North Macedonia
Strongest usable evidence: Coordination, at 75.1. Raise Experimentation first, at 27.0. Shared purpose needs more evidence: confidence is 0.25.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- ExperimentationPeers 20.00.47 usableno trend
- BuildingPeers 31.40.63 usable+4.2(3)
- AdaptabilityPeers 65.50.62 usable+8.8(3)
- LearningPeers 41.90.54 usable+4.8(2)
- AnticipationPeers 44.60.46 usable+23.2(2)
Measure before managing, thinnest first
- Shared purposePeers 48.10.25 thinno trend
- TrustPeers 69.00.33 thin+10.0(2)
Keep watching, highest first
- CoordinationPeers 69.10.48 usable+1.1(2)
- AgencyPeers 46.00.49 usableno trend
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read North Macedonia beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
48.90.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationNorth Macedonia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+23.1 over 10 years (2016 to 2026), band +23.1 to +23.1. Median change: all countries +11.2, Income quartile 3 of 4 in 2000 +12.5.
+25.9 over 20 years (2006 to 2026), band +18.4 to +33.7. Median change: all countries +13.4, Income quartile 3 of 4 in 2000 +15.2.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+23.2 over 10 years, from 25.7 in 2016 to 48.9 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 273articles per million peoplefrom 498.97 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 87.2index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2024
0.37 % of GDP, rank 69 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2024
888 per million people, rank 55 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
2,068 per million people, rank 60 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median38.0-10.9 against the indicators
Round 2. How this layer works
- 34.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 34: strong statistics carry the indicator, but science is thin and there is no state foresight function; panelist C's EU-candidate prop is external, not domestic capability.
- 38.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Moved 35 to 38: panelist C is right that statistics (87.4) are a real capability; I see no foresight function, so I stay well below 44 to 48.9.
- 40.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Moved down from 44. Peers A and B say they know of no foresight function and see little long-horizon research; EU candidacy is an external frame.
Agency
How able are individuals and organizations to turn an intention into action?
65.20.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyNorth Macedonia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+1.6 over 10 years (2016 to 2026), band -1.8 to +6.4, which includes no change. Median change: all countries +1.9, Income quartile 3 of 4 in 2000 +2.1.
+10.9 over 20 years (2006 to 2026), band +8.2 to +16.3. Median change: all countries +9.3, Income quartile 3 of 4 in 2000 +10.6.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 5.2per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 93.3score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 6count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2025
93.1 % of population, rank 26 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
84.3 % aged 15+, rank 50 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
56.3 % of GDP, rank 47 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median55.0-10.2 against the indicators
Round 2. How this layer works
- 56.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 56. Entry efficiency of 93.3, 6 procedures and density of 5.18 give a derived 65.2. Panelist B reaches 55 on party patronage and emigration. Panelist C's 48 says easy registration does not mean productive firms and cites blocked EU accession, but accession is outside the control of Macedonian actors, and firm output is an outcome. The Central Registry one-stop system works, from my own knowledge, so I stay above C.
- 55.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 55. Density of 5.18, entry efficiency of 93.3 and 6 procedures give 65.2. Registration is easy, but party patronage and emigration of the young limit what those firms become, from my own knowledge. Panelist A at 56 reads the same. Panelist C's 48 uses blocked EU accession, which is outside the country's hands and not a measure of its people acting.
- 50.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Raise slightly from 48 to 50. Entry efficiency 91.2, density 30.8 and 6 procedures are strong. Panelists at 56 and 55 shave less. Party-linked public jobs and youth emigration limit what firms become, and easy registration is not productive entry. Own knowledge.
Coordination
How effectively can independent actors organize around shared objectives?
75.10.48 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 1.00About CoordinationNorth Macedonia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.8 over 10 years (2016 to 2026), band -5.1 to +5.7, which includes no change. Median change: all countries -1.7, Income quartile 3 of 4 in 2000 +0.5.
-0.5 over 20 years (2006 to 2026), band -5.9 to +5.8, which includes no change. Median change: all countries -2.7, Income quartile 3 of 4 in 2000 -1.8.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+1.1 over 10 years, from 70.8 in 2016 to 71.9 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 76.8score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 96.4percentage points from approved budget | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.54index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration, Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2023
1.054 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2010North MacedoniaSkopje and Ohrid airports concession to TAV Macedoniastill operating
Skopje and Ohrid airports concession to TAV Macedonia
The government of North Macedonia handed both of the country's international airports, Skopje and Ohrid, to the concessionaire TAV Macedonia in 2010, and combined passenger traffic rose from 729,297 in 2010 to 3,475,288 in 2025.
3,475,288 passengers, passengers at skopje and ohrid airports combined, 2025. 729,297 passengers, passengers at skopje and ohrid airports combined, first year of the concession, 2010. TAV Macedonia, press release on 2025 traffic at Skopje and Ohrid airports, retrieved 2026-10-17.
How it worked: The government tendered the operation of both national airports as one 20-year concession, so a single private operator carried the terminal build and the route development and paid the state from traffic it grew.
Limits: Both numbers come from the concessionaire's own press releases, not from the state or a statistical office, and the 2010 figure sits on a second TAV page (airports.com.mk, release 'Five years of TAV in Macedonia'). The tier is the closest available for an operator's traffic count; a reviewer may prefer to treat it as self-reporting. Passenger growth mostly reflects low-cost carrier entry and diaspora travel, and the record cannot separate what the concession contributed from what any operator of the two airports would have seen. Passengers measure throughput, not the quality of the partnership. The concession also lost part of its scope: the cargo airport at Shtip that TAV was obliged to build was declared not economically justifiable in 2020, and the government diverted the 49.7 million euros planned for it to other projects through an annex (Meta.mk, 21 September 2020, reporting the economy minister). The amount TAV actually invested against its original commitment is not published at either source. Two airports in a small country is national in reach but a narrow slice of the construct.
Panel median60.0-15.1 against the indicators
Round 2. How this layer works
- 55.0 institutionalist@claude-opus-5-5, self-confidence 0.50
I hold at 55. B and C credit the Ohrid settlement and coalition power-sharing, which I accept as political coordination, but party patronage in public administration limits delivery between agencies, and civil society is only mid-frame.
- 62.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 62, with C: the Prespa Agreement and the 2001 Ohrid settlement show coordination across ethnic parties. A's party-patronage point is real and is why I sit well below 75.1.
- 60.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised 62 to 60. Panelist A names party patronage in public administration, a real limit on delivery; panelist B's Ohrid settlement is cross-group coordination, but it dates from 2001. Trade compliance at 77 and budget outturn within 3.6 points are strong.
Trust
How much cooperation is possible beyond immediate personal networks?
55.50.33 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 0.97About TrustNorth Macedonia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+6 over 10 years (2016 to 2026), band +0.4 to +10.8. Median change: all countries +1.9, Income quartile 3 of 4 in 2000 +1.4.
+2 over 20 years (2006 to 2026), band -3.9 to +7.1, which includes no change. Median change: all countries +2.1, Income quartile 3 of 4 in 2000 +2.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+10.0 over 10 years, from 58.4 in 2016 to 68.4 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 43.6score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 9.6% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 2.1scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median42.0-13.5 against the indicators
Round 2. How this layer works
- 44.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 44. Dispute efficiency of 43.6, bribery of 9.6% and court compliance of 2.15 give a derived 55.5. The panel agrees the bribery row is kind after the 2025 Kocani fire and the 2019 collapse of the Special Prosecutor's Office, from my own knowledge. Panelist B's point on separate Macedonian and Albanian communities is real, but Ohrid power-sharing does bind them formally, so I stay at the top of the range.
- 40.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 40. Bribery of 9.6% and compliance of 2.15 sit against dispute efficiency of 43.6, giving 55.5. From my own knowledge the 2025 Koฤani fire exposed licensing corruption and the Special Prosecutor's Office collapsed, which panelists A and C both cite. Macedonian and Albanian communities live largely apart, which is the stranger question itself, so I stay slightly below them.
- 42.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Hold 42. Dispute efficiency 29.8 is weak, bribery 9.6% (81.1) fine, compliance 55.7. Panelists at 44 and 40. The 2025 Kocani nightclub fire exposed bribed licensing that killed over 60 people, and the Special Prosecutor's Office collapse shows fragile anti-corruption follow-through. Own knowledge.
Learning
How effectively does the country acquire, distribute, and update knowledge?
44.30.54 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.78About LearningNorth Macedonia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+5.8 over 10 years (2016 to 2026), band +2.7 to +9.7. Median change: all countries -1.3, Income quartile 3 of 4 in 2000 -1.6.
+10.1 over 20 years (2006 to 2026), band +5.1 to +14.7. Median change: all countries +0.8, Income quartile 3 of 4 in 2000 -0.3.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2002, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+4.8 over 10 years, from 39.1 in 2016 to 43.9 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.56index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 44.3% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 0.8ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2023
55 % gross, rank 59 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2002
3.3 % of GDP, rank 92 of 135. Government expenditure on education as a share of GDP.
The value is from 2002, more than 15 years old.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2018
27.6 % of secondary, rank 24 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Panel median40.0-4.3 against the indicators
Round 2. How this layer works
- 40.0 institutionalist@claude-opus-5-5, self-confidence 0.55
I hold at 40. B and C sit close; firm training at 44 percent is good, but the Human Capital Index is below mid-frame and emigration drains skills.
- 42.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 42: firm training at 44 percent is a good capability row, while research impact is low and graduate emigration drains skills. A and C give no new fact.
- 38.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held at 38, as I find no new argument above or below. Firm training at 44 percent is a good capability row; a Human Capital Index of 56 is below mid-frame, citation impact is below world average, and emigration drains skills as panelist B notes.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
27.00.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationNorth Macedonia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-1.9 over 10 years (2016 to 2026), band -7.6 to +2.2, which includes no change. Median change: all countries 0, Income quartile 3 of 4 in 2000 0.
-3.3 over 20 years (2006 to 2026), band -8.4 to +1.2, which includes no change. Median change: all countries +0.1, Income quartile 3 of 4 in 2000 +0.8.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 4, last in 2025. The replay starts in 2004, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 13.7per million peoplefrom 25 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 1,008per million peoplefrom 1,839 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 35.6per million peoplefrom 65 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 12,661per million peoplefrom 23,055 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 65.7score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.
This project retired one row: Business share of R&D.
Panel median25.0-2.0 against the indicators
Round 2. How this layer works
- 25.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Moved up from 22: insolvency efficiency of 66.7 is an institutional exit channel I underweighted; patents stay low.
- 25.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Held 25: the panel sits at 22 to 28; fair insolvency (66.7) and moderate trademarks and repositories, with few venture channels.
- 26.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Held near indicator. Insolvency (66.7) is good, but designs and trademarks are mid and no institutional channel is visible.
Adaptability
How effectively can the system respond when circumstances change?
44.20.62 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 1.00About AdaptabilityNorth Macedonia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+9.5 over 10 years (2016 to 2026), band +7.1 to +11.8. Median change: all countries -0.8, Income quartile 3 of 4 in 2000 +0.8.
+5.2 over 20 years (2006 to 2026), band 0 to +10.8, which includes no change. Median change: all countries -1, Income quartile 3 of 4 in 2000 -1.5.
The model fills at least one of the 4 indicators in 19 of 27 years, at most 2, last in 2018. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+8.8 over 10 years, from 41.6 in 2016 to 50.4 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 12.3% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 74% of unemployed | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.2index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 2.5% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
65.8 % aged 15+, rank 90 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
29.9 per 100 people, rank 38 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
15.7 % of output, rank 91 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025
12 % of employment, rank 27 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2020North MacedoniaCOVID-19 wage subsidy scheme for private employersdelivered and closed
COVID-19 wage subsidy scheme for private employers
The Government of North Macedonia answered the March 2020 shutdowns with decrees that paid private employers up to 14,500 denars a month per employee for April, May and June 2020, funding 155,082 monthly salary subsidies across 24,331 monthly company payments, with the World Bank share fully disbursed by 6 October 2020.
155,082 employee-months, salary subsidies paid, employees summed across april, may (residual) and june, April to June 2020. 24,331 company-months, companies paid a salary subsidy, summed across april, may (residual) and june, April to June 2020. World Bank, Local Roads Connectivity Project Additional Financing project paper (P175841), retrieved 2026-10-16.
How it worked: The government issued decrees within weeks of the shutdown that paid employers a net minimum wage per retained employee, conditional on keeping headcount, and drew pre-negotiated contingency money from an unrelated World Bank loan to fund part of it.
Limits: The numbers sit in a PDF (Tables 1 and 2, printed page 12, PDF page 16) and the project paper itself calls them inclusive of duplications: the 155,082 adds the employees paid in each month, so the number of distinct workers is lower. The paper elsewhere describes the target as about 20,000 SMEs and 155,000 employees, and a World Bank brief of November 2020 says over 120,000 employees, so the distinct headcount is uncertain. The World Bank financed 37 million euros of the 80 million euro scheme through a contingency component of a roads loan, so the money was partly external, although the decrees and the payments were the government's. The figures come from the project's own reporting, through its implementation unit. The claim that the scheme preserved 80 percent of the most vulnerable jobs comes from a local think tank cited in the paper and is not carried here. The record does not show whether firms kept the workers after the retention period, and the Public Revenue Office later pursued firms that misused the subsidy.
2015North MacedoniaCompensation for the early 2015 flood damagedelivered and closed
Compensation for the early 2015 flood damage
The Government of North Macedonia, through the Ministry of Finance, paid 144.24 million denars in flood-damage compensation to 2,218 persons in nine flood-hit municipalities, among them Mogila, Novaci, Bitola and Stip, by 15 September 2015, after the storms and floods of early 2015.
144.24 million denars, flood-damage compensation paid so far, 2015-09-15. 2,218 persons, persons compensated so far, 2015-09-15. Government of North Macedonia, Ministry of Finance press release, republished by ReliefWeb (UN OCHA), retrieved 2026-10-16.
How it worked: After the floods, the central government paid compensation for household damage out of the state budget through the Ministry of Finance, municipality by municipality, as local damage assessments were completed.
Limits: The source is a government press release about its own payments, republished by ReliefWeb, not an audited account. The same release reports a further 29.9 million denars paid that day to 394 persons and does not say whether the 144.24 million total includes it. It gives no estimate of total damage, so the share of losses covered is unknown, and no dates for the damage, the claims or the payments, so the speed of recovery cannot be read from it. Compensation after the event shows recovery financing, not preparedness: a State Audit Office performance audit published on 22 September 2026 found that the national protection and rescue strategy expired in 2018 without replacement, that the national vulnerability assessment dates from 2007, and that the Skopje City Fire Brigade had 172 of 384 approved firefighter positions filled.
Panel median41.0-3.2 against the indicators
Round 2. How this layer works
- 40.0 institutionalist@claude-opus-5-5, self-confidence 0.50
I hold at 40. B and C agree that 12 percent unemployment with a 74 percent long-term share is a persistent weakness; diversification comes from foreign-owned plants in free zones rather than domestic reallocation.
- 45.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 45: 12 percent unemployment partly counts people working informally or abroad, which A and C do not adjust for. FDI plants in the technology zones diversified exports.
- 41.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised 42 to 41. Unemployment of 12 percent with a 74 percent long-term share is persistent, and diversification arrives through foreign-owned plants in free zones; I treat that as investor-driven rather than system adaptation, close to panelist A's 40.
Building
How capable is the country of turning plans and knowledge into functioning systems?
34.60.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingNorth Macedonia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3.1 over 10 years (2016 to 2026), band 0 to +6.5, which includes no change. Median change: all countries -0.3, Income quartile 3 of 4 in 2000 -0.3.
+5.6 over 20 years (2006 to 2026), band +1.9 to +9.5. Median change: all countries -0.5, Income quartile 3 of 4 in 2000 -0.8.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+4.2 over 10 years, from 13.1 in 2016 to 17.3 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 14.3% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 6.4% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 88.4score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.05index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
65,974 constant 2021 PPP $, rank 45 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2014North MacedoniaKicevo to Ohrid motorway, and its cost and time overrunstill operating
Kicevo to Ohrid motorway, and its cost and time overrun
North Macedonia's Public Enterprise for State Roads contracted Sinohydro in November 2013 to build the 56.7 km Kicevo to Ohrid section of motorway A2 for EUR411 million by January 2018; by December 2021 five annexes had moved completion to December 2023 and raised the contract value by EUR187 million (45 percent) to EUR598 million, and the State Audit Office found works 72 percent complete by value in August 2023.
598 million euros, contract value after annexes, 2021-12. 411 million euros, contract value at signing (contracted completion january 2018), 2013-11. State Audit Office of North Macedonia, Final report on the financial and compliance audit of the Public Enterprise for State Roads for 2022, February 2024, retrieved 2026-10-02.
How it worked: The government named a Chinese contractor by statute under a bilateral loan agreement and started construction on an old design, then absorbed the redesign of tunnels, cuttings and landslide sections through successive annexes that raised the price and moved the deadline.
Limits: The figures are in a PDF in Macedonian, in the key audit matter section 5.1 (printed pages 25 to 27); the 45 percent increase is also stated in the summary (printed page 4). The road was still under construction when the audit was written, so the record shows an overrun in progress, not an outturn; later annexes and deadlines reported in the press (a further increase and a 2027 deadline) were not checked against an official document. The EUR598 million is the contract value; the audit puts total investment, including expropriation, interest and exchange differences, at about EUR575 million spent by November 2023, and financing at US$685 million in two Chinese loans. The audit attributes the overrun to a basic design drawn up between 2002 and 2010 that did not match the terrain, giving 42 variations, which is the auditor's reading. The contractor was named by a 2013 law rather than chosen by open tender, so the record also reflects a procurement choice. 'Operating' means the build is still running, not that the road is open.
Panel median31.0-3.6 against the indicators
Round 2. How this layer works
- 30.0 institutionalist@claude-opus-5-5, self-confidence 0.50
I hold at 30. C agrees on the motorway corridor delays and contested contracts; utility connection at 88 is good but economic fitness is near the floor.
- 34.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised down from 36: A and C both cite the Corridor 8 and 10d motorway contract, which shows weak state delivery. Utility connection at 88 and FDI plants keep it near the indicator.
- 31.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised 30 to 31. Utility connection at 88 is a delivered-system row and manufacturing at 14 percent is moderate; Corridor 8 and 10d motorway contracts with delays and contested contracts, per panelist A, keep me under 34.6.