- Raw value
- 18225.29articles per million people
- Year
- 2023. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IP.JRN.ARTC.SC)
- History
Portugal
Strongest usable evidence: Anticipation, at 79.4. Raise Building first, at 42.0. Experimentation needs more evidence: confidence is 0.33.
Raise, lowest first
| Dimension | Confidence | Score |
|---|---|---|
| Building | 0.57 | 42.0 |
Measure before managing
| Dimension | Confidence | Score |
|---|---|---|
| Experimentation | 0.33 | 42.2 |
| Coordination | 0.39 | 87.9 |
| Shared Purpose | 0.42 | 46.6 |
These lists are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 18 gaps in the registry.
Why this country is included: Southern European comparison with strong social trust and a long convergence path.
Read Portugal beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
| Coordination | 0.39 | 3 of 5 | 0.81 | no trend | no data | no estimate | |
| Anticipation | 0.46 | 2 of 4 | 0.96 | +10.9(2) | 67.0 | -12.4 | |
| Adaptability | 0.62 | 4 of 6 | 1.00 | no trend | no data | no estimate | |
| Agency | 0.56 | 4 of 5 | 0.75 | no trend | no data | no estimate | |
| Learning | 0.54 | 3 of 4 | 0.78 | no trend | no data | no estimate | |
| Trust | 0.49 | 5 of 7 | 0.83 | no trend | no data | no estimate | |
| Shared Purpose | 0.42 | 3 of 6 | 0.92 | +1.5(2) | 52.0 | +5.4 | |
| Experimentation | 0.33 | 4 of 9 | 0.81 | -13.6(3) | no data | no estimate | |
| Building | 0.57 | 4 of 6 | 0.90 | -0.9(3) | no data | no estimate |
How to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 125 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
Anticipation
How capable is the country of identifying and preparing for emerging change?
+10.9 over 10 years, from 68.5 in 2016 to 79.4 on 2 indicators seen in both years.
Trends use fewer indicators than the current score and use today's frame. A longer span reaches further back.
- Raw value
- 90.708index 0-100
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IQ.SPI.OVRL)
- History
Government foresight capacity
direct capability measureno dataset exists, 1 record- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: No comparable international dataset. OECD and UN work is descriptive, not scored. Envisioning would have to build this.
Long-horizon research commitments
direct capability measureno dataset exists- Raw value
- no data% of new grants
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: Redefined 2026-10-02 (D152). The row asked for the share of R&D spending classed as basic research, which is the make-up of a spending stock, the construct D142 retired business R&D share for. OECD MSTI publishes that share for its members only, and UNESCO UIS no longer serves R&D by type of research (construct audit, 2026-10-02). The behaviour behind it is a funder committing to a horizon: a grant awarded for five years or more is a decision to wait for a result. Untried: no memo has triaged a grant register. National funders publish award lists one by one with their own durations, and commercial grant aggregators fail the inspectability rule. Wireable on a grant-level register with award and end dates, on one definition of a competitive public grant, for half the frame or more.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2023
1.7 % of GDP, rank 23 of 118. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well (D122).
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2023
5,983 per million people, rank 11 of 114. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found (D122). Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
28,710 per million people, rank 30 of 125. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation (D122). Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
PLANAPP and REPLAN, a centre-of-government foresight network
Portugal's PLANAPP operates as a Centre of Government body for evidence-based foresight, planning, monitoring, evaluation and impact analysis; its REPLAN network lists five multisectoral team remits and held its inaugural meeting on 23 November 2022.
5 team remits, named multisectoral replan team remits, 2022-11-23. PLANAPP, REPLAN presentation, retrieved 2026-09-02.
How it worked: Portugal placed foresight, planning, monitoring and evaluation in a centre-of-government body, then connected ministry planning units through REPLAN so cross-cutting work could be commissioned and reviewed across departmental boundaries.
Limits: The five is a count of named remits on PLANAPP's presentation page, not a verified staffing or output measure; the same page describes the teams as four before listing five. The record therefore evidences a formal foresight-and-coordination architecture and its inaugural date, not continuity across governments, the quality of forecasts or whether advice changed decisions.
Panel estimate, round 2, how this layer works
- 67.0 institutionalist@claude-opus-5-5, self-confidence 0.50
I move down one point net. Panelist C is right that AGIF, the integrated rural fire agency created after 2017, converted a shock into an institution, but panelist B's point about the April 2025 Iberian blackout shows grid resilience planning lagged the renewables build-out. Planning continuity across governments remains weaker than the research and statistics rows imply.
- 68.0 bottom_up@claude-opus-5-5, self-confidence 0.50
A's point that PlanAPP is recent and planning continuity across governments is weak is one I accept, so I trim two points; C's credit for the post-2017 rural fire agency is fair, but the 2025 blackout and recurrent fire losses keep me below the indicator score.
- 63.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Strong research and statistics for the income level, and the post-2017 wildfire agency reform and fast vaccination campaign convert shocks into preparation. Recurrent wildfire losses and the 2025 blackout show a design-delivery gap, so I move up one point but stay below the panelists at 68 to 70.
Agency
How able are individuals and organizations to turn an intention into action?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
- Raw value
- 10.995per 1,000 aged 15-64
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.BUS.NDNS.ZS)
- History
- Raw value
- 6.5days
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.REG.DURS.MA.DY)
- History
- Raw value
- 6count
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.REG.PROC.MA.NO)
- History
Adults doing digital tasks
direct capability measureno dataset exists, 1 record- Raw value
- no data% of adults
- Year
- no data
- Normalized
- no data
- Source
- ITU / UNESCO UIS (SDG 4.4.1, ICT skills by type)
- History
- no data
Note: Redefined 2026-10-02 (D152). The row asked whether adults can perform standard digital tasks, which reads a skill level, the kind of stock D122 moved out of the scores with internet users. It now counts the act: a person who did the task. It is not the internet users condition beside it, which counts access. Candidate: ITU ICT skills by type (SDG 4.4.1) through the UNESCO UIS API, probed 2026-10-02. Sent a message with an attached file reaches 33 of the 53 countries then in the frame, 25 at 2018 or later, with no United States, India or China and most of Africa and Central America missing; two other task items reach 31 and 16. The items are self-reported and the task list has changed between rounds. Wireable on one task observed for half the frame or more at 2018 or later.
- Raw value
- 7.1mean 1-10
- Year
- 2022. The rail runs from 1960 to 2026.
- Normalized
- Source
- Joint EVS/WVS (A173)
- History
- one year
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
88.5 % of population, rank 49 of 125. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting (D122). Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
91.4 % aged 15+, rank 31 of 122. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action (D122). Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2024
77.1 % of GDP, rank 29 of 124. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it (D122). High values can also signal a credit bubble, so more is not always better.
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
e.escola, a national laptop-and-broadband push
The European Commission's eSchool case study records more than 1.3 million people requesting laptops and broadband through Portugal's e.escola programme and more than one million laptops delivered in its first two years; the Portuguese government suspended the programme in 2011.
1,300,000 people, people requesting laptops and broadband (more than), 2007-2009. 1,000,000 laptops, laptops delivered in the first two years (more than), 2007-2009. European Commission Interoperable Europe, eSchool Programme (Portugal case), retrieved 2026-08-31.
How it worked: The state used a dedicated fund and mobile-operator partnership to put subsidised laptops and broadband into the hands of students, teachers and adult trainees, using schools and private partners for decentralised delivery.
Limits: Device distribution measures access, not sustained use, adult or student digital competence, learning outcomes or affordability after the subsidy. The scale figures come from the programme case study, while the suspension is recorded in a Portuguese government archive; the partnership and outstanding state payments also complicate any simple claim of a completed success.
Coordination
How effectively can independent actors organize around shared objectives?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
Government effectiveness
perception proxyretired, see notes- Raw value
- no dataz-score -2.5 to 2.5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (GOV_WGI_GE.EST)
- History
- no data
Note: Retired 2026-08-26. The WGI aggregate the opinions of experts and firms, and in this set the four WGI series correlate with each other between 0.93 and 0.98 while correlating with log GDP per capita at 0.91. That is one perception of national wealth counted in three dimensions. Cross-agency delivery records are the replacement and they are a declared gap. See D23 and A4.
Regulatory quality
perception proxyretired, see notes- Raw value
- no dataz-score -2.5 to 2.5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (GOV_WGI_RQ.EST)
- History
- no data
Note: Retired 2026-08-26. Same measurement as government effectiveness, filed under a different name, correlating with it above 0.93. See D23 and A4.
Logistics performance
perception proxyretired, see notes- Raw value
- no dataindex 1-5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (LP.LPI.OVRL.XQ)
- History
- no data
Note: Retired 2026-08-26. The LPI is a survey of international freight forwarders, so it records how a country looks to global logistics firms. A small country with a small port scores low whatever its state can organise, which is artefact A9. Container throughput and border time are observable and stay. See D23.
- Raw value
- 0hours
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (TRD.ACRS.BRDR.EXPT.BRDR.COMP.HR.DB1619)
- History
- Raw value
- 103.034percentage points from approved budget
- Year
- 2022. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (GF.XPD.BUDG.ZS)
- History
University-industry collaboration
direct capability measureno dataset exists, 1 record- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- Global Innovation Index
- History
- no data
Note: GII carries it, but the underlying item is a WEF executive opinion survey whose microdata is not inspectable. Excluded on principle 4.
- Raw value
- 0.711index 0-1
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- V-Dem (v2x_cspart)
- History
- one year
Public-private collaboration
direct capability measureno dataset exists, 1 record- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: No comparable dataset. PPP investment databases measure infrastructure finance, not collaboration capacity.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2023
7.712 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
Portugal's CoLAB applied-research network
Portugal's Agência Nacional de Inovação reported 41 recognized Collaborative Laboratories (CoLABs), and its 2024 innovation report recorded 639 highly qualified staff contracted by CoLABs, 32 percent of them PhDs.
41 CoLABs, recognized collaborative laboratories, 2024. 639 staff, highly qualified staff contracted by colabs, 2024. Agência Nacional de Inovação, Relatório Nacional de Inovação 2024, retrieved 2026-08-31.
How it worked: Portugal gives mission-led applied-research organisations a formal recognition and monitoring route, then combines public base or competitive funding with industry-facing agendas so researchers have an institution whose job is to carry work across the university-business boundary.
Limits: The network and staffing totals show institutional reach, not research quality, business adoption, additionality or durable jobs. CoLABs are separate private non-profit entities and report through the programme; the figures do not cover every university-industry link or establish that public recognition caused the reported staffing.
Agendas Mobilizadoras and green innovation alliances
Portugal's PRR transparency portal reports 52 Agendas Mobilizadoras and Verdes representing €5,278,338,665.70 of approved investment and €3,051,632,468.10 of approved support as of 17 August 2026.
52 consortia/agendas, agendas mobilizadoras and verdes represented, 2026-08-17. 5,278,338,665.7 EUR, approved investment across the agendas, 2026-08-17. Portal Mais Transparência / Estrutura de Missão Recuperar Portugal, PRR project C05-i01.01, retrieved 2026-09-02.
How it worked: Portugal used an open call to assemble firms, research organisations, clusters and public bodies into contract-based consortia, then tied public support to innovation, production, skills and technology-transfer work inside each agenda.
Limits: Approved investment and support are programme commitments, not money spent, products delivered, export growth or additional private R&D. The portal aggregates consortia with different sectors and execution rates, and the figures are reported by the programme itself; they show a coordination mechanism at national scale, not that every alliance will complete its milestones by the 2026 deadline.
Trust
How much cooperation is possible beyond immediate personal networks?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
Rule of law
perception proxyretired, see notes- Raw value
- no dataz-score -2.5 to 2.5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (GOV_WGI_RL.EST)
- History
- no data
Note: Retired 2026-08-26. A WGI perception composite correlating with control of corruption above 0.95 and with log GDP per capita at 0.83. Court throughput and case clearance rates are the observable replacement and are a declared gap. See D23 and A4.
Control of corruption
perception proxyretired, see notes- Raw value
- no dataz-score -2.5 to 2.5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (GOV_WGI_CC.EST)
- History
- no data
Note: Retired 2026-08-26. A WGI perception composite. It measures reputation for corruption, which is not the same thing as corruption, and it tracks income closely. Prosecution and audit records are the observable replacement and are a declared gap. See D23 and A4.
- Raw value
- 755days
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (ENF.CONT.DURS.DY)
- History
- Raw value
- 7.674% of firms
- Year
- 2023. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.FRM.BRIB.ZS)
- History
- Raw value
- 3.403scale 0-4 (never to always)
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- V-Dem (v2jucomp_osp)
- History
- one year
Intentional homicide rate
downstream outcomeretired, see notes- Raw value
- no dataper 100,000 people
- Year
- no data
- Normalized
- no data
- Source
- World Bank (VC.IHR.PSRC.P5)
- History
- no data
Note: Added 2026-08-26 by D23 as the observable replacement for two retired WGI perception composites, and retired 2026-08-27 by D44 when the diagnostic built in D42 measured what it was doing. It raised this dimension's correlation with log GDP per capita by 0.288, from 0.096 to 0.385, the largest single wealth contribution anywhere in the model. It was added to fix wealth contamination and it was the wealth contamination. The dataset is sound and the objection is to what it measures here: homicide is driven heavily by organised crime, a society can be physically safe while trusting very little, and across this country set the variation it carries is mostly income. Behavioural trust measures remain a gap.
- Raw value
- 16.9% agreeing
- Year
- 2022. The rail runs from 1960 to 2026.
- Normalized
- Source
- Joint EVS/WVS (A165)
- History
- one year
Trust in public institutions
perception proxyno dataset exists- Raw value
- no data% expressing confidence
- Year
- no data
- Normalized
- no data
- Source
- OECD Trust Survey / WVS
- History
- no data
Note: The OECD survey covers members only. Mixing it with WVS items for India and South Africa would break comparability. The Joint EVS/WVS confidence battery (E069) reaches 37 countries from one release, and confidence in the courts (E069_17) is published beside Trust as a check under this id rather than scored: every item of the battery tested (courts, civil service, police, parliament and government) reads higher in the closed and electoral autocracies of the frame than in its democracies, which is deference as much as confidence (A13). The gap stays open for a measure that does not reward a court that cannot rule against the state. See D132.
- Raw value
- 35.2% expressing trust
- Year
- 2022. The rail runs from 1960 to 2026.
- Normalized
- Source
- Joint EVS/WVS (G007_34_B)
- History
- one year
Court case clearance rate
downstream outcomeno dataset exists, 1 record- Raw value
- no data% of incoming cases
- Year
- no data
- Normalized
- no data
- Source
- CEPEJ / OECD / national court statistics
- History
- no data
Note: Whether a court finishes what it starts, counted from case records rather than asked in a survey. D23 named it as the observable replacement for the two retired WGI composites and it has stayed unfilled since. CEPEJ publishes it for Council of Europe members and OECD for its own members, so no single publisher reaches this country set, and a harmonised series needs the project second source adapter. See D57.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Confidence in the courtsJoint EVS/WVS (E069_17), 2022
6.5 % a great deal, higher is better. Share of survey respondents saying they have a great deal of confidence in the justice system and courts, of the four answers a great deal, quite a lot, not very much and none at all, in the Joint EVS/WVS 2017 to 2022 survey round.
Confidence in the courts is the public half of what this capability asks: whether people expect the rules to be enforced when a stranger breaks them. It is not scored because the survey answer reads two things the number cannot tell apart. Where courts are independent, confidence is a judgment of how they perform. Where they answer to the state, it is also deference, and saying otherwise to an interviewer has a cost. In this frame the pattern runs the wrong way. India, the Philippines and Indonesia, all electoral autocracies in the V-Dem 2025 classification, lead on the share saying a great deal, and Vietnam and China, the two closed autocracies surveyed, lead once quite a lot is counted too. The ten electoral autocracies average 21.8 percent saying a great deal and the two closed autocracies 28.1, against 13.6 for liberal and 8.4 for electoral democracies. Scored, it would rank highest the states whose courts are least able to rule against them. Income is not why it is left out: the share correlates about -0.18 with log GDP per capita. The value is the share saying a great deal; the share saying quite a lot is in the source note.
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
Civil-court clearance and the CEPEJ monitoring series
The CEPEJ Portugal country fiche records a 96.1% clearance rate for civil and commercial litigious cases at first instance in 2023, alongside 101.1% at second instance and 105.5% at the Supreme Court; first-instance disposition time was 267 days.
96.1 % of incoming cases, first-instance civil and commercial clearance rate, 2023. 267 days, first-instance disposition time, 2023. European Commission for the Efficiency of Justice (CEPEJ), Portugal country fiche, retrieved 2026-09-02.
How it worked: Portugal's courts feed case-flow data into a recurring national and European monitoring framework, making incoming, resolved and pending civil cases visible by instance and allowing backlog pressure to be compared over time.
Limits: The clearance rate is an administrative throughput measure for one year and one case class, not a judgment-quality, access-to-justice or public-trust measure. Disposition time is a theoretical estimate derived from pending and resolved cases, and rates differ sharply by court instance; CEPEJ republishes national data and the fiche cannot identify which reforms or court-management practices caused the result.
Learning
How effectively does the country acquire, distribute, and update knowledge?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
- Raw value
- 0.769index 0-1
- Year
- 2020. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (HD.HCI.OVRL)
- History
- Raw value
- 39.516% of firms
- Year
- 2023. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.FRM.TRNG.ZS)
- History
Adult learning participation
direct capability measureno dataset exists, 2 records- Raw value
- no data% of adults
- Year
- no data
- Normalized
- no data
- Source
- Eurostat / OECD PIAAC
- History
- no data
Note: The best available measure of continuous learning capacity, and it exists only for European and OECD members.
- Raw value
- 1.286ratio to world average
- Year
- 2021. The rail runs from 1960 to 2026.
- Normalized
- Source
- OpenAlex (citation_normalized_percentile.is_in_top_10_percent)
- History
- one year
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2023
77.7 % gross, rank 28 of 124. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned (D122).
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2022
4.6 % of GDP, rank 50 of 125. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about (D122).
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2018
23.9 % of secondary, rank 29 of 125. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better (D141). It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
Programa Qualifica and Portugal's adult-learning network
Portugal's ANQEP reported 1,025,569 cumulative Qualifica registrations by December 2023; 90 percent received a training or recognition, validation and certification referral, and 510,113 registrants obtained some certification.
1,025,569 registrations, cumulative qualifica registrations, 2023-12. 510,113 people, registrants receiving a certification, 2023-12. ANQEP, Plano de Atividades 2024, retrieved 2026-08-31.
How it worked: A national network of Centros Qualifica gives adults a common entry point for counselling, recognition and validation of prior learning (RVCC), formal training and a portable qualification record, linking fragmented providers to a visible pathway.
Limits: These are cumulative programme reach and certification totals, not an annual participation rate, completion quality, learning gain or employment and wage effect. The count can include partial certifications and administrative registrations, and it does not identify how many participants would have qualified without Qualifica; ANQEP reports the programme's own administrative data.
Novas Oportunidades, and the qualification-policy interruption
ANQEP's national review records 1,568,490 adult enrolments in Novas Oportunidades between 2006 and July 2011; after the initiative's peak and a period of disinvestment, Portugal launched Qualifica in 2017 and rebuilt a network of more than 300 Centros Qualifica.
1,568,490 adult enrolments, adult enrolments in novas oportunidades, 2011-07. 300 centres (more than), centros qualifica in the replacement network, 2017. ANQEP, Plano Nacional de Literacia de Adultos, retrieved 2026-08-31.
How it worked: Novas Oportunidades scaled adult qualification through recognition and validation of prior learning (RVCC), adult education and training (EFA) routes and a national delivery network; when political and fiscal support receded, the infrastructure contracted and a successor programme had to rebuild entry points.
Limits: Enrolment is a reach measure, not completed learning, quality, labour-market effect or value for money. The review's 1.57 million figure covers a high-activity period, while the later 300-plus-centre figure describes the replacement network rather than retained Novas Oportunidades capacity; the record evidences interruption and rebuilding, not a causal estimate of the policy's return.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
-13.6 over 10 years, from 56.2 in 2016 to 42.6 on 3 indicators seen in both years.
+21.1 over 20 years, from 21.5 in 2006 to 42.6 on 3 indicators seen in both years.
Trends use fewer indicators than the current score and use today's frame. A longer span reaches further back.
- Raw value
- 711per million people
- Year
- 2021. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IP.PAT.RESD)
- History
- Raw value
- 32344per million people
- Year
- 2021. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IP.TMK.RSCT)
- History
- Raw value
- 1008per million people
- Year
- 2021. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IP.IDS.RSCT)
- History
- Raw value
- 251156per million people
- Year
- 2026. The rail runs from 1960 to 2026.
- Normalized
- Source
- GitHub Innovation Graph (data/repositories.csv)
- History
- no data
Venture deals
direct capability measureno dataset exists, 1 record- Raw value
- no dataper million people
- Year
- no data
- Normalized
- no data
- Source
- OECD / national VC associations
- History
- no data
Note: Redefined 2026-10-02 (D152). The id keeps its first name so evidence records, links and published files still resolve. The row asked for venture capital deployed as a share of GDP, a level of financial depth of the kind private credit is (D122). A count of first rounds counts attempts started with outside risk money, which is what this capability asks about, and a large round counts once. Candidates, none wireable: the OECD SME and Entrepreneurship Financing scoreboard carried venture capital for 6 of the 16 countries the frame held on 2026-08-26, as amounts in national currency, latest year 2022, with Brazil, India, South Africa and Singapore absent (D21); national venture capital associations publish counts on their own definitions; commercial deal databases cover the world and are not inspectable (D10). Wireable on an inspectable deal count with one definition of a first round for half the frame or more. Read A1 before treating this dimension as measured.
Early-stage entrepreneurial activity
direct capability measuremissing- Raw value
- no data% aged 18-64
- Year
- no data
- Normalized
- no data
- Source
- Global Entrepreneurship Monitor (APS key indicators, TEA rate)
- History
- no data
Note: From the GEM Adult Population Survey, entered by hand because GEM has no open API. TEA counts every new business, so necessity self-employment scores the same as a funded startup, which is why Chile and Argentina sit above the United States here. Read it as how many people are trying, not as how much value the attempts create. GEM does not run every economy every year: Singapore last took part in 2014 and the recency term marks that value down hard.
Tolerance of entrepreneurial failure
perception proxymissing- Raw value
- no data% not deterred
- Year
- no data
- Normalized
- no data
- Source
- Global Entrepreneurship Monitor (APS key indicators, fear of failure rate)
- History
- no data
Note: Stored as 100 minus the published GEM fear of failure rate, so the direction matches the rest of the registry. GEM measures that rate among adults who already see good opportunities, not among all adults, so the denominator differs from the label. Attitudinal: bankruptcy law and time to discharge would be the observable substitute and are still worth wiring beside it.
Firms through regulatory sandboxes
direct capability measureno dataset exists, 2 records- Raw value
- no datafirms per million people
- Year
- no data
- Normalized
- no data
- Source
- national regulators
- History
- no data
Note: Redefined 2026-10-02 (D152). The row asked for the number and breadth of live sandboxes, which is a policy stock: a regime can exist with nobody in it. It now counts what passes through: firms a regulator let test under relaxed rules, and firms that came out, authorised, withdrawn or failed. Regulators publish cohort lists and exit reports one by one. The evidence corpus holds 22 records against this row, most of them counts of firms admitted or exited, each on the definition and window of its own regulator, and no register assembles them on one definition (O1 triage sweep, 2026-10-01). A realistic candidate for Envisioning to build from those lists. Wireable on a register that counts admissions and completions on one definition for half the frame or more.
University spinouts
direct capability measureno dataset exists- Raw value
- no dataper million people
- Year
- no data
- Normalized
- no data
- Source
- national TTO associations
- History
- no data
Note: Reported nationally with incompatible definitions of what counts as a spinout.
Business share of R&D
capability inputretired, see notes- Raw value
- no data% of R&D
- Year
- no data
- Normalized
- no data
- Source
- OECD MSTI / RICYT
- History
- no data
Note: Retired 2026-10-02. The only working source, OECD MSTI joined with RICYT for Latin America, covers 34 of the 53 countries then in the frame, but the row reads the make-up of a spending stock: who performs the R&D a country pays for. R&D spending itself is a condition since D122, and the share is high both where business research is large (Israel) and where total research is tiny and one firm dominates it (Thailand). State enterprises count as business, so China and Vietnam read their ownership model. UIS stopped publishing the series in 2023. Firms trying new things are read through patents, trademarks, designs and entrepreneurship instead. See D142.
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
Portugal Ventures, a public venture-capital bridge
Portugal Ventures, the public venture-capital company in the Banco Português de Fomento group, reports €233.2 million invested in 256 new companies since 2012 and €283 million under management.
233,200,000 EUR invested, invested since launch, 2026-08-31. 256 companies, new companies backed since launch, 2026-08-31. Portugal Ventures, institutional performance figures, retrieved 2026-08-31.
How it worked: A state-backed investor supplies pre-seed, seed and Series A capital, often alongside private investors, using staged minority investments and portfolio support to bridge companies that are too early for ordinary bank finance.
Limits: These are company-reported cumulative portfolio figures, not venture-capital investment as a share of GDP, additionality, exits, survival, jobs or a counterfactual. The homepage does not give a full reference-year methodology, and the totals can include private co-investment effects as well as Portugal Ventures' own capital.
Rede Nacional de Test Beds for company experimentation
ANI's National Innovation Report records 47 recognised Portuguese test beds and €150 million allocated to the national network for developing and testing new products and services at technology-readiness levels 5 to 9.
47 test beds, recognised test beds, 2024-12-31. 150,000,000 EUR, prr allocation to the test-bed network, 2022-2025. Agência Nacional de Inovação, Relatório Nacional de Inovação 2024, retrieved 2026-09-02.
How it worked: Portugal funded and recognised shared facilities where SMEs and startups can develop and test near-market products, lowering the cost of moving an experiment from prototype toward demonstration without requiring every firm to build its own laboratory.
Limits: The count and allocation show a national experimentation infrastructure, not the number of live trials, firms served, products commercialised or regulatory changes that resulted. ANI's report says 47 were recognised at publication but gives no common utilisation definition, and the €150 million is an allocation rather than completed spending or additional private investment.
Zonas Livres Tecnológicas, regulator-supervised experimentation zones
ANI's National Innovation Report records four Portuguese Zonas Livres Tecnológicas (technological free zones) by the end of 2024, where innovators can test technology-based processes in real or near-real environments under continuous regulator supervision.
4 zones, technological free zones identified, 2024-12-31. Agência Nacional de Inovação, Relatório Nacional de Inovação 2024, retrieved 2026-09-02.
How it worked: Portugal created a legal route for regulators and innovators to run controlled tests in defined physical environments, using supervised evidence from those tests to clarify or adapt rules where existing law is uncertain.
Limits: Four zones are an institutional count, not a measure of trials, firms admitted, time to authorisation or successful regulatory adaptation. ANI's report uses a 31 December 2024 cutoff and does not provide a common utilisation or outcome series, so the record shows that a sandbox channel exists rather than that it is broad or effective.
Adaptability
How effectively can the system respond when circumstances change?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
- Raw value
- 6.164% of labour force
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (SL.UEM.TOTL.ZS)
- History
- Raw value
- 36.8% of unemployed
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB)
- History
- one year
- Raw value
- 0.076index 0-1, lower = more diversified
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- UNCTAD (US.ConcentDiversIndices)
- History
- one year
- Raw value
- 5.69% of products not exported competitively at the start
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ))
- History
- one year
Disaster preparedness and recovery
direct capability measureno dataset exists, 3 records- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- INFORM / UNDRR
- History
- no data
Note: No source observes a country preparing for or recovering from a real shock. INFORM publishes its lack of coping capacity apart from hazard and exposure, but that dimension averages government self-assessments and governance perception indices with stocks such as roads, phones and physicians, which is the perception layer D23 retired plus conditions money buys (D122). Sendai and WHO reporting are governments grading themselves. A warning-reach survey item is a check candidate. See the disaster preparedness memo.
Institutional responsiveness
direct capability measureno dataset exists, 3 records- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: No dataset exists. Measurable in principle from legislative and regulatory timestamps, which no one has assembled comparably.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
77.8 % aged 15+, rank 27 of 125. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating (D141). Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
45.2 per 100 people, rank 6 of 125. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing (D122). Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
9.7 % of output, rank 60 of 117. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing (D141). Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025
2.3 % of employment, rank 5 of 102. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating (D150). Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
Chave Móvel Digital and Portugal's digital identity layer
Portugal's digital-government platform reported 4.4 million active Chave Móvel Digital credentials and 141 million authentications by 23 October 2025, with 490 entities using Autenticação.gov.
4,400,000 active digital identities, active chave móvel digital credentials, 2025-10-23. 141,000,000 authentications, authentications through autenticação.gov, 2025-10-23. Portugal Digital / ARTE, Identidade Digital statistics, retrieved 2026-08-31.
How it worked: Portugal made one state-certified mobile credential usable for authentication and signatures across public services and participating private services, so each new service can reuse an existing identity rather than build a separate account system.
Limits: These are administrative adoption and usage totals, not measures of service quality, inclusion, authentication success, fraud or trust. An active credential is not necessarily a unique active person, and the government platform reports the totals itself; the figures do not show whether citizens can complete the services they authenticate for.
Empresa na Hora and the one-stop company registry
Portugal's IRN reports 369,447 societies created through Empresa na Hora over its first 20 years; the service is available at more than 200 posts and averages 41 minutes from formation to registration.
369,447 companies, companies created through empresa na hora, 2025-08. 41 minutes, average service time, 2025-08. Instituto dos Registos e do Notariado, Empresa na Hora 20-year results, retrieved 2026-08-31.
How it worked: A single state counter combines name approval, incorporation and registration, passes the record between public services electronically and later extends the same workflow online, converting a multi-agency legal process into one accountable transaction.
Limits: The throughput and elapsed-time figures measure a standard incorporation route, not the full time or cost of becoming operational, survival, access for less standard firms or the quality of subsequent regulation. IRN reports its own service and cumulative count, and the average can hide variation by company type, name choice and whether applicants arrive prepared.
Sistema de Gestão Integrada de Fogos Rurais
Portugal's integrated rural-fire system reported 85 of 97 national-action projects in progress and 48 percent cumulative execution in 2024; €638 million was spent that year, with 55 percent on prevention, even as 137,651 hectares burned.
85 projects, national-action projects in progress, 2024. 638,000,000 EUR, sgifr expenditure, 2024. Agência para a Gestão Integrada de Fogos Rurais, SGIFR annual results 2024, retrieved 2026-08-31.
How it worked: After the 2017 fires, Portugal replaced a mainly suppression-led model with a cross-government system linking prevention, landscape management, preparedness, suppression and recovery, coordinated by AGIF and reported against a national action programme.
Limits: Projects in progress and spending are capacity measures, not proof that communities are safe; the 2024 burned-area and mortality figures show the residual risk plainly. Annual fire outcomes also depend on weather, land use and ignition behaviour, so the record cannot identify the causal contribution of coordination, prevention or suppression spending.
Simplex and LabX, a standing simplification-and-experimentation loop
AMA's 2022 activity report records 48 Simplex administrative-simplification measures, 24 PRR and modernisation milestones executed, and 62 innovation, participation and simplification activities across the agency's portfolio.
48 measures, simplex measures in the 2022 edition, 2022. 62 activities, innovation, participation and simplification activities, 2022. Agência para a Modernização Administrativa, Activity Report 2022, retrieved 2026-10-02.
How it worked: Portugal pairs a rolling political simplification agenda with a public-sector innovation lab: Simplex names and tracks changes, while LabX researches user needs, co-creates prototypes and tests service redesign before agencies adopt it.
Limits: Counting measures and workshops shows an administrative improvement pipeline, not reduced burden, faster case resolution or better user outcomes. AMA reports its own activity, and combining the recurring Simplex programme with LabX experiments hides which initiatives reached routine service delivery and which remained pilots. AMA has since been renamed ARTE and no longer hosts the report, so the record cites a Wayback Machine snapshot (6 May 2024) of the original PDF.
Programa Nacional de Vacinação and seasonal immunisation
Portugal's DGS reported 86 percent immunisation of eligible infants in the first RSV campaign, 98–99 percent first-year coverage for the universal childhood schedule, and nearly four million seasonal vaccines administered in 2024–2025.
86 %, eligible infants immunised against rsv, 2024-2025. 98 %, universal-schedule first-year coverage (lower bound), 2024. Direção-Geral da Saúde, Programa Nacional de Vacinação annual results, retrieved 2026-08-31.
How it worked: A national schedule, procurement and registry make routine childhood vaccination a standing service, while seasonal campaigns add new products, broaden delivery through pharmacies and publish coverage by age and municipality so the system can adapt to a changing respiratory threat.
Limits: Coverage is not the same as immunity, health impact or equal access, and the rounded seasonal-dose total is not a count of unique people. These figures mainly cover Portugal Continental and the DGS reports the programme's administrative data; high routine coverage can coexist with gaps in older groups, migrants or particular municipalities.
STAYAWAY COVID, a contact-tracing app suspended after the emergency
Portugal launched the voluntary STAYAWAY COVID exposure-notification app on 1 September 2020; the European Commission's case study records more than 3.2 million downloads and says the app was later suspended.
3,200,000 downloads, app downloads (more than), 2020-2021. European Commission, Digital Contact Tracing Study: Portugal case, retrieved 2026-08-31.
How it worked: Portugal combined a national health authority with research and technology partners to deploy an anonymous Bluetooth exposure-notification app quickly, using voluntary adoption rather than a centralised movement database.
Limits: Downloads do not show active use, the share of infected people entering test codes, alerts delivered or epidemiological effect. The voluntary, privacy-preserving design depended on test-result integration and public trust, and suspension after the emergency means the adoption peak was not a durable surveillance capability.
Building
How capable is the country of turning plans and knowledge into functioning systems?
-0.9 over 10 years, from 30.3 in 2016 to 29.4 on 3 indicators seen in both years.
Trends use fewer indicators than the current score and use today's frame. A longer span reaches further back.
- Raw value
- 11.296% of GDP
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (NV.IND.MANF.ZS)
- History
- Raw value
- 6.773% of manufactured exports
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (TX.VAL.TECH.MF.ZS)
- History
Logistics infrastructure quality
perception proxyretired, see notes- Raw value
- no dataindex 1-5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (LP.LPI.INFR.XQ)
- History
- no data
Note: Retired 2026-08-26. An LPI sub-index, so the same freight-forwarder survey as logistics performance and the same problem. Electricity connection speed stays as the observable infrastructure measure in this dimension. See D23.
- Raw value
- 79.565score 0-100
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.ELC.TIME.DFRN)
- History
- Raw value
- 1.689index
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (EF.EFM.UNIV.XD)
- History
Large project delivery
direct capability measureno dataset exists, 2 records- Raw value
- no data% overrun
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: The single best measure of execution capability and there is no comparable international dataset. Assembling one is a defensible Envisioning project. Building mixes industrial output with state delivery capacity, and this indicator carries the delivery side: the other six indicators cannot see a national programme that was delivered. Documented deliveries are recorded in data/evidence and never scored, see D20.
Firm scale-up rate
direct capability measureno dataset exists- Raw value
- no data% of firms
- Year
- no data
- Normalized
- no data
- Source
- OECD DynEmp
- History
- no data
Note: OECD business dynamics work covers members irregularly. Nothing comparable for India, Brazil or South Africa.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
89,377 constant 2021 PPP $, rank 30 of 123. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context (D122).
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
Plano de Recuperação e Resiliência delivery governance
Portugal's PRR barometer recorded €21.9 billion across 121 investments and 43 reforms, with €14.43 billion paid to beneficiaries by 27 August 2026.
14,431,510,367.98 EUR paid, prr funds paid, 2026-08-27. 121 investments, investments in the plan, 2026-08-27. Portal Mais Transparência / Estrutura de Missão Recuperar Portugal, PRR barometer, retrieved 2026-08-31.
How it worked: Portugal bound a large cross-government investment programme to a reform-and-milestone schedule, central monitoring and payment requests, while leaving implementation to ministries, public bodies, firms and local beneficiaries. The financing contract creates a common delivery clock across otherwise separate projects.
Limits: Funds paid, investment counts and reform counts are programme inputs and milestones, not completed infrastructure, cost and schedule performance or long-run outcomes. The plan is EU-funded and centrally coordinated but executed through many ministries and beneficiaries; the barometer's aggregate totals cannot attribute results to one delivery unit or show which projects will remain useful after the funding window closes.
Lisbon–Madrid high-speed rail concession, formally abandoned
Portugal's 2011 Council of Ministers formally abandoned the previous Lisbon–Madrid high-speed rail project, replacing its passenger priority with a freight connection through Sines, Lisbon, Setúbal, Poceirão and Madrid.
1 project, high-speed rail projects formally abandoned, 2011-11-10. Diário da República, Resolução do Conselho de Ministros n.º 45/2011, retrieved 2026-09-02.
How it worked: Under fiscal pressure, the government stopped a politically committed passenger megaproject by resolution and redirected the corridor toward freight interoperability, changing the objective before further construction commitments accumulated.
Limits: The number is categorical: one formally abandoned national project. The resolution records a policy reversal, not the project's final cost, the amount already spent or a completed line; the replacement freight priority and a later revival of high-speed planning mean this is evidence of stop-and-reframe capacity, not proof that Portugal solved rail delivery.