Jordan
Strongest usable evidence: Coordination, at 77.1. Raise Experimentation first, at 12.2. Shared purpose needs more evidence: confidence is 0.14.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- ExperimentationPeers 9.30.47 usable+1.3(3)
- BuildingPeers 23.30.62 usable-0.2(3)
- AgencyPeers 31.80.49 usableno trend
- AnticipationPeers 30.30.46 usable+26.4(2)
- AdaptabilityPeers 58.90.62 usable-5.3(3)
Measure before managing, thinnest first
- Shared purposePeers 48.10.14 very thinno trend
- TrustPeers 60.60.34 thin+18.2(2)
Keep watching, highest first
- CoordinationPeers 68.70.47 usable+3.9(2)
- LearningPeers 34.10.55 usable+33.9(2)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Jordan beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
45.20.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationJordan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+26.4 over 10 years (2016 to 2026), band +26.4 to +26.4. Median change: all countries +11.2, Income quartile 2 of 4 in 2000 +12.5.
+26.8 over 20 years (2006 to 2026), band +19.8 to +33.9. Median change: all countries +13.4, Income quartile 2 of 4 in 2000 +13.6.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+26.4 over 10 years, from 18.8 in 2016 to 45.2 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 474articles per million peoplefrom 5,419.23 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 78.8index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2016
0.7 % of GDP, rank 49 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2017
576 per million people, rank 64 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
212 per million people, rank 88 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median40.0-5.2 against the indicators
Round 2. How this layer works
- 40.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Moved up from 36: panelist C is right that the figures are not wealth-driven, and my cut was about plan execution, which is not anticipation; reactive water and refugee policy keeps me below 45.
- 40.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held 40: panelist C keeps 45.2 but ignores the reactive record on water and refugee shocks; panelist A's 36 overweights execution, which is not anticipation.
- 40.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Moved down from 45. Peers A and B point to reactive water-scarcity and refugee-shock policy, which I cannot answer; statistics (72.3) stay a real signal.
Agency
How able are individuals and organizations to turn an intention into action?
38.00.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyJordan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.2 over 10 years (2016 to 2026), band -4.1 to +5, which includes no change. Median change: all countries +1.9, Income quartile 2 of 4 in 2000 +3.
+5.3 over 20 years (2006 to 2026), band +0.9 to +10.2. Median change: all countries +9.3, Income quartile 2 of 4 in 2000 +10.4.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 0.67per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 55.7score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 7count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
95.6 % of population, rank 13 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
46.5 % aged 15+, rank 106 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
71.3 % of GDP, rank 34 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median41.0+3.0 against the indicators
Round 2. How this layer works
- 38.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 38, the derived level. Density of 0.669, entry efficiency of 55.7 and 7 procedures (2019) are low to middling. Panelist B's home businesses work under wasta and work-permit limits, which is B's own description of narrow capacity. Panelist C's tech-service sector is real but small. Neither gives a measure of how many actors it reaches, so the 4-point gap stays a disagreement. Jordan's civil service is competent for its region, from my own knowledge.
- 42.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 42. Density of 0.669 and entry efficiency of 55.7 show formal friction, with a derived 38. From my own knowledge home-based businesses and Syrian traders act under work-permit limits and wasta shapes access. Panelist C reaches the same score and panelist A's 38 omits the unregistered layer. No new argument moves me.
- 41.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Lower slightly from 42 to 41. Density 0.669 (3.7), entry efficiency 55.7 (41.9) and 7 procedures. Both panelists (38, 42) sit close. Wasta and youth unemployment limit new actors; refugee-trader work-permit limits are own knowledge.
Coordination
How effectively can independent actors organize around shared objectives?
77.10.47 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 0.97About CoordinationJordan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+2.6 over 10 years (2016 to 2026), band -2.8 to +6.6, which includes no change. Median change: all countries -1.7, Income quartile 2 of 4 in 2000 -1.6.
+12.8 over 20 years (2006 to 2026), band +7.8 to +16.8. Median change: all countries -2.7, Income quartile 2 of 4 in 2000 -2.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2005, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+3.9 over 10 years, from 74.8 in 2016 to 78.7 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 69.7score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 97.3percentage points from approved budget | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.65index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration (1 case below), Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2024
2.707 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2015JordanUtility-scale renewable power through direct proposals and IPP rounds, and the stop after 2021operating below its peak
Utility-scale renewable power through direct proposals and IPP rounds, and the stop after 2021
Jordan's Ministry of Energy and Mineral Resources added utility-scale solar and wind plants selling to the grid every year from 2015 to 2021, mostly private projects under direct proposals and competitive rounds, peaking at 345 MWac commissioned in 2020, and then added none: its annual reports put grid-selling renewable capacity at 1,498 MW in 2022 and 2023 and 1,478 MW in 2024.
0 MW (stock 1,498 MW in 2022 and 2023, 1,478 MW in 2024), utility-scale renewable capacity selling to the grid added from 2022 to 2024 (computed from the reported stock), 2024. 345 MWac, utility-scale renewable capacity added in 2020, the peak year, 2020. Ministry of Energy and Mineral Resources of Jordan, Annual Report 2024, retrieved 2026-10-02.
How it worked: The ministry offered sites and long-term power purchase agreements with the state-owned single buyer NEPCO to private developers through direct proposals and competitive rounds, alongside donor-financed public plants, and added no utility-scale plant after 2021.
Limits: The 2024 annual report's year-by-year table, 'Renewable Energy Power Generation Projects: Direct Proposals and Grants', runs over PDF pages 13 to 15 with annual totals on page 15 (134.5, 270, 14, 339.1, 235.1, 345 and 135.5 MWac for 2015 to 2021, under a note that the 2015 to 2021 list 'remain[s] as stated'); the 2021 total is a misprint for 153.5, the sum of its three projects and the figure in the 2022 report. The zero is ours, not printed: it rests on the grid-selling capacity the ministry reports, 1,498 MW in the 2022 report (https://www.memr.gov.jo/ebv4.0/root_storage/en/eb_list_page/annual_report_2022.pdf) and the 2023 report (same path, annual_report_2023.pdf) and 1,478 MW on PDF page 12 of the 2024 report, and on the 2022 report's project table also stopping at 2021; the 20 MW fall in 2024 looks like reclassification (a new 10 MW biogas and hydro line) rather than a closure. The 345 MWac peak is a commissioning year for plants contracted in earlier rounds, so it overstates the pace at which new partnerships were being signed in 2020. The table mixes private independent power producers (Masdar's Baynounah 200 MW, ACWA's Mafraq plant, the Tafila wind farms) with plants financed by Gulf, EU and Spanish grants and loans, including an Air Force plant, so not every megawatt is a partnership; we did not separate them. The reports do not say why additions stopped. What kept growing was subscriber-owned capacity under net metering and wheeling, 1,079 MW in 2022 and 1,320.8 MW in 2024, which is private investment without a public counterpart contract. The erosion is in the frequency of new joint deliveries, not in the stock, which still operates. The ministry reports on its own programme, and the stop may be a pause rather than an end.
1994JordanHCST Industrial Research and Development Fund (IR&DF)still operating
HCST Industrial Research and Development Fund (IR&DF)
Jordan's Higher Council for Science and Technology, through its Industrial Research and Development Fund, supported 380 projects from 1994 to 2017 worth JD 3,306,208, of which 204 were research and development projects worth JD 2,116,308 that industrial firms carried out with a university, research centre or consulting partner.
204 projects, research and development projects supported by the fund, cumulative, 1994-2017. 2,116,308 Jordanian dinars, fund support to research and development projects, cumulative, 1994-2017. Higher Council for Science and Technology (HCST), Industrial Research and Development Fund, presentation by the fund director to the INVENT industrial innovation workshop (Arabic, slides 'Projects supported 1994-2017'), hosted by Jordan University of Science and Technology, retrieved 2026-10-17.
How it worked: The Higher Council for Science and Technology pays up to three quarters of a small applied project that a registered manufacturer runs with a university, research centre or consultancy, and releases later payments against progress reports from both partners.
Limits: The figures are the fund's own, read from a slide deck in PDF dated October 2017, and they are cumulative over 23 years, about 16 projects a year on average; no later count was found, so the current scale is not known. The 380 total includes 157 quality and certification grants (ISO 9000, ISO 14000, HACCP and quality marks, our sum) and 19 studies, incubator and other grants that are not research collaboration, which is why the record leads with the 204 research and development projects. The partner on a project need not be a university: the fund's rules ask only for a research or consulting partner, and by the deck's own table about 205 projects ran with universities and public research bodies, 138 of them with eight universities (our sum), while about 175 ran with private consulting firms, a row the PDF text renders imperfectly. Grants are capped at JD 30,000 or 75 percent of project cost, so each collaboration is small. The deck gives no outcome measure beyond one case study. The HCST page archived in May 2026 still describes the fund and its committees, but its last listed calls date from 2022 and are run with the Royal Academy of Engineering.
Panel median60.0-17.1 against the indicators
Round 2. How this layer works
- 60.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 60. B and C credit refugee coordination with donors, which is real, but the Jordan Response Plan is donor-structured and runs top-down; civil society operates under legal restriction.
- 62.0 bottom_up@claude-opus-5-5, self-confidence 0.45
I hold at 62: all three of us trim the 77 for top-down coordination and a constrained civil society, and credit the refugee response coordinated with donors. No round-1 point moves me.
- 60.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Revised down from 62 to 60, matching panelist A. Budget execution near the top and the donor-coordinated refugee response are real, but panelists A and B are right that coordination runs top-down and civil society is constrained, so fidelity partly shows command.
Trust
How much cooperation is possible beyond immediate personal networks?
73.90.34 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 1.00About TrustJordan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+8.7 over 10 years (2016 to 2026), band +3.2 to +14.2. Median change: all countries +1.9, Income quartile 2 of 4 in 2000 +2.5.
+4.9 over 20 years (2006 to 2026), band -0.3 to +10.4, which includes no change. Median change: all countries +2.1, Income quartile 2 of 4 in 2000 +4.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+18.2 over 10 years, from 72.0 in 2016 to 90.2 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 50score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 3.9% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 3.4scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median50.0-23.9 against the indicators
Round 2. How this layer works
- 52.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 52. Court compliance of 3.35 and bribery of 3.9% give a derived 73.9, and the panel agrees compliance under a strong monarchy reads partly as deference, as in artefact A13. Panelist B goes 4 lower on wasta and tribal ties, which I weighed already. The courts and the Integrity and Anti-Corruption Commission function as organisations, from my own knowledge, and dispute efficiency of 50 is the credible row, so I hold mid-frame.
- 48.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 48. Compliance of 3.35 and bribery of 3.9% give 73.9, but panelists A and I both read compliance in a strong monarchy as partly deference (A13). Dispute efficiency of 50 is the more credible row. From my own knowledge wasta and tribal networks carry cooperation. Panelist A's and C's 52 credits the anti-corruption commission more than I can on evidence I have.
- 50.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Lower from 52 to 50. Court compliance 3.35 (88) and bribery 3.9% read strong, but under a palace-dominated state compliance partly reads deference (A13), as panelists A and B say. Dispute efficiency 41.4 is the more credible row. Wasta is pervasive, own knowledge.
Learning
How effectively does the country acquire, distribute, and update knowledge?
51.00.55 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.81About LearningJordan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+19.2 over 10 years (2016 to 2026), band +15.9 to +22.2. Median change: all countries -1.3, Income quartile 2 of 4 in 2000 -0.4.
+16.6 over 20 years (2006 to 2026), band +12.2 to +21. Median change: all countries +0.8, Income quartile 2 of 4 in 2000 +2.2.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+33.9 over 10 years, from 20.3 in 2016 to 54.2 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.55index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 42.2% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 1.2ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2024
35.9 % gross, rank 80 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2024
3.2 % of GDP, rank 96 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
2.8 % of secondary, rank 111 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
1976JordanVocational Training Corporation continuing trainingstill operating
Vocational Training Corporation continuing training
Jordan's Vocational Training Corporation took in 10,712 new trainees in 2022 across its institutes in the north, centre and south, and 7,292 trainees graduated that year, including 2,864 new entrants and 2,794 graduates in its continuing-training courses, according to the corporation's tables on the national open data portal.
2,864 trainees, new entrants to vocational training corporation continuing-training courses, 2022. 2,794 graduates, graduates of vocational training corporation continuing-training courses, 2022. Vocational Training Corporation, Trainee Data 2022 (numbers of trainees by region and by occupational level), Jordan Open Government Data portal, retrieved 2026-10-17.
How it worked: The state set up a public training corporation that runs its own vocational institutes in every region, enrols school leavers and adults on graded occupational courses and continuing-training courses, and publishes its intake and graduate counts.
Limits: The figures are the corporation's own administrative counts, published as spreadsheets for one year only, so no trend can be read from this source. The corporation mainly trains young school leavers for initial occupational qualifications, so the record rests on its continuing-training line alone; most of its 10,712 new trainees are initial vocational students rather than adults returning to learning. The count is a head count at one provider, not a share of adults, and it leaves out the Ministry of Education's adult literacy centres, employer training and universities. The 1976 founding year is not stated on the portal; it comes from the corporation's statements relayed by the state news agency.
Panel median48.0-3.0 against the indicators
Round 2. How this layer works
- 48.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 48. The panel sits within five points; nothing raised changes my reading of mid-frame training and citations with a stale HCI.
- 49.0 bottom_up@claude-opus-5-5, self-confidence 0.45
I hold near 50, at 49: firm training and citation impact are mid-frame and the HCI is from 2020. C's trim for stale HCI is already in my score.
- 46.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held at about 46, up one. Panelists A and B at 48 to 50 sit slightly above me; HCI is a 2020 stock and citation impact comes from a small output base, so I trim.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
12.20.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationJordan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.8 over 10 years (2016 to 2026), band -2.9 to +4.6, which includes no change. Median change: all countries 0, Income quartile 2 of 4 in 2000 +0.5.
-1.6 over 20 years (2006 to 2026), band -5.9 to +2, which includes no change. Median change: all countries +0.1, Income quartile 2 of 4 in 2000 +0.7.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 4, last in 2025. The replay starts in 2004, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+1.3 over 10 years, from 3.3 in 2016 to 4.6 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 1.2per million peoplefrom 14 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 486per million peoplefrom 5,613 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 7.4per million peoplefrom 86 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 7,256per million peoplefrom 83,594 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 34.2score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes (1 case below), University spinouts.
This project retired one row: Business share of R&D.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2024JordanJoRegBox, the Central Bank of Jordan regulatory sandboxstill operating
JoRegBox, the Central Bank of Jordan regulatory sandbox
The Central Bank of Jordan approved three companies on 31 October 2024, out of nine applications to the first cohort of its JoRegBox regulatory sandbox launched in February 2024, to begin testing digital financial products with real customers, among them the escrow platforms E-Damana and Watheq.
3 companies, companies approved to enter the sandbox for live testing, 2024-10-31. Central Bank of Jordan, news release 'CBJ approves three Entrepreneurial Companies to Enter the Regulatory Sandbox Environment (JoRegBox)', archived copy of 15 May 2025, retrieved 2026-10-02.
How it worked: The central bank admits fintech firms in cohorts to test mature products with real customers under its supervision, and links the sandbox to the national financial inclusion strategy and the economic modernisation vision.
Limits: The live cbj.gov.jo page refused the connection, so the number was read on a Wayback Machine copy of the central bank's own release. Three is the admission decision for one cohort, the first under the JoRegBox name, and the release gives no count of firms completing the sandbox; the bank's annual report, which would carry later cohorts and exits, was not located today. The central bank had an earlier sandbox framework, which the World Bank's 2020 survey lists as operational from April 2018; the release treats JoRegBox as a new launch on 18 February 2024, and whether firms passed through the earlier framework is not shown here. The governor has been quoted in the press giving a cumulative count of tested products, which this record does not use because no official page carrying it was opened. Three admissions against about 11 million people is about 0.3 per million. The release frames the cohort as part of the government's economic modernisation programme, so the timing is partly political.
Panel median20.0+7.8 against the indicators
Round 2. How this layer works
- 20.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Held at 20: the Central Bank sandbox and startup support bodies justify a small lift, but insolvency efficiency of 34.7 keeps exit costly; panelist B's 25 has no institutional evidence beyond mine.
- 22.0 bottom_up@claude-opus-5-5, self-confidence 0.30
Moved 25 to 22: panelist C's weak-insolvency point (34.7) makes exit costly, which I underweighted; the Amman startup scene and Central Bank sandbox still keep me above 17.
- 18.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Held. Peers lift to 20-25 on Amman's startup scene and the CBJ sandbox, but with insolvency at 34.7 and patents at 0.7 that is unquantified.
Adaptability
How effectively can the system respond when circumstances change?
47.60.62 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 1.00About AdaptabilityJordan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.2 over 10 years (2016 to 2026), band -2.6 to +2.1, which includes no change. Median change: all countries -0.8, Income quartile 2 of 4 in 2000 -1.6.
-8.8 over 20 years (2006 to 2026), band -13.9 to -3.1. Median change: all countries -1, Income quartile 2 of 4 in 2000 +0.4.
The model fills at least one of the 4 indicators in 17 of 27 years, at most 2, last in 2016. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-5.3 over 10 years, from 50.3 in 2016 to 45.0 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 16.5% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 46.3% of unemployed | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.2index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 2.9% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (2 cases below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
42.8 % aged 15+, rank 131 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
7 per 100 people, rank 87 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
11 % of output, rank 71 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2024
54.2 % of employment, rank 46 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2020JordanNational Aid Fund temporary cash transfers to informal workers, 2020delivered and closed
National Aid Fund temporary cash transfers to informal workers, 2020
Jordan's National Aid Fund reused the Takaful cash-transfer platform after the March 2020 curfew, opened online registration for ten days in mid-April and had paid about 150,000 newly identified households by 10 May 2020, and 237,000 households had received three months of temporary cash support by March 2021.
150,000 households, households identified and paid by the temporary cash transfer as of 10 may 2020, 2020-05-10. 237,000 households, households that had received temporary cash transfers (three months of support), 2021-03-31. World Bank, Project Appraisal Document, Jordan Emergency Cash Transfer COVID-19 Response Project (P173974), June 2020, retrieved 2026-10-02.
How it worked: The National Aid Fund opened the Takaful online registration platform to informal workers who had lost income, selected households with the Takaful targeting formula against linked administrative data, and paid them into e-wallets and bank accounts authorised by the central bank.
Limits: The 150,000 figure is in paragraph 60 of the appraisal document (printed page 28 of 60), and the curfew dates are in paragraphs 2 and 3 (printed page 9). The 237,000 figure is in a second World Bank document, the Implementation Status and Results Report of 26 April 2021, sequence 2 (http://documents.worldbank.org/curated/en/429691619464662394/pdf/Disclosable-Version-of-the-ISR-Jordan-Emergency-Cash-Transfer-COVID-19-Response-Project-P173974-Sequence-No-02.pdf, page 1), which also says the transfers cost about US$114 million, of which the government paid about US$103 million through national charity accounts and the project financed US$11 million retroactively. Both documents come from the lender to the programme, and the PAD figure is an 'about'. The speed is the delivery system's, not a new law's: the Takaful platform, its registry of almost one million households and digital payments were built from 2019 with World Bank, UNICEF, WFP and other donor support, so the response mostly reused prior investment. The emergency transfer lasted three months per household and the project's own PDO indicator for cash support through the project still read zero in that report because the loan became effective only on 11 November 2020: the fast part was financed domestically. Refugees, about 655,000 registered, were outside this programme and were served by UN agencies.
2021JordanCOVID-19 vaccination campaigndelivered and closed
Jordan's health authorities reported to WHO that 4,821,579 people, 47 per 100 population, had received at least one COVID-19 vaccine dose by 21 August 2022, from a first dose given on 13 January 2021, with 4,558,313 (45 per 100) completing the primary series.
4,821,579 people, people vaccinated with at least one covid-19 vaccine dose, 2022-08-21. 45 per 100 population, people who completed the primary series (last dose), 2022-08-21. World Health Organization, COVID-19 dashboard vaccination data (vaccination-data.csv), retrieved 2026-10-02.
How it worked: Jordan's health ministry ran a national COVID-19 campaign through its primary care network and mass vaccination sites and reported progress to WHO.
Limits: The figures are Jordan's own reports to WHO (DATA_SOURCE 'REPORTING'), with no independent coverage survey behind them. Completion of the primary series reached 45 per 100 and boosters 682,211 people (7 per 100), so the record shows a partial delivery. The row was last updated on 21 August 2022, earlier than most, so later doses are missing; first-dose reach stayed below half of WHO's population estimate. The VACCINES_USED field is empty, so the record cannot show which products were used or where the doses came from, and it evidences distribution only. The per-100 rates divide by WHO's population estimate. Vaccination is a response to one shock, not proof of general preparedness, and it is filed under the precedent of bol-covid-vaccination and ven-covid-vaccination as a judgement call because no hazard-specific delivery with an official figure was found for this country in this batch. The source is a CSV with no prose; the numbers are read from one row. The cited URL is the blob the WHO dashboard serves, the same one bol-covid-vaccination cites.
2016JordanWork permits for Syrian refugees under the Jordan Compact, and the end of the fee waiveroperating below its peak
Work permits for Syrian refugees under the Jordan Compact, and the end of the fee waiver
After the February 2016 London conference, Jordan's Ministry of Labour opened formal work permits to Syrian refugees and waived their fees. Annual permits issued rose from 36,788 in 2016 to a peak of 90,152 in 2023. In July 2024 the waiver was not extended for flexible or employer-sponsored permits, and issuance fell to 54,586 in 2024.
54,586 permits per year, work permits issued to syrian refugees in jordan, 2024. 90,152 permits per year, work permits issued to syrian refugees in jordan at the 2023 peak, 2023. UNHCR Jordan, Economic Inclusion of Syrian Refugees factsheet (June 2025), from Ministry of Labour data, retrieved 2026-10-02.
How it worked: Jordan's Ministry of Labour turned a donor compact into labour-law changes: it waived permit fees, created flexible permits not tied to one employer, and let cooperatives and trade unions act as sponsors. When the donor-funded waiver lapsed in July 2024, it charged Syrians full foreign-worker fees, and issuance fell by about 40 percent.
Limits: The construct is how fast rules and programmes change when conditions change, but a permit count measures uptake. The speed of the 2016 rule change is shown only by the timeline and the 2016 bar. The annual figures are chart labels in a one-page UNHCR factsheet, and the factsheet credits them to the Ministry of Labour. They count permits, not people: renewals, short-term and retroactive permits are all counted, so 340,000 cumulative permits overstates the number of refugees who ever held one. The World Bank and UNHCR copies disagree slightly (45,000 against 47,762 for 2019). The waiver ended in July 2024, so 2024 is only half a post-change year. The 2025 figure (35,702 to July) is partial and is not annualised here. Fall in permits is not fall in work: refugees may have moved back into informal jobs, and the series cannot show that.
Panel median46.0-1.6 against the indicators
Round 2. How this layer works
- 46.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Revised up by one. C's point that Jordan kept macro stability through regional shocks is an institutional achievement of the central bank and finance ministry; unemployment above 16 percent still shows a labour market that does not reallocate.
- 46.0 bottom_up@claude-opus-5-5, self-confidence 0.45
I hold near 45, at 46: C's point that Jordan kept macro stability through repeated regional shocks is fair, and I add one point for it. Unemployment above 16 percent is still the strongest signal of slow absorption.
- 46.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised down from 48 to 46, toward panelists A and B at 45. Absorbing refugee inflows with macro stability is real institutional capacity, but 16.5 percent unemployment shows the labour market does not reallocate.
Building
How capable is the country of turning plans and knowledge into functioning systems?
29.20.62 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 0.98About BuildingJordan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.2 over 10 years (2016 to 2026), band -3.9 to +3.3, which includes no change. Median change: all countries -0.3, Income quartile 2 of 4 in 2000 +0.3.
+1.1 over 20 years (2006 to 2026), band -3.7 to +4.9, which includes no change. Median change: all countries -0.5, Income quartile 2 of 4 in 2000 -0.6.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-0.2 over 10 years, from 18.5 in 2016 to 18.3 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 17.4% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 2.1% of manufactured exports | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 70.9score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.07index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
46,257 constant 2021 PPP $, rank 66 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2004JordanAmman Development Corridor (Amman Ring Road phase 1), and its overrundelivered and closed
Amman Development Corridor (Amman Ring Road phase 1), and its overrun
Jordan's Ministry of Public Works and Housing built the 40 km first phase of the Amman Ring Road under the Amman Development Corridor Project, whose estimated total cost rose from US$160.6 million at appraisal in 2004 to US$455.97 million in March 2013, with the road works alone rising from US$106.92 million to US$279.87 million, while the loan closing date moved from June 2009 to December 2012 and one of three sections was 65 percent complete at closing.
455.97 million US dollars, actual or latest estimated total project cost (15 march 2013), 2013-03-15. 160.6 million US dollars, total project cost estimated at appraisal, 2004. World Bank, Implementation Completion and Results Report, Jordan Amman Development Corridor Project (P081505, Loan 7634), report ICR2661, 10 June 2013, retrieved 2026-10-02.
How it worked: The public works ministry split a 40 km expressway around Amman into three sections financed by three lenders, acquired land late and at rising prices, and absorbed design changes during construction with additional financing rather than rescoping.
Limits: The World Bank, which financed one of three road sections (with the Arab Fund and the EIB financing the others), wrote the report and rated the outcome, its own performance and the borrower's Moderately Unsatisfactory. The costs are in Annex 1 (printed page 18): land acquisition rose from US$40.9 million to US$158.43 million and is a large part of the overrun, and the latest estimate includes US$42 million of payments due after closing to finish Section 1 and settle bills. Against the 2008 additional-financing estimate of US$343.18 million the overrun is 32 percent, so much of the growth was already recognised mid-project. The 65 percent figure for Section 1 is in the results table; the report says in para. 48 that the road remained uncertain of reaching operation 'when nearly twice the expected construction time has passed', and that the inland port and customs depot were 'gradually dropped'. The text is a scanned 2013 report with OCR errors in the data sheet. When the whole road opened was not read at an official source; 'concluded' means the financed project closed with the road mostly built.
Panel median30.0+0.8 against the indicators
Round 2. How this layer works
- 30.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Revised down from 32. B's point that the Aqaba-Amman water conveyance project is still not delivered is a direct delivery failure that I should weigh.
- 30.0 bottom_up@claude-opus-5-5, self-confidence 0.45
I revise down slightly from 32 to 30: C is right that the water conveyance and rail projects are undelivered, and the indicator already sits at 29. Utility connection and a fair manufacturing share stop me going lower.
- 29.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Held at 29. Panelists A and B at 32 weight manufacturing share and utility connection; I weight fitness and high-tech exports at the floor, and panelist B's own note that the Aqaba-Amman water conveyance is still undelivered is the delivery evidence.