno trend
  • Shared purpose

    Shared purpose

    To what extent can people imagine themselves as participants in a common project?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 75.80.32 thin-0.8(2)
  • Trust

    Trust

    How much cooperation is possible beyond immediate personal networks?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 92.10.34 thinno trend

Keep watching, highest first

  • Adaptability

    Adaptability

    How effectively can the system respond when circumstances change?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 72.10.62 usable+0.7(4)
  • Anticipation

    Anticipation

    How capable is the country of identifying and preparing for emerging change?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 80.30.46 usable+0.9(2)
  • Learning

    Learning

    How effectively does the country acquire, distribute, and update knowledge?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 79.00.55 usableno trend
  • Building

    Building

    How capable is the country of turning plans and knowledge into functioning systems?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 42.70.59 usable+0.4(3)
  • Experimentation

    Experimentation

    How easily can new approaches be attempted, tested, abandoned, and improved?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 52.80.64 usableno trend

These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.

255075100
AnticipationUnited States70.7Income peers80.3Confidence0.46usableHow capable is the country of identifying and preparing for emerging change?
United StatesIncome peers

Read United States beside up to three other countries, down to the indicator behind every row.

  • Usable or good evidence
  • Thin evidence, hollow point. The dashes open further as confidence falls.
  • The point still sits at the score, because confidence never moves it.
  • Click any axis to see every country on that dimension.

A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.

Confidence

Why this country is included: High innovation and agency; large-scale institutional complexity.

Download this country as CSV
How to read this page

Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.

A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.

A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.

The record behind each score

Anticipation

How capable is the country of identifying and preparing for emerging change?

70.70.46 usable2 of 4

Recency 0.96About AnticipationUnited States beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 1 of 2 indicators modelled2001: 1 of 2 indicators modelled2002: 1 of 2 indicators modelled2003: 1 of 2 indicators modelled2004: 1 of 2 indicators modelled2005: 1 of 2 indicators modelled2006: 1 of 2 indicators modelled2007: 1 of 2 indicators modelled2008: 1 of 2 indicators modelled2009: 1 of 2 indicators modelled2010: 1 of 2 indicators modelled2011: 1 of 2 indicators modelled2012: 1 of 2 indicators modelled2013: 1 of 2 indicators modelled2014: 1 of 2 indicators modelled2015: 1 of 2 indicators modelled2016: 0 of 2 indicators modelled2017: 0 of 2 indicators modelled2018: 0 of 2 indicators modelled2019: 0 of 2 indicators modelled2020: 0 of 2 indicators modelled2021: 0 of 2 indicators modelled2022: 0 of 2 indicators modelled2023: 0 of 2 indicators modelled2024: 0 of 2 indicators modelled2025: 0 of 2 indicators modelled2026: 0 of 2 indicators modelledmodel
  • Reconstruction on today's 2 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+0.9 over 10 years (2016 to 2026), band +0.9 to +0.9. Median change: all countries +11.2, Income quartile 4 of 4 in 2000, highest +8.4.

+1.5 over 20 years (2006 to 2026), band -4.6 to +9.8, which includes no change. Median change: all countries +13.4, Income quartile 4 of 4 in 2000, highest +12.4.

The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+0.9 over 10 years, from 69.8 in 2016 to 70.7 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Scientific articles

Scientific and technical journal articles published, per million people.

Measured in articles per million people; higher is better. Source: World Bank (IP.JRN.ARTC.SC), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IP.JRN.ARTC.SC)
1,279articles per million peoplefrom 430,843.27 national total2023. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Scientific articles

Scientific and technical journal articles published, per million people.

Measured in articles per million people; higher is better. Source: World Bank (IP.JRN.ARTC.SC), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Statistical performance

World Bank Statistical Performance Indicators overall score for the national statistical system.

Measured in index 0-100; higher is better. Source: World Bank (IQ.SPI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IQ.SPI.OVRL)
90.1index 0-1002024. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Statistical performance

World Bank Statistical Performance Indicators overall score for the national statistical system.

Measured in index 0-100; higher is better. Source: World Bank (IQ.SPI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: Government foresight capacity (1 case below), Long-horizon research commitments.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2023

    3.4 % of GDP, rank 4 of 123. Gross domestic expenditure on research and development as a share of GDP.

    A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.

  • Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2022

    4,937 per million people, rank 20 of 118. Full-time-equivalent researchers per million people.

    A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.

  • Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024

    196,616 per million people, rank 5 of 135. Servers using encryption in internet transactions, per million people.

    A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 1972United StatesOffice of Technology Assessment, defunded and closed in 1995dismantled
    United Stateslinked to Government foresight capacitystarted 1972dismantled

    Office of Technology Assessment, defunded and closed in 1995

    Congress gave the Office of Technology Assessment, created under the Technology Assessment Act of 1972, the statutory function to provide early indications of the probable impacts of technology; it appropriated $21,970,000 for the office with a cap of 143 staff for fiscal year 1995, then appropriated $3,615,000 for fiscal year 1996 to carry out its orderly closure, with no more than 17 employees paid except for severance.

    3,615,000 US dollars, appropriation for the orderly closure of the office of technology assessment, FY1996. 21,970,000 US dollars, appropriation for office of technology assessment salaries and expenses, the last operating year, FY1995. US Government Publishing Office, Public Law 104-53, Legislative Branch Appropriations Act, 1996 (109 Stat. 514), retrieved 2026-10-02.

    How it worked: Congress built its own analytic office, governed by a bipartisan board of members, to give legislators early warning on technology choices, and later closed it through the appropriations bill rather than by repeal, cutting its funding by roughly five sixths in one year and capping staff for the wind-down.

    Limits: Technology assessment is adjacent to strategic foresight, not the same thing: the office studied technologies on request from congressional committees rather than running whole-of-government scenarios. It is filed here because its statute, 2 U.S.C. 472(c), states an anticipatory function, to provide early indications of the probable beneficial and adverse impacts of the applications of technology (govinfo, US Code 2023 edition, https://www.govinfo.gov/content/pkg/USCODE-2023-title2/html/USCODE-2023-title2-chap15-sec472.htm). Both figures are appropriations, not spending or output: they show the money Congress gave, not what the office produced, and the 143 and 17 figures are statutory staff caps, not headcounts. The FY1995 figure comes from a different source, Public Law 103-283 in the Statutes at Large (108 Stat. 1423), inside a PDF on page 11 of the file (https://www.govinfo.gov/content/pkg/STATUTE-108/pdf/STATUTE-108-Pg1423.pdf). The authorising statute was not repealed and still appears in the US Code, so the office was ended by withdrawing funds rather than by abolishing its legal basis; it could be refunded without new legislation. The 1996 act also carried $2,500,000 of FY1995 funds forward to September 1996, so the FY1996 closure figure is not the whole of the wind-down money. Started is the year of the authorising Act, not the year the office first reported.

Panel median66.0-4.7 against the indicators

Round 2. How this layer works

  • 66.0 institutionalist@claude-opus-5-5, self-confidence 0.55

    Hold 66: panelist B treats cuts to federal foresight units as cyclical, but 2025 cuts to US statistical and science agencies erode the institutional base, which the indicator does not yet show.

  • 68.0 bottom_up@claude-opus-5-5, self-confidence 0.55

    Moved from 72 to 68. Panelist A's point on 2025 cuts to statistical and science agencies is one I cannot answer; the base is still deep but its continuity is now uncertain.

  • 65.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45

    Moved 64 to 65. A and B both cite federal foresight erosion and 2025 agency cuts, which I accept; I hold near my view because pandemic-preparedness failures show anticipation weaker than the 92 statistics score implies.

Agency

How able are individuals and organizations to turn an intention into action?

71.30.30 thin2 of 5

Recency 0.79About AgencyUnited States beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 2 indicators modelled2001: 2 of 2 indicators modelled2002: 2 of 2 indicators modelled2003: 2 of 2 indicators modelled2004: 2 of 2 indicators modelled2005: 2 of 2 indicators modelled2006: 2 of 2 indicators modelled2007: 2 of 2 indicators modelled2008: 2 of 2 indicators modelled2009: 2 of 2 indicators modelled2010: 2 of 2 indicators modelled2011: 2 of 2 indicators modelled2012: 2 of 2 indicators modelled2013: 1 of 2 indicators modelled2014: 1 of 2 indicators modelled2015: 1 of 2 indicators modelled2016: 1 of 2 indicators modelled2017: 1 of 2 indicators modelled2018: 1 of 2 indicators modelled2019: 1 of 2 indicators modelled2020: 1 of 2 indicators modelled2021: 1 of 2 indicators modelled2022: 1 of 2 indicators modelled2023: 1 of 2 indicators modelled2024: 1 of 2 indicators modelled2025: 0 of 2 indicators modelled2026: 0 of 2 indicators modelledmodel
  • Reconstruction on today's 2 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

0 over 10 years (2016 to 2026), band -7.1 to +7.3, which includes no change. Median change: all countries +1.9, Income quartile 4 of 4 in 2000, highest +0.8.

+7.9 over 20 years (2006 to 2026), band -1.4 to +20, which includes no change. Median change: all countries +9.3, Income quartile 4 of 4 in 2000, highest +6.8.

The model fills at least one of the 2 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2025, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
New business densitydirect capability measureWorld Bank (IC.BUS.NDNS.ZS)no dataper 1,000 aged 15-64no datano data
direct capability measureMeasures the thing itself.

Business entry efficiency

B-READY score for the time and cost to register a new domestic or foreign limited liability company.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BE.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.BE.P3)
76.3score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Business entry efficiency

B-READY score for the time and cost to register a new domestic or foreign limited liability company.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BE.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Procedures to start a business

Number of separate official procedures to register a company.

Measured in count; lower is better. Source: World Bank (IC.REG.PROC.MA.NO), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.REG.PROC.MA.NO)
6count2019. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Procedures to start a business

Number of separate official procedures to register a company.

Measured in count; lower is better. Source: World Bank (IC.REG.PROC.MA.NO), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.

This project retired one row: Time to start a business.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024

    94.7 % of population, rank 16 of 135. Share of the population that used the internet in the last three months.

    A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.

  • Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024

    97 % aged 15+, rank 23 of 131. Adults with an account at a bank or mobile money provider.

    A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.

  • Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025

    201 % of GDP, rank 1 of 134. Domestic credit provided to the private sector by financial corporations.

    A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.

Panel median80.0+8.7 against the indicators

Round 2. How this layer works

  • 80.0 institutionalist@claude-opus-5-5, self-confidence 0.60

    Hold at 80. Density is missing, and entry of 76.3 and 6 procedures give 71.3. Census Business Formation Statistics, capital markets and Delaware law (my own knowledge) support a move up. C says this is partly wealth-backed, but corporate law and Chancery courts are institutions and not money. B's 85 passes over permitting blockage in building and transmission, which I keep.

  • 82.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Revise from 85 to 82. Density is missing, entry efficiency is 76 and procedures are 6, which understate what, from my own knowledge, millions of Census business applications per year show. Panelist C's point is valid under our rules: part of this is wealth-backed venture finance, and I had counted it. Panelist A's building blockage also limits organisations. I stay above 72 and 80 for gig work and breadth.

  • 72.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35

    Density is missing; entry efficiency 69 and 6 procedures give 71.3 on thin coverage. Census Business Formation Statistics, venture capital conversion and Delaware law (own knowledge) show real firm formation, but deep capital is partly wealth-backed. I hold 72 and do not follow panelists A and B at 80-85, who lean on income-linked finance.

Coordination

How effectively can independent actors organize around shared objectives?

79.00.29 thin2 of 5

Recency 1.00About CoordinationUnited States beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 1 of 2 indicators modelled2001: 1 of 2 indicators modelled2002: 1 of 2 indicators modelled2003: 1 of 2 indicators modelled2004: 1 of 2 indicators modelled2005: 1 of 2 indicators modelled2006: 1 of 2 indicators modelled2007: 1 of 2 indicators modelled2008: 1 of 2 indicators modelled2009: 1 of 2 indicators modelled2010: 1 of 2 indicators modelled2011: 1 of 2 indicators modelled2012: 1 of 2 indicators modelled2013: 1 of 2 indicators modelled2014: 1 of 2 indicators modelled2015: 1 of 2 indicators modelled2016: 1 of 2 indicators modelled2017: 1 of 2 indicators modelled2018: 1 of 2 indicators modelled2019: 1 of 2 indicators modelled2020: 1 of 2 indicators modelled2021: 1 of 2 indicators modelled2022: 1 of 2 indicators modelled2023: 1 of 2 indicators modelled2024: 1 of 2 indicators modelled2025: 0 of 2 indicators modelled2026: 0 of 2 indicators modelledmodel
  • Reconstruction on today's 2 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-0.9 over 10 years (2016 to 2026), band -7.7 to +6, which includes no change. Median change: all countries -1.7, Income quartile 4 of 4 in 2000, highest -3.2.

-0.9 over 20 years (2006 to 2026), band -8.7 to +6.4, which includes no change. Median change: all countries -2.7, Income quartile 4 of 4 in 2000, highest -3.4.

The model fills at least one of the 2 indicators in 25 of 27 years, at most 1, last in 2024. The replay starts in 2025, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

Trade compliance efficiency

B-READY score for the time and cost firms report to comply with export and import requirements.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.IT.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.IT.P3)
57.1score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Trade compliance efficiency

B-READY score for the time and cost firms report to comply with export and import requirements.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.IT.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

Budget execution fidelitydirect capability measureWorld Bank (GF.XPD.BUDG.ZS)no datapercentage points from approved budgetno datano data
direct capability measureMeasures the thing itself.

Civil society strength

Autonomy, density and participatory reach of civil society organisations.

Measured in index 0-1; higher is better. Source: V-Dem (v2x_cspart), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
V-Dem (v2x_cspart)
0.96index 0-12025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Civil society strength

Autonomy, density and participatory reach of civil society organisations.

Measured in index 0-1; higher is better. Source: V-Dem (v2x_cspart), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: University-industry collaboration (1 case below), Public-private collaboration (2 cases below).

This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.

Behavioral check, not scored

Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.

  • Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2024

    8.225 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.

    Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 2021United StatesAffordable Connectivity Program, and its lapsedismantled
    United Stateslinked to Public-private collaborationstarted 2021dismantled

    Affordable Connectivity Program, and its lapse

    The Federal Communications Commission ran the Affordable Connectivity Program from 31 December 2021, paying monthly broadband discounts through voluntarily participating internet providers to more than 23 million enrolled households, and ended it on 1 June 2024 when the funding Congress had provided ran out.

    23 million households, households enrolled in the acp when new enrolments stopped, 2024-02. Federal Communications Commission, press release 'FCC brings Affordable Connectivity Program to a close' (DOC-402930A1), retrieved 2026-10-01.

    How it worked: Congress funded a fixed pot, the FCC turned it into a monthly discount that private internet providers applied on their own bills, and enrolment climbed until the pot was exhausted; when Congress did not refill it, the FCC froze enrolment, cut the benefit to a partial discount and closed the program.

    Limits: The 23 million figure is the regulator's own enrolment count, taken at the February 2024 freeze, and it reports sign-ups, not households that would otherwise have gone without broadband: the FCC's claim that 68 percent of ACP households had inconsistent or no connectivity before rests on a self-reported agency survey. The program was a voucher paid through private providers whose participation was voluntary, so a hostile reviewer would call it a subsidy channel rather than joint delivery; the public-private element is that providers carried enrolment, billing and the discount. It grew out of the pandemic-era Emergency Broadband Benefit, so the 2021 start understates how long the capability was built. It ended through a funding lapse rather than a repeal, and the FCC said it could resume if Congress appropriated money, so 'dismantled' records the end of delivery, not the destruction of the administrative machinery. The release is an agency press statement, not an audited statistical series, and the PDF is the script-readable copy; the fcc.gov program pages block automated requests.

  • 2020United StatesOperation Warp Speeddelivered and closed
    United Stateslinked to Public-private collaborationstarted 2020delivered and closed

    Operation Warp Speed

    Operation Warp Speed, an HHS and DOD partnership, financed private vaccine makers' development, at-risk manufacturing and advance purchases, including a $5.97 billion contract for 300 million Pfizer/BioNTech doses. Three of the vaccines it bought held FDA emergency use authorization by 1 March 2021, the first from 11 December 2020.

    3 vaccines, ows-purchased covid-19 vaccines holding fda emergency use authorization, 2021-03-01. 5.97 USD billion, ows contract value for 300 million pfizer/biontech doses, 2021-03-01. Congressional Research Service, Insight IN11560 'Operation Warp Speed Contracts for COVID-19 Vaccines and Ancillary Vaccination Materials', version 7, retrieved 2026-10-01.

    How it worked: HHS and DOD pooled BARDA's countermeasure contracting with defense logistics and paid private manufacturers to build production capacity while trials were still running, carrying the financial risk of failure so that doses existed the day authorization came.

    Limits: The metric counts authorized products, not doses delivered or people vaccinated. It does not show what share of the speed came from federal money rather than private R&D already under way: Pfizer/BioNTech took no federal development funding and joined only through a purchase contract, as the CRS notes. The contract values are awards, not outlays, and CRS cites BARDA and DOD pages without auditing them; the GAO's audit of OWS sits on gao.gov, which blocks automated requests, so it is not the source here. The CRS Insight is a congressional research summary rather than a statistical series, and it does not state the May 2020 launch date, so 'started' is the year vaccine delivery began. Ancillary-supply shortages and distribution problems are flagged in the same document. The Biden administration said it planned to restructure and rename OWS, so 'concluded' marks the end of the vehicle, not of federal vaccine purchasing.

  • 2012United StatesManufacturing USA innovation institutesstill operating
    United Stateslinked to University-industry collaborationstarted 2012still operating

    Manufacturing USA innovation institutes

    In fiscal 2023 the 16 reporting Manufacturing USA institutes, public-private consortia sponsored by the Departments of Commerce, Defense and Energy, managed 929 applied research and development projects and held 2,921 memberships, 655 of them universities, community colleges and other academic members alongside 1,315 small and 493 large manufacturers.

    929 projects, ongoing applied research and development projects across the institutes, FY 2023. 655 memberships, academic members (universities, community colleges, etc.) of the institutes, FY 2023. National Institute of Standards and Technology, Advanced Manufacturing National Program Office, Manufacturing USA Report to Congress 2025 (covering FY 2023), retrieved 2026-10-02.

    How it worked: Federal agencies fund a standing consortium per manufacturing technology for a fixed term; firms, universities and colleges pay membership and cost share to sit on a shared applied research and workforce agenda that no single member would fund alone.

    Limits: The figures are the institutes' own reports aggregated by the program office, in Table 2 on PDF page 13 (printed page 11) of the report, and they cover fiscal 2023 although the report was posted in March 2026, so they are about three years old. Sixteen of the 17 institutes report; EPIXC joined mid-year and is excluded. The counts are memberships, not distinct organisations: a university that belongs to three institutes counts three times. The academic count mixes research universities with community colleges, which join mainly for workforce training, and the report does not say how many of the 929 projects actually pair a university with a firm; some are workforce or firm-only projects. Federal base funding was 160.4 million dollars in the year against 379.5 million of cost share and other funding, all as reported by the institutes, with no counterfactual for what members would have done anyway. The start year is the first institute, America Makes, established August 2012 per the report's Appendix B; the program's statute is the Revitalize American Manufacturing and Innovation Act of 2014.

Panel median60.0-19.0 against the indicators

Round 2. How this layer works

  • 60.0 institutionalist@claude-opus-5-5, self-confidence 0.40

    Revised down 6 to 60. Panelists B and C note that the score rests on two series and the record 2025 shutdown shows that federal coordination is breaking down. Strong civil society keeps it above C.

  • 60.0 bottom_up@claude-opus-5-5, self-confidence 0.40

    Held at 60: shutdowns and federal-state breakdowns pull well below 79, but strong local and civic coordination keeps me above C.

  • 56.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Moved up four points. A at 66 notes strong civil society; I still weigh repeated shutdowns and debt-ceiling standoffs, and budget execution is missing, so the 79 rests on civil society at 98 plus one other series.

Trust

How much cooperation is possible beyond immediate personal networks?

85.50.34 thin3 of 7

Recency 1.00About TrustUnited States beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 3 indicators modelled2001: 2 of 3 indicators modelled2002: 2 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 2 of 3 indicators modelled2009: 2 of 3 indicators modelled2010: 2 of 3 indicators modelled2011: 2 of 3 indicators modelled2012: 2 of 3 indicators modelled2013: 2 of 3 indicators modelled2014: 2 of 3 indicators modelled2015: 2 of 3 indicators modelled2016: 2 of 3 indicators modelled2017: 2 of 3 indicators modelled2018: 2 of 3 indicators modelled2019: 2 of 3 indicators modelled2020: 2 of 3 indicators modelled2021: 2 of 3 indicators modelled2022: 2 of 3 indicators modelled2023: 2 of 3 indicators modelled2024: 1 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-4.6 over 10 years (2016 to 2026), band -10.2 to +1.9, which includes no change. Median change: all countries +1.9, Income quartile 4 of 4 in 2000, highest +0.1.

-4.9 over 20 years (2006 to 2026), band -10.3 to +1.7, which includes no change. Median change: all countries +2.1, Income quartile 4 of 4 in 2000, highest +0.1.

The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2024, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

Dispute resolution efficiency

B-READY score for the reliability, time and cost of resolving a commercial dispute and enforcing the decision.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.DR.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.DR.P3)
73.6score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Dispute resolution efficiency

B-READY score for the reliability, time and cost of resolving a commercial dispute and enforcing the decision.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.DR.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Bribery incidence

Firms asked for at least one bribe payment across six public transactions covering utilities, permits, licences and taxes.

Measured in % of firms; lower is better. Source: World Bank (IC.FRM.BRIB.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IC.FRM.BRIB.ZS)
2.8% of firms2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Bribery incidence

Firms asked for at least one bribe payment across six public transactions covering utilities, permits, licences and taxes.

Measured in % of firms; lower is better. Source: World Bank (IC.FRM.BRIB.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Government compliance with the courts

How often the government complies with important decisions of the ordinary and specialised courts that it disagrees with.

Measured in scale 0-4 (never to always); higher is better. Source: V-Dem (v2jucomp_osp), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
V-Dem (v2jucomp_osp)
3scale 0-4 (never to always)2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Government compliance with the courts

How often the government complies with important decisions of the ordinary and specialised courts that it disagrees with.

Measured in scale 0-4 (never to always); higher is better. Source: V-Dem (v2jucomp_osp), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.

This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.

Panel median66.0-19.5 against the indicators

Round 2. How this layer works

  • 68.0 institutionalist@claude-opus-5-5, self-confidence 0.55

    Hold at 68. Dispute efficiency of 73.6, bribery of 2.8% and compliance of 2.97 give 85.5. All three of us discount for 2025 disputes over executive compliance with federal orders (my own knowledge). C's 60 leans on low generalised trust, which is not in evidence here. Arm's-length commerce runs at huge scale, so B's 66 and my 68 are the better reading.

  • 66.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Hold 66. Dispute efficiency of 74 and bribery of 2.8% are strong and compliance is 2.97. All of us discount 85 for executive disputes over federal court orders in 2025, from my own knowledge. Panelist C at 60 leans on low generalised trust, which is an unmeasured row here. Arm's-length commerce at huge scale still shows daily cooperation among strangers.

  • 62.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35

    Dispute resolution 84.5, bribery 2.8% and compliance 2.97/4 are strong legal-system rows. Executive compliance with federal court orders became contested in 2025 (own knowledge), which the 2025 compliance row may only partly capture, and generalised trust has fallen. I move from 60 to 62 toward panelists A and B at 66-68 because arm's-length contract enforcement still runs at scale.

Learning

How effectively does the country acquire, distribute, and update knowledge?

63.10.55 usable3 of 4

Recency 0.81About LearningUnited States beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 3 indicators modelled2001: 2 of 3 indicators modelled2002: 2 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 2 of 3 indicators modelled2009: 2 of 3 indicators modelled2010: 1 of 3 indicators modelled2011: 1 of 3 indicators modelled2012: 1 of 3 indicators modelled2013: 1 of 3 indicators modelled2014: 1 of 3 indicators modelled2015: 1 of 3 indicators modelled2016: 1 of 3 indicators modelled2017: 1 of 3 indicators modelled2018: 1 of 3 indicators modelled2019: 1 of 3 indicators modelled2020: 1 of 3 indicators modelled2021: 1 of 3 indicators modelled2022: 1 of 3 indicators modelled2023: 1 of 3 indicators modelled2024: 0 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-4 over 10 years (2016 to 2026), band -9.6 to +0.8, which includes no change. Median change: all countries -1.3, Income quartile 4 of 4 in 2000, highest +0.8.

+1.9 over 20 years (2006 to 2026), band -5 to +8.7, which includes no change. Median change: all countries +0.8, Income quartile 4 of 4 in 2000, highest +1.9.

The model fills at least one of the 3 indicators in 24 of 27 years, at most 2, last in 2023. The replay starts in 2010, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

Human Capital Index

Expected productivity of a child born today relative to full health and complete education.

Measured in index 0-1; higher is better. Source: World Bank (HD.HCI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (HD.HCI.OVRL)
0.7index 0-12020. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Human Capital Index

Expected productivity of a child born today relative to full health and complete education.

Measured in index 0-1; higher is better. Source: World Bank (HD.HCI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Firms offering formal training

Share of firms that provide formal training to permanent employees.

Measured in % of firms; higher is better. Source: World Bank (IC.FRM.TRNG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.FRM.TRNG.ZS)
40.8% of firms2024. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Firms offering formal training

Share of firms that provide formal training to permanent employees.

Measured in % of firms; higher is better. Source: World Bank (IC.FRM.TRNG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Research citation impact

Share of a country's articles and reviews that are in the top 10% most cited for their subfield and year, as a ratio to the same share across all country-affiliated works.

Measured in ratio to world average; higher is better. Source: OpenAlex (citation_normalized_percentile.is_in_top_10_percent), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
OpenAlex (citation_normalized_percentile.is_in_top_10_percent)
1.5ratio to world average2021. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Research citation impact

Share of a country's articles and reviews that are in the top 10% most cited for their subfield and year, as a ratio to the same share across all country-affiliated works.

Measured in ratio to world average; higher is better. Source: OpenAlex (citation_normalized_percentile.is_in_top_10_percent), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for one row, each a gap: Adult learning participation (1 case below).

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2022

    79.4 % gross, rank 25 of 134. Gross enrolment ratio in tertiary education.

    A condition, not scored: enrolment counts people in formal education and records nothing learned.

  • Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2021

    5.4 % of GDP, rank 27 of 135. Government expenditure on education as a share of GDP.

    A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.

  • Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 1996

    0 % of secondary, rank 133 of 135. Vocational pupils as a share of total secondary enrolment.

    The value is from 1996, more than 15 years old.

    A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 1966United StatesState-administered adult education under the Adult Education and Family Literacy Act, and its erosionoperating below its peak
    United Stateslinked to Adult learning participationstarted 1966operating below its peak

    State-administered adult education under the Adult Education and Family Literacy Act, and its erosion

    Federally funded, state-administered adult basic, adult secondary and English language programmes served 2,629,643 participants in fiscal year 2000, and by fiscal year 2021 served 770,179, after a fall through every year the table shows up to fiscal year 2020 (627,728) and a partial rebound in 2021.

    770,179 participants, participants in state-administered adult basic, adult secondary and english language acquisition programmes, FY2021. 2,629,643 participants, participants in the same programmes in fiscal year 2000, the highest year the table shows, FY2000. U.S. Department of Education, National Center for Education Statistics, Digest of Education Statistics 2022, table 507.20 (from the OCTAE National Reporting System), retrieved 2026-10-02.

    How it worked: The federal government funds states by formula to run adult basic education, high school equivalency preparation and English classes through local providers, and requires every state to report participants and outcomes into one national reporting system.

    Limits: The table starts in fiscal year 2000, so the second metric is the highest year it shows, not a proven all-time peak. FY2021 is a pandemic year and a partial rebound from FY2020's 627,728; FY2019, before the pandemic, already stood at 948,934, so most of the fall predates it. The fall is computed from two published table cells (about 71 percent), and part of it may reflect tighter participant definitions and federal performance reporting rather than lost provision; the table carries no note on definitional changes. The count covers only programmes reporting to the federal National Reporting System, not community college, employer or private adult learning, so it is not a national adult participation rate. Funding is shared between federal and state governments and the record does not attribute the decline to a single decision.

Panel median66.0+2.9 against the indicators

Round 2. How this layer works

  • 66.0 institutionalist@claude-opus-5-5, self-confidence 0.55

    Held at 66. The panel agrees, and community colleges and research universities are durable learning institutions.

  • 66.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Held at 66 with A: research impact, firm training and community colleges are strong, and open-source learning adds to it.

  • 63.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Raised one point. A and B at 66 treat research impact and training as strong; the measured outcomes are good, though large university spending plays a part.

Experimentation

How easily can new approaches be attempted, tested, abandoned, and improved?

52.80.64 usable7 of 10

Recency 1.00About ExperimentationUnited States beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 5 of 7 indicators modelled2001: 5 of 7 indicators modelled2002: 5 of 7 indicators modelled2003: 5 of 7 indicators modelled2004: 4 of 7 indicators modelled2005: 4 of 7 indicators modelled2006: 4 of 7 indicators modelled2007: 4 of 7 indicators modelled2008: 4 of 7 indicators modelled2009: 4 of 7 indicators modelled2010: 4 of 7 indicators modelled2011: 4 of 7 indicators modelled2012: 4 of 7 indicators modelled2013: 4 of 7 indicators modelled2014: 4 of 7 indicators modelled2015: 4 of 7 indicators modelled2016: 4 of 7 indicators modelled2017: 4 of 7 indicators modelled2018: 4 of 7 indicators modelled2019: 4 of 7 indicators modelled2020: 4 of 7 indicators modelled2021: 4 of 7 indicators modelled2022: 4 of 7 indicators modelled2023: 4 of 7 indicators modelled2024: 4 of 7 indicators modelled2025: 1 of 7 indicators modelled2026: 0 of 7 indicators modelledmodel
  • Reconstruction on today's 7 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-0.3 over 10 years (2016 to 2026), band -4.9 to +3.8, which includes no change. Median change: all countries 0, Income quartile 4 of 4 in 2000, highest -4.2.

+2.3 over 20 years (2006 to 2026), band -1.6 to +6.5, which includes no change. Median change: all countries +0.1, Income quartile 4 of 4 in 2000, highest -5.

The model fills at least one of the 7 indicators in 26 of 27 years, at most 5, last in 2025. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Resident patent applications

Patent applications filed by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.PAT.RESD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IP.PAT.RESD)
169per million peoplefrom 270,295 national total2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Resident patent applications

Patent applications filed by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.PAT.RESD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Resident trademark applications

Direct trademark applications by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.TMK.RSCT), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IP.TMK.RSCT)
1,451per million peoplefrom 493,415 national total2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Resident trademark applications

Direct trademark applications by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.TMK.RSCT), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Resident industrial design applications

Industrial design applications filed by residents at their national office, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.IDS.RSCT), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IP.IDS.RSCT)
60.8per million peoplefrom 20,670 national total2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Resident industrial design applications

Industrial design applications filed by residents at their national office, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.IDS.RSCT), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

New public software repositories

Growth over one year in the public GitHub repositories located in the country, per million people.

Measured in per million people; higher is better. Source: GitHub Innovation Graph (data/repositories.csv), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
GitHub Innovation Graph (data/repositories.csv)
28,862per million peoplefrom 9,864,576 national total2026. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

New public software repositories

Growth over one year in the public GitHub repositories located in the country, per million people.

Measured in per million people; higher is better. Source: GitHub Innovation Graph (data/repositories.csv), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Early-stage entrepreneurial activity

Adults starting or running a business less than 42 months old.

Measured in % aged 18-64; higher is better. Source: Global Entrepreneurship Monitor (APS key indicators, TEA rate), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
Global Entrepreneurship Monitor (APS key indicators, TEA rate)
17.7% aged 18-642025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Early-stage entrepreneurial activity

Adults starting or running a business less than 42 months old.

Measured in % aged 18-64; higher is better. Source: Global Entrepreneurship Monitor (APS key indicators, TEA rate), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

perception proxyRecords what people or experts say, not what they did.

Tolerance of entrepreneurial failure

Share of adults who see good opportunities and say fear of failure would not stop them starting a business.

Measured in % not deterred; higher is better. Source: Global Entrepreneurship Monitor (APS key indicators, fear of failure rate), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

perception proxy
Global Entrepreneurship Monitor (APS key indicators, fear of failure rate)
57.6% not deterred2025. The rail runs from 1960 to 2026.
perception proxyRecords what people or experts say, not what they did.

Tolerance of entrepreneurial failure

Share of adults who see good opportunities and say fear of failure would not stop them starting a business.

Measured in % not deterred; higher is better. Source: Global Entrepreneurship Monitor (APS key indicators, fear of failure rate), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Insolvency efficiency

B-READY score for the time and cost of in-court liquidation and reorganization of a failed firm.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BI.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.BI.P3)
60.5score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Insolvency efficiency

B-READY score for the time and cost of in-court liquidation and reorganization of a failed firm.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BI.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes (1 case below), University spinouts.

This project retired one row: Business share of R&D.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 2019United StatesCFPB Compliance Assistance Sandbox, rescinded in 2022 and withdrawn again in 2025dismantled
    United Stateslinked to Firms through regulatory sandboxesstarted 2019dismantled

    CFPB Compliance Assistance Sandbox, rescinded in 2022 and withdrawn again in 2025

    The Consumer Financial Protection Bureau opened a national Compliance Assistance Sandbox in September 2019, issued two sandbox approval orders in December 2020, terminated one of them in June 2022 and rescinded the policy with effect from 30 September 2022; a reissued version of January 2025 was withdrawn in May 2025.

    2 approval orders, compliance assistance sandbox approval orders listed as granted, 2020-12. Consumer Financial Protection Bureau, Innovation: granted applications, retrieved 2026-10-02.

    How it worked: A federal consumer-finance regulator offered firms a statutory safe harbour and a written approval that a described product complied with named laws, in exchange for sharing data during the test. A later leadership judged that the policies did not advance innovation and lacked transparency, let the information-collection authority lapse and rescinded the policy.

    Limits: The count of two is ours, made by counting the approval orders the CFPB lists as granted (Payactiv and Synchrony Bank); the page also lists one template (Build Commonwealth) and separate No-Action Letters and Trial Disclosure waivers, which are not counted here. The rescission and the 2025 withdrawal are read from Federal Register notices on govinfo.gov (87 FR 58439, 90 FR 1974 and 90 FR 20086), not from the cited page. The CFPB page is blocked to some automated clients. Two approvals over three years is evidence that the federal consumer-finance sandbox barely operated before it was ended, not that it failed on its merits: the Bureau's stated reasons were that the policies did not advance consumer-beneficial innovation and failed to meet standards for transparency and stakeholder participation. State sandboxes (Arizona, Utah and others) are subnational and are not counted.

Panel median72.0+19.2 against the indicators

Round 2. How this layer works

  • 72.0 institutionalist@claude-opus-5-5, self-confidence 0.55

    Hold 72: panelist B's 80 rests on venture depth that no indicator here measures; the institutional case is Chapter 11 and patents, which justify 72 and not more.

  • 76.0 bottom_up@claude-opus-5-5, self-confidence 0.55

    Moved from 80 to 76. C's 70 is fair that the indicator is dragged by trademarks only, but A and C both agree on venture and Chapter 11 depth; I trim to reflect that venture counts remain unmeasured here.

  • 70.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45

    Held at 70. Patents at the fence, deep venture markets and Chapter 11 restart are conversion rather than endowment; B at 80 leans on venture depth that no indicator here measures.

Adaptability

How effectively can the system respond when circumstances change?

72.40.62 usable4 of 6

Recency 1.00About AdaptabilityUnited States beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 4 indicators modelled2001: 2 of 4 indicators modelled2002: 2 of 4 indicators modelled2003: 2 of 4 indicators modelled2004: 2 of 4 indicators modelled2005: 2 of 4 indicators modelled2006: 2 of 4 indicators modelled2007: 2 of 4 indicators modelled2008: 2 of 4 indicators modelled2009: 2 of 4 indicators modelled2010: 0 of 4 indicators modelled2011: 0 of 4 indicators modelled2012: 0 of 4 indicators modelled2013: 0 of 4 indicators modelled2014: 0 of 4 indicators modelled2015: 0 of 4 indicators modelled2016: 0 of 4 indicators modelled2017: 0 of 4 indicators modelled2018: 0 of 4 indicators modelled2019: 0 of 4 indicators modelled2020: 0 of 4 indicators modelled2021: 0 of 4 indicators modelled2022: 0 of 4 indicators modelled2023: 0 of 4 indicators modelled2024: 0 of 4 indicators modelled2025: 0 of 4 indicators modelled2026: 0 of 4 indicators modelledmodel
  • Reconstruction on today's 4 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+0.7 over 10 years (2016 to 2026), band +0.7 to +0.7. Median change: all countries -0.8, Income quartile 4 of 4 in 2000, highest -0.9.

-1 over 20 years (2006 to 2026), band -6 to +3.2, which includes no change. Median change: all countries -1, Income quartile 4 of 4 in 2000, highest -1.9.

The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+0.7 over 10 years, from 71.7 in 2016 to 72.4 on 4 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Unemployment rate

Unemployed as a share of the labour force, modelled ILO estimate.

Measured in % of labour force; lower is better. Source: World Bank (SL.UEM.TOTL.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (SL.UEM.TOTL.ZS)
4.2% of labour force2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Unemployment rate

Unemployed as a share of the labour force, modelled ILO estimate.

Measured in % of labour force; lower is better. Source: World Bank (SL.UEM.TOTL.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Long-term unemployment share

Unemployed for 12 months or more, as a share of total unemployment.

Measured in % of unemployed; lower is better. Source: ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB)
13.8% of unemployed2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Long-term unemployment share

Unemployed for 12 months or more, as a share of total unemployment.

Measured in % of unemployed; lower is better. Source: ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Export diversification

Concentration of the merchandise export basket across products: the normalised Herfindahl-Hirschman index over SITC Rev.3 3-digit lines, 0 when exports are spread evenly and 1 when one product is everything.

Measured in index 0-1, lower = more diversified; lower is better. Source: UNCTAD (US.ConcentDiversIndices), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
UNCTAD (US.ConcentDiversIndices)
0.11index 0-1, lower = more diversified2025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Export diversification

Concentration of the merchandise export basket across products: the normalised Herfindahl-Hirschman index over SITC Rev.3 3-digit lines, 0 when exports are spread evenly and 1 when one product is everything.

Measured in index 0-1, lower = more diversified; lower is better. Source: UNCTAD (US.ConcentDiversIndices), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

New export products

Share of the products a country did not export competitively in 2009-2011 that it exported competitively in 2022-2024.

Measured in % of products not exported competitively at the start; higher is better. Source: Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ))
2% of products not exported competitively at the start2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

New export products

Share of the products a country did not export competitively in 2009-2011 that it exported competitively in 2022-2024.

Measured in % of products not exported competitively at the start; higher is better. Source: Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025

    73.7 % aged 15+, rank 52 of 135. Share of the working-age population in the labour force.

    A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.

  • Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024

    38.9 per 100 people, rank 18 of 135. Fixed broadband subscriptions per 100 people.

    A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.

  • Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2025

    5.3 % of output, rank 21 of 122. Power lost in transmission and distribution, including unbilled use.

    A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.

  • Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT)

    No value for this country. Informal employment as a share of total employment, SDG indicator 8.3.1.

    A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 1968United StatesNational Flood Insurance Program coverage, and its erosionoperating below its peak
    United Stateslinked to Disaster preparedness and recoverystarted 1968operating below its peak

    National Flood Insurance Program coverage, and its erosion

    OpenFEMA's records of National Flood Insurance Program contracts in force fell from 4,667,875 on 31 December 2009 to 3,589,275 on 31 December 2025, a fall of about 23 percent in the federal flood insurance base over 16 years.

    3,589,275 contracts, nfip policy contracts in force (openfema records active on the date), 2025-12-31. 4,667,875 contracts, nfip policy contracts in force at the first complete year-end in the dataset, 2009-12-31. FEMA, OpenFEMA NFIP Redacted Policies dataset (v3), retrieved 2026-10-02.

    How it worked: Congress created a federal insurer of last resort for flood, tied to community floodplain management and to a purchase requirement for federally backed mortgages in high-risk zones, so that recovery after floods would be paid for by premiums rather than only by disaster aid.

    Limits: Both numbers are computed, not published headlines: they are the record counts the OpenFEMA API returns for policies whose effective date is on or before, and termination date after, each date, which is the method FEMA's own NFIP data FAQ gives. The 2009 figure comes from the same URL with the date changed to 2009-12-31. The count is of contracts, not policies: one condominium contract can cover many units, and FEMA's own 'NFIP by the Numbers' report for 31 August 2026 shows 3,388,273 contracts but 4,460,103 policies. The API count runs about 2 percent above FEMA's contracts-in-force report (3,589,275 against 3,512,555 for December 2025), so the level carries a small method error, though both ends use the same method. The dataset starts with policies effective in 2009, so the true earlier peak cannot be shown from it. The fall is not all lost protection: private flood insurance has grown, some properties left mapped flood zones, and Risk Rating 2.0 (2021) raised premiums by design to price risk. What the record shows is that the public programme's reach shrank, not that total insured flood exposure fell by the same amount.

  • 2021United StatesExpanded Child Tax Credit of 2021, and its lapsedismantled
    United Stateslinked to Institutional responsivenessstarted 2021dismantled

    Expanded Child Tax Credit of 2021, and its lapse

    The American Rescue Plan, passed in March 2021, expanded the Child Tax Credit and made it payable monthly, and on 15 July 2021 the IRS paid roughly 15 billion dollars to families of nearly 60 million children; Congress did not extend the expansion beyond 2021.

    60,000,000 children (nearly), eligible children in families paid in the first monthly payment, 2021-07-15. 15,000,000,000 US dollars (roughly), paid in the first monthly payment, 2021-07-15. US Department of the Treasury, press release of 15 July 2021, retrieved 2026-10-02.

    How it worked: Congress turned an annual tax credit into a monthly payment and the IRS paid it automatically from prior-year tax returns, reaching most families within four months without a new application system.

    Limits: The source is the Treasury announcing its own first payment, rounded ('nearly', 'roughly'), not an audited count. The four-month interval from the March 2021 law to the July payment is derived from the release's 'passed in March' and its date. The expansion was legislated for 2021 only and lapsed when Congress declined to extend it, so 'dismantled' records a decision not to continue rather than a repeal. The loss is documented by the Census Bureau, not by this source: in Poverty in the United States: 2022 (https://www.census.gov/library/publications/2023/demo/p60-280.html) the Supplemental Poverty Measure child poverty rate more than doubled, from 5.2 percent in 2021 to 12.4 percent in 2022, and other programmes also expired in that year, so not all of the rise is the credit. Families the IRS could not find through prior tax filings were missed by the automatic payments.

Panel median70.0-2.4 against the indicators

Round 2. How this layer works

  • 70.0 institutionalist@claude-opus-5-5, self-confidence 0.50

    Held at 70. Panelist C's reserve-currency point is fair, but the fast labour reallocation runs through institutions such as unemployment insurance and the bankruptcy courts.

  • 70.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Held at 70: the labour market reallocates fast; C's reserve-currency point is fair, but few new export products already hold me below 72.4.

  • 66.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Raised one point. Fast labour reallocation is capability, per A and B, but new export products of 22 show a basket that does not change, and reserve currency status eases adjustment.

Building

How capable is the country of turning plans and knowledge into functioning systems?

62.40.59 usable4 of 6

Recency 0.94About BuildingUnited States beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 3 of 4 indicators modelled2001: 3 of 4 indicators modelled2002: 3 of 4 indicators modelled2003: 3 of 4 indicators modelled2004: 3 of 4 indicators modelled2005: 3 of 4 indicators modelled2006: 3 of 4 indicators modelled2007: 1 of 4 indicators modelled2008: 1 of 4 indicators modelled2009: 1 of 4 indicators modelled2010: 1 of 4 indicators modelled2011: 1 of 4 indicators modelled2012: 1 of 4 indicators modelled2013: 1 of 4 indicators modelled2014: 1 of 4 indicators modelled2015: 1 of 4 indicators modelled2016: 1 of 4 indicators modelled2017: 1 of 4 indicators modelled2018: 1 of 4 indicators modelled2019: 1 of 4 indicators modelled2020: 1 of 4 indicators modelled2021: 1 of 4 indicators modelled2022: 1 of 4 indicators modelled2023: 1 of 4 indicators modelled2024: 1 of 4 indicators modelled2025: 0 of 4 indicators modelled2026: 0 of 4 indicators modelledmodel
  • Reconstruction on today's 4 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+0.3 over 10 years (2016 to 2026), band -3.4 to +3.7, which includes no change. Median change: all countries -0.3, Income quartile 4 of 4 in 2000, highest +0.3.

-4.2 over 20 years (2006 to 2026), band -8.2 to +0.9, which includes no change. Median change: all countries -0.5, Income quartile 4 of 4 in 2000, highest -0.2.

The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+0.4 over 10 years, from 55.7 in 2016 to 56.1 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Manufacturing value added

Manufacturing value added as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (NV.IND.MANF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (NV.IND.MANF.ZS)
10.5% of GDP2021. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Manufacturing value added

Manufacturing value added as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (NV.IND.MANF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

High-technology exports

High-technology exports as a share of manufactured exports.

Measured in % of manufactured exports; higher is better. Source: World Bank (TX.VAL.TECH.MF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (TX.VAL.TECH.MF.ZS)
24.3% of manufactured exports2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

High-technology exports

High-technology exports as a share of manufactured exports.

Measured in % of manufactured exports; higher is better. Source: World Bank (TX.VAL.TECH.MF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Utility connection efficiency

B-READY score for the time to obtain electricity, water and internet connections and the reliability of their supply.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.US.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.US.P3)
84.7score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Utility connection efficiency

B-READY score for the time to obtain electricity, water and internet connections and the reliability of their supply.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.US.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Economic fitness

Diversity and ubiquity-adjusted sophistication of the export basket.

Measured in index; higher is better. Source: World Bank (EF.EFM.UNIV.XD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (EF.EFM.UNIV.XD)
16.2index2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Economic fitness

Diversity and ubiquity-adjusted sophistication of the export basket.

Measured in index; higher is better. Source: World Bank (EF.EFM.UNIV.XD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: Large project delivery (4 cases below), Firm scale-up rate.

This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025

    156,983 constant 2021 PPP $, rank 5 of 133. GDP per person employed, constant purchasing power parity.

    A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 2000United StatesMeasles elimination, and its erosionoperating below its peak
    United Stateslinked to Large project deliverystarted 2000operating below its peak

    Measles elimination, and its erosion

    The United States eliminated endemic measles transmission by 2000 through school-entry vaccination requirements, and falling coverage brought 2,777 confirmed cases by August 2026, the most since 1991, against 285 in all of 2024.

    2,777 cases, confirmed measles cases in 2026, to 20 august, 2026-08. 285 cases, confirmed measles cases in the last pre-outbreak year, 2024. US Centers for Disease Control and Prevention, measles cases and outbreaks, retrieved 2026-08-27.

    How it worked: The erosion is the mechanism recorded here: vaccination requirements are enforced at school entry by states, so a delivery that took federal purchasing and decades of practice is being undone state by state through widening exemption rules and falling trust, with no single decision anywhere.

    Limits: A case count is the lagging end of the erosion; the leading end is kindergarten vaccination coverage, which CDC reports separately as falling from about 95 percent before the pandemic to under 93 percent, below the outbreak-prevention threshold. The 2026 number is a year in progress and will rise. Elimination status is a WHO-defined property of transmission chains, not of case counts, and had not been formally revoked at retrieval; what the record documents is a maintained public-health achievement being lost while the infrastructure that delivered it still exists.

  • 1956United StatesInterstate Highway Systemdelivered and closed
    United Stateslinked to Large project deliverystarted 1956delivered and closed

    Interstate Highway System

    Under the Federal-Aid Highway Act of 1956, the federal government and the states built the Interstate System. In nominal dollars, the estimated federal cost to complete it rose from $34 billion in the 1958 Interstate Cost Estimate to $114 billion in the final estimate of 1991.

    114 USD billion, estimated federal cost to complete the interstate system, final (1991) interstate cost estimate, nominal, 1991. 34 USD billion, estimated federal cost to complete the interstate system, first (1958) interstate cost estimate, nominal, 1958. US Federal Highway Administration, Highway History: How many Interstate programs were there?, retrieved 2026-10-01.

    How it worked: Congress set a 90 percent federal match paid from a dedicated Highway Trust Fund fed by fuel taxes, and the Bureau of Public Roads (later FHWA) apportioned it to state highway departments by repeated cost-to-complete estimates, which let the states build to one national standard on a pay-as-you-go basis.

    Limits: Both figures are in dollars not adjusted for inflation, so the 235 percent rise we compute from them, (114-34)/34, is not a real cost overrun. FHWA itself attributes the growth to inflation, mileage added by Congress in 1968 and later, 'more safety and more attention to the environment' in later programs and 'changes in the definition of completion', as well as to the Interstate Program 'evolving'. The page gives no real-terms figure, no schedule baseline and no per-mile comparison, so it cannot separate execution failure from scope change. The 1958 ICE was a cost-to-complete estimate used to apportion funds, not a contract budget. The source gives no schedule baseline; the final estimate came 35 years after the Act. The source says later Interstate Programs have not ended, so 'concluded' refers to the end of Interstate Construction apportionments under ISTEA. The figures are federal share only.

  • 2014United StatesAffordable Care Act marketplaces, and their 2026 contractionstill operating
    United Stateslinked to Large project deliverystarted 2014still operating

    Affordable Care Act marketplaces, and their 2026 contraction

    The United States' health insurance exchanges enrolled 23.1 million people in the 2026 open enrollment period, the first after the enhanced premium tax credits expired at the end of 2025, about 1.2 million fewer than in 2025.

    23.1 million people, exchange plan selections, 2026 open enrollment period, 2026. 1.2 million people, fewer plan selections than in the 2025 open enrollment period, 2026. Centers for Medicare and Medicaid Services, Health Insurance Exchanges 2026 Open Enrollment Report, retrieved 2026-10-17.

    How it worked: Congress widened the exchange tax credits in 2021 and extended them in 2022 with an end date. When the extension lapsed at the end of 2025 and CMS removed improper enrolments, plan selections fell, most among automatic re-enrollees and rural consumers.

    Limits: The figures are read from a PDF and are plan selections, not effectuated coverage: people who select a plan and never pay a premium are counted. CMS reports on its own programme. Part of the 5 percent fall is not a loss of wanted coverage: CMS ended tax-credit payments or coverage for nearly 1.5 million people it found ineligible or enrolled without their authorization. The 2026 total is still 1.7 million above 2024, so the 2025 peak was itself lifted by temporary subsidies. Illinois moved to its own exchange in 2026, which shifts the platform split but not the national total. The exchanges cover the individual market only and are not a universal system.

  • 2023United StatesFedNow Service, an opt-in central bank instant railstill operating
    United Stateslinked to Large project deliverystarted 2023still operating

    FedNow Service, an opt-in central bank instant rail

    The Federal Reserve Banks launched the FedNow instant payment service in 2023 and it settled 8.41 million customer credit transfers in 2025, an average of 23,050 a day, rising to 5.00 million in the second quarter of 2026.

    8,413,402 transactions, fednow settled payments in the calendar year, 2025. 4,997,811 transactions, fednow settled payments in the quarter, 2026-Q2. Federal Reserve Financial Services, FedNow Service Volume and Value Statistics, retrieved 2026-10-17.

    How it worked: The Federal Reserve built and runs the instant rail for institutions that choose to connect, and left participation and customer-facing products to each bank's own decision.

    Limits: The series counts settled customer credit transfers only and uses calendar days, as the publisher notes. Volume is growing fast from a small base, so the record shows a slow start and not a failure, and the status is operating. The page gives no count of participating institutions, no share of US payments and no figures for the privately run RTP network, which competes for the same banks, so it cannot show how much of US instant payment the public rail carries. Average value per payment was 101,435 dollars in 2025, which suggests much of the value is business and interbank liquidity flows rather than retail use. The operator reports on its own service.

Panel median56.0-6.4 against the indicators

Round 2. How this layer works

  • 56.0 institutionalist@claude-opus-5-5, self-confidence 0.45

    Revised down 2 to 56. Panelists B and C give public examples of slow, costly delivery (California high-speed rail, Gateway), so I trim; firm-level building remains strong.

  • 56.0 bottom_up@claude-opus-5-5, self-confidence 0.45

    Held near 56: firms build at scale, but public infrastructure such as California high-speed rail and Gateway is slow and costly.

  • 55.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Raised three points. A at 58 and B at 55 stress slow, costly public infrastructure; I accept that, but fitness at the cap and utility connection of 81 are real, even if income helps.

Shared purpose

To what extent can people imagine themselves as participants in a common project?

38.50.32 thin2 of 6

Recency 1.00About Shared purposeUnited States beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 0 of 2 indicators modelled2001: 0 of 2 indicators modelled2002: 0 of 2 indicators modelled2003: 0 of 2 indicators modelled2004: 0 of 2 indicators modelled2005: 0 of 2 indicators modelled2006: 0 of 2 indicators modelled2007: 0 of 2 indicators modelled2008: 0 of 2 indicators modelled2009: 0 of 2 indicators modelled2010: 0 of 2 indicators modelled2011: 0 of 2 indicators modelled2012: 0 of 2 indicators modelled2013: 0 of 2 indicators modelled2014: 0 of 2 indicators modelled2015: 0 of 2 indicators modelled2016: 0 of 2 indicators modelled2017: 0 of 2 indicators modelled2018: 0 of 2 indicators modelled2019: 0 of 2 indicators modelled2020: 0 of 2 indicators modelled2021: 0 of 2 indicators modelled2022: 0 of 2 indicators modelled2023: 0 of 2 indicators modelled2024: 0 of 2 indicators modelled2025: 0 of 2 indicators modelled2026: 0 of 2 indicators modelledmodel
  • Reconstruction on today's 2 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-0.8 over 10 years (2016 to 2026), band -0.8 to -0.8. Median change: all countries +2.7, Income quartile 4 of 4 in 2000, highest +1.8.

-0.9 over 20 years (2006 to 2026), band -0.9 to -0.9. Median change: all countries +4, Income quartile 4 of 4 in 2000, highest +1.1.

No indicator is modelled in any year. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

-0.8 over 10 years, from 39.3 in 2016 to 38.5 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Tax revenue

Central government tax revenue as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (GC.TAX.TOTL.GD.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (GC.TAX.TOTL.GD.ZS)
10.8% of GDP2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Tax revenue

Central government tax revenue as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (GC.TAX.TOTL.GD.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Income inequality

Gini index of disposable income.

Measured in Gini 0-100; lower is better. Source: World Bank (SI.POV.GINI), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (SI.POV.GINI)
41.8Gini 0-1002024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Income inequality

Gini index of disposable income.

Measured in Gini 0-100; lower is better. Source: World Bank (SI.POV.GINI), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 4 rows, each a gap: Sense of national belonging, Volunteering, Political polarisation (1 case below), Civic participation.

This project retired one row: Voice and accountability.

Behavioral check, not scored

Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.

  • Political polarizationV-Dem (v2cacamps_osp), 2025

    3.813 index 0-4, lower is better. Whether supporters of opposing political camps generally meet in a friendly or a hostile manner, rated by V-Dem country experts from 0, friendly, to 4, hostile.

    The question counts hostility and leaves disagreement alone, which is what pluralism asks for. It is not scored because a low reading has two causes the number cannot tell apart. Where camps compete openly, a calm reading means people who disagree still meet as fellow citizens. Where no opposition may organize, it means there is no camp left to be hostile to. In 2025 the five closed autocracies in the frame average 2.18 and the liberal democracies 1.67, while electoral democracies and electoral autocracies sit near 2.8 and 3.3. Scored, the reading would have lifted the United Arab Emirates about 11 points on this capability for a uniformity the benchmark does not count as shared purpose. Income is not why it is left out: richer countries read only somewhat calmer, at about -0.41 against log GDP per capita.

  • Voter turnoutV-Dem (v2eltrnout), 2024

    70.75 % of registered voters, higher is better. Share of registered voters who cast a vote in the latest national election up to 2025, according to official results, as coded by V-Dem from IDEA, IPU and IFES sources. Where executive and legislative elections fall on the same day, the executive turnout is coded.

    Turnout is the one act in which a whole population takes part in a common decision, so it is the closest behavioral reading of shared purpose the benchmark has. It is not scored for three reasons the number cannot separate. It reads the democratic channel, which is why voice and accountability was retired from this capability (A5): a country with no competitive elections cannot score well for reasons unrelated to whether its people see themselves in a common project. Compulsory voting turns it into a reading of the law: Brazil enforces it, and the eight countries that enforce sanctions average 83 percent against 65 where voting is voluntary. And closed and electoral autocracies manage it: Vietnam reads 95.6, Rwanda 98.2 and Singapore 92.8, which is mobilization, not participation (A13). The year shown is the latest national election, because elections are coded only in the year they happen.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Wealth held by the top 10%OECD (DSD_WEALTH@DF_WEALTH), 2022

    75.1 % of household net wealth, rank 29 of 29. Share of household net wealth held by the wealthiest 10% of households, excluding pension entitlements.

    A condition, not scored: how household wealth is divided describes the society a country works with and does not measure a capability. The rank orders values and is not a verdict. The OECD has this share for 29 benchmark countries, nearly all OECD members, so the row says nothing about the other 106. Net wealth here excludes pension entitlements, and the unit is the household. Surveys reach the richest households to different degrees, so a small gap between two countries means little. Denmark, the Netherlands and Norway use tax and administrative records; the rest use surveys. United Kingdom values cover Great Britain only. The latest year is 2016 for Poland and 2023 for Canada and the Netherlands.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 1977United StatesFederal funding gaps and the 2019 shutdownoperating below its peak
    United Stateslinked to Political polarisationstarted 1977operating below its peak

    Federal funding gaps and the 2019 shutdown

    The Congressional Research Service records 20 federal funding-gap shutdowns with at least one full day between FY1977 and FY2019, including the 35-day partial shutdown from 21 December 2018 to 25 January 2019, the longest in the period it surveys.

    35 days, longest partial federal shutdown, 2019-01-25. 20 shutdowns, funding-gap shutdowns with at least one full day, 1977-2019. Congressional Research Service, Past Government Shutdowns: Key Resources, retrieved 2026-08-31.

    How it worked: The US appropriations process allows a lapse in budget authority to stop or furlough parts of the federal government, turning unresolved political conflict into an interruption of administration. Continuing resolutions and contingency plans soften the shock but do not remove the incentive or the coordination cost of brinkmanship.

    Limits: Shutdown duration and frequency are institutional consequences that can reflect constitutional rules, divided government and bargaining strategy, not a direct measure of public attitudes or latent polarisation. The CRS series ends in FY2019 for this historical resource, and a shutdown's operational cost varies with which agencies lose budget authority.

Panel median44.0+5.5 against the indicators

Round 2. How this layer works

  • 44.0 institutionalist@claude-opus-5-5, self-confidence 0.50

    Hold at 44. Tax of 10.8% covers central government only (my own knowledge), so 38.5 is low, and Gini of 41.8 is high. C also notes the data oddity. B's congregational and local aid is real and supports my small lift, but it does not reach national collective action given hostile sorting and repeated federal shutdowns, so I do not follow to 48.

  • 48.0 bottom_up@claude-opus-5-5, self-confidence 0.45

    Hold 48. Tax of 10.8% covers central government only and Gini is 41.8, giving 38. From my own knowledge, charity, congregations and local mutual aid are large, and I weigh them more than Panelists A and C do. Hostile partisan sorting, contested results and political violence undermine a national common project. Local capacity and national failure both exist, so I remain mid-range.

  • 43.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30

    Indicator 38.5 is pulled down by tax at 10.8% (central government only, own knowledge) and Gini 41.8. Associational life, charity and congregations are strong; affective polarisation, shutdowns and political violence undermine a national project. I move from 42 to 43; hostile polarisation counts against, as does the data oddity in tax.