Slovakia
Strongest usable evidence: Coordination, at 63.7. Raise Experimentation first, at 30.7. Shared purpose needs more evidence: confidence is 0.30.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- ExperimentationPeers 34.80.47 usable-0.9(3)
- BuildingPeers 33.80.63 usable-1.3(3)
Measure before managing, thinnest first
- Shared purposePeers 64.60.30 thin+3.6(2)
- TrustPeers 78.90.33 thin+1.9(2)
Keep watching, highest first
- CoordinationPeers 74.90.45 usable-36.7(2)
- AgencyPeers 66.60.49 usableno trend
- AnticipationPeers 61.40.46 usable+1.1(2)
- LearningPeers 48.60.54 usable+11.0(2)
- AdaptabilityPeers 72.90.62 usable-4.5(4)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Slovakia beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
58.90.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationSlovakia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+1.1 over 10 years (2016 to 2026), band +1.1 to +1.1. Median change: all countries +11.2, Income quartile 3 of 4 in 2000 +12.5.
+10.6 over 20 years (2006 to 2026), band +4.7 to +19.1. Median change: all countries +13.4, Income quartile 3 of 4 in 2000 +15.2.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+1.1 over 10 years, from 57.8 in 2016 to 58.9 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 983articles per million peoplefrom 5,332.18 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 83.3index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2023
1 % of GDP, rank 36 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2023
3,507 per million people, rank 29 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
43,287 per million people, rank 21 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median52.0-6.9 against the indicators
Round 2. How this layer works
- 50.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Hold 50: the Value for Money unit is analytic capacity, but frequent government turnover in Slovakia undercuts long-horizon planning, which panelist B also notes.
- 53.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Moved from 55 to 53. Panelist C's point that foresight is mostly driven by EU recovery-plan requirements is one I cannot answer with a domestic example; the Value for Money unit is analytic, not long-horizon.
- 52.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held at 52. High statistics, mid research; A's Value for Money unit is real analytic capacity, but frequent policy reversals and EU recovery-plan conditionality explain much of the planning.
Agency
How able are individuals and organizations to turn an intention into action?
61.30.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencySlovakia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3.6 over 10 years (2016 to 2026), band -1.1 to +7.9, which includes no change. Median change: all countries +1.9, Income quartile 3 of 4 in 2000 +2.1.
+9.6 over 20 years (2006 to 2026), band +5.3 to +14.2. Median change: all countries +9.3, Income quartile 3 of 4 in 2000 +10.6.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 5.7per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 86.1score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 7count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
89.8 % of population, rank 40 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
92.2 % aged 15+, rank 29 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2024
59.7 % of GDP, rank 42 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median58.0-3.3 against the indicators
Round 2. How this layer works
- 60.0 institutionalist@claude-opus-5-5, self-confidence 0.65
Hold at 60. Density of 5.7 and entry efficiency of 86.1 agree with 61.3. B's emigration and C's foreign-owned car industry are real, but neither shows that the channel fails for people who use it, and foreign plants do not lower domestic firm entry. Tax-driven self-employment (my own knowledge) keeps me just under the indicator.
- 58.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Hold 58. Density of 5.7 and entry efficiency of 86 show a working formal route, and informality is small, so my usual upward correction does not apply here. Panelist A's tax-driven self-employment point supports staying under 61. Panelist C's foreign-owned car industry point fits the same reading. From my own knowledge, emigration of the young removes some initiative.
- 56.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Density 5.7 per 1,000 (33.8/100) and entry efficiency 81.8 are a working formal route. Self-employment for tax reasons may inflate density, and heavy young emigration removes initiative (own knowledge). A foreign-owned car industry means firm density is the better signal than output. I move from 55 to 56, near panelists A and B at 60 and 58, since the indicator is fair.
Coordination
How effectively can independent actors organize around shared objectives?
63.70.45 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 0.94About CoordinationSlovakia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-24.5 over 10 years (2016 to 2026), band -25.9 to -19.2. Median change: all countries -1.7, Income quartile 3 of 4 in 2000 +0.5.
-25.9 over 20 years (2006 to 2026), band -28.8 to -20.3. Median change: all countries -2.7, Income quartile 3 of 4 in 2000 -1.8.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-36.7 over 10 years, from 84.3 in 2016 to 47.6 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 89.7score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 133percentage points from approved budget | 2022. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.66index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration (1 case below), Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2023
2.356 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2016SlovakiaD4/R7 Bratislava bypass PPPstill operating
Slovakia built the D4 motorway and R7 expressway around Bratislava, 59.0 km at EUR 1,670 million, as a public-private partnership between 2016 and 2021, the only PPP among the major road projects the Supreme Audit Office listed in its 2025 audit of road investment.
59 km, length of the d4/r7 ppp project, 2021. 1,670 EUR million, cost of the d4/r7 ppp project as listed by the audit office, 2025. Najvyšší kontrolný úrad Slovenskej republiky (NKÚ SR), Správa o výsledku kontroly: Investičné projekty v cestnej doprave (2025), retrieved 2026-10-02.
How it worked: The transport ministry procured the Bratislava bypass as one availability-payment concession covering design, construction, financing and decades of operation, so a single private partner delivered 59 km at once rather than in budget-limited sections.
Limits: The figures are one row of a table on printed page 12 of the audit office's PDF, which lists the period 2016 to 2021, 59.0 km, EUR 1,670.00 million and 'PPP' as the funding source; the audit is about road investment generally and does not evaluate the PPP itself, its cost against a public alternative or its schedule against plan. The table gives no definition of the cost (construction cost, capital value or total availability payments), so the EUR 1,670 million cannot be compared with the other rows without that caveat. The opening dates of the sections are not on this page; 2021 is the end of the period the table gives. The same table shows every other major road project financed from EU or state funds, so the record documents one delivered PPP, not a programme, and this source says nothing about Slovakia's earlier PPP attempts.
2024SlovakiaMatching grants for research income from the private sectordelivered and closed
Matching grants for research income from the private sector
Slovakia's Research and Innovation Authority, under the Recovery and Resilience Plan, contracted 44 matching grants worth 30.8 million euros in 2024 and 2025 to universities and public research organisations as a reward for the research and development they had already done with the private sector, 21 of them, worth 24.2 million euros, to universities.
30,778,076 euros, matching grant funds contracted, rounds one and two (summed from the published recipient lists), 2024-2025. 44 contracts, matching grant contracts signed, rounds one and two, 2024-2025. Vyskumna a inovacna autorita (VAIA), call 09I02-03-V02 'Matching granty ku zdrojom ziskanym od sukromneho sektora v ramci vyskumnej spoluprace', call page and recipient lists as of 4 September 2024 and 27 June 2025, retrieved 2026-10-17.
How it worked: The research and innovation authority paid each university and public research organisation a grant sized by the research income it had already earned from private firms, so institutions that had sold research to industry received equipment money that the others did not.
Limits: The call page gives the allocation (32,473,000 euros) and the number of applications (15 in round one, 31 in round two) but no total of awards: 44 contracts and 30.8 million euros are our sums of the two recipient spreadsheets linked from that page (13 contracts and 17.2 million euros in round one, 31 contracts and 13.6 million euros in round two), and the 21 university contracts are those whose recipient name contains 'univerzita'; the rest went to Slovak Academy of Sciences institutes and state research centres. Contracted sums are not disbursed sums. The grant is a reward for collaboration that already happened, matched against private research income for periods the project titles give as 2020 to 2023, and the money buys research equipment, so the record shows how much contract and joint research with firms the public research system had, not new collaboration the grant created. The lists do not name the firms or say how much income each institution earned, and the matching ratio is set in the call text, not on the page. The money is European Union Recovery and Resilience Facility funding, run once through a closed call, so this is a one-off delivery rather than a standing programme. The University of Zilina, the Slovak University of Technology and the Technical University of Kosice took 21.3 million euros between them, so the volume is concentrated in a few technical universities.
Panel median55.0-8.7 against the indicators
Round 2. How this layer works
- 55.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised down from 58 toward panelist C: a 33-point budget deviation is a planning failure that trade compliance cannot offset, and slow EU fund absorption confirms weak cross-agency execution.
- 56.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised down from 60. Panelist A's point about slow absorption of EU cohesion and recovery funds is evidence of weak cross-agency execution that I cannot answer, and C is right that a 33-point budget deviation is among the worst in the frame. Trade compliance at 95.8 and a fairly strong civil society keep me above C.
- 54.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Revised up from 52 to 54. Panelists A and B (58, 60) point to strong trade compliance and civil society at 0.66, but I hold below them: budget outturn at 133% of approved is among the worst in the frame and is a planning failure income does not explain.
Trust
How much cooperation is possible beyond immediate personal networks?
82.00.33 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 0.97About TrustSlovakia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.6 over 10 years (2016 to 2026), band -4.4 to +5.5, which includes no change. Median change: all countries +1.9, Income quartile 3 of 4 in 2000 +1.4.
+2.1 over 20 years (2006 to 2026), band -3.4 to +7.5, which includes no change. Median change: all countries +2.1, Income quartile 3 of 4 in 2000 +2.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+1.9 over 10 years, from 85.8 in 2016 to 87.7 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 66.1score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 2.1% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 3scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median66.0-16.0 against the indicators
Round 2. How this layer works
- 66.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Hold at 66. Bribery of 2.1% and compliance of 3.03 give 82. C and B discount for the same facts that I do: the 2024 abolition of the Special Prosecutor's Office and the penal code changes (my own knowledge). C's 62 goes further, but the Constitutional Court still ruled on those changes and commercial dispute efficiency is 66.1, so I do not follow.
- 66.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Hold 66. Bribery of 2% and compliance of 3.03 are strong in this frame. All panelists discount the 82 for the same reason: from my own knowledge the Special Prosecutor's office was abolished in 2024, so the rows may lag. A majority can remove a body in one session, as Panelist A notes, but ordinary commercial cooperation still runs. I see no reason to go lower.
- 63.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Compliance 3.03/4 and dispute resolution 70.8 are strong, bribery 2.1%. I discount the 82 indicator for the 2024 abolition of the Special Prosecutor's Office and the criminal code changes (own knowledge); a durable organisation that one majority can remove in one session is less than the 2025 reading shows. I move from 62 to 63, since panelists A and B at 66 note the 2018 Kuciak legacy, but the 2025 compliance row may not reflect the abolition yet.
Learning
How effectively does the country acquire, distribute, and update knowledge?
57.80.54 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.78About LearningSlovakia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+5.9 over 10 years (2016 to 2026), band +2.5 to +9.3. Median change: all countries -1.3, Income quartile 3 of 4 in 2000 -1.6.
-0.6 over 20 years (2006 to 2026), band -5.6 to +4.9, which includes no change. Median change: all countries +0.8, Income quartile 3 of 4 in 2000 -0.3.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2002, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+11.0 over 10 years, from 43.9 in 2016 to 54.9 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.67index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 53% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 1ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2024
54.5 % gross, rank 60 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2022
4.7 % of GDP, rank 51 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2018
30.2 % of secondary, rank 17 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2024SlovakiaZručnosti pre trh práce, retraining and training contributions of the labour officesstill operating
Zručnosti pre trh práce, retraining and training contributions of the labour offices
Slovakia's Central Office of Labour, Social Affairs and Family enrolled 17,008 clients in its national project 'Zručnosti pre trh práce' in 2025 and paid training contributions for 16,853 of them, 14.56 million euros in all, with 9,714 registered jobseekers starting retraining courses against 5,904 in 2024.
17,008 clients, clients enrolled in the national project zručnosti pre trh práce, 2025. 9,714 jobseekers, registered jobseekers who started retraining under the project, 2025. Ústredie práce, sociálnych vecí a rodiny (Central Office of Labour, Social Affairs and Family), Vyhodnotenie aktívnych opatrení na trhu práce za rok 2025, section 6.4, retrieved 2026-10-02.
How it worked: Labour offices let registered jobseekers pick an accredited course and provider themselves, approve a contract, and reimburse the fee and travel costs once the course is completed.
Limits: The office evaluates its own project, in a 76-page PDF (printed pages 36 to 37, PDF page 37). The 17,008 mixes three activities, retraining of registered jobseekers, skills for young people not in employment or training, and training of registered job applicants (záujemcovia o zamestnanie), who may be in work, and the client counts are enrolments and payments, not completions; the retraining contributions are paid after a course ends, so some 2025 payments relate to agreements from 2024. The client chooses the course and provider from the open market and the office only reimburses it, so course quality is not controlled by the office. The six-month placement rate the office reports (53.83 percent for retrained jobseekers) is not a measured effect, since there is no comparison group. The project began in April 2024, so the 2024 comparison covers only part of a year; earlier demand-led retraining schemes of the labour offices (known as REPAS+ and KOMPAS+) are not covered in this report and their scale was not checked.
Panel median55.0-2.8 against the indicators
Round 2. How this layer works
- 55.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Held at 55, inside the panel range. Firm training at 53% is the solid institutional channel and the rest sits mid-frame.
- 56.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held near 57, one point down. Firm training at 53 percent is the strength, as C says, and citation impact is at world average; I have nothing to add from outside the indicators.
- 54.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Revised up from 52 to 54. Firm training of 53% is a real behavioural strength; HCI 0.665 and citation impact 0.995 are mid-frame. I stay slightly below A and B (55, 57).
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
30.70.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationSlovakia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.6 over 10 years (2016 to 2026), band -4.8 to +3.6, which includes no change. Median change: all countries 0, Income quartile 3 of 4 in 2000 0.
+1.7 over 20 years (2006 to 2026), band -3 to +5.7, which includes no change. Median change: all countries +0.1, Income quartile 3 of 4 in 2000 +0.8.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 4, last in 2025. The replay starts in 2004, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-0.9 over 10 years, from 27.3 in 2016 to 26.4 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 30.8per million peoplefrom 167 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 2,001per million peoplefrom 10,849 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 43.2per million peoplefrom 234 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 10,165per million peoplefrom 55,029 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 55.5score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes (1 case below), University spinouts.
This project retired one row: Business share of R&D.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2022SlovakiaNarodna banka Slovenska regulatory sandboxstill operating
Narodna banka Slovenska regulatory sandbox
Slovakia's central bank opened its regulatory sandbox on 1 January 2022 and lists one former participant, Crowdberry Investment Platform, which entered on 22 November 2023, tested an electronic bulletin board for secondary trading of crowdfunded securities with selected clients from 15 December 2024 to 18 April 2025, and exited on 15 May 2025.
1 firms, firms listed as former participants (completed) of the regulatory sandbox, 2025-05-15. Narodna banka Slovenska, Regulatory sandbox page, retrieved 2026-10-02.
How it worked: The central bank admits firms year-round into a preparation phase of up to six months of consultations and a testing phase of up to six months on real clients under a test plan, ending with a final report and meeting.
Limits: The page lists former participants only and gives no count of current participants or applications, so admissions in progress are unknown; one completion in nearly four years of operation is the figure the page supports. The sandbox waives no regulatory requirement: the page says requirements cannot be waived, so it is supervised testing with consultation. The bank states that its innovation hub handles far more interactions than the sandbox, which reflects the design rather than a measured failure. The regulator reports on its own programme.
Panel median31.0+0.3 against the indicators
Round 2. How this layer works
- 31.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Hold 31: the panel agrees within two points; foreign-owned plants carry most innovation, so domestic trial and exit stays mid-frame.
- 30.0 bottom_up@claude-opus-5-5, self-confidence 0.60
Held at 30. The panel agrees on 30-32; a foreign-plant economy with mid trademarks and insolvency fits the indicator, and I see no informal channel that lifts it.
- 32.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held at 32. All three of us agree: mid trademarks and insolvency, low patents, and most R&D sits in foreign-owned plants.
Adaptability
How effectively can the system respond when circumstances change?
57.70.62 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 1.00About AdaptabilitySlovakia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-4.5 over 10 years (2016 to 2026), band -4.5 to -4.5. Median change: all countries -0.8, Income quartile 3 of 4 in 2000 +0.8.
-6.8 over 20 years (2006 to 2026), band -10.6 to -2.3. Median change: all countries -1, Income quartile 3 of 4 in 2000 -1.5.
The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-4.5 over 10 years, from 62.2 in 2016 to 57.7 on 4 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 5.4% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 63.4% of unemployed | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.25index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 3.8% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
76.2 % aged 15+, rank 38 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
33.8 per 100 people, rank 31 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2025
5.1 % of output, rank 16 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025
6.2 % of employment, rank 24 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2020SlovakiaPrvá pomoc (First Aid) job retention scheme, 2020 to 2022delivered and closed
Prvá pomoc (First Aid) job retention scheme, 2020 to 2022
Slovakia's government approved the labour ministry's job retention scheme on 31 March 2020, labour offices began accepting applications on 6 April with support backdated to 13 March, and over two years the scheme paid almost EUR 2.5 billion to 176,000 employers and self-employed people, 5.7 million monthly payments covering more than 770,000 employees.
6 days, days from government approval to the first applications, 2020-04-06. 2.5 EUR billion, first aid support paid over the life of the scheme (almost), 2022-02-28. Ministerstvo práce, sociálnych vecí a rodiny SR, Prvá pomoc (pomahameludom.sk), closing summary, retrieved 2026-10-02.
How it worked: The labour ministry designed a state aid scheme paid through the network of labour offices, with separate measures for closed businesses, firms with falling revenue and the self-employed, and the government approved it so offices could take applications within a week.
Limits: The page is the labour ministry's own scheme site and its closing summary is promotional: it quotes the minister calling the ministry the most successful state body at delivering aid, and cites a supportive analysis by the ministry's own Institute of Social Policy. The figures are rounded ('almost 2.5 billion', 'more than 770 thousand') and the page has no publication date; the eligible period it states runs from 13 March 2020 to 28 February 2022. The six days are our arithmetic from the two dates on the page; the record does not show how long the first payments took after applications opened, and this record has not read any audit of the scheme. Employees counted are those in supported firms, not jobs shown to have been saved, and nearly half of the money went to micro-enterprises, per the institute's director quoted on the page.
2019SlovakiaIntervention equipment for municipal volunteer fire brigades, Operational Programme Quality of Environmentdelivered and closed
Slovakia's Ministry of Interior, as intermediate body for the Operational Programme Quality of Environment, improved the intervention equipment of 371 bodies for climate-related emergencies by 2022, mainly municipal volunteer fire brigades, against an original target of 20.
371 bodies, bodies with improved intervention equipment (implemented value), 2022. 20 bodies, original target for the same output indicator, 2016 to 2020 programme target. European Commission, ESIF 2014-2020 programme-specific achievements (Cohesion Open Data), indicator O0026 of Slovakia's Operational Programme Quality of Environment, retrieved 2026-10-16.
How it worked: The Ministry of Interior, acting as intermediate body for an EU environmental programme, used the programme's climate-adaptation axis to equip municipal volunteer fire brigades directly, turning a target sized for national and regional services into a nationwide local roll-out.
Limits: The figure is the managing authority's own report to the European Commission, republished as open data, so the programme reports on itself. It counts bodies that received equipment, not the equipment's quantity, condition, use in real incidents or any change in response times; the same programme's result indicator for intervention duration reports 108 minutes in every year from 2016 to 2022 against an 87 minute target. The managing authority's note says 370 of the 371 operations were only partially realised at the 2022 report, and that the ITMS2014+ monitoring system had reported 410 in error. The scale grew because a local project was added after the original target of 20 national and regional bodies, so the overshoot reflects a change of design rather than outperformance. The programme was EU co-financed; the record does not show what national funding sustains the equipment after 2023. A Supreme Audit Office report on crisis management for 2020 to 2022 found no functioning shelter system and civil-protection stocks that were run down, so this record is evidence for local response equipment and not for civil protection as a whole.
Panel median54.0-3.7 against the indicators
Round 2. How this layer works
- 54.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Revised down by one from 55: panelist C's point that the auto export base is foreign-held is correct, so plant decisions sit outside Slovak institutions. A 63% long-term unemployment share stays the main drag.
- 54.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held near 55. C's point that the auto sector is foreign-held, so its adaptability is partly decided abroad, supports my car-reliance concern; a long-term unemployment share of 63.4 percent is the main drag.
- 52.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held at 52, below A and B (55). Unemployment is fine, but 63% long-term share and a car-heavy export base show rigidity, and the auto sector's adaptation is partly decided abroad.
Building
How capable is the country of turning plans and knowledge into functioning systems?
39.30.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingSlovakia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.9 over 10 years (2016 to 2026), band -4.3 to +3, which includes no change. Median change: all countries -0.3, Income quartile 3 of 4 in 2000 -0.3.
-0.4 over 20 years (2006 to 2026), band -4.9 to +3.7, which includes no change. Median change: all countries -0.5, Income quartile 3 of 4 in 2000 -0.8.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-1.3 over 10 years, from 27.5 in 2016 to 26.2 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 16.2% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 10.6% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 82.6score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.47index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
84,278 constant 2021 PPP $, rank 34 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2015SlovakiaDecommissioning of the Bohunice V1 nuclear power plant, and its four-year slipstill operating
Decommissioning of the Bohunice V1 nuclear power plant, and its four-year slip
Slovakia's state decommissioning company JAVYS, which the European Court of Auditors reported in 2016 as holding the Bohunice V1 decommissioning end date at 2025 with a cost estimate of 1,239 million euros, reported in its 2025 annual report that the final decontamination and demolition contract signed on 18 December 2024 runs 60 months, putting the end of decommissioning at the end of 2029, at a total estimated cost of 1,220 million euros, with 66 decommissioning projects completed by 31 December 2025.
1,220 million euros, total estimated cost of decommissioning bohunice v1, 2025-12-31. 2029 year, expected year of completion of the whole v1 decommissioning process, against 2025 in the plan the eca reviewed in 2016, 2025-12-31. JAVYS, a.s. (Jadrová a vyraďovacia spoločnosť, state-owned), Výročná správa 2025 (annual report 2025), section on V1 decommissioning, retrieved 2026-10-02.
How it worked: A state company created to decommission shut-down reactors runs dozens of EU-funded projects under a detailed decommissioning plan monitored by the European Commission and the EBRD, and reschedules the end date when the final demolition contract is procured.
Limits: JAVYS reports on its own programme; the figures are in a PDF, the 2029 end date and the 60-month contract of 18 December 2024 on PDF page 17, the 1,220 million euro estimate and the 735 million EU share on PDF page 19, and the 66 completed projects on PDF page 20. The baseline comes from a different publisher: the European Court of Auditors' Special Report 22/2016 (https://www.eca.europa.eu/Lists/ECADocuments/SR16_22/SR_NUCLEAR_DECOMMISSIONING_EN.pdf) says the Slovak end date 'has remained at 2025' (paragraph 64, PDF page 40) and gives estimated costs of 1,146 million euros in 2011 and 1,239 million in 2015 (Table 8, PDF page 46). The two cost figures are not on the same basis, so the record does not claim the cost fell; it claims cost was held roughly flat while completion slipped about four years. Decommissioning is a stretch for 'major public infrastructure projects': it is a large state engineering programme that builds waste facilities and demolishes a plant rather than a new asset, and it is mostly paid for by the EU (735 million euros of the 1,220 million, through the EBRD-managed BIDSF fund and the Slovak Innovation and Energy Agency). The started year is 2015, the start of the second decommissioning stage under the nuclear regulator's licence of 23 December 2014; the first stage began earlier. Whether the 2029 date holds is not known.
Panel median46.0+6.7 against the indicators
Round 2. How this layer works
- 46.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised up from 45 by one, not to B's 50: running car plants at high output per head is real, but the plants are built and directed by foreign owners, and the state's own D1 motorway delivery has run years late.
- 48.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised down from 50. A and C both note slow motorway completion such as the D1 eastward extension, which is state delivery I had not weighed. I stay above both because car output per head shows plants built and run to a high standard that the high-tech export share undercounts.
- 46.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held at 46, between A (45) and B (50). Car output per head is an assembly role inside foreign supply chains, which a high-tech export share of 10.6% reflects; motorway delays show state delivery is slow.