Madagascar
No capability reaches 50 on usable evidence. Raise Building first, at 9.7. Shared purpose needs more evidence: confidence is 0.28.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- BuildingPeers 11.60.63 usable+2.8(3)
- ExperimentationPeers 0.70.47 usable+0.3(3)
- AnticipationPeers 10.40.46 usable+15.6(2)
- LearningPeers 25.00.52 usable-10.8(2)
- AgencyPeers 39.50.49 usableno trend
- AdaptabilityPeers 40.50.48 usable-2.3(3)
- CoordinationPeers 61.90.48 usable-27.5(2)
Measure before managing, thinnest first
- Shared purposePeers 44.20.28 thin+10.5(2)
- TrustPeers 41.80.32 thin+3.9(2)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Madagascar beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
17.00.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationMadagascar beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+15.6 over 10 years (2016 to 2026), band +15.6 to +15.6. Median change: all countries +11.2, Income quartile 1 of 4 in 2000, lowest +11.6.
+15.6 over 20 years (2006 to 2026), band +9.2 to +17.7. Median change: all countries +13.4, Income quartile 1 of 4 in 2000, lowest +11.7.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+15.6 over 10 years, from 1.4 in 2016 to 17.0 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 4.9articles per million peoplefrom 153.44 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 57.5index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2017
0.01 % of GDP, rank 121 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2018
32.9 per million people, rank 106 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
25.1 per million people, rank 121 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median15.0-2.0 against the indicators
Round 2. How this layer works
- 14.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Moved up from 12: panelist B is right that BNGRC runs cyclone early warning as a standing national body; the research and statistics base remains at the floor.
- 16.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Moved 17 to 16: panelist C's point that cyclone forecast use is thinly evidenced is fair; BNGRC warning still gives some anticipation above panelist A's 12.
- 15.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Held. Near-zero science and weak statistics (33.9); BNGRC cyclone warning is real but donor-led.
Agency
How able are individuals and organizations to turn an intention into action?
40.60.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyMadagascar beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+5.3 over 10 years (2016 to 2026), band +0.7 to +10.3. Median change: all countries +1.9, Income quartile 1 of 4 in 2000, lowest +1.5.
+10.7 over 20 years (2006 to 2026), band +5.5 to +17.1. Median change: all countries +9.3, Income quartile 1 of 4 in 2000, lowest +10.9.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2014, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 0.12per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 56.2score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 5count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
18.7 % of population, rank 129 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
24.5 % aged 15+, rank 125 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2024
16.5 % of GDP, rank 112 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median31.0-9.6 against the indicators
Round 2. How this layer works
- 30.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Revised up from 28. Panelist B's point has some force: entry efficiency of 56.2 and 5 procedures are not bad, and the EDBM one-stop shop does function, from my own knowledge, so I went too far below the derived 40.6. Density of 0.12 is near the floor. Power cuts, the 2009 and 2025 coups and short-lived plans keep me below B's 42, since rice and vanilla growers act with little institutional backing.
- 38.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Revised from 42. Density of 0.12 ignores rice farmers, vanilla growers and small traders, and entry efficiency of 56.2 and 5 procedures are not bad. Panelist A's point that power cuts and coups in 2009 and 2025 give plans short lives is one I cannot answer: a farmer can act, but an intention needing water, power or stable rules is often lost. I stay above A's 28 and C's 32 because they treat subsistence activity as absence of action.
- 31.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Lower slightly from 32 to 31. Density 0.12 (0.4), entry efficiency 42.5, 5 procedures. Panelist A (28) cites poverty, power cuts and coups in 2009 and 2025; panelist B (42) credits rice farmers and vanilla growers. Most activity is subsistence agriculture and the state reach is low. Own knowledge.
Coordination
How effectively can independent actors organize around shared objectives?
47.30.48 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 1.00About CoordinationMadagascar beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-18.4 over 10 years (2016 to 2026), band -22.9 to -13.9. Median change: all countries -1.7, Income quartile 1 of 4 in 2000, lowest +2.6.
-15.9 over 20 years (2006 to 2026), band -23.6 to -10.1. Median change: all countries -2.7, Income quartile 1 of 4 in 2000, lowest +0.7.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2010, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-27.5 over 10 years, from 70.3 in 2016 to 42.8 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 53.9score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 60.6percentage points from approved budget | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.69index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration, Public-private collaboration.
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2022
18.373 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Panel median33.0-14.3 against the indicators
Round 2. How this layer works
- 30.0 institutionalist@claude-opus-5-5, self-confidence 0.50
I hold at 30. C agrees that a 39-point miss on the approved budget is the decisive row; B's fokontany village structures are local administration that did not prevent the 2025 collapse of central authority.
- 36.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Revised down from 40: the October 2025 military takeover and a 39-point budget miss show a centre that cannot coordinate, and A and C weight that rightly. Fokontany structures still organise village-level work, which keeps me a few points above them.
- 33.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised 32 to 33. Panelist B's fokontany structures give village coordination but budget execution missing by 39 points is the weakest direct row, and panelist A makes the same point that civil society does not turn into state coordination.
Trust
How much cooperation is possible beyond immediate personal networks?
39.50.32 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 0.94About TrustMadagascar beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.5 over 10 years (2016 to 2026), band -5.6 to +5.4, which includes no change. Median change: all countries +1.9, Income quartile 1 of 4 in 2000, lowest +4.7.
-13.9 over 20 years (2006 to 2026), band -19.2 to -7.7. Median change: all countries +2.1, Income quartile 1 of 4 in 2000, lowest +6.2.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+3.9 over 10 years, from 37.9 in 2016 to 41.8 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 46.5score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 19.2% of firms | 2022. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 0.87scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median27.0-12.5 against the indicators
Round 2. How this layer works
- 26.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 26. Court compliance of 0.87 and dispute efficiency of 46.5 are weak and bribery of 19.2% (2022) looks fair, for a derived 39.5. The High Constitutional Court's confirmation of the October 2025 takeover shows law bending to force, from my own knowledge. Panelist B's fokonolona and dina do real work, but B admits they can be coercive. Panelist C's 28 is close and for the same reason.
- 30.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Revised from 33. Compliance of 0.87 and dispute efficiency of 46.5 fit a state of repeated coups. Panelist A's point that the High Constitutional Court confirmed the October 2025 takeover, from my own knowledge, and that dahalo banditry shows limited reach, pushes me down. Fokonolona and dina do real cooperative work but can be coercive and stay local, so I stop at 30.
- 27.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Lower slightly from 28 to 27. Compliance 0.87 (21.5), dispute 35, bribery 19.2% (62). The 2009 coup and the October 2025 military takeover confirmed by the High Constitutional Court show law bending to force (panelist A, 26). Dina local rules can be coercive (B, 33). Own knowledge.
Learning
How effectively does the country acquire, distribute, and update knowledge?
21.20.52 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.75About LearningMadagascar beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-6 over 10 years (2016 to 2026), band -9.4 to -3. Median change: all countries -1.3, Income quartile 1 of 4 in 2000, lowest -2.3.
-7 over 20 years (2006 to 2026), band -12.8 to -1.6. Median change: all countries +0.8, Income quartile 1 of 4 in 2000, lowest +0.6.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 3, last in 2009. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-10.8 over 10 years, from 34.1 in 2016 to 23.3 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.39index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 10.5% of firms | 2022. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 0.86ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2023
6.1 % gross, rank 121 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2023
3 % of GDP, rank 102 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
2.6 % of secondary, rank 113 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2019MadagascarFonds Malgache de Formation Professionnellestill operating
Fonds Malgache de Formation Professionnelle
Madagascar's vocational training fund, the FMFP, financed by a payroll levy on formal employers and governed with ministry, employer and worker representatives, trained 30,043 people in 2022 after 42,044 in 2021 and 19,898 in 2020, through 741 company training requests and sector projects in 21 regions.
30,043 people, people trained with fmfp financing, 2022. 42,044 people, people trained with fmfp financing, 2021. Fonds Malgache de Formation Professionnelle (FMFP), Rapport moral 2022, key figures, retrieved 2026-10-17.
How it worked: The state created a training fund paid for by a levy on the payroll of formal employers, and a board of ministries, employers and unions spends it on company training plans, sector projects and equity projects for informal workers chosen through calls for proposals.
Limits: The fund reports on itself, in a PDF annual report with no stated method, and the figures do not reconcile: the key-figures page gives 30,043 people trained in 2022, while the sector breakdown in the same report totals 28,791. The 2024 annual report prints a beneficiary breakdown of 42,044 with the same male and female counts as 2021, which looks like a copied table, so the 2023 and 2024 counts cannot be read from it. A person trained in two projects may be counted twice. Against an adult population of well over ten million, about 30,000 trainees a year is a fraction of one percent. The fund mainly serves employees of levy-paying formal firms, a small part of a mostly informal workforce, although its equity projects reach informal workers. Its expansion in 2021 and 2022 relied on additional money from the European Union and the French development agency, AFD. A count of people trained says nothing about training length, quality, or effect on skills or earnings.
Panel median18.0-3.2 against the indicators
Round 2. How this layer works
- 18.0 institutionalist@claude-opus-5-5, self-confidence 0.55
I hold at 18, between B and C. The Human Capital Index at 0.39 and firm training at 10 percent show a weak school and firm learning system, and the citation ratio rests on mostly foreign-led biodiversity papers.
- 20.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised down slightly from 22: C's point that the 0.86 citation ratio rests on few, mostly foreign-led papers holds. HCI and firm training are both low, and I lack data on informal apprenticeship.
- 17.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Revised 15 to 17, as the citation ratio of 0.86 is a real row even on few papers and panelist B's biodiversity point about foreign-led research is fair. A Human Capital Index of 17 and training at 10 percent keep me low.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
14.20.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationMadagascar beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.2 over 10 years (2016 to 2026), band -3.3 to +3.6, which includes no change. Median change: all countries 0, Income quartile 1 of 4 in 2000, lowest 0.
-1.6 over 20 years (2006 to 2026), band -4.3 to +1.9, which includes no change. Median change: all countries +0.1, Income quartile 1 of 4 in 2000, lowest +0.1.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 3, last in 2025. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+0.3 over 10 years, from 1.8 in 2016 to 2.1 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 0.09per million peoplefrom 3 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 117per million peoplefrom 3,739 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 7.9per million peoplefrom 252 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 1,582per million peoplefrom 51,801 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 61.3score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.
This project retired one row: Business share of R&D.
Panel median11.0-3.2 against the indicators
Round 2. How this layer works
- 8.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Held at 8: insolvency efficiency of 62.2 is a legal score few firms use, as panelist B also says; all attempt measures are at the floor.
- 12.0 bottom_up@claude-opus-5-5, self-confidence 0.30
Held 12: the panel agrees at 8 to 12; panelist A is right that insolvency (62.2) is law on paper, and informal agricultural and trade trial is unmeasured.
- 11.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.25
Moved down slightly from 12. Peers A and B agree insolvency efficiency (62.2) is a legal score few firms use.
Adaptability
How effectively can the system respond when circumstances change?
45.20.48 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 0.78About AdaptabilityMadagascar beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-1.7 over 10 years (2016 to 2026), band -4.4 to -1.1. Median change: all countries -0.8, Income quartile 1 of 4 in 2000, lowest -0.2.
-2.9 over 20 years (2006 to 2026), band -7.2 to +1.4, which includes no change. Median change: all countries -1, Income quartile 1 of 4 in 2000, lowest +0.9.
The model fills at least one of the 4 indicators in 12 of 27 years, at most 2, last in 2011. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-2.3 over 10 years, from 61.7 in 2016 to 59.4 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 3% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 95.5% of unemployed | 2012. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.27index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 1.5% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
86.9 % aged 15+, rank 1 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2023
0.12 per 100 people, rank 125 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
5.3 % of output, rank 19 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2022
96.1 % of employment, rank 108 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2016MadagascarFID crisis response transfers, including Fiavotadelivered and closed
FID crisis response transfers, including Fiavota
Madagascar's Fonds d'Intervention pour le Developpement turned its safety net project into a shock-response channel from December 2016, delivering crisis-response unconditional cash transfers to 622,961 people and crisis cash-for-work to 155,649 people after droughts in the South and the 2022 cyclones, by the project's close in October 2024.
622,961 people, people who benefited from crisis response unconditional cash transfers, 2024-10. 155,649 people, people who benefited from cash-for-work under the crisis response mechanism, 2024-10. World Bank Independent Evaluation Group, ICR Review ICRR0024665, MG-Social Safety Net Project (P149323), retrieved 2026-10-02.
How it worked: FID, a government agency with field staff and a beneficiary registry from the regular safety net, repeatedly restructured the project to redirect funds to drought and cyclone victims, paying unconditional transfers and cash-for-work through the channels it already ran.
Limits: The figures are cumulative over 2016 to 2024 and come from the World Bank's own evaluation of a project it financed, which draws on the implementing agency's reporting; they count people reached, not whether households recovered, and say nothing about speed of delivery after each shock. Almost all the money was IDA credit and grants (US$305.9 million actual), so the record shows the state's agency delivering donor-financed transfers, not domestic fiscal capacity to respond. Targets were set and raised repeatedly in emergency conditions, and IEG notes that some reach targets were not scaled up as financing grew (its remark about targets set quickly and with limited clarity concerns the emergency nutrition targets), so exceeding them is weak evidence. The response was reactive, reallocating funds after each shock rather than drawing on a pre-arranged trigger, which is recovery more than preparedness. Security problems in the South forced FID to sign an agreement with the police to deliver cash. The project closed in October 2024, so the status is concluded.
2020MadagascarTosika Fameno, the COVID-19 urban emergency cash transferdelivered and closed
Tosika Fameno, the COVID-19 urban emergency cash transfer
Madagascar's social protection agency FID designed the Tosika Fameno emergency cash transfer after the March 2020 urban lockdown, registered almost 200,000 households in about 12 days, made the first payment four weeks after the lockdown began, and reached more than 368,000 urban households in ten cities with 100,000 ariary payments.
4 weeks, time from the start of the urban lockdown to the first tosika fameno payment, 2020. 368,000 households, vulnerable urban households reached (more than), 2020. UNICEF, Being Prepared and Acting Fast: Madagascar case study on UNICEF's role in the social protection response to COVID-19 (2021), retrieved 2026-10-02.
How it worked: The President asked the national social protection fund FID to extend its rural cash transfer machinery to the locked-down cities; FID and WFP built a rapid registration process, paid by mobile money and post, and partners aligned their transfers on the same amount and targeting.
Limits: The figures are in an eight-page UNICEF case study PDF (PDF page 4: first payment four weeks after the start of the urban lockdown, registration of almost 200,000 households in about 12 days, more than 368,000 households; PDF page 6: registration completed two weeks after the declaration of the state of health emergency, first payments within one month; the 368,000 by the end of 2020 also on PDF page 2). UNICEF co-led the cash working group and directly supported 8,500 of the households, so it is grading a response it helped build, and the case study gives no exact dates for the lockdown or the first payment. The 368,000 mixes government payments financed by the World Bank with humanitarian top-ups by UNICEF, WFP, the EU and NGOs using the same parameters; the World Bank's Social Safety Net Project ICR (2025, P149323, paragraph 43 and annex note 2) counts 215,093 households paid under its own financing, a smaller number on a different scope. The benefit was 100,000 ariary (about US$26), small against lost urban income, and coverage was limited to ten cities. The speed came from an agency that already ran rural safety nets, not from a standing urban programme.
Panel median28.0-17.2 against the indicators
Round 2. How this layer works
- 25.0 institutionalist@claude-opus-5-5, self-confidence 0.50
I hold at 25. B and C agree that 3 percent unemployment reads subsistence and that the 2012 long-term figure is unusable; repeated political crises reset policy before reallocation can happen.
- 32.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Revised down from 35: the panel agrees 3 percent unemployment reads subsistence and the long-term figure from 2012 is unusable. Households rebuild after cyclones, but A and C are right that the economy shows little structural change.
- 28.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held at 28. Both others use the same reasoning on unemployment at 3 percent reflecting subsistence and the 2012 long-term row being unusable; panelist B's 35 credits household coping, which I treat as coping, not system adaptation.
Building
How capable is the country of turning plans and knowledge into functioning systems?
9.70.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingMadagascar beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+2.1 over 10 years (2016 to 2026), band -1.6 to +2.1, which includes no change. Median change: all countries -0.3, Income quartile 1 of 4 in 2000, lowest -1.1.
+2.8 over 20 years (2006 to 2026), band -0.7 to +6.5, which includes no change. Median change: all countries -0.5, Income quartile 1 of 4 in 2000, lowest -0.5.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 4, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+2.8 over 10 years, from 10.1 in 2016 to 12.9 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 13.1% of GDP | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 0.96% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 26.6score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.04index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
3,296 constant 2021 PPP $, rank 131 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2004MadagascarTransport Infrastructure Investment Project (national roads, ports and the Northern Railway)delivered and closed
Transport Infrastructure Investment Project (national roads, ports and the Northern Railway)
Madagascar's road authority and transport agencies delivered road, port, airport and Northern Railway works under the Transport Infrastructure Investment Project from 2004, cutting travel time on the RN44 from 24 to 6 hours, with the closing date extended four years from 30 June 2008 to 30 June 2012 and IDA-financed costs of US$169.39 million against US$150.00 million at appraisal plus US$15.60 million of additional financing added in 2007.
169.39 million US dollars, total project costs, actual or latest estimate, 2012-06. 150 million US dollars, total project costs, appraisal estimate, 2003. World Bank, Implementation Completion and Results Report, Madagascar Transport Infrastructure Investment Project (P082800), 2013, retrieved 2026-10-02.
How it worked: Madagascar's road authority and port and rail agencies ran a multi-modal investment programme on a lender credit, re-scoping it repeatedly as priorities and the political situation changed, and finished four years late.
Limits: The costs are in Annex 1 of the World Bank's own completion report, which rated the outcome Moderately Satisfactory. They are IDA disbursements only (the borrower's own contribution is shown as US$1.11 million against 17.42 appraised), and the 112.9 percent of appraisal is almost entirely the US$15.60 million additional financing of 2007 for the Northern Railway component, which was not in the appraisal; against the revised estimate including that financing, the outturn is 102.3 percent, so the record shows no meaningful cost overrun and should not be read as one. Port and airport components spent a fraction of their estimates and the RN5a upgrade was dropped at the January 2006 restructuring, so scope shrank in some places while it grew in others. The RN44 travel-time result is the report's own indicator comment. The closing date moved through five restructurings, and the 2009 political crisis froze disbursements during implementation. The project is a portfolio of works, not one build, so no single project's baseline and outturn are shown. Plain-text file, no PDF page numbers.
Panel median8.0-1.7 against the indicators
Round 2. How this layer works
- 8.0 institutionalist@claude-opus-5-5, self-confidence 0.60
I hold at 8. Utility connection is the weakest in the frame, which every panelist accepts, and the 2025 outage protests show JIRAMA cannot deliver; B's textile free zones add little state delivery.
- 10.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Revised down from 12: A notes power and water outages triggered the 2025 protests, and utility connection is the worst in the frame. Textile free-zone manufacturing at 13 percent adds a little.
- 7.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Revised 6 to 7. Utility connection at the frame floor and fitness near zero keep me low; panelist B's textile export zone manufacturing at 13 percent adds a little. Power and water outages triggered the 2025 protests, per panelist A.