Bosnia and Herzegovina
Strongest usable evidence: Coordination, at 77.9. Raise Experimentation first, at 15.8. Shared purpose needs more evidence: confidence is 0.28.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- ExperimentationPeers 23.10.47 usable+0.9(3)
- AgencyPeers 50.80.49 usableno trend
- BuildingPeers 32.40.63 usable+2.5(3)
- AnticipationPeers 44.00.46 usable+15.3(2)
- LearningPeers 38.10.54 usable-15.6(2)
Measure before managing, thinnest first
- Shared purposePeers 48.10.28 thin+4.3(2)
- TrustPeers 64.20.33 thin+10.4(2)
Keep watching, highest first
- CoordinationPeers 63.90.45 usable+5.0(2)
- AdaptabilityPeers 64.30.62 usable+5.4(4)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Bosnia and Herzegovina beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
33.40.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationBosnia and Herzegovina beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+15.2 over 10 years (2016 to 2026), band +15.2 to +15.2. Median change: all countries +11.2, Income quartile 2 of 4 in 2000 +12.5.
+17 over 20 years (2006 to 2026), band +10.2 to +24.9. Median change: all countries +13.4, Income quartile 2 of 4 in 2000 +13.6.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+15.3 over 10 years, from 18.1 in 2016 to 33.4 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 340articles per million peoplefrom 1,082.64 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 68.6index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2024
0.21 % of GDP, rank 90 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2024
705 per million people, rank 59 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
5,554 per million people, rank 50 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median25.0-8.4 against the indicators
Round 2. How this layer works
- 25.0 institutionalist@claude-opus-5-5, self-confidence 0.60
I hold at 25: panelists B and C agree that split entity and cantonal institutions in Bosnia and Herzegovina block a national horizon.
- 27.0 bottom_up@claude-opus-5-5, self-confidence 0.50
I move one point to 27: power split between entities blocks a national horizon, as the panel agrees; nobody offered evidence of foresight at entity level that would lift it.
- 25.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Held at 25. Entity and canton split blocks a shared national horizon; panelist B's 28 gives no evidence of joint planning.
Agency
How able are individuals and organizations to turn an intention into action?
27.00.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyBosnia and Herzegovina beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.9 over 10 years (2016 to 2026), band -4.4 to +5.9, which includes no change. Median change: all countries +1.9, Income quartile 2 of 4 in 2000 +3.
+2.1 over 20 years (2006 to 2026), band -2.5 to +8.2, which includes no change. Median change: all countries +9.3, Income quartile 2 of 4 in 2000 +10.4.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 1.6per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 50score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 13count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
86.1 % of population, rank 55 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
77.5 % aged 15+, rank 60 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
50.5 % of GDP, rank 54 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median30.0+3.0 against the indicators
Round 2. How this layer works
- 25.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Hold at 25. Thirteen procedures, entry efficiency of 50 and density of 1.65 agree near the 27 derived score, and the rows here are unusually consistent. Panelist B's remittance-funded firms and grey trade are real (own knowledge), but they work around the Dayton design rather than through it. Separate entity registers (own knowledge) are the barrier, and B's lift has no measure behind it.
- 36.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 36, above A and C. Density of 1.65, entry of 50 and 13 procedures all agree that entity registers are a real barrier, and A's point on design is correct. But A and C read only the formal channel. From my own knowledge remittance-funded family firms and grey trade do move, and many residents act through work abroad, so I keep a modest lift over the 27.
- 30.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Raised from 28. Panelist B at 36 notes remittance-funded family firms and grey trade. Thirteen procedures, entry efficiency 50 and density 1.6 agree with the 27 derived score. Separate entity registers under Dayton are an institutional barrier. I lift slightly, not to 36.
Coordination
How effectively can independent actors organize around shared objectives?
77.90.45 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 0.94About CoordinationBosnia and Herzegovina beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3.3 over 10 years (2016 to 2026), band -1 to +8, which includes no change. Median change: all countries -1.7, Income quartile 2 of 4 in 2000 -1.6.
-2.1 over 20 years (2006 to 2026), band -6.5 to +3.4, which includes no change. Median change: all countries -2.7, Income quartile 2 of 4 in 2000 -2.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+5.0 over 10 years, from 68.2 in 2016 to 73.2 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 82score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 91.1percentage points from approved budget | 2022. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.66index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration, Public-private collaboration.
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2023
1.593 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Panel median40.0-37.9 against the indicators
Round 2. How this layer works
- 35.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 35. B at 45 and C at 38 agree on the ethnic veto system; I stay lowest because the Office of the High Representative still imposes decisions, which shows the domestic institutions cannot coordinate without an outside actor.
- 40.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Revised down from 45: C's point that cross-entity cooperation is the real test and is structurally blocked is one I share. Municipal and NGO cooperation across entity lines exists locally, so I stay above A's 35.
- 40.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised 38 to 40 toward B's 45. Trade compliance (87.3) and budget execution (81.6) are real, but the test for this dimension is cross-entity coordination, and the Republika Srpska challenges to state institutions show it is blocked; I do not follow B higher because EU accession steps stalled for years.
Trust
How much cooperation is possible beyond immediate personal networks?
58.10.33 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 0.97About TrustBosnia and Herzegovina beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+8 over 10 years (2016 to 2026), band +3.3 to +12.6. Median change: all countries +1.9, Income quartile 2 of 4 in 2000 +2.5.
+4.3 over 20 years (2006 to 2026), band -0.5 to +9.7, which includes no change. Median change: all countries +2.1, Income quartile 2 of 4 in 2000 +4.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+10.4 over 10 years, from 66.8 in 2016 to 77.2 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 38.1score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 3.5% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 2.4scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median37.0-21.1 against the indicators
Round 2. How this layer works
- 37.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised from 35 to 37. Panelist B's Dodik case moves me slightly: a state court convicted a leader of open defiance and the election commission removed his mandate in 2025 (own knowledge), which is an institution acting under pressure, and it fits compliance of 2.36. Dispute resolution of 38 and ethnic parallel structures still rule out 58.1. Bribery of 3.5% remains doubtful beside them, as panelist C says.
- 40.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 40. Bribery of 3.5% and compliance of 2.36 give 58.1, which no panelist accepts, and dispute efficiency of 38 is the low anchor. A and C cite Republika Srpska's defiance and the Dodik case, which I also count. I stay above them because, from my own knowledge, ordinary trade and work do cross entity lines more often than the elite conflict suggests.
- 36.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Raised from 35. Dispute efficiency 38 is low and bribery 3.5% and compliance 2.36 push the derived score to 58. Republika Srpska's defiance of state courts and the Dodik conviction crisis test law at the top, and parallel ethnic institutions shape cooperation. Panel is 35 to 40.
Learning
How effectively does the country acquire, distribute, and update knowledge?
34.40.54 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.78About LearningBosnia and Herzegovina beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-9.3 over 10 years (2016 to 2026), band -12.8 to -5.2. Median change: all countries -1.3, Income quartile 2 of 4 in 2000 -0.4.
-9.7 over 20 years (2006 to 2026), band -14.4 to -3.2. Median change: all countries +0.8, Income quartile 2 of 4 in 2000 +2.2.
The model fills at least one of the 3 indicators in 17 of 27 years, at most 2, last in 2016. The replay starts in 2002, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-15.6 over 10 years, from 42.6 in 2016 to 27.0 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.58index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 24.6% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 0.65ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2023
45.5 % gross, rank 71 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2023
3.2 % of GDP, rank 94 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
37.8 % of secondary, rank 6 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Panel median33.0-1.4 against the indicators
Round 2. How this layer works
- 33.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 33. B's brain drain point is consistent with mine; human capital is mid-frame, but education is run by many separate ministries with no common standard, and research impact is low.
- 34.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 34: A's twelve education ministries point and brain drain both pull down against mid-frame human capital, and the panel converges here.
- 33.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held at 33, matching A, and just under B's 35. Human capital at 49 normalised is mid-frame but firm training and citations are weak, and the fragmented education governance A cites has no offset in the data.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
15.80.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationBosnia and Herzegovina beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.6 over 10 years (2016 to 2026), band -3.1 to +4.4, which includes no change. Median change: all countries 0, Income quartile 2 of 4 in 2000 +0.5.
+5 over 20 years (2006 to 2026), band +1.4 to +9.5. Median change: all countries +0.1, Income quartile 2 of 4 in 2000 +0.7.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 4, last in 2025. The replay starts in 2004, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+0.9 over 10 years, from 11.9 in 2016 to 12.8 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 10.7per million peoplefrom 34 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 391per million peoplefrom 1,238 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 48.4per million peoplefrom 153 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 6,402per million peoplefrom 20,102 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 28.7score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.
This project retired one row: Business share of R&D.
Panel median15.0-0.8 against the indicators
Round 2. How this layer works
- 15.0 institutionalist@claude-opus-5-5, self-confidence 0.55
I move from 14 to 15 only to reflect panelist B's emigration point as context; split jurisdictions and weak insolvency efficiency (29) remain the main constraint.
- 17.0 bottom_up@claude-opus-5-5, self-confidence 0.40
I hold close to 18 at 17: designs (24.5) show real filing activity and informal activity exists, but emigration and split jurisdictions limit trial, as panelists A and C noted.
- 15.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held at 15. Divided jurisdictions add cost to every venture; design filings are a mild plus only.
Adaptability
How effectively can the system respond when circumstances change?
51.60.62 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 1.00About AdaptabilityBosnia and Herzegovina beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+5.4 over 10 years (2016 to 2026), band +5.4 to +5.4. Median change: all countries -0.8, Income quartile 2 of 4 in 2000 -1.6.
+1.1 over 20 years (2006 to 2026), band -3.1 to +6, which includes no change. Median change: all countries -1, Income quartile 2 of 4 in 2000 +0.4.
The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+5.4 over 10 years, from 46.2 in 2016 to 51.6 on 4 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 11% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 76.8% of unemployed | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.09index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 3.5% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
63.1 % aged 15+, rank 100 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
29.4 per 100 people, rank 41 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
7.9 % of output, rank 50 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025
14.1 % of employment, rank 28 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2014Bosnia and HerzegovinaFloods Emergency Recovery Project after the May 2014 floodsdelivered and closed
Floods Emergency Recovery Project after the May 2014 floods
After the May 2014 floods displaced about 90,000 people and directly affected about a million in Bosnia and Herzegovina, the two entities' agriculture and water ministries and Brcko District distributed US$27 million of emergency goods and restored 446 public service facilities to pre-flood condition against a target of 200, including more than 260 km of rural roads and 53,460 m of flood defences, by the project's June 2019 closing.
446 facilities, public service infrastructure facilities recovered to pre-flood condition, 2019-06-30. 200 facilities, target for facilities recovered, 2014-06-30. World Bank, Implementation Completion and Results Report, Bosnia and Herzegovina Floods Emergency Recovery Project, December 2019, retrieved 2026-10-02.
How it worked: The state treasury on-lent an emergency loan to the two entities and Brcko District, whose ministries bought relief goods through strategic reserves and then rebuilt municipal and regional infrastructure from a list drawn from the joint needs assessment.
Limits: The figures are the World Bank's, from a completion report on its own US$100 million emergency loan; the event figures are in the context section (printed page 5), the outcome table on page 13, and the road and flood defence figures on page 18. The 446 facilities exceeds its target partly because unused emergency-goods funds were moved into infrastructure in January 2016, so the target was not a fixed plan. 'Facilities' counts very different things, from a culvert to a bridge, and the report does not say how many were fully rebuilt. Emergency goods reached beneficiaries according to third-party audits in 2017, but some agricultural goods arrived late. The project closed six months after its December 2018 original date, five years after the floods, so this is slow recovery, not rapid response, and it covers one loan, not the whole post-flood programme financed by the EU and others.
2020Bosnia and HerzegovinaFederation law on mitigating the economic consequences of COVID-19, paid at under a fifth of its budgetdelivered and closed
The Parliament of the Federation of Bosnia and Herzegovina adopted an emergency law on 4 May 2020 to subsidise employers' mandatory insurance contributions, and the Federation paid 90,934,169 KM under it, 18.63 percent of the 488,207,999 KM appropriated, with the first payment in July 2020 and the last in January 2021, after the law lapsed on 31 July 2020.
90,934,169 KM (convertible marks), contribution subsidies paid under the law on mitigating negative economic consequences, 2020. 18.63 %, share of the 488,207,999 km appropriation that was used, 2020. Ured za reviziju institucija u FBiH (Audit Office of the Institutions in the Federation of BiH), audit report on the most important findings and recommendations for 2020/2021, published by the Parliament of the Federation, retrieved 2026-10-16.
How it worked: The Federation government drafted an emergency law within days of the shutdown and the Federation parliament passed it under urgent procedure, paying part of each employer's mandatory insurance contributions per worker through the pension, health and employment funds, with the tax administration determining eligibility.
Limits: The measure covers one of the country's two entities, the Federation, and not Republika Srpska or Brcko District, which ran their own schemes; it is not a state-level response. The numbers sit inside a long PDF, on printed pages 157 to 158 and 180 to 181. The audit office found that the law passed without the required fiscal estimate, that the first subsidy, for April 2020, was paid in July, two months after the law took effect, because the tax administration had not prepared its implementing rules in time, and that the 80,000,000 KM guarantee fund the law named drew nothing from this appropriation. After the law lapsed, 111,700,000 KM was moved to other uses and 285,573,830 KM stayed unused. The audit office dropped its planned performance audit and reported that the movement in employment could not be linked to the subsidies: the most subsidies were approved in April 2020, the month with the largest fall in employment. The record shows that a rule changed within weeks of the shock and was paid at small scale, and it does not show that the change protected jobs.
Panel median41.0-10.6 against the indicators
Round 2. How this layer works
- 40.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 40. B and C agree that 11 percent unemployment with 77 percent long-term shows labour does not reallocate; C's point that subcontracting lifts the diversification score supports reading it down.
- 42.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 42: 11 percent unemployment with 77 percent long-term shows labour does not reallocate; emigration and remittances carry adaptation, and the panel agrees.
- 41.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held at 41, between A (40) and B (42). Unemployment of 11 percent with 77 percent long-term is direct evidence of weak reallocation, and export diversification of 96.5 is helped by small-economy subcontracting; emigration is the adjustment channel.
Building
How capable is the country of turning plans and knowledge into functioning systems?
27.30.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingBosnia and Herzegovina beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+1.8 over 10 years (2016 to 2026), band -1.5 to +5.6, which includes no change. Median change: all countries -0.3, Income quartile 2 of 4 in 2000 +0.3.
+2.5 over 20 years (2006 to 2026), band -1.6 to +7, which includes no change. Median change: all countries -0.5, Income quartile 2 of 4 in 2000 -0.6.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+2.5 over 10 years, from 12.7 in 2016 to 15.2 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 12% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 6.2% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 72score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.09index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
55,755 constant 2021 PPP $, rank 55 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2017Bosnia and HerzegovinaFederation Road Sector Modernization Project, and its shrunken rehabilitation scopedelivered and closed
Federation Road Sector Modernization Project, and its shrunken rehabilitation scope
The Federation of Bosnia and Herzegovina's public road company PC Roads FBH delivered 76.9 km of road works, including a 35 km upgrade of the Neum to Stolac road, under a project approved in August 2016, but rehabilitated only 41.75 km of main roads against an appraisal target of 178 km, which was cut to 42.23 km in 2021, and the closing date moved from December 2021 to September 2023.
41.75 km, roads rehabilitated, non-rural, achieved at closing, 2023-09-30. 178 km, target for roads rehabilitated, non-rural, at appraisal, 2016-08-02. World Bank, Implementation Completion and Results Report, Bosnia and Herzegovina Federation Road Sector Modernization Project, April 2024, retrieved 2026-10-02.
How it worked: The entity road company took a multilateral loan for a list of sections whose designs did not yet exist, then cut the list to what designs, land and budget allowed and concentrated on one strategic coastal link.
Limits: The figures are the World Bank's, from a completion report on a project it co-financed with the EIB. The 178 and 42.23 km targets are in para. 55 (printed page 19), and the 41.75 km achieved against the revised 42.23 km target is in the outcome table (Table 4, page 13), the 76.9 km and the Neum to Stolac upgrade in paras. 30 to 31 (page 11), the cost per km in para. 45 (page 17) and the dates on the datasheet (page 2). The Bank attributes the cut to designs that were only 1.0 km complete at entry, so the 178 km target may have been an error of preparation rather than a delivery that shrank; the report says rehabilitation cost per km came out more than five times the plan for the same reason. Total project cost rose from US$101.3 million to about US$105.5 million, mostly as an EIB increase. Land acquisition and COVID-19 delayed the Crnaja tunnel and led to sections being cancelled. The project covers one of the country's two entities, not Bosnia and Herzegovina as a whole.
Panel median26.0-1.3 against the indicators
Round 2. How this layer works
- 25.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 25. The panel agrees; utility connection is decent but economic fitness is near the floor and Corridor Vc has taken decades.
- 27.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at the indicator level: the Corridor Vc motorway has taken decades and economic fitness is near the floor, as all panelists say.
- 26.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held at 26, between A (25) and B (28). Economic fitness is near the floor and Corridor Vc took decades; utility connection at 63.6 is the only strength.