- Raw value
- 1736.07articles per million people
- Year
- 2023. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IP.JRN.ARTC.SC)
- History
Latvia
Strongest usable evidence: Adaptability, at 78.2. Raise Building first, at 30.1. Experimentation needs more evidence: confidence is 0.33.
Raise, lowest first
| Dimension | Confidence | Score |
|---|---|---|
| Building | 0.57 | 30.1 |
Measure before managing
| Dimension | Confidence | Score |
|---|---|---|
| Experimentation | 0.33 | 43.2 |
| Coordination | 0.39 | 87.1 |
| Shared Purpose | 0.42 | 43.1 |
These lists are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 18 gaps in the registry.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Read Latvia beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
| Coordination | 0.39 | 3 of 5 | 0.81 | no trend | no data | no estimate | |
| Adaptability | 0.62 | 4 of 6 | 1.00 | no trend | no data | no estimate | |
| Anticipation | 0.46 | 2 of 4 | 0.96 | +8.8(2) | 59.0 | -3.6 | |
| Trust | 0.50 | 5 of 7 | 0.85 | no trend | no data | no estimate | |
| Agency | 0.56 | 4 of 5 | 0.75 | no trend | no data | no estimate | |
| Learning | 0.55 | 3 of 4 | 0.81 | no trend | no data | no estimate | |
| Experimentation | 0.33 | 4 of 9 | 0.81 | -4.3(3) | no data | no estimate | |
| Shared Purpose | 0.42 | 3 of 6 | 0.92 | +1.0(2) | 42.0 | -1.1 | |
| Building | 0.57 | 4 of 6 | 0.90 | -0.3(3) | no data | no estimate |
How to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 125 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
Anticipation
How capable is the country of identifying and preparing for emerging change?
+8.8 over 10 years, from 53.8 in 2016 to 62.6 on 2 indicators seen in both years.
Trends use fewer indicators than the current score and use today's frame. A longer span reaches further back.
- Raw value
- 88.081index 0-100
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IQ.SPI.OVRL)
- History
Government foresight capacity
direct capability measureno dataset exists- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: No comparable international dataset. OECD and UN work is descriptive, not scored. Envisioning would have to build this.
Long-horizon research commitments
direct capability measureno dataset exists- Raw value
- no data% of new grants
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: Redefined 2026-10-02 (D152). The row asked for the share of R&D spending classed as basic research, which is the make-up of a spending stock, the construct D142 retired business R&D share for. OECD MSTI publishes that share for its members only, and UNESCO UIS no longer serves R&D by type of research (construct audit, 2026-10-02). The behaviour behind it is a funder committing to a horizon: a grant awarded for five years or more is a decision to wait for a result. Untried: no memo has triaged a grant register. National funders publish award lists one by one with their own durations, and commercial grant aggregators fail the inspectability rule. Wireable on a grant-level register with award and end dates, on one definition of a competitive public grant, for half the frame or more.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2023
0.82 % of GDP, rank 42 of 118. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well (D122).
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2023
2,191 per million people, rank 38 of 114. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found (D122). Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
28,218 per million people, rank 31 of 125. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation (D122). Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel estimate, round 2, how this layer works
- 59.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Hold close to round 1: strong statistics, the Cross-Sectoral Coordination Centre and security and energy preparation alongside Baltic neighbours give solid anticipatory institutions. A thin public sector and slow response to foreseen demographic decline and emigration hold it back.
- 59.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Strong statistics, a cross-sectoral coordination centre and security and energy preparation alongside its Baltic neighbours, against a moderate research base and slow response to demographic decline and emigration. The panel agrees; I hold within a point.
- 59.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Strong statistics and security and energy preparation, with a middling research base and a demographic decline not yet met by policy. I move up one toward A and B.
Agency
How able are individuals and organizations to turn an intention into action?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
- Raw value
- 7.021per 1,000 aged 15-64
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.BUS.NDNS.ZS)
- History
- Raw value
- 5.5days
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.REG.DURS.MA.DY)
- History
- Raw value
- 4count
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.REG.PROC.MA.NO)
- History
Adults doing digital tasks
direct capability measureno dataset exists- Raw value
- no data% of adults
- Year
- no data
- Normalized
- no data
- Source
- ITU / UNESCO UIS (SDG 4.4.1, ICT skills by type)
- History
- no data
Note: Redefined 2026-10-02 (D152). The row asked whether adults can perform standard digital tasks, which reads a skill level, the kind of stock D122 moved out of the scores with internet users. It now counts the act: a person who did the task. It is not the internet users condition beside it, which counts access. Candidate: ITU ICT skills by type (SDG 4.4.1) through the UNESCO UIS API, probed 2026-10-02. Sent a message with an attached file reaches 33 of the 53 countries then in the frame, 25 at 2018 or later, with no United States, India or China and most of Africa and Central America missing; two other task items reach 31 and 16. The items are self-reported and the task list has changed between rounds. Wireable on one task observed for half the frame or more at 2018 or later.
- Raw value
- 6.6mean 1-10
- Year
- 2022. The rail runs from 1960 to 2026.
- Normalized
- Source
- Joint EVS/WVS (A173)
- History
- one year
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
92.7 % of population, rank 27 of 125. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting (D122). Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
95 % aged 15+, rank 26 of 122. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action (D122). Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2024
29.3 % of GDP, rank 85 of 124. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it (D122). High values can also signal a credit bubble, so more is not always better.
Coordination
How effectively can independent actors organize around shared objectives?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
Government effectiveness
perception proxyretired, see notes- Raw value
- no dataz-score -2.5 to 2.5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (GOV_WGI_GE.EST)
- History
- no data
Note: Retired 2026-08-26. The WGI aggregate the opinions of experts and firms, and in this set the four WGI series correlate with each other between 0.93 and 0.98 while correlating with log GDP per capita at 0.91. That is one perception of national wealth counted in three dimensions. Cross-agency delivery records are the replacement and they are a declared gap. See D23 and A4.
Regulatory quality
perception proxyretired, see notes- Raw value
- no dataz-score -2.5 to 2.5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (GOV_WGI_RQ.EST)
- History
- no data
Note: Retired 2026-08-26. Same measurement as government effectiveness, filed under a different name, correlating with it above 0.93. See D23 and A4.
Logistics performance
perception proxyretired, see notes- Raw value
- no dataindex 1-5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (LP.LPI.OVRL.XQ)
- History
- no data
Note: Retired 2026-08-26. The LPI is a survey of international freight forwarders, so it records how a country looks to global logistics firms. A small country with a small port scores low whatever its state can organise, which is artefact A9. Container throughput and border time are observable and stay. See D23.
- Raw value
- 24hours
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (TRD.ACRS.BRDR.EXPT.BRDR.COMP.HR.DB1619)
- History
- Raw value
- 109.443percentage points from approved budget
- Year
- 2022. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (GF.XPD.BUDG.ZS)
- History
University-industry collaboration
direct capability measureno dataset exists, 1 record- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- Global Innovation Index
- History
- no data
Note: GII carries it, but the underlying item is a WEF executive opinion survey whose microdata is not inspectable. Excluded on principle 4.
- Raw value
- 0.892index 0-1
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- V-Dem (v2x_cspart)
- History
- one year
Public-private collaboration
direct capability measureno dataset exists, 1 record- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: No comparable dataset. PPP investment databases measure infrastructure finance, not collaboration capacity.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2024
4.51 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
Kompetences centri, the industry competence centres programme
Latvia's six industry competence centres, funded through the Investment and Development Agency with 53.2 million euros of ERDF money, had run 231 research projects involving 164 companies and 33 scientific partners by 31 December 2014, of which 78 were completed and 44 percent involved cooperation with scientific institutions.
231 research projects, research projects supported in the six competence centres (table 3, total), 2014-12-31. 164 companies, industry partners in the six competence centres (table 3, total), 2014-12-31. Ekonomikas ministrija (Ministry of Economics of Latvia), ex-ante evaluation of SAM 1.2.1.1 'Atbalsts jaunu produktu un tehnoloģiju izstrādei kompetences centru ietvaros', Riga 2015, chapter 2 (evaluation of the 2007 to 2013 programme), retrieved 2026-10-02.
How it worked: The economics ministry funded industry-led competence centres, companies grouped by sector, which commissioned or ran research projects for their members, partly with universities and institutes, from EU structural funds.
Limits: The ministry evaluated a programme its own agency ran, and the figures are in a 43-page PDF: the 164 companies, 231 projects and 78 completed are on printed page 10 (PDF page 10) and Table 3 with 33 scientific partners on printed page 10 to 11 (PDF page 11). Most projects were firms' own research: the same evaluation says only 44 percent of projects involved cooperation with private or public scientific institutions, with 24 registered institutions, so the 231 overstates university-firm collaboration, and the 33 scientific partners count partners of the centres, not distinct universities. The programme was suspended from December 2011 to May 2012 and the centres only started full operation in 2013; by the end of 2014 they had drawn 56 percent of their funding and completed 34 percent of projects. Patents (3) and publications (25 against 107 planned) were few. The data are eleven years old. The evaluation states the 2007 to 2013 centre projects were to run until 31 December 2015, so this delivery is concluded; a successor competence centre programme for 2014 to 2020 under the same agency is what this ex-ante evaluation prepares, and this record does not show its scale.
Ķekava bypass, the first major road PPP in the Baltic states
Latvia's Ministry of Transport and the state roads company signed a design, build, finance and maintain contract for the Ķekava bypass on the A7 on 16 July 2021, the private partner Kekava ABT built the roughly 18 km road from 2021 to 2023 and it opened on 13 October 2023, with the state paying EUR 250.13 million in availability payments over 20 years.
250.13 EUR million, total availability payments over the 20-year maintenance period, 2023-10-13. 27 months, months from contract signature (16 july 2021) to opening (13 october 2023), 2023-10-13. Centrālā finanšu un līgumu aģentūra (CFLA), Atklāj vērienīgāko PPP ceļu projektu Baltijā: Ķekavas apvedceļu (news, October 2023), retrieved 2026-10-02.
How it worked: The transport ministry and the state roads company procured a bypass as one design, build, finance and maintain contract, the private partner built it in about two years, and the state pays quarterly for 20 years once the road is available.
Limits: CFLA supervises PPP projects in Latvia and is part of the delivery it reports, so this is the supervisor's announcement on opening day, not an audit. The 27 months are our arithmetic from the two dates on the page; the page gives no planned opening date, so it does not show whether the road opened on schedule, and it gives no construction cost separate from the availability payments. The same page says the state roads company had to obtain several Eurostat opinions to keep the project off the government balance sheet, and that CFLA is working to remove that step: the procedure was slow before construction began. One project is not a programme; the page calls it the first large road PPP in the Baltic states, which also means Latvia has no record of repeating it. Representatives of the Nordic Investment Bank and the European Investment Bank took part in the opening; the page does not describe the financing.
Trust
How much cooperation is possible beyond immediate personal networks?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
Rule of law
perception proxyretired, see notes- Raw value
- no dataz-score -2.5 to 2.5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (GOV_WGI_RL.EST)
- History
- no data
Note: Retired 2026-08-26. A WGI perception composite correlating with control of corruption above 0.95 and with log GDP per capita at 0.83. Court throughput and case clearance rates are the observable replacement and are a declared gap. See D23 and A4.
Control of corruption
perception proxyretired, see notes- Raw value
- no dataz-score -2.5 to 2.5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (GOV_WGI_CC.EST)
- History
- no data
Note: Retired 2026-08-26. A WGI perception composite. It measures reputation for corruption, which is not the same thing as corruption, and it tracks income closely. Prosecution and audit records are the observable replacement and are a declared gap. See D23 and A4.
- Raw value
- 469days
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (ENF.CONT.DURS.DY)
- History
- Raw value
- 0.042% of firms
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.FRM.BRIB.ZS)
- History
- Raw value
- 3.183scale 0-4 (never to always)
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- V-Dem (v2jucomp_osp)
- History
- one year
Intentional homicide rate
downstream outcomeretired, see notes- Raw value
- no dataper 100,000 people
- Year
- no data
- Normalized
- no data
- Source
- World Bank (VC.IHR.PSRC.P5)
- History
- no data
Note: Added 2026-08-26 by D23 as the observable replacement for two retired WGI perception composites, and retired 2026-08-27 by D44 when the diagnostic built in D42 measured what it was doing. It raised this dimension's correlation with log GDP per capita by 0.288, from 0.096 to 0.385, the largest single wealth contribution anywhere in the model. It was added to fix wealth contamination and it was the wealth contamination. The dataset is sound and the objection is to what it measures here: homicide is driven heavily by organised crime, a society can be physically safe while trusting very little, and across this country set the variation it carries is mostly income. Behavioural trust measures remain a gap.
- Raw value
- 22.2% agreeing
- Year
- 2022. The rail runs from 1960 to 2026.
- Normalized
- Source
- Joint EVS/WVS (A165)
- History
- one year
Trust in public institutions
perception proxyno dataset exists- Raw value
- no data% expressing confidence
- Year
- no data
- Normalized
- no data
- Source
- OECD Trust Survey / WVS
- History
- no data
Note: The OECD survey covers members only. Mixing it with WVS items for India and South Africa would break comparability. The Joint EVS/WVS confidence battery (E069) reaches 37 countries from one release, and confidence in the courts (E069_17) is published beside Trust as a check under this id rather than scored: every item of the battery tested (courts, civil service, police, parliament and government) reads higher in the closed and electoral autocracies of the frame than in its democracies, which is deference as much as confidence (A13). The gap stays open for a measure that does not reward a court that cannot rule against the state. See D132.
- Raw value
- 21.3% expressing trust
- Year
- 2022. The rail runs from 1960 to 2026.
- Normalized
- Source
- Joint EVS/WVS (G007_34_B)
- History
- one year
Court case clearance rate
downstream outcomeno dataset exists- Raw value
- no data% of incoming cases
- Year
- no data
- Normalized
- no data
- Source
- CEPEJ / OECD / national court statistics
- History
- no data
Note: Whether a court finishes what it starts, counted from case records rather than asked in a survey. D23 named it as the observable replacement for the two retired WGI composites and it has stayed unfilled since. CEPEJ publishes it for Council of Europe members and OECD for its own members, so no single publisher reaches this country set, and a harmonised series needs the project second source adapter. See D57.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Confidence in the courtsJoint EVS/WVS (E069_17), 2022
5.4 % a great deal, higher is better. Share of survey respondents saying they have a great deal of confidence in the justice system and courts, of the four answers a great deal, quite a lot, not very much and none at all, in the Joint EVS/WVS 2017 to 2022 survey round.
Confidence in the courts is the public half of what this capability asks: whether people expect the rules to be enforced when a stranger breaks them. It is not scored because the survey answer reads two things the number cannot tell apart. Where courts are independent, confidence is a judgment of how they perform. Where they answer to the state, it is also deference, and saying otherwise to an interviewer has a cost. In this frame the pattern runs the wrong way. India, the Philippines and Indonesia, all electoral autocracies in the V-Dem 2025 classification, lead on the share saying a great deal, and Vietnam and China, the two closed autocracies surveyed, lead once quite a lot is counted too. The ten electoral autocracies average 21.8 percent saying a great deal and the two closed autocracies 28.1, against 13.6 for liberal and 8.4 for electoral democracies. Scored, it would rank highest the states whose courts are least able to rule against them. Income is not why it is left out: the share correlates about -0.18 with log GDP per capita. The value is the share saying a great deal; the share saying quite a lot is in the source note.
Learning
How effectively does the country acquire, distribute, and update knowledge?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
- Raw value
- 0.707index 0-1
- Year
- 2020. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (HD.HCI.OVRL)
- History
- Raw value
- 43.281% of firms
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.FRM.TRNG.ZS)
- History
Adult learning participation
direct capability measureno dataset exists, 1 record- Raw value
- no data% of adults
- Year
- no data
- Normalized
- no data
- Source
- Eurostat / OECD PIAAC
- History
- no data
Note: The best available measure of continuous learning capacity, and it exists only for European and OECD members.
- Raw value
- 1.148ratio to world average
- Year
- 2021. The rail runs from 1960 to 2026.
- Normalized
- Source
- OpenAlex (citation_normalized_percentile.is_in_top_10_percent)
- History
- one year
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2024
82.9 % gross, rank 18 of 124. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned (D122).
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2022
4.3 % of GDP, rank 55 of 125. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about (D122).
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2018
20.4 % of secondary, rank 35 of 125. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better (D141). It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
Mācības pieaugušajiem, the ESF training programme for employed adults 2017 to 2023
Latvia's State Education Development Agency (VIAA) trained almost 77,000 employed adults aged 25 and over through its ESF-funded 'Mācības pieaugušajiem' project between 2017 and 2023, in ten rounds and 2,309 programmes offered by 124 education institutions, with 90 to 100 percent of fees covered.
77,000 persons, employed persons aged 25 and over who improved their competence in the project ('teju 77 000', almost 77,000), 2017 to 2023. 2,309 programmes, education programmes offered in the project, 2017 to 2023. Valsts izglītības attīstības aģentūra (State Education Development Agency of Latvia), project page 'ESF projekts Nodarbināto personu profesionālās kompetences pilnveide', published 4 December 2024, retrieved 2026-10-02.
How it worked: The national education agency bought places on formal and non-formal programmes from colleges, universities and vocational schools and offered them to employed adults in competitive rounds, with EU money paying almost the whole fee.
Limits: The agency reports on its own project, and the headline is a rounded 'almost 77,000' credited to 'project data' with no table behind it; whether it counts people or enrolments is not stated, and an adult who took part in two rounds may be counted twice. The figure covers seven years, roughly 11,000 a year against fewer than a million employed people, and only employed adults aged 25 and over, so the unemployed and young adults are outside it. 'Improved their competence' is the agency's wording; the page does not say how many completed a programme or gained a qualification, beyond 1,909 people compensated for a qualification exam. The project was financed by the European Social Fund and ended in 2023; the agency has since moved to individual learning accounts funded by the EU recovery plan, which this record does not cover.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
-4.3 over 10 years, from 28.6 in 2016 to 24.3 on 3 indicators seen in both years.
+0.3 over 20 years, from 26.2 in 2006 to 26.5 on 2 indicators seen in both years.
Trends use fewer indicators than the current score and use today's frame. A longer span reaches further back.
- Raw value
- 104per million people
- Year
- 2021. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IP.PAT.RESD)
- History
- Raw value
- 2321per million people
- Year
- 2021. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IP.TMK.RSCT)
- History
- Raw value
- 84per million people
- Year
- 2021. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IP.IDS.RSCT)
- History
- Raw value
- 133868per million people
- Year
- 2026. The rail runs from 1960 to 2026.
- Normalized
- Source
- GitHub Innovation Graph (data/repositories.csv)
- History
- no data
Venture deals
direct capability measureno dataset exists- Raw value
- no dataper million people
- Year
- no data
- Normalized
- no data
- Source
- OECD / national VC associations
- History
- no data
Note: Redefined 2026-10-02 (D152). The id keeps its first name so evidence records, links and published files still resolve. The row asked for venture capital deployed as a share of GDP, a level of financial depth of the kind private credit is (D122). A count of first rounds counts attempts started with outside risk money, which is what this capability asks about, and a large round counts once. Candidates, none wireable: the OECD SME and Entrepreneurship Financing scoreboard carried venture capital for 6 of the 16 countries the frame held on 2026-08-26, as amounts in national currency, latest year 2022, with Brazil, India, South Africa and Singapore absent (D21); national venture capital associations publish counts on their own definitions; commercial deal databases cover the world and are not inspectable (D10). Wireable on an inspectable deal count with one definition of a first round for half the frame or more. Read A1 before treating this dimension as measured.
Early-stage entrepreneurial activity
direct capability measuremissing- Raw value
- no data% aged 18-64
- Year
- no data
- Normalized
- no data
- Source
- Global Entrepreneurship Monitor (APS key indicators, TEA rate)
- History
- no data
Note: From the GEM Adult Population Survey, entered by hand because GEM has no open API. TEA counts every new business, so necessity self-employment scores the same as a funded startup, which is why Chile and Argentina sit above the United States here. Read it as how many people are trying, not as how much value the attempts create. GEM does not run every economy every year: Singapore last took part in 2014 and the recency term marks that value down hard.
Tolerance of entrepreneurial failure
perception proxymissing- Raw value
- no data% not deterred
- Year
- no data
- Normalized
- no data
- Source
- Global Entrepreneurship Monitor (APS key indicators, fear of failure rate)
- History
- no data
Note: Stored as 100 minus the published GEM fear of failure rate, so the direction matches the rest of the registry. GEM measures that rate among adults who already see good opportunities, not among all adults, so the denominator differs from the label. Attitudinal: bankruptcy law and time to discharge would be the observable substitute and are still worth wiring beside it.
Firms through regulatory sandboxes
direct capability measureno dataset exists- Raw value
- no datafirms per million people
- Year
- no data
- Normalized
- no data
- Source
- national regulators
- History
- no data
Note: Redefined 2026-10-02 (D152). The row asked for the number and breadth of live sandboxes, which is a policy stock: a regime can exist with nobody in it. It now counts what passes through: firms a regulator let test under relaxed rules, and firms that came out, authorised, withdrawn or failed. Regulators publish cohort lists and exit reports one by one. The evidence corpus holds 22 records against this row, most of them counts of firms admitted or exited, each on the definition and window of its own regulator, and no register assembles them on one definition (O1 triage sweep, 2026-10-01). A realistic candidate for Envisioning to build from those lists. Wireable on a register that counts admissions and completions on one definition for half the frame or more.
University spinouts
direct capability measureno dataset exists- Raw value
- no dataper million people
- Year
- no data
- Normalized
- no data
- Source
- national TTO associations
- History
- no data
Note: Reported nationally with incompatible definitions of what counts as a spinout.
Business share of R&D
capability inputretired, see notes- Raw value
- no data% of R&D
- Year
- no data
- Normalized
- no data
- Source
- OECD MSTI / RICYT
- History
- no data
Note: Retired 2026-10-02. The only working source, OECD MSTI joined with RICYT for Latin America, covers 34 of the 53 countries then in the frame, but the row reads the make-up of a spending stock: who performs the R&D a country pays for. R&D spending itself is a condition since D122, and the share is high both where business research is large (Israel) and where total research is tiny and one firm dominates it (Thailand). State enterprises count as business, so China and Vietnam read their ownership model. UIS stopped publishing the series in 2023. Firms trying new things are read through patents, trademarks, designs and entrepreneurship instead. See D142.
Adaptability
How effectively can the system respond when circumstances change?
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
- Raw value
- 6.568% of labour force
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (SL.UEM.TOTL.ZS)
- History
- Raw value
- 33.7% of unemployed
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB)
- History
- one year
- Raw value
- 0.076index 0-1, lower = more diversified
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- UNCTAD (US.ConcentDiversIndices)
- History
- one year
- Raw value
- 6.63% of products not exported competitively at the start
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ))
- History
- one year
Disaster preparedness and recovery
direct capability measureno dataset exists, 1 record- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- INFORM / UNDRR
- History
- no data
Note: No source observes a country preparing for or recovering from a real shock. INFORM publishes its lack of coping capacity apart from hazard and exposure, but that dimension averages government self-assessments and governance perception indices with stocks such as roads, phones and physicians, which is the perception layer D23 retired plus conditions money buys (D122). Sendai and WHO reporting are governments grading themselves. A warning-reach survey item is a check candidate. See the disaster preparedness memo.
Institutional responsiveness
direct capability measureno dataset exists- Raw value
- no dataindex 0-100
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: No dataset exists. Measurable in principle from legislative and regulatory timestamps, which no one has assembled comparably.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
76.6 % aged 15+, rank 36 of 125. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating (D141). Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
25.8 per 100 people, rank 49 of 125. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing (D122). Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
5.8 % of output, rank 27 of 117. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing (D141). Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025
8.9 % of employment, rank 26 of 102. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating (D150). Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
National warning siren network and its twice-yearly test
Latvia's State Fire and Rescue Service tested the national early warning siren network on 23 May 2025 and reported that 160 of the 162 sirens tested worked without faults, out of 164 installed, against 119 of 155 in the test of 20 May 2024.
160 of 162 tested (164 installed), sirens that worked without faults in the national test, 2025-05-23. 119 of 155 tested (164 installed), sirens that worked without faults in the national test a year earlier, 2024-05-20. Valsts ugunsdzēsības un glābšanas dienests (State Fire and Rescue Service of Latvia), news item 'Pārbaudot 162 trauksmes sirēnas, bez traucējumiem nostrādāja 160 sirēnas', 23 May 2025, retrieved 2026-10-02.
How it worked: The fire and rescue service sounds every national warning siren twice a year, publishes how many worked by region, and repairs or relocates the failures before the next test.
Limits: The fire service reports on its own system. A test is not a shock: the record shows that sirens sounded on a set day, not that people were warned or acted in a real event, and the item does not say what share of the population lives within hearing range of 164 sirens. Sirens not tested because they were being moved, repaired or renewed (two in May 2025, nine in May 2024) are outside the denominator. The 2024 figure is from the service's item of 20 May 2024 (https://www.vugd.gov.lv/lv/jaunums/parbaudot-155-trauksmes-sirenas-bez-traucejumiem-nostradaja-119-sirenas); other items in the series give 152 of 158 (May 2023), 138 of 159 (November 2023) and 151 of 158 (November 2024), and in June 2022 the remote activation software failed and the sirens had to be started by hand, so performance has swung between tests rather than improved steadily. No test result after May 2025 was found in the service's sitemap. The started year is the first test in the series read (June 2022), not the founding of the network; Latvia also sends cell broadcast and app alerts, which this figure does not cover.
Building
How capable is the country of turning plans and knowledge into functioning systems?
-0.3 over 10 years, from 19.9 in 2016 to 19.6 on 3 indicators seen in both years.
Trends use fewer indicators than the current score and use today's frame. A longer span reaches further back.
- Raw value
- 9.988% of GDP
- Year
- 2025. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (NV.IND.MANF.ZS)
- History
- Raw value
- 17.49% of manufactured exports
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (TX.VAL.TECH.MF.ZS)
- History
Logistics infrastructure quality
perception proxyretired, see notes- Raw value
- no dataindex 1-5
- Year
- no data
- Normalized
- no data
- Source
- World Bank (LP.LPI.INFR.XQ)
- History
- no data
Note: Retired 2026-08-26. An LPI sub-index, so the same freight-forwarder survey as logistics performance and the same problem. Electricity connection speed stays as the observable infrastructure measure in this dimension. See D23.
- Raw value
- 61.304score 0-100
- Year
- 2019. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (IC.ELC.TIME.DFRN)
- History
- Raw value
- 0.136index
- Year
- 2024. The rail runs from 1960 to 2026.
- Normalized
- Source
- World Bank (EF.EFM.UNIV.XD)
- History
Large project delivery
direct capability measureno dataset exists, 1 record- Raw value
- no data% overrun
- Year
- no data
- Normalized
- no data
- Source
- none
- History
- no data
Note: The single best measure of execution capability and there is no comparable international dataset. Assembling one is a defensible Envisioning project. Building mixes industrial output with state delivery capacity, and this indicator carries the delivery side: the other six indicators cannot see a national programme that was delivered. Documented deliveries are recorded in data/evidence and never scored, see D20.
Firm scale-up rate
direct capability measureno dataset exists- Raw value
- no data% of firms
- Year
- no data
- Normalized
- no data
- Source
- OECD DynEmp
- History
- no data
Note: OECD business dynamics work covers members irregularly. Nothing comparable for India, Brazil or South Africa.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
80,906 constant 2021 PPP $, rank 39 of 123. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context (D122).
Evidence for missing indicators
Each record describes a case the indicators above cannot see. It does not affect the score or confidence because one case is not comparable across countries. A gap can become an indicator when a comparable series covers at least two countries.
Rail Baltica in Latvia, and its cost and schedule overrun
The Latvian State Audit Office found in June 2024 that the estimated construction cost of Rail Baltica's main line in Latvia had risen sevenfold since 2017 to about 8.7 billion euros, that design work due by the end of 2021 was only 54 percent complete and now planned to finish by the end of 2027, and that the Riga Central Station works contracted in 2019 at 430 million euros had risen to 565 million euros.
8.7 billion euros (about), estimated construction cost of the rail baltica main line, latvian section, 2024-06. 54 %, share of main line design work completed, against an original deadline of end 2021, 2024-06. Valsts kontrole (State Audit Office of the Republic of Latvia), news release 'Rail Baltica tvērums Latvijā mainījies bez vienotas pieejas un lēmumi ir grūti izsekojami', 12 June 2024, with the attached infographic of the national situation review, retrieved 2026-10-02.
How it worked: The transport ministry approved scope changes and cost increases for stations, the Riga node and the main line itself, often without bringing a full cost picture to the Cabinet, while design guidelines kept changing and EU co-financing deadlines kept slipping.
Limits: The source is a situation review (situācijas izpēte), which the audit office itself describes as a short compilation of facts with no conclusions or recommendations, not a full audit. The 8.7 billion is stated as 'aptuveni' (about) and as a sevenfold rise since 2017, so the 2017 baseline (roughly 1.2 billion) is implied, not printed; it is not used as a metric here. Much of the rise is scope and specification change (the design guidelines were revised more than 100 times after 2018, and the station node went from two tracks to four), so the multiple measures how far the 2017 estimate was from a buildable project as much as delivery performance. The project is not finished: the release says only 4.5 percent of the needed main line financing was available, and the joint Baltic review it summarises puts the whole three-country project at 23.8 billion euros in 2023 against 5.8 billion in 2017, with the first phase now due in 2030. Rail Baltica is a joint Estonian, Latvian and Lithuanian project funded about 85 percent by the EU; this record covers only the Latvian section and the Latvian ministry's management. Status is operating because the project is under construction; a decision to phase or cut the Latvian scope after June 2024 was not checked at an official source. The started year is the 2016 Cabinet approval of the project scope named in the release. The 565 million euro station figure is computed here: the release says the 2019 contract cost of 430 million euros rose by a further 135 million in 2024, and does not print 565.