Mauritius
Strongest usable evidence: Coordination, at 87.4. Raise Building first, at 20.5. Shared purpose needs more evidence: confidence is 0.22.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- BuildingPeers 27.50.63 usable-0.4(3)
- ExperimentationPeers 26.90.47 usable+19.3(3)
- AnticipationPeers 45.40.46 usable+5.9(2)
Measure before managing, thinnest first
- Shared purposePeers 51.20.22 very thinno trend
- TrustPeers 67.50.33 thinno trend
Keep watching, highest first
- CoordinationPeers 74.30.48 usable+26.2(2)
- AgencyPeers 52.50.49 usableno trend
- AdaptabilityPeers 56.50.62 usable+0.4(4)
- LearningPeers 43.60.54 usableno trend
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Mauritius beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
40.70.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationMauritius beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+6 over 10 years (2016 to 2026), band +6 to +6. Median change: all countries +11.2, Income quartile 3 of 4 in 2000 +12.5.
+7.4 over 20 years (2006 to 2026), band -2 to +14.2, which includes no change. Median change: all countries +13.4, Income quartile 3 of 4 in 2000 +15.2.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+5.9 over 10 years, from 34.8 in 2016 to 40.7 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 164articles per million peoplefrom 205.31 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 80.4index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2024
0.26 % of GDP, rank 84 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2024
689 per million people, rank 60 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
2,158 per million people, rank 59 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median42.0+1.3 against the indicators
Round 2. How this layer works
- 40.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Hold at 40, close to the derived 40.7. B and C add climate and cyclone planning, which I already count within a capable state; the research base remains small.
- 42.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at 42: the panel spans 40 to 44 and nobody raised a point I cannot answer; climate adaptation planning for a small island is real anticipation.
- 43.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Held near 44 (moved down 1): A and B agree on a capable statistics office and climate adaptation planning; I discount the small-island scale on science.
Agency
How able are individuals and organizations to turn an intention into action?
87.00.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyMauritius beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+10.5 over 10 years (2016 to 2026), band +8.2 to +15.3. Median change: all countries +1.9, Income quartile 3 of 4 in 2000 +2.1.
+14.3 over 20 years (2006 to 2026), band +11.9 to +18.6. Median change: all countries +9.3, Income quartile 3 of 4 in 2000 +10.6.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 14per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 94.9score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 4count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
73.3 % of population, rank 81 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
89.6 % aged 15+, rank 34 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
72 % of GDP, rank 33 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median76.0-11.0 against the indicators
Round 2. How this layer works
- 78.0 institutionalist@claude-opus-5-5, self-confidence 0.65
Held at 78. Density of 13.975 (83.6), entry efficiency of 94.888 (93.3) and 4 procedures (84.2) are recent and agree, giving 87. All panelists trim. B and I trim for global business vehicles, which is a specific reason. C trims to 70 because of a small wealthy base, and I reject that: the frame already scores capability apart from income, and the move from sugar to textiles and finance is C's own evidence of conversion.
- 76.0 bottom_up@claude-opus-5-5, self-confidence 0.60
Held at 76. Density of 13.975, entry efficiency of 94.888 and 4 procedures all read high, and the small economy means formal channels do reach most people. Panelist A trims for the same offshore vehicles as I do. Panelist C's sugar-to-services record is real but it is past. I hold the discount from 87.
- 72.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.55
I move from 70 to 72. Density 13.975, entry efficiency 94.888 and 4 procedures are all direct and recent. A and B discount for global business companies in the count, which is a fair point I accept partly. The long conversion of sugar into textiles, tourism and finance is capability beyond income. I stay below 87 since the rows are partly shaped by offshore vehicles.
Coordination
How effectively can independent actors organize around shared objectives?
87.40.48 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 1.00About CoordinationMauritius beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+17.4 over 10 years (2016 to 2026), band +12.7 to +22.8. Median change: all countries -1.7, Income quartile 3 of 4 in 2000 +0.5.
-1.2 over 20 years (2006 to 2026), band -5.9 to +4.1, which includes no change. Median change: all countries -2.7, Income quartile 3 of 4 in 2000 -1.8.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2008, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+26.2 over 10 years, from 65.8 in 2016 to 92.0 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 73.6score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 101percentage points from approved budget | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.85index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration (1 case below), Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2023
6.993 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2014MauritiusCollaborative Research and Innovation Grant Scheme (CRIGS)still operating
Collaborative Research and Innovation Grant Scheme (CRIGS)
The Mauritius Research and Innovation Council's Collaborative Research and Innovation Grant Scheme, which co-funds projects led by a local company with a local academic or research institution, had completed 17 projects and had 14 more under way as at 30 June 2020, with 61.5 million rupees of private contribution to the completed ones.
17 projects, crigs projects completed (project value rs 115.9 m, private sector contribution rs 61.5 m, mric amount rs 53.4 m), cumulative to 30 June 2020. 14 projects, crigs projects ongoing (project value rs 102.18 m, private sector contribution rs 57.22 m), 30 June 2020. Mauritius Research and Innovation Council, Annual Report September 2019 to June 2020, Portfolio section, retrieved 2026-10-02.
How it worked: The national research council pays roughly half the cost of an R&D project only when a registered company applies with a local university or research institute as partner, so public money follows a firm's own commitment.
Limits: The council reports on its own scheme. The figures sit in a PDF on page 23 of 66 (printed page 22); the portfolio table on the same page gives a different split for the reporting year alone (10 ongoing and 3 completed CRIGS initiatives), so the cumulative and annual counts must not be mixed. 2019-20 is the latest annual report the council has published: its publications page lists the 2020-21 to 2023-24 reports as awaiting audit or in process, so nothing after June 2020 can be checked against an annual report. The scheme page (mric.mu/collaborative-research-and-innovation-grant-scheme) still describes the scheme and lists 18 funded projects, all marked completed, with no ongoing project and no call dates, so the scheme may have funded little or nothing since 2020; 'operating' rests on the page still offering it and is the weakest part of the record. Thirty-one projects over six years is small even for a country of 1.3 million people, the counts are projects rather than distinct firms, and project value includes the firm's in-kind contribution. The start year is the first call for proposals, June 2014, stated in the council's Annual Report 2014, not at the cited URL. Nothing here shows the research results or commercial outcomes.
2019MauritiusMauCAS Instant Payment System, run by the Bank of Mauritius with banks and non-banksstill operating
MauCAS Instant Payment System, run by the Bank of Mauritius with banks and non-banks
The Bank of Mauritius launched the Mauritius Central Automated Switch in August 2019 as a central hub through which banks and non-bank payment providers route instant payments, and its Instant Payment System grew from 126,000 transactions in FY2019-20 to 19.4 million transactions worth Rs63.0 billion in FY2024-25, with 11 banks and 4 non-banks participating.
19.4 million transactions, maucas instant payment system transactions in the financial year, FY2024-25. 126,000 transactions, maucas instant payment system transactions in its first financial year, FY2019-20. Bank of Mauritius, Annual Report for the year ended 30 June 2025, retrieved 2026-10-02.
How it worked: The central bank built and ran a national switch that every bank and licensed non-bank could connect to, making transfers between any two accounts settle in seconds, then cut fees and raised limits to push use.
Limits: The central bank owns and operates the switch, sets the fees and reports the volumes, so this is the system's owner grading its own system. The FY2024-25 figures are in the text on PDF page 88 of the 2025 annual report; the FY2019-20 baseline and the August 2019 launch are in the Annual Report for the year ended 30 June 2020 (https://www.bom.mu/AnnualReport/2020/BOM_June_2020.pdf, PDF pages 129 to 130), where only seven banks and one non-bank were connected. The 95.4 percent growth in FY2024-25 followed the Bank's own 2024 rule changes (interchange revisions, removal of person-to-person charges, a higher limit), so it measures a policy push as much as adoption. Nineteen million transactions a year in a country of about 1.3 million people is still modest beside card and cash use; the report gives no per-capita or merchant figure. The collaboration is a public switch with private participants, not a contractual PPP.
Panel median75.0-12.4 against the indicators
Round 2. How this layer works
- 75.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Held at 75. Panelists B and C trim for the same reasons I do; C's size artefact point supports staying below 87.
- 75.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at 75: budget fidelity, trade efficiency and civil society are strong. The sugar estate and conglomerate oligopoly and the 2024 phone-tapping scandal keep it below the derived 87.
- 76.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Moved from 78 to 76 toward A and B at 75. Budget fidelity and civil society are strong, but the small compact state is a size artefact and the sugar estate and state oligopoly limits real coordination.
Trust
How much cooperation is possible beyond immediate personal networks?
66.70.33 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 0.97About TrustMauritius beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3.8 over 10 years (2016 to 2026), band -1.5 to +9.1, which includes no change. Median change: all countries +1.9, Income quartile 3 of 4 in 2000 +1.4.
0 over 20 years (2006 to 2026), band -4.3 to +6.8, which includes no change. Median change: all countries +2.1, Income quartile 3 of 4 in 2000 +2.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 42.4score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 5.7% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 3.2scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median66.0-0.7 against the indicators
Round 2. How this layer works
- 68.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Revised from 70 to 68. C's point is sound: dispute resolution of 42.418 (2025, 27.6) is the only direct capability row and I kept it only in view. A court system that resolves commercial disputes slowly limits cooperation among strangers. Bribery of 5.73% (88.6) and compliance of 3.202 (84) still hold, and the Privy Council appeal gives real restraint. C's 2024 wiretap leak point (own knowledge) cuts both ways, since the voters then removed the government.
- 66.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Held at 66. Bribery of 5.73% and compliance of 3.202 are strong, and dispute resolution of 42.418 (27.6) is a real weakness that panelist C rightly calls the direct row. Panelist A's Privy Council point supports the higher rows but does not speed up a commercial dispute. Communal lines hold peacefully (own knowledge), so I keep the indicator level.
- 63.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.55
I move from 62 to 63. Bribery 5.73% and compliance 3.202 are strong. Dispute resolution 42.4 (27.6) is the one direct measure and it is weak, and I keep that in view. Bribery tracks income, so I mark down. The 2024 peaceful alternation helps; the 2021-24 wiretap affair hurt. Panelist A's 70 gives the Privy Council appeal too much weight against a weak direct measure.
Learning
How effectively does the country acquire, distribute, and update knowledge?
62.80.54 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.78About LearningMauritius beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+10 over 10 years (2016 to 2026), band +6.5 to +12.9. Median change: all countries -1.3, Income quartile 3 of 4 in 2000 -1.6.
+20.1 over 20 years (2006 to 2026), band +13.8 to +24.9. Median change: all countries +0.8, Income quartile 3 of 4 in 2000 -0.3.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 3, last in 2009. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.62index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 47% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 1.6ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2024
45.8 % gross, rank 70 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2024
4.2 % of GDP, rank 63 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
11.1 % of secondary, rank 66 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2009MauritiusMauritius Institute of Training and Development part-time trainingstill operating
Mauritius Institute of Training and Development part-time training
The Mauritius Institute of Training and Development, the state technical and vocational training body, enrolled 3,352 trainees on part-time courses across its training centres between July 2022 and June 2023, out of 8,668 people it trained that year in full-time, part-time and apprenticeship modes.
3,352 trainees, part-time enrolment, all mitd training centres, July 2022 to June 2023. 8,668 people, people trained by mitd in full-time, part-time or apprenticeship mode, July 2022 to June 2023. Mauritius Institute of Training and Development, Annual Report 2022/2023, table 'Part time enrolment by training centres and gender for the period July 2022 to June 2023', retrieved 2026-10-02.
How it worked: A statutory training institute under the education ministry runs a national network of training centres that sell evening and part-time courses to workers alongside its full-time and apprenticeship programmes, and publishes centre-by-centre enrolment each year.
Limits: MITD reports on itself. The part-time table is on page 54 of the PDF (printed page 52) and the 8,668 total is in the opening statement on page 6. The counts are enrolments, not unique adults, and the report gives no ages: part-time courses are the mode most likely to serve working adults, but the full-time courses (2,993 trainees on page 50) mainly take school leavers and are not adult learning in the sense of the indicator, which is why the part-time figure is the metric. Professional drivers training (526) and hotel school short courses (787) make up close to two fifths of the part-time count. MITD is one provider: the Human Resource Development Council's training schemes, private providers and the universities are not in it, so it is not a national participation rate. 2022/23 is the latest annual report on the MITD site. The start year is the 2009 Act that created MITD from the former Industrial and Vocational Training Board, as commonly reported; it was not read at the cited source.
Panel median60.0-2.8 against the indicators
Round 2. How this layer works
- 60.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Held at 60, the panel consensus. The HCI is among the highest in Africa and firm training is good; citation impact rests on a small output.
- 60.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Held at 60, the panel agrees: a good HCI, firm training at 47 percent and high citation impact on a small base. I see no informal learning channel the indicators miss.
- 60.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held at 60; the panel is unanimous. HCI of 0.62 and 47% firm training are above peers, and the citation ratio of 1.56 sits on a small base.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
33.90.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationMauritius beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+8.4 over 10 years (2016 to 2026), band +3.8 to +12.9. Median change: all countries 0, Income quartile 3 of 4 in 2000 0.
+8.7 over 20 years (2006 to 2026), band +3.2 to +14.1. Median change: all countries +0.1, Income quartile 3 of 4 in 2000 +0.8.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 4, last in 2025. The replay starts in 2011, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+19.3 over 10 years, from 7.3 in 2016 to 26.6 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 5.6per million peoplefrom 7 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 1,599per million peoplefrom 1,992 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 89.1per million peoplefrom 111 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 14,156per million peoplefrom 17,607 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 63.7score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes (1 case below), University spinouts.
This project retired one row: Business share of R&D.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2018MauritiusRegulatory Sandbox Licence of the Economic Development Boardstill operating
Regulatory Sandbox Licence of the Economic Development Board
Mauritius's Economic Development Board, operating a regulatory sandbox licence regime for innovative financial projects since September 2018 by the World Bank's dating, had nine firms in its sandbox when the World Bank compiled its global database of sandboxes in 2020.
9 firms, firms in the sandbox (edb regulatory sandbox licence), 2020 (database published November 2020). World Bank, Global Experiences from Regulatory Sandboxes (Fintech Note No. 8, November 2020), Appendix 3 Database of Global Sandboxes, row 'Mauritius, EDB', retrieved 2026-10-02.
How it worked: The investment promotion board issued time-bound sandbox licences to firms proposing financial activities for which Mauritian law had no framework, on the recommendation of a national committee, before the sector regulators took on their own sandbox authorisations.
Limits: The figure is a stock of firms in the sandbox at an unstated date in 2020, compiled by the World Bank from EDB sources, not an annual count of admissions and exits, and it sits in a wide table in the plain-text version of the report (the row lists 'Operational', 9, 'Regulatory Sandbox license', established Sep-18). EDB's own annual reports do not give admissions: the 2020/21 report says only that the EDB 'registered 8 new applications for fintech RSL' and that licences were issued when positively determined, and the 2021/22, 2022/23 and 2023/24 reports read today do not mention the licence at all. A licence under the EDB regime could cover activities with no legal framework at all, so some licensees used it as a market-entry route rather than a time-limited test. Since 2021 the sandbox function has also sat with the sector regulators: the Financial Services Commission issued its first Regulatory Sandbox Authorisation under section 14B of the Financial Services Act on 30 March 2022 and reported that entity exiting after successful testing in its 2022/23 annual report, and the Bank of Mauritius issued a Guideline for Regulatory Sandbox Authorisation in May 2024 with no participant count in its 2024 annual report or December 2024 Financial Stability Report. Status operating rests on those successor regimes, not on evidence that the EDB licence itself still admits firms.
Panel median35.0+1.1 against the indicators
Round 2. How this layer works
- 32.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Hold at 32. The panel agrees on the Regulatory Sandbox Licence and insolvency; the gap is small and seven resident patents keep me just under the indicator.
- 36.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at 36: the Regulatory Sandbox Licence and working insolvency give a formal route to try and exit, and panelist C's point about tourism and finance filings does not cut the repository and design signal.
- 35.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held at 35 (moved down 1): the sandbox licence and 64.6 insolvency score are conversion, but 7 resident patents and a services economy cap the filings.
Adaptability
How effectively can the system respond when circumstances change?
66.00.62 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 1.00About AdaptabilityMauritius beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.4 over 10 years (2016 to 2026), band +0.4 to +0.4. Median change: all countries -0.8, Income quartile 3 of 4 in 2000 +0.8.
+3.7 over 20 years (2006 to 2026), band -1.3 to +8.1, which includes no change. Median change: all countries -1, Income quartile 3 of 4 in 2000 -1.5.
The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+0.4 over 10 years, from 65.6 in 2016 to 66.0 on 4 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 5.6% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 19.1% of unemployed | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.19index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 1.8% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
68.8 % aged 15+, rank 74 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
28 per 100 people, rank 43 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
5.6 % of output, rank 26 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2024
23.5 % of employment, rank 34 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2020MauritiusWage Assistance Scheme and Self-Employed Assistance Scheme, paid by the MRAdelivered and closed
Wage Assistance Scheme and Self-Employed Assistance Scheme, paid by the MRA
Mauritius made its revenue authority, the MRA, a payer of COVID-19 income support in March 2020, and by end June 2020 the MRA had disbursed Rs 9,985 million under the Wage Assistance Scheme (Rs 7,603 million) and the Self-Employed Assistance Scheme (Rs 2,382 million) to some 500,000 workers and self-employed people, after receiving 176,000 online SEAS applications within 10 days of the lockdown.
9,985 Rs million, wage assistance scheme and self-employed assistance scheme disbursements, march to june 2020, 2020-06. 176,000 applications, online seas applications received within 10 days during the lockdown, 2020. Mauritius Revenue Authority, Annual Report 2019/20, retrieved 2026-10-02.
How it worked: The government handed income support to the tax authority, which built online application forms, verified wage claims against employers' PAYE and pension returns, and paid employers and self-employed people directly into bank accounts.
Limits: The MRA reports on its own delivery. The 9,985 is the sum we computed from Table 3 of the annual report (Rs 7,603 million WAS plus Rs 2,382 million SEAS, March to June 2020; the text rounds it to Rs 10 billion); the 500,000 recipients is the Director General's 'some 500,000 workers and self-employed individuals', paid 'directly or indirectly', so wage subsidies reached employees through their employers and the count is approximate. The 176,000 applications in 10 days is a pull quote, not a table, and the report gives no time to first payment. The scheme rules date the speed: the MRA communique announcing the Wage Assistance Scheme is dated 23 March 2020 (mra.mu communique list, WageAssistanceScheme230320.pdf), and the first SEAS payment covered the period from 16 March 2020, but the annual report itself gives no date for the first payment. Mauritius had a complete PAYE and pension contribution register to verify claims against, which most countries in this group did not. The report does not show fraud, errors or employees laid off despite the scheme, and the WAS was extended for tourism-linked firms into 2021, so this record covers only the first four months.
2021MauritiusCOVID-19 vaccination campaigndelivered and closed
Mauritius's health authorities reported to WHO that 1,123,773 people, 88 per 100 population, had received at least one COVID-19 vaccine dose by 31 December 2023, from a first dose given on 26 January 2021, with 1,088,142 (86 per 100) completing the primary series.
1,123,773 people, people vaccinated with at least one covid-19 vaccine dose, 2023-12-31. 86 per 100 population, people who completed the primary series (last dose), 2023-12-31. World Health Organization, COVID-19 dashboard vaccination data (vaccination-data.csv), retrieved 2026-10-02.
How it worked: Mauritius's health ministry vaccinated almost the whole adult population through its public hospital and health centre network, aided by a small island population and early dose supply.
Limits: The figures are Mauritius's own reports to WHO (DATA_SOURCE 'REPORTING'), with no independent coverage survey behind them, read from one row of a CSV with no prose. Completion of 86 per 100 is near-universal, but Mauritius is a small island of about 1.3 million people with a dense public health network, so the scale says little about logistics capacity. Booster or additional doses reached 654,507 people, 51 per 100. The VACCINES_USED field is empty, so the record cannot show which products were used or where the doses came from, and it evidences distribution only. The per-100 rates divide by WHO's population estimate. Vaccination is a response to one shock, not proof of preparedness for cyclones, floods or droughts, and the brief for this column prefers a hazard-specific delivery; this is filed because none with an official figure was found in the time available. The cited URL is the blob the WHO dashboard serves, as in bol-covid-vaccination.
Panel median60.0-6.0 against the indicators
Round 2. How this layer works
- 60.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised up from 58 to 60: panelist B is right that the low new-export-products figure misses the move into services. The dependence on tourism and offshore finance, shown in the COVID shock, keeps me below 66.
- 62.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at 62: repeated reallocation since independence is the best evidence, and the low new-export-products figure reflects a move to services. The COVID tourism shock and fiscal strain keep it below 66.
- 60.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Moved from 62 to 60. The sequence from sugar to textiles to tourism and finance is the best evidence of reallocation, but the COVID tourism shock and fiscal strain argue against pushing to 66, and A's 58 is close.
Building
How capable is the country of turning plans and knowledge into functioning systems?
20.50.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingMauritius beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.3 over 10 years (2016 to 2026), band -4.6 to +2.7, which includes no change. Median change: all countries -0.3, Income quartile 3 of 4 in 2000 -0.3.
-5.9 over 20 years (2006 to 2026), band -10.8 to -1.9. Median change: all countries -0.5, Income quartile 3 of 4 in 2000 -0.8.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-0.4 over 10 years, from 11.4 in 2016 to 11.0 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 11.2% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 1.2% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 61.7score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.03index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
60,930 constant 2021 PPP $, rank 49 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2010MauritiusB6 Belle Rive to Quartier Militaire road upgradestill operating
B6 Belle Rive to Quartier Militaire road upgrade
Mauritius's Ministry of Public Infrastructure upgraded the 12.1 km B6 Belle Rive to Quartier Militaire road under the World Bank Infrastructure Project approved in 2009, at a cost of US$33.88 million against an appraisal estimate of US$21.60 million, 157 percent of the estimate.
33.88 million US dollars, cost of upgrading works on the belle rive to quartier militaire road, actual, 2014-12. 21.6 million US dollars, cost of upgrading works, appraisal estimate, 2009. World Bank, Implementation Completion and Results Report, Mauritius Infrastructure Project (P091828), Report No. ICR3303, 2015, retrieved 2026-10-02.
How it worked: The infrastructure ministry procured a rural road upgrade on an estimate that was never checked against designs, then added scope under local pressure, and paid half as much again as appraised.
Limits: The costs are in Annex 1 of the World Bank's own completion report, which rated the outcome Moderately Satisfactory and the borrower Moderately Unsatisfactory. Para. 41 explains most of the increase as poor checking of the estimate at appraisal and added scope requested by stakeholders (junctions, a bridge, village works), with further increases from weather and flooding, and gives slightly different totals (about US$32 million, then about US$35 million for the contract), so the 157 percent is the annex figure and the narrative does not match it exactly. A 12 km road is a small project for the construct, chosen because it is the one Mauritian build with an official baseline and outturn found; Mauritius's larger Metro Express light rail was not assessed. The project closed on its original date, 31 December 2014. Plain-text file, no PDF page numbers.
Panel median35.0+14.5 against the indicators
Round 2. How this layer works
- 36.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Revised down from 40 to 36: panelist C is right that Metro Express was built with Indian finance and contractors, so it shows less domestic delivery than I credited. I stay well above 20.5 because goods-complexity indicators misread a services economy and utility connection is mid-frame.
- 35.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Revised down from 40: panelist C's point that Metro Express was built with Indian financing and contractors means part of the delivery is not domestic. I still hold well above 21 because goods-complexity indicators misread a small services economy that runs reliable utilities.
- 32.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Revised up from 25 to 32. A and B both argue that high-tech exports and economic fitness misread a services economy and that Metro Express and utility coverage show delivery; I accept part of that, but I do not go to 40 because the delivery evidence is anecdotal and utility connection is only mid-frame.