Uruguay
No capability reaches 50 on usable evidence. Raise Building first, at 29.3. Shared purpose needs more evidence: confidence is 0.32.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- BuildingPeers 31.10.63 usable-1.6(3)
- ExperimentationPeers 25.50.62 usableno trend
- AgencyPeers 55.30.49 usableno trend
- LearningPeers 40.70.55 usable+8.3(2)
- AnticipationPeers 46.50.46 usable+14.5(2)
- AdaptabilityPeers 68.50.46 usable-6.8(3)
Measure before managing, thinnest first
- Shared purposePeers 47.60.32 thin-6.0(2)
- TrustPeers 68.90.34 thin+1.6(2)
- CoordinationPeers 71.60.44 thin+7.2(2)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Uruguay beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Small state with the strongest institutional trust in the region.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
43.30.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationUruguay beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+14.5 over 10 years (2016 to 2026), band +14.5 to +14.5. Median change: all countries +11.2, Latin America +11, Income quartile 3 of 4 in 2000 +12.5.
+17.1 over 20 years (2006 to 2026), band +9.6 to +24.7. Median change: all countries +13.4, Latin America +12.1, Income quartile 3 of 4 in 2000 +15.2.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+14.5 over 10 years, from 28.8 in 2016 to 43.3 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 313articles per million peoplefrom 1,059.81 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 80.1index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2023
0.7 % of GDP, rank 48 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2024
938 per million people, rank 53 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
4,641 per million people, rank 53 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median45.0+1.7 against the indicators
Round 2. How this layer works
- 46.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Hold 46: the OPP foresight work toward 2050 is a standing institution; the others agree within two points.
- 45.0 bottom_up@claude-opus-5-5, self-confidence 0.60
Held at 45. The panel agrees within one point; OPP's 2050 foresight work and stable institutions support a score near the indicator.
- 44.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held at 44. Good statistics and the OPP planning office with 2050 work lift it above what income explains, as A and B also say.
Agency
How able are individuals and organizations to turn an intention into action?
35.40.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyUruguay beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+2.9 over 10 years (2016 to 2026), band -2.8 to +5.1, which includes no change. Median change: all countries +1.9, Latin America +2.1, Income quartile 3 of 4 in 2000 +2.1.
+11.3 over 20 years (2006 to 2026), band +6.3 to +14.1. Median change: all countries +9.3, Latin America +9.3, Income quartile 3 of 4 in 2000 +10.6.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 3.2per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 30score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 5count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
92 % of population, rank 30 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
73.7 % aged 15+, rank 63 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
30.8 % of GDP, rank 85 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median46.0+10.6 against the indicators
Round 2. How this layer works
- 48.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Hold at 48. Entry of 30 and density of 3.2 give 35.4 with 5 procedures. AGESIC, Empresa en el Dia and Ceibal (my own knowledge) show capable bodies, which is why I go above it, and B and C do the same. The entry reading looks harsh, but my evidence for that is memory, so I do not go to 50 or above.
- 45.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Hold 45. Entry efficiency of 30 is very low and density is 3.2, with 5 procedures. Panelists A and C go to 48 and 50 by citing Ceibal and AGESIC, which are state execution and digital ID. My lift rests on cooperatives and software exports, from my own knowledge, and an ageing population limits it. The formal cost seems real, so I do not go further.
- 46.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Entry efficiency 8.3/100 (score 30) is very low, density 3.2 per 1,000 modest, 5 procedures fine. AGESIC e-government, Ceibal and software exports (own knowledge) show state and sector capacity. I move from 50 to 46: the entry score is a direct measure, and I cannot discount it for institutions that are not about starting firms. Panel 45-48.
Coordination
How effectively can independent actors organize around shared objectives?
79.30.44 thin3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 0.92About CoordinationUruguay beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+4.8 over 10 years (2016 to 2026), band -0.2 to +10.1, which includes no change. Median change: all countries -1.7, Latin America -1.4, Income quartile 3 of 4 in 2000 +0.5.
+11.9 over 20 years (2006 to 2026), band +6.5 to +18.5. Median change: all countries -2.7, Latin America -5.2, Income quartile 3 of 4 in 2000 -1.8.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+7.2 over 10 years, from 83.1 in 2016 to 90.3 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 55score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 97.8percentage points from approved budget | 2021. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.85index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration (1 case below), Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2024
2.934 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2006UruguaySNIG, universal individual cattle traceabilitystill operating
SNIG, universal individual cattle traceability
Uruguay required producers to register every calf in a national traceability system from 2006, and by October 2011 the registry covered 100 percent of the herd, 11.75 million live cattle, while identification tags reached more than 45,000 producers each year.
11,750,000 cattle, live cattle registered and individually identified, 2011-10. 45,000 producers, producers receiving identification tags each year, 2011. Presidency of Uruguay, SNIG traceability report, retrieved 2026-08-30.
How it worked: The agriculture ministry made lifetime identification compulsory, issued paired visual and electronic tags, reused the existing producer register and enlisted the postal service to deliver tags to farms, while producers and processors recorded every movement through one national system.
Limits: A complete administrative register does not prove that every movement is reported correctly, that inspectors can reconcile cattle with the database, or that the commercial benefit exceeds the public and producer cost. The source is a government report from 2011, and the collaboration rests on a legal obligation rather than voluntary agreement, so it evidences coordinated national implementation more strongly than mutual public-private agenda-setting.
2009UruguayANII Alianzas para la Innovaciónstill operating
ANII Alianzas para la Innovación
Uruguay's national research and innovation agency ANII began co-funding joint academia-firm projects through Alianzas para la Innovación in 2009 and had signed 29 such contracts, committing US$3.85 million and drawing US$1.71 million from firms, by 30 June 2016; in 2023 it approved 23 projects joining the productive sector and academia, matching the 2022 record.
29 projects, alianzas para la innovación contracts signed since 2009, 2016-06-30. 23 projects, projects approved in the year involving the productive sector with academia, 2023. Agencia Nacional de Investigación e Innovación, Unidad de Evaluación y Monitoreo, evaluation of Alianzas para la Innovación and Redes Tecnológicas Sectoriales, retrieved 2026-10-01.
How it worked: ANII, the state innovation agency, offered non-repayable co-funding only to projects where a firm brought a problem and money and a university or research institute brought the research team, with a firm employee placed inside that team.
Limits: The scale is small: 29 contracts in seven years and US$3.85 million committed is a national instrument, but a thin one, and it says little about how much Uruguayan universities and firms collaborate outside ANII funding. Both figures are the agency reporting on its own instruments, the first from its internal evaluation unit and the second from a year-end press note. The 2023 figure is not limited to Alianzas: it counts every approved project the agency describes as joining firms with academia, under its technology-transfer line, so the two metrics are not one series and no trend can be drawn between them. Signed contracts measure funding decisions, not completed research, patents, products or lasting relationships; the evaluation shows only 14 of the 29 finished by mid-2016. The evaluation report is undated on its cover and the date comes from its own tables.
Panel median75.0-4.3 against the indicators
Round 2. How this layer works
- 75.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Held at 75. The panel agrees that tripartite wage councils, faithful budgets and strong civil society show organised coordination.
- 76.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Held near 76: tripartite wage councils, civil society and faithful budgets all point the same way.
- 74.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Raised two points. Tripartite wage councils and civil society at 85 are organised coordination, as A and B say; trade compliance of 57 is middling, so I stop at 74.
Trust
How much cooperation is possible beyond immediate personal networks?
76.40.34 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 1.00About TrustUruguay beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+2.6 over 10 years (2016 to 2026), band -1.8 to +7.6, which includes no change. Median change: all countries +1.9, Latin America +1.1, Income quartile 3 of 4 in 2000 +1.4.
+1.1 over 20 years (2006 to 2026), band -3.3 to +6.2, which includes no change. Median change: all countries +2.1, Latin America +2, Income quartile 3 of 4 in 2000 +2.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+1.6 over 20 years, from 93.8 in 2006 to 95.4 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 48.3score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 1.3% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 3.6scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median77.0+0.6 against the indicators
Round 2. How this layer works
- 78.0 institutionalist@claude-opus-5-5, self-confidence 0.65
Hold at 78. Compliance of 3.55 and bribery of 1.3% are near the top, with long-standing courts and the Junta de Transparencia (my own knowledge). Dispute efficiency of 48.3 is the one weak spot and keeps me from going further. C holds the same 78 and notes this is not only wealth; B's 75 gives a little more weight to the weak row, and I find no reason to move.
- 75.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Hold 75. Compliance of 3.55 and bribery of 1.3% are near the frame top, and dispute efficiency of 48 is the one weak spot. The panel agrees within 3 points. From my own knowledge, social insurance and honest elections are widely accepted. I do not rise further because slow civil procedure limits what strangers can rely on in commerce.
- 77.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Compliance 3.55/4 (93/100) and bribery 1.3% are direct signals; dispute resolution 38.4 is the weak row. Uruguay is consistently top in Latin America on institutions at middling income (own knowledge), which is the capability-not-income pattern I look for. Panel 75-78. I move from 78 to 77.
Learning
How effectively does the country acquire, distribute, and update knowledge?
42.00.55 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.81About LearningUruguay beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-9.5 over 10 years (2016 to 2026), band -12.5 to -6.3. Median change: all countries -1.3, Latin America -3.5, Income quartile 3 of 4 in 2000 -1.6.
+6 over 20 years (2006 to 2026), band +1.7 to +11. Median change: all countries +0.8, Latin America +2.2, Income quartile 3 of 4 in 2000 -0.3.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+8.3 over 20 years, from 28.5 in 2006 to 36.8 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.6index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 32.1% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 0.83ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2023
80 % gross, rank 24 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2023
4.8 % of GDP, rank 49 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2018
23.9 % of secondary, rank 28 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2009UruguayINEFOP, the tripartite national training institutestill operating
INEFOP, the tripartite national training institute
Uruguay's Instituto Nacional de Empleo y Formación Profesional, created by Law 18.406 in 2008 and governed by government, employers and workers, grew from 9,696 training, guidance and technical-assistance places in 2009 to 114,364 in 2019, and its director reported that more than 50,000 people took its training in 2023.
50,000 people, people who took inefop training (more than), 2023. 114,364 places, inefop training, guidance and technical-assistance places, national total, 2019. Presidency of Uruguay, Comunicación Presidencial, statement of INEFOP's director general, retrieved 2026-10-01.
How it worked: Parliament placed the national labour-retraining fund in a non-state public body governed jointly by the government, employers and unions, which buys courses from training providers and steers them to the unemployed, to workers in firms and to people outside Montevideo.
Limits: The 2023 figure is a rounded "more than 50,000" spoken by the institute's own director in an interview relayed by the presidency's press office, not a published statistical table. The 2019 figure counts places, not people: it includes guidance and technical assistance as well as courses, can count one person several times, and is read from data labels on a chart in a PDF. The two numbers are in different units and must not be read as a fall from 114,364 to 50,000, and the jump from 47,590 in 2016 to 112,183 in 2017 coincides with a change in the source behind the series, so the trend before and after 2017 is not continuous either. The same report also claims "more than 120,000" annual users, which does not match its own chart. Fifty thousand people is roughly 2 percent of Uruguay's adult population, so INEFOP is a national delivery channel but carries only a small part of adult participation in training, and neither number says whether anyone completed a course, learned anything or found work. Half of 2023 participants were unemployed and the reported age band is 20 to 35, so the reach is skewed young.
Panel median44.0+2.0 against the indicators
Round 2. How this layer works
- 44.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Held at 44. The panel agrees that Plan Ceibal is a durable institution that spreads digital learning.
- 45.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at 45 with the panel: Plan Ceibal spread digital learning that the formal measures understate.
- 44.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Moved down one point. Plan Ceibal is a real conversion of resources into learning, but no learning outcome measure is in the brief and citations are 0.83.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
32.20.62 usable7 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 0.98About ExperimentationUruguay beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 7 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+1.4 over 10 years (2016 to 2026), band -2.3 to +5.2, which includes no change. Median change: all countries 0, Latin America +0.5, Income quartile 3 of 4 in 2000 0.
-1.2 over 20 years (2006 to 2026), band -5.2 to +3, which includes no change. Median change: all countries +0.1, Latin America +0.5, Income quartile 3 of 4 in 2000 +0.8.
The model fills at least one of the 7 indicators in 26 of 27 years, at most 5, last in 2025. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 3.8per million peoplefrom 13 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 1,747per million peoplefrom 5,916 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 2.7per million peoplefrom 9 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 15,331per million peoplefrom 51,892 national total | 2026. The rail runs from 1960 to 2026. | |
| direct capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | 26.2% aged 18-64 | 2023. The rail runs from 1960 to 2026. | |
| perception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | 48.3% not deterred | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 46.3score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.
This project retired one row: Business share of R&D.
Panel median38.0+5.8 against the indicators
Round 2. How this layer works
- 36.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Hold 36: panelist C's lift rests on the TEA reading, which I count, but high fear of failure and very low patents and designs hold Uruguay below 40.
- 38.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Held at 38. The panel range is 36 to 40; high 2023 early-stage activity and software exports offset very low patents, and C's fear-of-failure point balances the lift.
- 38.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Moved 40 to 38. B is right that patents and designs are very low; fear of failure at 48 percent not deterred and 26 percent early activity pull in opposite directions.
Adaptability
How effectively can the system respond when circumstances change?
47.80.46 usable3 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 1.00About AdaptabilityUruguay beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-6.8 over 10 years (2016 to 2026), band -6.8 to -6.8. Median change: all countries -0.8, Latin America -1.7, Income quartile 3 of 4 in 2000 +0.8.
-10 over 20 years (2006 to 2026), band -15.4 to -5.3. Median change: all countries -1, Latin America -4, Income quartile 3 of 4 in 2000 -1.5.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 1, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-6.8 over 10 years, from 54.6 in 2016 to 47.8 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 7.5% of labour force | 2025. The rail runs from 1960 to 2026. | |
| Long-term unemployment sharedownstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | no data% of unemployed | no data | no data |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.33index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 1.1% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
77.5 % aged 15+, rank 30 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
33 per 100 people, rank 33 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
8.5 % of output, rank 55 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025
32.7 % of employment, rank 38 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2020UruguayPartial and flexible unemployment subsidy, 2020-2021delivered and closed
Partial and flexible unemployment subsidy, 2020-2021
Uruguay's labour ministry created partial and flexible unemployment-subsidy modalities by resolution after the health emergency of 13 March 2020, and the social security bank (BPS) paid 12,773 beneficiaries under them in April 2020, while total unemployment-subsidy beneficiaries rose from 45,937 in February to a record 185,769 in May.
12,773 beneficiaries, beneficiaries under the new partial and flexible modalities in their first month, 2020-04. 185,769 beneficiaries, total unemployment-subsidy beneficiaries at the 2020 peak, 2020-05. Banco de Previsión Social, Asesoría General en Seguridad Social, Comentarios de Seguridad Social No. 85 (March 2022), Impacto del COVID-19 en el subsidio por desempleo, retrieved 2026-10-02.
How it worked: The labour ministry used its resolution power to open the unemployment subsidy to workers whose hours were cut rather than suspended, and BPS paid it through the claims channel employers already used.
Limits: BPS is analysing a benefit it pays, from its own administrative records, and the numbers are inside a PDF (Cuadro 2 on page 6 and Cuadro 4 on page 13 of the file). Most of the surge went through the ordinary subsidy for total suspension, which already existed; the new modalities, set by labour ministry resolutions 143/20, 163/20, 233/20 and 1024/20 (partial) and 2225/20, 21/21 and 97/21 (flexible), peaked at 30,221 beneficiaries in June 2020 and fell to 10,549 by December 2021. The record evidences rules changed and paid within weeks, not jobs kept: a beneficiary count is a monthly stock, and the report does not estimate how many of those workers returned to their jobs. The end date of the special regime is not in this source.
2015UruguayPlan Nacional de Relocalizaciones, moving households out of flood-prone landstill operating
Plan Nacional de Relocalizaciones, moving households out of flood-prone land
Uruguay's national housing directorate relocated 2,618 households from flood-prone or contaminated land between 2015 and 2020 under the Plan Nacional de Relocalizaciones and related agreements with departmental governments, against a target of 3,500 to 6,000 households by 2025.
2,618 households, households relocated (cumulative), 2020. 2,245 households, households relocated (cumulative, previous reported value), 2019. Ministerio de Ambiente, NDC monitoring technical sheet No. 61 'Relocalizaciones' (March 2021, version 1.1), indicator compiled by the Dirección Nacional de Vivienda (DINAVI, MVOT) from administrative records, retrieved 2026-10-02.
How it worked: The national housing directorate co-finances departmental relocation projects that move households from land that floods repeatedly into new or purchased homes, with multidisciplinary teams handling each move and the department responsible for keeping the vacated land unoccupied.
Limits: The number is in a six-page PDF: page 1 gives 'Último valor disponible 2.618 (2020)' and page 4 the version history (2,245 for 2019, 2,618 for 2020); pages 5 and 6 give the yearly totals 294, 442, 660, 438, 411 and 373 for 2015 to 2020, which sum to 2,618. The headline on page 1 ('A 2025 se han relocalizado al menos entre 3.500 y 6.000 hogares') is the 2025 target written as if achieved, and the sheet's own data show 2,618 by 2020, below the low end of that target; no later official value was found, so whether the target was met is not shown. The count mixes flood-prone and contaminated land and does not split them, and it includes relocations after specific floods ('Inundados 2015', 'Inundados 2017'), which are recovery rather than preparation. It counts households, not people, and says nothing about whether vacated land stayed empty, which the sheet itself names as a condition that depends on departmental enforcement. The plan predates 2015, but the sheet's series starts with the 2015 to 2019 housing plan, so 'started' is the first year counted, not the plan's creation. The sheet states the plan's objective as reversing social segregation and territorial fragmentation, so it is a settlement and housing policy as much as a risk-reduction one; it is filed here because the same sheet classes it as a climate-adaptation measure. Status 'operating' rests on the sheet naming the 2020 to 2024 five-year housing plan as the plan's current frame; no count after 2020 was found. The sheet is a government monitoring document for Uruguay's climate pledge, self-reported by the ministry that runs the programme.
Panel median50.0+2.2 against the indicators
Round 2. How this layer works
- 50.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised down 2 to 50. Panelist C is right that the beef, soy and cellulose base reallocates slowly; the electricity transition I cited belongs under Building.
- 50.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 50: A's energy and 2023 water crisis points support me, but C is right that new export products are few.
- 48.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Held at 48. A and B scored 50-52 on the energy transition; I credit it, but new export products of 12 and a beef, soy and cellulose basket show slow reallocation.
Building
How capable is the country of turning plans and knowledge into functioning systems?
29.30.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingUruguay beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-1.2 over 10 years (2016 to 2026), band -4.5 to +2.8, which includes no change. Median change: all countries -0.3, Latin America -1.2, Income quartile 3 of 4 in 2000 -0.3.
-0.7 over 20 years (2006 to 2026), band -4.2 to +4.1, which includes no change. Median change: all countries -0.5, Latin America -2.6, Income quartile 3 of 4 in 2000 -0.8.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-1.6 over 10 years, from 17.2 in 2016 to 15.6 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 10% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 9.8% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 76.9score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.13index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (4 cases below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
66,348 constant 2021 PPP $, rank 44 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2010UruguayElectricity supply rebuilt on renewable sourcesstill operating
Electricity supply rebuilt on renewable sources
Uruguay rebuilt its electricity supply between 2010 and 2017 through public tenders and long-term contracts, and in 2025 fossil fuels produced 293 GWh of the 15,855 GWh generated, so 98.2 percent came from hydro, wind, biomass and solar.
98.2 % of generation, renewable share of electricity generation, 2025. Ministry of Industry, Energy and Mining, national energy balance, retrieved 2026-08-26.
How it worked: Long-term power purchase agreements at fixed prices, awarded by competitive auction, with the state utility as a single creditworthy buyer carrying the offtake risk.
Limits: The share is computed from the published generation series by source and is not itself a published headline figure. A generation mix is an outcome, and it hides the cost and schedule record of the projects behind it. A wet or dry year moves the hydro share by several points, so one year is not the programme.
2007UruguayPlan Ceibal, one connected laptop per childstill operating
Plan Ceibal, one connected laptop per child
Uruguay gave a connected laptop to every child in public primary school from 2007, the first country to do it nationally, and the household survey found a Ceibal computer in the homes of 35.8 percent of the population in 2018.
35.8 % of people, people with a plan ceibal computer in the household, 2018. Ministry of Social Development, from the national household survey, retrieved 2026-08-26.
How it worked: A dedicated agency outside the education ministry procured devices and connectivity at national scale and used schools as the distribution channel.
Limits: Household reach peaked at 40.1 percent in 2014 and the series stops in 2018, so this number says nothing about the programme now. A device in the home measures distribution and says nothing about learning. The record is here because the delivery is documented and the measure of it is weak.
1952UruguayAFE passenger rail and network contractionoperating below its peak
AFE passenger rail and network contraction
Uruguay's state railway suspended passenger service in January 1988 to focus on freight; by 1990 about half of the national network had been declared non-operational, leaving 1,484 kilometres active from a 2,998-kilometre network, before passenger services returned only partially in 1993.
1,484 kilometres, rail network remaining active after the contraction, 1990. 2,998 kilometres, rail network before the contraction, 1985. Ministry of Transport and Public Works, National Railway Network Statement 2025, retrieved 2026-08-31.
How it worked: The state railway concentrated scarce operating capacity on freight, suspended passenger service and then allowed half the network to fall outside the active system; the later partial restart could not simply recreate the connections and maintenance routines that had been dropped.
Limits: Track kilometres are an infrastructure count, not a measure of trains, reliability, passengers or freight capacity, and the source does not establish that every kilometre declared non-operational was physically removed. Passenger service returned on selected routes in 1993, so this is a contraction and partial recovery rather than a permanently closed railway. The network statement is a government description and does not evaluate the decision's social or economic effects.
2013UruguayLínea Rivera rail rehabilitation, and its decayoperating below its peak
Línea Rivera rail rehabilitation, and its decay
Uruguay's transport ministry signed a FOCEM-funded contract in November 2013 to rehabilitate 422 km of the Pintado to Rivera line within 36 months, cut the scope to the 310 km between Paso de los Toros and Rivera in January 2017, took the last provisional handover in May 2019, and by June 2025 reported the line in a degraded state with freight limited to 10 to 25 km/h against its set maximum of 40 km/h and no freight carried in recent years.
10 km/h, lowest freight speed under the line's standing speed restrictions, 2025-06. 40 km/h, maximum freight speed set for the rehabilitated rivera line, 2025-06. Ministry of Transport and Public Works, reply to the Chamber of Representatives (Oficio 615/2025, technical report of the National Directorate of Rail Transport), retrieved 2026-10-01.
How it worked: The transport ministry used a regional cohesion fund to finance a capital rehabilitation, contracted a state-owned rail company to deliver it, and then let the maintenance contract lapse in 2021 without a successor, so the rebuilt track degraded within four years.
Limits: The source is a scanned ministerial reply to a parliamentary information request, so the quoted text comes from the PDF's OCR layer (it names the contractor "CEU" where the contracting firm was CFU), and checking it means reading the scan. The two speeds measure the asset's condition, not cost or schedule, which is what the construct asks for. The schedule slip is our computation: 36 months from a November 2013 signature against a last provisional handover in May 2019, about two and a half years late, and on a scope that had been cut from 422 to 310 km in January 2017, so a like-for-like slip cannot be stated. The final cost of the works was not found at an official URL: only the 2013 budget of US$75 million and a CND contract figure of 1,462 million pesos, which cannot be compared without exchange-rate and indexation assumptions, so no cost overrun is claimed. The 10 km/h figure is the bottom of a range of speed restrictions and does not apply along the whole line. The absence of freight reflects demand and operator choices as well as track condition, since the pulp traffic that justified the Ferrocarril Central runs south of Paso de los Toros. This is a different delivery from the 1988 to 1990 contraction recorded in ury-rail-network, but both concern AFE's network, and the record leans on the same ministry describing its own asset.
Panel median37.0+7.7 against the indicators
Round 2. How this layer works
- 40.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 40. Panelists B and C name the same deliveries (UTE wind build-out, UPM2, Ferrocarril Central) but weight them less; a near-renewable grid built by a state utility is durable building capacity.
- 37.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised up from 35: A's point that UTE delivered a near-renewable grid in under a decade is delivery I already credit and it merits a little more.
- 34.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Raised one point. The wind build-out, UPM2 and the central railway were delivered, which A and B point out; manufacturing of 10% and fitness of 4 keep me below A's 40.