Peru
Strongest usable evidence: Coordination, at 59.4. Raise Experimentation first, at 23.6. Shared purpose needs more evidence: confidence is 0.28.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- ExperimentationPeers 19.60.64 usableno trend
- BuildingPeers 20.40.63 usable-1.1(3)
- AnticipationPeers 36.80.46 usable+19.6(2)
- AgencyPeers 40.90.49 usableno trend
Measure before managing, thinnest first
- Shared purposePeers 48.20.28 thin+7.9(2)
- TrustPeers 64.00.33 thin+6.3(2)
Keep watching, highest first
- CoordinationPeers 74.60.45 usable+4.5(2)
- AdaptabilityPeers 70.00.46 usable-9.3(3)
- LearningPeers 32.40.54 usable+6.7(2)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Peru beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Sustained growth with persistent institutional instability and high informality.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
42.00.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationPeru beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+19.5 over 10 years (2016 to 2026), band +19.5 to +19.5. Median change: all countries +11.2, Latin America +11, Income quartile 2 of 4 in 2000 +12.5.
+19.9 over 20 years (2006 to 2026), band +12.4 to +27.7. Median change: all countries +13.4, Latin America +12.1, Income quartile 2 of 4 in 2000 +13.6.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+19.6 over 10 years, from 22.4 in 2016 to 42.0 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 155articles per million peoplefrom 5,241.67 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 82index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2023
0.18 % of GDP, rank 96 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6)
No value for this country. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
827 per million people, rank 70 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median39.0-3.0 against the indicators
Round 2. How this layer works
- 38.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Move from 36 to 38. C's ENFEN point names a standing multi-agency El Niño committee, which is the kind of institution I credit; extreme presidential turnover still weakens CEPLAN's plans.
- 40.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 40: CEPLAN and ENFEN El Niño warning give Peru real anticipation; presidential churn cuts follow-through, as panelist A says, which I already weighed.
- 39.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held near 39 (down 1): A and B cite CEPLAN and extreme presidential turnover; ENFEN early warning is real, but the 2023 El Nino response was slow.
Agency
How able are individuals and organizations to turn an intention into action?
47.80.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyPeru beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+2.2 over 10 years (2016 to 2026), band -2.5 to +6.9, which includes no change. Median change: all countries +1.9, Latin America +2.1, Income quartile 2 of 4 in 2000 +3.
+10.8 over 20 years (2006 to 2026), band +5.9 to +15.8. Median change: all countries +9.3, Latin America +9.3, Income quartile 2 of 4 in 2000 +10.4.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 4.9per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 62.8score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 8count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
82 % of population, rank 68 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
59.3 % aged 15+, rank 85 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2024
39.6 % of GDP, rank 66 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median45.0-2.8 against the indicators
Round 2. How this layer works
- 45.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Held at 45. Density of 4.9 (29.1), entry efficiency of 62.811 (51.3) and 8 procedures (63.2) give 47.8. B at 62 counts Gamarra and self-built cities, which show drive that exists because formal channels fail, so I do not count it as institutional capability. C at 44 agrees. SUNARP and SUNAT work, and agro-export firms show real organisation, so I do not go lower. Lima extortion, which B notes, now costs informal firms too.
- 58.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Trimmed from 62, and I keep the disagreement with panelists A (45) and C (44). A says informal effort is not institutional capability, but the question names individuals as well as organisations. Gamarra, self-built districts in Lima and migrant vendors turn intention into action daily (own knowledge), and density of 4.9 cannot see this. The trim is for extortion: since 2024 it has forced transport strikes and shop closures in Lima, and it taxes exactly these small actors.
- 45.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
I move from 44 to 45. Density 4.9, entry efficiency 62.8 and 8 procedures give 47.8. Panelist B's 62 argues informality means registers miss Gamarra and Andean migrants; I accept some of it, but individual informal effort is not institutional capability, and extortion in Lima is a growing limit. SUNARP and SUNAT work reasonably.
Coordination
How effectively can independent actors organize around shared objectives?
59.40.45 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 0.94About CoordinationPeru beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3 over 10 years (2016 to 2026), band -1.6 to +8.7, which includes no change. Median change: all countries -1.7, Latin America -1.4, Income quartile 2 of 4 in 2000 -1.6.
-2.8 over 20 years (2006 to 2026), band -7 to +2.8, which includes no change. Median change: all countries -2.7, Latin America -5.2, Income quartile 2 of 4 in 2000 -2.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2005, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+4.5 over 10 years, from 71.6 in 2016 to 76.1 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 26.4score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 91.6percentage points from approved budget | 2022. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.71index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration, Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2023
5.399 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2009PeruObras por Impuestos, firms financing public infrastructurestill operating
Obras por Impuestos, firms financing public infrastructure
Peru's Obras por Impuestos scheme lets private firms finance public projects against future tax liabilities; the finance ministry recorded S/5.504 billion in certificates issued from 2009 through January 2024 and six projects identified as physically and financially complete in 2024.
5,504,000,000 Peruvian soles, certificates issued through obras por impuestos, 2024-01. 6 projects, projects identified as complete in 2024, 2024. Ministry of Economy and Finance, Obras por Impuestos detailed report, retrieved 2026-08-31.
How it worked: Peru let companies propose and finance public works and recover the cost through tax certificates, creating a bridge between private capital and local public priorities while the state retained project approval and service ownership.
Limits: Certificates and completion counts show the scale of a tax-linked financing mechanism, not whether projects were additional, delivered on time, well maintained or distributed fairly. The ministry compiles project information from public systems and companies; the scheme shifts financing and execution roles but does not remove public responsibility for selecting, regulating and operating the asset.
Panel median45.0-14.4 against the indicators
Round 2. How this layer works
- 42.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Moved from 40 to 42: panelist B's rondas campesinas and comedores populares are constitutionally and legally recognised local bodies, which I credit slightly, but panelist C agrees that budget fidelity reads the MEF island while six presidents since 2016 break coordination at the top.
- 46.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Revised down slightly from 48. A and C are right that coordination at the top breaks with six presidents in a decade and lives in MEF islands; comedores populares and rondas campesinas keep local coordination above their scores.
- 45.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held, between A at 40 and B at 48. The MEF island and six presidents in a decade support A; B's rondas and comedores are local coordination, which I count as moderate.
Trust
How much cooperation is possible beyond immediate personal networks?
58.20.33 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 0.97About TrustPeru beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+4.5 over 10 years (2016 to 2026), band -0.6 to +9.8, which includes no change. Median change: all countries +1.9, Latin America +1.1, Income quartile 2 of 4 in 2000 +2.5.
+4.2 over 20 years (2006 to 2026), band -0.5 to +9.4, which includes no change. Median change: all countries +2.1, Latin America +2, Income quartile 2 of 4 in 2000 +4.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+6.3 over 20 years, from 70.5 in 2006 to 76.8 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 38.8score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 7.6% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 2.6scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median38.0-20.2 against the indicators
Round 2. How this layer works
- 38.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Held at 38. Dispute resolution of 38.832 (21.1) is the most believable input, and bribery of 7.597% (84.9) reads too favourable next to criminal cases against ex-presidents (own knowledge). Congress moving against prosecutors and the JNJ strains compliance of 2.63 (68.6). B at 36 and C at 40 share this reading. B's rondas and ollas comunes are real, but they are local and they emerge where the state is absent.
- 36.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at 36. Bribery of 7.597% looks too favourable and dispute resolution of 38.832 fits better, and the panel agrees. Panelist C's 40 keeps more weight on compliance of 2.63, but Congress's moves against prosecutors and the JNJ, which panelist A names, undercut that. Rondas campesinas and ollas comunes show strong cooperation (own knowledge), but at local reach.
- 38.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
I move from 40 to 38. Panelist A's argument holds: dispute resolution 38.8 (21.1) is more believable than bribery 7.6% (84.9) in a country where every living ex-president has faced criminal cases, and Congress has moved against prosecutors and the JNJ. Rondas campesinas and ollas comunes show local cooperation. Six presidents in about a decade undermine commitment.
Learning
How effectively does the country acquire, distribute, and update knowledge?
52.10.54 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.78About LearningPeru beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3.4 over 10 years (2016 to 2026), band -0.1 to +6.3, which includes no change. Median change: all countries -1.3, Latin America -3.5, Income quartile 2 of 4 in 2000 -0.4.
+7.9 over 20 years (2006 to 2026), band +3.1 to +12.8. Median change: all countries +0.8, Latin America +2.2, Income quartile 2 of 4 in 2000 +2.2.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+6.7 over 20 years, from 44.7 in 2006 to 51.4 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.61index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 61.4% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 0.66ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2017
71.2 % gross, rank 39 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2024
4.4 % of GDP, rank 58 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
2.1 % of secondary, rank 115 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2003PeruEducación Básica Alternativa (EBA), and its erosionoperating below its peak
Educación Básica Alternativa (EBA), and its erosion
Peru's Educación Básica Alternativa, the second-chance basic education modality for youths and adults, enrolled 226,500 students in 2016, the highest year of the 2014 to 2023 table, and 190,700 in 2023, according to INEI's Compendio Estadístico 2024 citing the Ministry of Education's school census.
190.7 thousand students, enrolment in educación básica alternativa, 2023. 226.5 thousand students, enrolment in educación básica alternativa at the 2016 peak of the 2014 to 2023 series, 2016. Instituto Nacional de Estadística e Informática (INEI), Perú: Compendio Estadístico 2024, Tomo 1, Table 5.6 (source: Ministerio de Educación, Censo Escolar, Unidad de Estadística Educativa), retrieved 2026-10-02.
How it worked: The 2003 General Education Law converted Peru's old adult schools into a separate modality of basic education, delivered by public and private CEBA centres with flexible schedules and counted in the national school census. Enrolment peaked in 2016 and has drifted down since.
Limits: The numbers are in a PDF table (Table 5.6, PDF page 323 of 1,046), published in thousands with one decimal, and INEI republishes the Ministry of Education's census rather than collecting it; the Ministry's own ESCALE portal sits behind a bot-verification wall and could not be read. The peak is only the highest year of the ten-year window the table shows (2014 to 2023), and it was a one-year jump: enrolment was 204,500 in 2014 and 203,900 in 2015, so against 2014 the 2023 count is only about 7 percent lower, and the fall of about 16 percent is measured from that jump. The series reached its low of 188,600 in 2022 and rose slightly in 2023. The modality serves adolescents from 14 as well as adults, so not every learner is an adult, and the table does not split public from private centres. Enrolment is a census-day count, not attendance or completion, and a smaller EBA can partly reflect more young people completing regular schooling. A table footnote says the conversion of former adult education centres into the modality has been under way since 2006, so early years mix old and new structures. The 2003 start is the Ley General de Educación 28044 that created the modality, which is not stated at the source URL.
Panel median47.0-5.1 against the indicators
Round 2. How this layer works
- 46.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Moved from 45 to 46: panelist C's PISA gains before 2018 came through a reformed Ministry of Education and SUNEDU university licensing, which are institutional, but the post-pandemic stall and the weakening of SUNEDU in 2022 cap the score.
- 47.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held near 47. The panel agrees: strong firm training against weak citation impact, and C's note that PISA gains stalled after the pandemic fits a small discount.
- 47.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held. A and B at 45-48 agree; firm training of 76.8 is strong but citation impact of 26 and a pandemic stall in PISA hold it down.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
23.60.64 usable7 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationPeru beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 7 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+1.4 over 10 years (2016 to 2026), band -2.6 to +5.5, which includes no change. Median change: all countries 0, Latin America +0.5, Income quartile 2 of 4 in 2000 +0.5.
+1.7 over 20 years (2006 to 2026), band -2.9 to +6.7, which includes no change. Median change: all countries +0.1, Latin America +0.5, Income quartile 2 of 4 in 2000 +0.7.
The model fills at least one of the 7 indicators in 26 of 27 years, at most 5, last in 2025. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 6.3per million peoplefrom 214 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 993per million peoplefrom 33,986 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 4.2per million peoplefrom 142 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 11,258per million peoplefrom 389,275 national total | 2026. The rail runs from 1960 to 2026. | |
| direct capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | 12.8% aged 18-64 | 2025. The rail runs from 1960 to 2026. | |
| perception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | 55.1% not deterred | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 52.2score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.
This project retired one row: Business share of R&D.
Panel median27.0+3.4 against the indicators
Round 2. How this layer works
- 23.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Move from 22 to 23, the derived score, on 70% coverage. B's informal sector argument fails because informal ventures have no legal exit, which is what insolvency and registries test.
- 30.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 30: panelist A keeps the 23.6 indicator, but Peru's very large informal sector means much venture-making never reaches a registry, and the GEM rate only partly captures it.
- 27.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Moved down 1 to 27: B argues informal ventures never reach a registry, but that cuts both ways; TEA 12.8 and failure tolerance 49 are mid-frame and I stay modestly above 23.6.
Adaptability
How effectively can the system respond when circumstances change?
53.30.46 usable3 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 1.00About AdaptabilityPeru beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-9.3 over 10 years (2016 to 2026), band -9.3 to -9.3. Median change: all countries -0.8, Latin America -1.7, Income quartile 2 of 4 in 2000 -1.6.
-19.3 over 20 years (2006 to 2026), band -24.2 to -14.8. Median change: all countries -1, Latin America -4, Income quartile 2 of 4 in 2000 +0.4.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 1, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-9.3 over 10 years, from 62.6 in 2016 to 53.3 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 5.1% of labour force | 2025. The rail runs from 1960 to 2026. | |
| Long-term unemployment sharedownstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | no data% of unemployed | no data | no data |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.31index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 1.2% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
77 % aged 15+, rank 32 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
11.7 per 100 people, rank 77 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
11.6 % of output, rank 76 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025
70.5 % of employment, rank 67 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2005PeruJuntos, a conditional-transfer system at national scalestill operating
Juntos, a conditional-transfer system at national scale
Peru's Juntos conditional cash-transfer programme, created in 2005 and placed under MIDIS in 2012, operated in 1,885 districts and benefited 793,623 households by August 2024 through SISFOH-targeted support.
793,623 households, households benefiting from juntos, 2024-08. 1,885 districts, districts where juntos operates, 2024-08. Ministry of Development and Social Inclusion (MIDIS), monitoring-tools presentation, retrieved 2026-08-31.
How it worked: Peru linked regular cash transfers to health and education conditions and used the intergovernmental SISFOH targeting system to identify poor households, giving a national programme a way to reach dispersed communities while retaining a welfare-policy feedback and evaluation function.
Limits: Household coverage shows administrative reach, not whether transfers arrive on time, improve health or schooling, reduce poverty durably or exclude eligible families. MIDIS reports the programme totals and the targeting system, while causal effects require evaluations rather than beneficiary counts. District presence can also mask uneven access across a mountainous and remote country.
2021PeruNational COVID-19 vaccination campaigndelivered and closed
National COVID-19 vaccination campaign
From its first dose on 9 February 2021 to the end of 2023, Peru's national COVID-19 vaccination campaign administered 91.3 million doses and completed the primary series for 28.7 million people, 87 per 100 population, with 22.2 million boosted.
28,709,882 persons, persons with a completed primary series, 2023-12-29. 87 per 100 population, persons with a completed primary series per 100 population, 2023-12-29. World Health Organization, COVID-19 vaccination data (country-reported), retrieved 2026-10-02.
How it worked: The Ministry of Health ran a national campaign through its own clinics plus mass sites and age-tiered scheduling, and tied access to indoor public spaces to a vaccination card from December 2021 to push the late adopters.
Limits: WHO publishes what Peru's Ministry of Health reports, so the count is the country's administrative record, not a serosurvey; the CSV is machine-readable and the Peru row carries DATE_UPDATED 2023-12-29. Doses and persons are cumulative and do not show timeliness: vaccination came after Peru had already recorded one of the world's highest COVID-19 death rates, so the campaign evidences recovery capacity, not preparedness that prevented the first waves. Coverage was uneven: the ministry's own 11 December 2021 release, when 70 percent of the target population had two doses, named Madre de Dios, Puno and Ucayali below 50 percent. In January 2023 the ministry reported 1,964,490 doses close to expiry in its central warehouse. Per-100 figures use WHO's population denominator, not the national target population.
Panel median48.0-5.3 against the indicators
Round 2. How this layer works
- 46.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Revised up from 42 to 46: panelist C is right that the central bank and fiscal rule handled commodity swings well, which is institutional adaptation, though the COVID death rate and slow 2017 and 2023 flood responses show weak response beyond macro policy.
- 54.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Revised down from 58. Panelist A's point that Peru had among the highest Covid death rates per person despite an early lockdown is one I cannot answer; informal absorption through political crises and the central bank's handling of commodity swings keep me above A.
- 48.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Revised down five points. A at 42 cites one of the highest COVID death rates per person despite early lockdown, and I cannot answer that; the 2017 and 2023 flood responses were also slow, so only the central bank and fiscal rule offset.
Building
How capable is the country of turning plans and knowledge into functioning systems?
26.30.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingPeru beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.8 over 10 years (2016 to 2026), band -4.9 to +2.6, which includes no change. Median change: all countries -0.3, Latin America -1.2, Income quartile 2 of 4 in 2000 +0.3.
-1.9 over 20 years (2006 to 2026), band -6.2 to +3, which includes no change. Median change: all countries -0.5, Latin America -2.6, Income quartile 2 of 4 in 2000 -0.6.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-1.1 over 10 years, from 18.1 in 2016 to 17.0 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 12.2% of GDP | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 5.2% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 65.3score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.27index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (4 cases below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
30,451 constant 2021 PPP $, rank 81 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2016PeruInvierte.pe, a national multi-year investment-management systemstill operating
Invierte.pe, a national multi-year investment-management system
Peru's Invierte.pe system tracks public investment across national, regional and local governments; by 25 July 2024 the three levels had executed S/25.939 billion of a S/67.797 billion investment budget, a reported 38.3% advance.
25,939,000,000 Peruvian soles, public investment executed by 25 july, 2024-07-25. 67,797,000,000 Peruvian soles, 2024 public investment budget, 2024-07-25. Ministry of Economy and Finance, Invierte.pe daily investment-execution report, retrieved 2026-08-31.
How it worked: Peru replaced a project-by-project approval model with a multi-year investment cycle that registers, prioritises and follows projects across government levels, giving the finance ministry a common pipeline and a basis for tracking execution rather than seeing only annual spending requests.
Limits: Budget execution is an administrative flow, not evidence that projects were selected well, completed on schedule, delivered value or reached underserved regions. The daily report aggregates three government levels and counts expenditure against a budget that can change during the year. A planning-and-monitoring system can make bottlenecks visible without guaranteeing that agencies resolve them.
2017PeruReconstrucción con Cambios, a delayed recovery portfoliooperating below its peak
Reconstrucción con Cambios, a delayed recovery portfolio
A 2023 Contraloría control report found the education portfolio of Peru's Reconstrucción con Cambios programme at 36.6% implementation by July 2023 against a 78% milestone expected in the earlier baseline, with the corresponding target date already expired.
36.6 % implemented, education-portfolio implementation in july 2023, 2023-07. 78 % expected, earlier baseline milestone for education portfolio, 2021-12. Contraloría General de la República del Perú, concurrent control report on Reconstrucción con Cambios, retrieved 2026-08-31.
How it worked: Peru created a dedicated reconstruction authority and hired government-to-government technical assistance, then used concurrent audit to expose procurement and schedule risks while projects were still moving. The 36.6% result shows that a new delivery wrapper did not automatically clear local preparation and contracting bottlenecks.
Limits: The comparison is for one education portfolio and one control milestone, not the whole reconstruction programme or every project type. The Contraloría measures implementation against a management baseline; it does not by itself explain land, procurement or design causes, nor the quality and resilience of completed works. The gap shows a delayed delivery path, not that every intervention failed.
2015PeruGasoducto Sur Peruano, a terminated pipeline concessiondismantled
Gasoducto Sur Peruano, a terminated pipeline concession
Peru's Gasoducto Sur Peruano concession, signed in July 2014 for a US$7.328 billion gas pipeline due in commercial operation by March 2019, stood at 37.32% overall progress against 76.49% scheduled in December 2016, according to the energy regulator Osinergmin, and the Ministry of Energy and Mines terminated the concession in January 2017 after the consortium failed to reach financial close.
37.32 % complete, actual overall project progress, 2016-12-25. 76.49 % complete, scheduled overall project progress at the same date, 2016-12-25. Osinergmin (energy regulator), Gas Natural supervision division, monthly supervision report on the GSP project, December 2016, retrieved 2026-10-01.
How it worked: Peru's energy ministry awarded a single private consortium a design-build-finance-operate concession for a strategic southern gas pipeline, backed by a guaranteed-revenue charge on electricity bills, and then terminated it when the consortium could not close financing; the regulator was left administering the half-built assets.
Limits: Both progress figures are the concessionaire's own report as relayed by the regulator (the table cites 'Fuente: Reporte de Concesionario Gasoducto Sur Peruano SA'); Osinergmin supervised but did not independently measure overall progress. The figure is a weighted composite of permits, engineering, logistics and construction, so 37% overstates what was built: construction and assembly stood at 10.37% against 63.78% planned. The record does not show the final cost to the state, the arbitration outcome, the value of stranded assets, or how far the collapse stemmed from the Odebrecht corruption case and lost bank financing rather than from Peruvian institutions' project management. It is a concession (design, finance, build, operate), so the schedule failure is shared between the grantor and a private consortium. The numbers sit inside PDFs, not a statistical API. Later governments have repeatedly proposed reviving the pipeline under new names; this record concerns the 2014 concession, which ended by decision.
2014PeruTalara refinery modernisation, delivered late and over coststill operating
Talara refinery modernisation, delivered late and over cost
Petroperú's Talara Refinery Modernisation Project, begun with the May 2014 EPC contract, reached full operation in 2023 after Peru's Contraloría found its estimated investment had risen from US$1.3 billion to more than US$5 billion by October 2020, about 400%, and a cumulative schedule slippage of more than three years in the project's execution schedule, traced to the auxiliary-units contracting.
400 % increase, increase in estimated investment from feasibility estimate (us$1.3bn) to october 2020 (over us$5bn), 2020-10. 3 years (more than), cumulative schedule slippage, auxiliary units and complementary works, 2021-09-09. Contraloría General de la República del Perú, press release on compliance audit N° 15543-2021-CG/MPROY-AC of the PMRT, retrieved 2026-10-01.
How it worked: Peru legislated a state-owned refiner's modernisation, let the company contract a single EPC builder and then improvise the auxiliary works, and the Contraloría's audit traced repeated procurement reversals to a schedule slip of over three years and a several-fold cost rise before the plant reached full operation.
Limits: The 400% figure is a conditional statement ('estaría significando') attributed to the Comptroller General in a press release, comparing a feasibility-study estimate with an October 2020 cost, not an audited final cost; part of the rise reflects scope changes (Flexicoking, auxiliary units) rather than pure overrun, and the press release does not separate them. The press release's own figures (US$1.3bn to over US$5bn) imply an increase of about 285%, or roughly 3.85 times the estimate, so the stated 400% is the Comptroller's rounding and not the arithmetic; the metric keeps 400 because it is the published figure. The three-year slippage is the audit's figure for the auxiliary-units component over its 2014 to 2018 review window, not a measured end-to-end delay. Petroperú is a state-owned company, not a ministry: the record judges the state as project owner, and Petroperú's subsequent financial distress and government bailouts are not shown here. 'Operating' rests on a ministry press release declaring 100% operability in September 2023, not on independent utilisation data. The evidence is of a delivery that was completed late and far over cost, not a success.
Panel median28.0+1.7 against the indicators
Round 2. How this layer works
- 27.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Moved from 25 to 27: panelist C's 2019 Pan-American Games and Lima Metro Line 1 were delivered, though the Games relied on a government-to-government contract with the UK, and the stalled Southern Peru gas pipeline and Majes Siguas confirm weak state delivery.
- 28.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at 28. C's list of Chancay port and the 2019 Pan-American Games is balanced by the stalled Southern gas pipeline and Majes Siguas, and Lima Metro Line 2 has run years late.
- 30.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held. A at 25 and B at 28 point to Chancay built by a foreign firm and Metro Line 2 delays; Lima Metro lines and the 2019 Pan-American Games count on the other side.