Skip to content
NCBNational Capability Benchmark
Navigate with โ†‘ โ†“Enter to openEsc to close

Challenge the benchmark

Choose a score and give the benchmark a specific reason to reconsider it.

When you submit, the form attaches the current score and confidence for the country and capability you chose.

Submissions are public and start as awaiting review. A maintainer can add a response and signature after review.

Cyprus

Strongest usable evidence: Learning, at 74.6. Raise Experimentation first, at 23.8. Shared purpose needs more evidence: confidence is 0.30.

A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.

Raise, lowest first

  • Experimentation

    Experimentation

    How easily can new approaches be attempted, tested, abandoned, and improved?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 49.60.47 usable-2.1(3)
  • Building

    Building

    How capable is the country of turning plans and knowledge into functioning systems?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 54.70.63 usable+2.6(3)

Measure before managing, thinnest first

  • Shared purpose

    Shared purpose

    To what extent can people imagine themselves as participants in a common project?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 69.90.30 thin+2.1(2)
  • Trust

    Trust

    How much cooperation is possible beyond immediate personal networks?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 88.20.34 thinno trend

Keep watching, highest first

  • Learning

    Learning

    How effectively does the country acquire, distribute, and update knowledge?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 72.80.55 usableno trend
  • Coordination

    Coordination

    How effectively can independent actors organize around shared objectives?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 85.20.45 usableno trend
  • Anticipation

    Anticipation

    How capable is the country of identifying and preparing for emerging change?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 72.90.46 usable+25.5(2)
  • Adaptability

    Adaptability

    How effectively can the system respond when circumstances change?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 71.40.62 usable+5.7(4)
  • Agency

    Agency

    How able are individuals and organizations to turn an intention into action?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loadingโ€ฆ

    Peers 58.60.49 usableno trend

These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.

255075100
AnticipationCyprus66.8Income peers72.9Confidence0.46usableHow capable is the country of identifying and preparing for emerging change?
CyprusIncome peers

Read Cyprus beside up to three other countries, down to the indicator behind every row.

  • Usable or good evidence
  • Thin evidence, hollow point. The dashes open further as confidence falls.
  • The point still sits at the score, because confidence never moves it.
  • Click any axis to see every country on that dimension.

A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.

Confidence

Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.

Download this country as CSV
How to read this page

Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.

A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.

A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.

The record behind each score

Anticipation

How capable is the country of identifying and preparing for emerging change?

66.80.46 usable2 of 4

Recency 0.96About AnticipationCyprus beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 1 of 2 indicators modelled2001: 1 of 2 indicators modelled2002: 1 of 2 indicators modelled2003: 1 of 2 indicators modelled2004: 1 of 2 indicators modelled2005: 1 of 2 indicators modelled2006: 1 of 2 indicators modelled2007: 1 of 2 indicators modelled2008: 1 of 2 indicators modelled2009: 1 of 2 indicators modelled2010: 1 of 2 indicators modelled2011: 1 of 2 indicators modelled2012: 1 of 2 indicators modelled2013: 1 of 2 indicators modelled2014: 1 of 2 indicators modelled2015: 1 of 2 indicators modelled2016: 0 of 2 indicators modelled2017: 0 of 2 indicators modelled2018: 0 of 2 indicators modelled2019: 0 of 2 indicators modelled2020: 0 of 2 indicators modelled2021: 0 of 2 indicators modelled2022: 0 of 2 indicators modelled2023: 0 of 2 indicators modelled2024: 0 of 2 indicators modelled2025: 0 of 2 indicators modelled2026: 0 of 2 indicators modelledmodel
  • Reconstruction on today's 2 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+25.4 over 10 years (2016 to 2026), band +25.4 to +25.4. Median change: all countries +11.2, Income quartile 4 of 4 in 2000, highest +8.4.

+35.3 over 20 years (2006 to 2026), band +28.9 to +43.2. Median change: all countries +13.4, Income quartile 4 of 4 in 2000, highest +12.4.

The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+25.5 over 10 years, from 41.3 in 2016 to 66.8 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Scientific articles

Scientific and technical journal articles published, per million people.

Measured in articles per million people; higher is better. Source: World Bank (IP.JRN.ARTC.SC), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IP.JRN.ARTC.SC)
1,312articles per million peoplefrom 1,764.12 national total2023. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Scientific articles

Scientific and technical journal articles published, per million people.

Measured in articles per million people; higher is better. Source: World Bank (IP.JRN.ARTC.SC), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Statistical performance

World Bank Statistical Performance Indicators overall score for the national statistical system.

Measured in index 0-100; higher is better. Source: World Bank (IQ.SPI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IQ.SPI.OVRL)
85.1index 0-1002024. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Statistical performance

World Bank Statistical Performance Indicators overall score for the national statistical system.

Measured in index 0-100; higher is better. Source: World Bank (IQ.SPI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2023

    0.68 % of GDP, rank 50 of 123. Gross domestic expenditure on research and development as a share of GDP.

    A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.

  • Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2023

    1,686 per million people, rank 42 of 118. Full-time-equivalent researchers per million people.

    A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.

  • Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024

    221,298 per million people, rank 2 of 135. Servers using encryption in internet transactions, per million people.

    A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.

Panel median54.0-12.8 against the indicators

Round 2. How this layer works

  • 50.0 institutionalist@claude-opus-5-5, self-confidence 0.45

    Held at 50. The others agree articles (50) overstate a small university base; I see no standing foresight unit in Cyprus beyond EU semester obligations, so the 66.8 indicator rests on the statistics row alone.

  • 55.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Hold 55: I already discounted the article score for a small university base; A gives no new evidence below that.

  • 54.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Held near 55. The 50/100 article score reflects a small, rich, English-publishing university base and I still discount it; B's reasoning agrees. No foresight body is evidenced beyond EU Semester duties.

Agency

How able are individuals and organizations to turn an intention into action?

58.00.49 usable3 of 5

Recency 0.86About AgencyCyprus beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 3 of 3 indicators modelled2001: 3 of 3 indicators modelled2002: 3 of 3 indicators modelled2003: 3 of 3 indicators modelled2004: 3 of 3 indicators modelled2005: 3 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 1 of 3 indicators modelled2009: 1 of 3 indicators modelled2010: 1 of 3 indicators modelled2011: 1 of 3 indicators modelled2012: 1 of 3 indicators modelled2013: 1 of 3 indicators modelled2014: 1 of 3 indicators modelled2015: 1 of 3 indicators modelled2016: 1 of 3 indicators modelled2017: 1 of 3 indicators modelled2018: 1 of 3 indicators modelled2019: 1 of 3 indicators modelled2020: 1 of 3 indicators modelled2021: 1 of 3 indicators modelled2022: 1 of 3 indicators modelled2023: 1 of 3 indicators modelled2024: 1 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+0.2 over 10 years (2016 to 2026), band -4.2 to +5.1, which includes no change. Median change: all countries +1.9, Income quartile 4 of 4 in 2000, highest +0.8.

+2.1 over 20 years (2006 to 2026), band -3.6 to +7.9, which includes no change. Median change: all countries +9.3, Income quartile 4 of 4 in 2000, highest +6.8.

The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2008, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

New business density

New limited liability companies registered per 1,000 working-age people.

Measured in per 1,000 aged 15-64; higher is better. Source: World Bank (IC.BUS.NDNS.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BUS.NDNS.ZS)
2.1per 1,000 aged 15-642024. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

New business density

New limited liability companies registered per 1,000 working-age people.

Measured in per 1,000 aged 15-64; higher is better. Source: World Bank (IC.BUS.NDNS.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Business entry efficiency

B-READY score for the time and cost to register a new domestic or foreign limited liability company.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BE.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.BE.P3)
86.9score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Business entry efficiency

B-READY score for the time and cost to register a new domestic or foreign limited liability company.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BE.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Procedures to start a business

Number of separate official procedures to register a company.

Measured in count; lower is better. Source: World Bank (IC.REG.PROC.MA.NO), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.REG.PROC.MA.NO)
5count2019. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Procedures to start a business

Number of separate official procedures to register a company.

Measured in count; lower is better. Source: World Bank (IC.REG.PROC.MA.NO), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.

This project retired one row: Time to start a business.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024

    89.6 % of population, rank 43 of 135. Share of the population that used the internet in the last three months.

    A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.

  • Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024

    96.1 % aged 15+, rank 25 of 131. Adults with an account at a bank or mobile money provider.

    A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.

  • Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2024

    56.7 % of GDP, rank 46 of 134. Domestic credit provided to the private sector by financial corporations.

    A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.

Panel median52.0-6.0 against the indicators

Round 2. How this layer works

  • 52.0 institutionalist@claude-opus-5-5, self-confidence 0.50

    Moved from 54 to 52. Panelist B's point stands: density of 2.1 per 1,000 is low even with holding structures in the count, so resident start-up behaviour may be weaker than the row shows. Entry efficiency of 86.9 and 5 procedures remain strong rules. From my own knowledge the registry modernised late. The 58 score leans on those rules.

  • 50.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Held at 50, below the 58 indicator score. Entry efficiency of 86.9 and 5 procedures are good, but density of 2.1 per 1,000 (12/100) is low. From my own knowledge a part of the register is holding structures, so resident start-up behaviour may be weaker. A and C are 2 to 4 points higher on the same facts and give no reason that outweighs this. Family firms and tourism own-account work add some unrecorded activity.

  • 52.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    I hold 52. Entry efficiency 87 (83) and 5 procedures show friction-free registration, but density 2.1 per 1,000 (12) is low and Cyprus registers many holding and shell companies, so the registry does not equal domestic action. The two other panelists sit at 50 and 54 and I find no reason to move.

Coordination

How effectively can independent actors organize around shared objectives?

73.90.45 usable3 of 5

Recency 0.94About CoordinationCyprus beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 3 indicators modelled2001: 2 of 3 indicators modelled2002: 2 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 2 of 3 indicators modelled2009: 2 of 3 indicators modelled2010: 2 of 3 indicators modelled2011: 2 of 3 indicators modelled2012: 2 of 3 indicators modelled2013: 2 of 3 indicators modelled2014: 2 of 3 indicators modelled2015: 2 of 3 indicators modelled2016: 2 of 3 indicators modelled2017: 1 of 3 indicators modelled2018: 1 of 3 indicators modelled2019: 1 of 3 indicators modelled2020: 1 of 3 indicators modelled2021: 1 of 3 indicators modelled2022: 1 of 3 indicators modelled2023: 1 of 3 indicators modelled2024: 1 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-4.2 over 10 years (2016 to 2026), band -10.2 to +1.4, which includes no change. Median change: all countries -1.7, Income quartile 4 of 4 in 2000, highest -3.2.

-6 over 20 years (2006 to 2026), band -10.7 to +0.5, which includes no change. Median change: all countries -2.7, Income quartile 4 of 4 in 2000, highest -3.4.

The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2017, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

Trade compliance efficiency

B-READY score for the time and cost firms report to comply with export and import requirements.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.IT.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.IT.P3)
52.1score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Trade compliance efficiency

B-READY score for the time and cost firms report to comply with export and import requirements.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.IT.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Budget execution fidelity

Distance between primary government expenditure and the original approved budget.

Measured in percentage points from approved budget; lower is better. Source: World Bank (GF.XPD.BUDG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (GF.XPD.BUDG.ZS)
108percentage points from approved budget2022. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Budget execution fidelity

Distance between primary government expenditure and the original approved budget.

Measured in percentage points from approved budget; lower is better. Source: World Bank (GF.XPD.BUDG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Civil society strength

Autonomy, density and participatory reach of civil society organisations.

Measured in index 0-1; higher is better. Source: V-Dem (v2x_cspart), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
V-Dem (v2x_cspart)
0.83index 0-12025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Civil society strength

Autonomy, density and participatory reach of civil society organisations.

Measured in index 0-1; higher is better. Source: V-Dem (v2x_cspart), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: University-industry collaboration (1 case below), Public-private collaboration (1 case below).

This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.

Behavioral check, not scored

Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.

  • Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2024

    9.369 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.

    Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 2006CyprusLarnaka and Pafos airports BOT concession to Hermes Airportsstill operating
    Cypruslinked to Public-private collaborationstarted 2006still operating

    Larnaka and Pafos airports BOT concession to Hermes Airports

    The Republic of Cyprus handed both of its international airports to the Hermes Airports consortium under a 25-year build-operate-transfer concession in May 2006; the consortium delivered new terminals at Pafos in 2008 and Larnaka in 2009, and traffic rose from 7,028,959 passengers in 2007 to 13,751,247 in 2025.

    13,751,247 passengers, passengers at larnaka and pafos airports combined, 2025. 7,028,959 passengers, passengers at larnaka and pafos airports combined, first full concession year, 2007. Hermes Airports, passenger traffic statistics for Larnaka and Pafos, retrieved 2026-10-17.

    How it worked: The Republic of Cyprus bundled both international airports into one 25-year BOT concession, so a consortium of construction, airport-operator and Cypriot investors financed and built the new terminals and recovers the cost from traffic before handing the assets back.

    Limits: The traffic series and the concession terms both come from the concessionaire's own website (the terms on hermesairports.com/corporate/who-we-are/), so this is self-reporting by the private partner and not a state or statistical office count. The tier is the closest available for an operator's traffic table; a reviewer may prefer to treat it as self-reporting. Passenger growth in Cyprus is driven by tourism demand and by airline entry after the 2015 collapse of Cyprus Airways, and the record cannot separate the concession's contribution from demand any operator would have seen. Traffic was flat at about seven million from 2007 to 2015 and fell to 2,312,697 in 2020 before recovering. The site gives no investment amount, only 'a substantial investment', and says nothing on fees paid to the state or on renegotiations. Two airports carry almost all of the island's air access, so the delivery is national in reach, but it is one infrastructure concession, a narrow slice of the construct.

  • 2018CyprusCompetitiveness and Sustainable Development programme 2014-2020, research and innovation prioritydelivered and closed
    Cypruslinked to University-industry collaborationstarted 2018delivered and closed

    Competitiveness and Sustainable Development programme 2014-2020, research and innovation priority

    Cyprus's cohesion programme for competitiveness and sustainable development reported that 143 enterprises it supported had cooperated with research institutions by the end of 2023, against a final target of 120, after a slow start in which only five had done so by the end of 2019.

    143 enterprises, enterprises cooperating with research institutions, investment priority 1b (common indicator co26, cumulative implemented value), 2023. 200 enterprises, original target for the same indicator, before it was lowered in 2020, 2019. European Commission, Cohesion Open Data Platform, ESIF 2014-2020 Achievement Details timeseries (programme 2014CY16M1OP001, indicator CO26), retrieved 2026-10-17.

    How it worked: Cyprus's research and innovation agency ran cohesion-funded calls that paid firms for research projects carried out with universities and research centres, and the managing authority reported each participating firm against a common European indicator.

    Limits: The values are what the Cypriot managing authority reported to the Commission in its annual implementation reports, so they are the programme's own account, republished by the Commission without audit. The target moved: it was 200 enterprises until 2019, 100 in 2020 to 2022 and 120 in 2023, so the programme exceeded a target that had been cut, and against the original target it reached 72 percent. Delivery came late, with two enterprises counted in 2018, five in 2019 and most of the total in the last three years. CO26 counts enterprises, not projects, money or results, and any firm that took part in a supported project with a research institution counts once, whatever the size of the collaboration. A research institution includes public research centres as well as universities, and the dataset does not split them or give a figure per call. The money was mostly European Regional Development Fund co-financing administered nationally. The year 2018 is the first year with a reported value, not the first call. The single-year URL carries the 2023 values; the earlier years are in the same dataset without the year filter.

Panel median62.0-11.9 against the indicators

Round 2. How this layer works

  • 62.0 institutionalist@claude-opus-5-5, self-confidence 0.45

    Held at 62. Panelist C's point that coordination in a small administration is face-to-face rather than institutional matches my reading of the citizenship-by-investment affair, and the Vasilikos terminal delays named by panelist B confirm weak cross-agency delivery despite good budget fidelity.

  • 63.0 bottom_up@claude-opus-5-5, self-confidence 0.35

    Revised slightly down from 65: A's point on the citizenship-by-investment scandal shows agencies coordinating around rents, which I had not weighed. I hold above C's 60 because budget fidelity and civil-society density are real, and coordination across the Green Line is not a fair test of the Republic's own state.

  • 61.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Moved from 60 to 61. Panelists A and B both point to delayed state energy projects and the citizenship-by-investment episode, which supports my discount. I keep the budget fidelity and civil society strength credit but not the 73.9.

Trust

How much cooperation is possible beyond immediate personal networks?

65.20.34 thin3 of 7

Recency 1.00About TrustCyprus beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 3 indicators modelled2001: 2 of 3 indicators modelled2002: 2 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 2 of 3 indicators modelled2009: 2 of 3 indicators modelled2010: 2 of 3 indicators modelled2011: 2 of 3 indicators modelled2012: 2 of 3 indicators modelled2013: 2 of 3 indicators modelled2014: 2 of 3 indicators modelled2015: 2 of 3 indicators modelled2016: 2 of 3 indicators modelled2017: 2 of 3 indicators modelled2018: 2 of 3 indicators modelled2019: 1 of 3 indicators modelled2020: 1 of 3 indicators modelled2021: 1 of 3 indicators modelled2022: 1 of 3 indicators modelled2023: 1 of 3 indicators modelled2024: 1 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-2.3 over 10 years (2016 to 2026), band -7 to +3.2, which includes no change. Median change: all countries +1.9, Income quartile 4 of 4 in 2000, highest +0.1.

-3.9 over 20 years (2006 to 2026), band -10.4 to +2.1, which includes no change. Median change: all countries +2.1, Income quartile 4 of 4 in 2000, highest +0.1.

The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2019, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

Dispute resolution efficiency

B-READY score for the reliability, time and cost of resolving a commercial dispute and enforcing the decision.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.DR.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.DR.P3)
40score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Dispute resolution efficiency

B-READY score for the reliability, time and cost of resolving a commercial dispute and enforcing the decision.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.DR.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Bribery incidence

Firms asked for at least one bribe payment across six public transactions covering utilities, permits, licences and taxes.

Measured in % of firms; lower is better. Source: World Bank (IC.FRM.BRIB.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IC.FRM.BRIB.ZS)
5.7% of firms2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Bribery incidence

Firms asked for at least one bribe payment across six public transactions covering utilities, permits, licences and taxes.

Measured in % of firms; lower is better. Source: World Bank (IC.FRM.BRIB.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Government compliance with the courts

How often the government complies with important decisions of the ordinary and specialised courts that it disagrees with.

Measured in scale 0-4 (never to always); higher is better. Source: V-Dem (v2jucomp_osp), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
V-Dem (v2jucomp_osp)
3.2scale 0-4 (never to always)2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Government compliance with the courts

How often the government complies with important decisions of the ordinary and specialised courts that it disagrees with.

Measured in scale 0-4 (never to always); higher is better. Source: V-Dem (v2jucomp_osp), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.

This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.

Panel median52.0-13.2 against the indicators

Round 2. How this layer works

  • 52.0 institutionalist@claude-opus-5-5, self-confidence 0.50

    Held at 52. The panel agrees, though agreement is not evidence. Dispute resolution of 40 (23/100) is the capability row and bribery of 5.7% and compliance of 3.19 are outcome rows. From my own knowledge the golden-passport collapse and slow courts justify the discount. Panelist B adds the Green Line, which is real, but this brief covers the government-controlled area only, so I do not subtract twice for partition here.

  • 52.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Held at 52, below the 65.2 indicator score. All three panelists reach this number, which proves little because we rely on the same scandals. Dispute resolution of 40 (23/100) is the row that fits what I know. Bribery of 5.7% and compliance of 3.19 read better. From my own knowledge the 2013 bail-in and the golden passports case hurt, and cooperation across the Green Line is thin. The brief covers only the Republic-controlled side.

  • 52.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    I hold 52, matching both panelists. Dispute resolution of 40 (23) is the capability measure, and bribery 5.7% and court compliance 3.19 are outcomes that track income. The golden-passport scandal and the 2013 bail-in argue against a high score. Own knowledge.

Learning

How effectively does the country acquire, distribute, and update knowledge?

74.60.55 usable3 of 4

Recency 0.81About LearningCyprus beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 3 indicators modelled2001: 2 of 3 indicators modelled2002: 2 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 2 of 3 indicators modelled2009: 2 of 3 indicators modelled2010: 1 of 3 indicators modelled2011: 1 of 3 indicators modelled2012: 1 of 3 indicators modelled2013: 1 of 3 indicators modelled2014: 1 of 3 indicators modelled2015: 1 of 3 indicators modelled2016: 1 of 3 indicators modelled2017: 1 of 3 indicators modelled2018: 1 of 3 indicators modelled2019: 0 of 3 indicators modelled2020: 0 of 3 indicators modelled2021: 0 of 3 indicators modelled2022: 0 of 3 indicators modelled2023: 0 of 3 indicators modelled2024: 0 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+3.8 over 10 years (2016 to 2026), band +0.7 to +7.5. Median change: all countries -1.3, Income quartile 4 of 4 in 2000, highest +0.8.

+10.2 over 20 years (2006 to 2026), band +3.9 to +15.5. Median change: all countries +0.8, Income quartile 4 of 4 in 2000, highest +1.9.

The model fills at least one of the 3 indicators in 19 of 27 years, at most 2, last in 2018. The replay starts in 2010, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

Human Capital Index

Expected productivity of a child born today relative to full health and complete education.

Measured in index 0-1; higher is better. Source: World Bank (HD.HCI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (HD.HCI.OVRL)
0.76index 0-12020. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Human Capital Index

Expected productivity of a child born today relative to full health and complete education.

Measured in index 0-1; higher is better. Source: World Bank (HD.HCI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Firms offering formal training

Share of firms that provide formal training to permanent employees.

Measured in % of firms; higher is better. Source: World Bank (IC.FRM.TRNG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.FRM.TRNG.ZS)
43.1% of firms2024. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Firms offering formal training

Share of firms that provide formal training to permanent employees.

Measured in % of firms; higher is better. Source: World Bank (IC.FRM.TRNG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Research citation impact

Share of a country's articles and reviews that are in the top 10% most cited for their subfield and year, as a ratio to the same share across all country-affiliated works.

Measured in ratio to world average; higher is better. Source: OpenAlex (citation_normalized_percentile.is_in_top_10_percent), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
OpenAlex (citation_normalized_percentile.is_in_top_10_percent)
1.9ratio to world average2021. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Research citation impact

Share of a country's articles and reviews that are in the top 10% most cited for their subfield and year, as a ratio to the same share across all country-affiliated works.

Measured in ratio to world average; higher is better. Source: OpenAlex (citation_normalized_percentile.is_in_top_10_percent), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for one row, each a gap: Adult learning participation (1 case below).

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2024

    121 % gross, rank 2 of 134. Gross enrolment ratio in tertiary education.

    A condition, not scored: enrolment counts people in formal education and records nothing learned.

  • Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2022

    4.7 % of GDP, rank 50 of 135. Government expenditure on education as a share of GDP.

    A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.

  • Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2018

    8.6 % of secondary, rank 82 of 135. Vocational pupils as a share of total secondary enrolment.

    A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 1979CyprusHuman Resource Development Authority (HRDA) subsidised training programmesstill operating
    Cypruslinked to Adult learning participationstarted 1979still operating

    Human Resource Development Authority (HRDA) subsidised training programmes

    Cyprus's Human Resource Development Authority subsidised more than 106,000 participations in 11,064 single-company and multi-company training programmes in 2024, at a cost of 35.9 million euros, including 68,064 participations of employed persons in standard single-company programmes against 32,987 in 2023.

    106,000 participations, participations in single-company and multi-company training programmes ('more than 106.000'), 2024. 68,064 participations, participations of employed persons subsidised in standard single-company training programmes, 2024. ฮ‘ฯฯ‡ฮฎ ฮ‘ฮฝฮฌฯ€ฯ„ฯ…ฮพฮทฯ‚ ฮ‘ฮฝฮธฯฯŽฯ€ฮนฮฝฮฟฯ… ฮ”ฯ…ฮฝฮฑฮผฮนฮบฮฟฯ (Human Resource Development Authority of Cyprus), ฮ•ฯ„ฮฎฯƒฮนฮฑ ฮˆฮบฮธฮตฯƒฮท 2024 (Annual Report 2024), bilingual Greek and English, retrieved 2026-10-02.

    How it worked: A levy-funded public authority reimburses employers part of the cost of training their staff, in their own firm or through accredited training centres, against a list of priority themes agreed with the social partners.

    Limits: The authority reports on its own schemes, in a 185-page PDF: the 106,000 headline is a rounded floor ('more than') in the summary of results on PDF page 16, and the scheme figures are on PDF page 22. The counts are participations, not people: one employee attending three subsidised courses counts three times, many courses last a day or less, and the report gives no count of distinct individuals. The bulk is employer training of people already in work, subsidised from a levy employers pay; the unemployed and adults outside employment are a small part. The doubling of single-company participations from 2023 to 2024 coincides with what the report calls a substantial increase in subsidy amounts and simplified approval, so part of the rise may be employers claiming for training they would have run anyway. The 1979 start is stated in the report's introduction as the year the authority began operating. The URL carries a cache identifier from the authority's portal and may change.

Panel median66.0-8.6 against the indicators

Round 2. How this layer works

  • 66.0 institutionalist@claude-opus-5-5, self-confidence 0.50

    Revised from 68 to 66. Panelist C correctly notes the HCI is from 2020 and the citation score is a small-number effect, which adds to my PISA point; I stay above C because the school and university institutions are stable.

  • 67.0 bottom_up@claude-opus-5-5, self-confidence 0.40

    Revised down from 70: C and A are right that the citation ratio comes from a small base and the HCI is dated 2020, and Cypriot PISA results sit below the EU average. I stop above C's 60 because firm training is mid-frame and tertiary attainment is high.

  • 64.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Raised from 60 to 64. The panel is right that HCI is a sound base, but the 92 citation score rests on a small publication base and A's point on below-average PISA supports a discount from 74.6. I stay below both other panelists.

Experimentation

How easily can new approaches be attempted, tested, abandoned, and improved?

23.80.47 usable5 of 10

Recency 1.00About ExperimentationCyprus beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 4 of 5 indicators modelled2001: 4 of 5 indicators modelled2002: 4 of 5 indicators modelled2003: 4 of 5 indicators modelled2004: 3 of 5 indicators modelled2005: 3 of 5 indicators modelled2006: 3 of 5 indicators modelled2007: 3 of 5 indicators modelled2008: 2 of 5 indicators modelled2009: 2 of 5 indicators modelled2010: 2 of 5 indicators modelled2011: 2 of 5 indicators modelled2012: 2 of 5 indicators modelled2013: 2 of 5 indicators modelled2014: 2 of 5 indicators modelled2015: 2 of 5 indicators modelled2016: 2 of 5 indicators modelled2017: 2 of 5 indicators modelled2018: 2 of 5 indicators modelled2019: 2 of 5 indicators modelled2020: 2 of 5 indicators modelled2021: 2 of 5 indicators modelled2022: 2 of 5 indicators modelled2023: 2 of 5 indicators modelled2024: 2 of 5 indicators modelled2025: 1 of 5 indicators modelled2026: 0 of 5 indicators modelledmodel
  • Reconstruction on today's 5 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-1.3 over 10 years (2016 to 2026), band -5.2 to +3.1, which includes no change. Median change: all countries 0, Income quartile 4 of 4 in 2000, highest -4.2.

-5.6 over 20 years (2006 to 2026), band -10.5 to -0.7. Median change: all countries +0.1, Income quartile 4 of 4 in 2000, highest -5.

The model fills at least one of the 5 indicators in 26 of 27 years, at most 4, last in 2025. The replay starts in 2004, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

-2.1 over 10 years, from 12.5 in 2016 to 10.4 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Resident patent applications

Patent applications filed by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.PAT.RESD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IP.PAT.RESD)
2.2per million peoplefrom 3 national total2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Resident patent applications

Patent applications filed by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.PAT.RESD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Resident trademark applications

Direct trademark applications by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.TMK.RSCT), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IP.TMK.RSCT)
1,248per million peoplefrom 1,695 national total2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Resident trademark applications

Direct trademark applications by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.TMK.RSCT), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Resident industrial design applications

Industrial design applications filed by residents at their national office, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.IDS.RSCT), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (IP.IDS.RSCT)
11per million peoplefrom 15 national total2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Resident industrial design applications

Industrial design applications filed by residents at their national office, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.IDS.RSCT), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

New public software repositories

Growth over one year in the public GitHub repositories located in the country, per million people.

Measured in per million people; higher is better. Source: GitHub Innovation Graph (data/repositories.csv), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
GitHub Innovation Graph (data/repositories.csv)
33,873per million peoplefrom 46,431 national total2026. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

New public software repositories

Growth over one year in the public GitHub repositories located in the country, per million people.

Measured in per million people; higher is better. Source: GitHub Innovation Graph (data/repositories.csv), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate)no data% aged 18-64no datano data
Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate)no data% not deterredno datano data
direct capability measureMeasures the thing itself.

Insolvency efficiency

B-READY score for the time and cost of in-court liquidation and reorganization of a failed firm.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BI.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.BI.P3)
27.7score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Insolvency efficiency

B-READY score for the time and cost of in-court liquidation and reorganization of a failed firm.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BI.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.

This project retired one row: Business share of R&D.

Panel median30.0+6.2 against the indicators

Round 2. How this layer works

  • 30.0 institutionalist@claude-opus-5-5, self-confidence 0.40

    Held at 30. B's relocation-driven startup activity rests on foreign firms registering in Cyprus, not on domestic channels; insolvency efficiency at 28.1 means exit is slow.

  • 35.0 bottom_up@claude-opus-5-5, self-confidence 0.40

    Hold 35: C dismisses repositories as foreign-registered firms, but relocated teams do test products in Cyprus and that counts as trial capacity in the country; weak insolvency (28.1) keeps it low.

  • 28.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35

    Held at 28. B's lift for relocation-driven startups counts foreign-registered firms, which is endowment-like; 3 patents and insolvency efficiency of 28 stay decisive.

Adaptability

How effectively can the system respond when circumstances change?

59.30.62 usable4 of 6

Recency 1.00About AdaptabilityCyprus beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 4 indicators modelled2001: 2 of 4 indicators modelled2002: 2 of 4 indicators modelled2003: 2 of 4 indicators modelled2004: 2 of 4 indicators modelled2005: 2 of 4 indicators modelled2006: 2 of 4 indicators modelled2007: 2 of 4 indicators modelled2008: 2 of 4 indicators modelled2009: 2 of 4 indicators modelled2010: 0 of 4 indicators modelled2011: 0 of 4 indicators modelled2012: 0 of 4 indicators modelled2013: 0 of 4 indicators modelled2014: 0 of 4 indicators modelled2015: 0 of 4 indicators modelled2016: 0 of 4 indicators modelled2017: 0 of 4 indicators modelled2018: 0 of 4 indicators modelled2019: 0 of 4 indicators modelled2020: 0 of 4 indicators modelled2021: 0 of 4 indicators modelled2022: 0 of 4 indicators modelled2023: 0 of 4 indicators modelled2024: 0 of 4 indicators modelled2025: 0 of 4 indicators modelled2026: 0 of 4 indicators modelledmodel
  • Reconstruction on today's 4 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+5.6 over 10 years (2016 to 2026), band +5.6 to +5.6. Median change: all countries -0.8, Income quartile 4 of 4 in 2000, highest -0.9.

-24.2 over 20 years (2006 to 2026), band -28.6 to -19.2. Median change: all countries -1, Income quartile 4 of 4 in 2000, highest -1.9.

The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+5.7 over 10 years, from 53.6 in 2016 to 59.3 on 4 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Unemployment rate

Unemployed as a share of the labour force, modelled ILO estimate.

Measured in % of labour force; lower is better. Source: World Bank (SL.UEM.TOTL.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (SL.UEM.TOTL.ZS)
4.9% of labour force2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Unemployment rate

Unemployed as a share of the labour force, modelled ILO estimate.

Measured in % of labour force; lower is better. Source: World Bank (SL.UEM.TOTL.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Long-term unemployment share

Unemployed for 12 months or more, as a share of total unemployment.

Measured in % of unemployed; lower is better. Source: ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB)
20.8% of unemployed2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Long-term unemployment share

Unemployed for 12 months or more, as a share of total unemployment.

Measured in % of unemployed; lower is better. Source: ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Export diversification

Concentration of the merchandise export basket across products: the normalised Herfindahl-Hirschman index over SITC Rev.3 3-digit lines, 0 when exports are spread evenly and 1 when one product is everything.

Measured in index 0-1, lower = more diversified; lower is better. Source: UNCTAD (US.ConcentDiversIndices), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
UNCTAD (US.ConcentDiversIndices)
0.48index 0-1, lower = more diversified2025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Export diversification

Concentration of the merchandise export basket across products: the normalised Herfindahl-Hirschman index over SITC Rev.3 3-digit lines, 0 when exports are spread evenly and 1 when one product is everything.

Measured in index 0-1, lower = more diversified; lower is better. Source: UNCTAD (US.ConcentDiversIndices), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

New export products

Share of the products a country did not export competitively in 2009-2011 that it exported competitively in 2022-2024.

Measured in % of products not exported competitively at the start; higher is better. Source: Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ))
2.7% of products not exported competitively at the start2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

New export products

Share of the products a country did not export competitively in 2009-2011 that it exported competitively in 2022-2024.

Measured in % of products not exported competitively at the start; higher is better. Source: Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025

    79.3 % aged 15+, rank 20 of 135. Share of the working-age population in the labour force.

    A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.

  • Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024

    37.6 per 100 people, rank 21 of 135. Fixed broadband subscriptions per 100 people.

    A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.

  • Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024

    4.1 % of output, rank 7 of 122. Power lost in transmission and distribution, including unbilled use.

    A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.

  • Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025

    2.9 % of employment, rank 7 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.

    A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 2020CyprusCOVID-19 public moratorium on loan instalmentsdelivered and closed
    Cypruslinked to Institutional responsivenessstarted 2020delivered and closed

    COVID-19 public moratorium on loan instalments

    Cyprus suspended loan instalments by a Minister of Finance decree of 30 March 2020, and by 19 June 2020 banks and credit acquiring companies had suspended the obligations of 50,586 borrowers on facilities with a gross carrying amount of 11.75 billion euros, with 27,184 borrowers already covered by 24 April 2020.

    50,586 borrowers, borrowers whose loan obligations were suspended under the public moratorium, cumulative, 19 June 2020. 11,745,737 thousand euros, gross carrying amount of suspended credit facilities, as at 29 february 2020, 19 June 2020. Central Bank of Cyprus, Aggregate Cyprus banking sector data, publication on suspended facilities, retrieved 2026-10-16.

    How it worked: Parliament passed an emergency measures law for financial institutions, the Minister of Finance used it to decree a moratorium that banks could not refuse to an eligible applicant, and the Central Bank collected cumulative uptake from every lender every two weeks.

    Limits: The figures sit in a spreadsheet whose reporting dates are stored as spreadsheet serial numbers (43945 is 24 April 2020, 44001 is 19 June 2020), and the last reporting date published is 19 June 2020, so the series stops before the moratorium ended. Suspension deferred payments and did not cancel them. The count shows uptake of a rule change, not whether it prevented defaults or merely postponed them. Only facilities less than 30 days in arrears at 29 February 2020 were eligible, so borrowers already in arrears are outside the number. The file does not give the share of all loans suspended, and the borrower counts are reported by the lenders to the Central Bank, not audited.

  • 2025CyprusLimassol wildfire recovery support schemestill operating
    Cypruslinked to Disaster preparedness and recoverystarted 2025still operating

    Limassol wildfire recovery support scheme

    After the July 2025 wildfire in Limassol district, which the Limassol District Administration recorded as damaging 440 homes, 211 of them destroyed, the Council of Ministers adopted a recovery scheme on 30 July 2025 and the Ministry of the Interior had paid its one-off basic-needs grant to 286 beneficiaries, about EUR 2 million in total, by 13 August 2025.

    286 beneficiaries, beneficiaries paid the one-off basic-needs grant, 2025-08-13. 440 homes, homes recorded as damaged by the fire (211 totally destroyed), 2025-07-30. Republic of Cyprus, Ministry of the Interior, announcement of 13 August 2025 on gov.cy, retrieved 2026-10-16.

    How it worked: The Council of Ministers fixed flat one-off grants per household on 30 July 2025, waived supporting documents to speed payment, routed the money through the Treasury payment system with community councils collecting bank details, and tied reconstruction money to damage estimates by members of the Cyprus Scientific and Technical Chamber (ETEK).

    Limits: The ministry reports on its own scheme, and both numbers are announcements, not audited accounts. The 286 beneficiaries and EUR 2 million cover only the one-off grant for basic needs, the fastest and simplest part of the scheme: on 13 August 2025 the ministry had only begun assessing claims for repair and reconstruction, which pay licensed destroyed homes in three instalments tied to design and to half the building work. The record carries no later official total for reconstruction payments, rent subsidies or completed rebuilds, so the record does not show whether the homes were rebuilt or how long rebuilding took. The 440 and 211 figures come from a separate Ministry of the Interior statement of 30 July 2025 (gov.cy, 'Dilosi tou Ypourgou Esoterikon ... gia apozimiosi ton pyroplikton politon'), and that statement says the final counts could change as further claims arrive. The scheme is a response to one regional fire, not a standing national recovery programme, and the payments say nothing about whether the fire could have been prevented or contained. Both pages are in Greek.

Panel median61.0+1.7 against the indicators

Round 2. How this layer works

  • 61.0 institutionalist@claude-opus-5-5, self-confidence 0.50

    Held at 61, one point lower than round 1. Panelist C is right that exports stay narrow and new products are scarce, but the troika-era bank restructuring was an institutional reallocation that the panel's 56 does not credit.

  • 62.0 bottom_up@claude-opus-5-5, self-confidence 0.45

    Held at 62. A and I both read the post-2013 employment and banking recovery as real reallocation; C's concern about narrow exports is valid but the Cypriot economy shifted into services such as tech relocation and shipping management that goods-export indicators do not see.

  • 58.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Raised from 56 to 58. Both others cite the post-2013 recovery as reallocation after a severe shock, and I cannot dismiss that, though part of it was imposed by the troika programme and not chosen. Narrow exports and few new export products keep me near the 59.3.

Building

How capable is the country of turning plans and knowledge into functioning systems?

28.80.63 usable4 of 6

Recency 1.00About BuildingCyprus beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 3 of 4 indicators modelled2001: 3 of 4 indicators modelled2002: 3 of 4 indicators modelled2003: 3 of 4 indicators modelled2004: 3 of 4 indicators modelled2005: 3 of 4 indicators modelled2006: 3 of 4 indicators modelled2007: 1 of 4 indicators modelled2008: 1 of 4 indicators modelled2009: 1 of 4 indicators modelled2010: 1 of 4 indicators modelled2011: 1 of 4 indicators modelled2012: 1 of 4 indicators modelled2013: 1 of 4 indicators modelled2014: 1 of 4 indicators modelled2015: 1 of 4 indicators modelled2016: 1 of 4 indicators modelled2017: 1 of 4 indicators modelled2018: 1 of 4 indicators modelled2019: 1 of 4 indicators modelled2020: 1 of 4 indicators modelled2021: 1 of 4 indicators modelled2022: 1 of 4 indicators modelled2023: 1 of 4 indicators modelled2024: 1 of 4 indicators modelled2025: 0 of 4 indicators modelled2026: 0 of 4 indicators modelledmodel
  • Reconstruction on today's 4 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+1.9 over 10 years (2016 to 2026), band -1.8 to +5.5, which includes no change. Median change: all countries -0.3, Income quartile 4 of 4 in 2000, highest +0.3.

-6.9 over 20 years (2006 to 2026), band -11.9 to -2.5. Median change: all countries -0.5, Income quartile 4 of 4 in 2000, highest -0.2.

The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+2.6 over 10 years, from 11.3 in 2016 to 13.9 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Manufacturing value added

Manufacturing value added as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (NV.IND.MANF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (NV.IND.MANF.ZS)
4.4% of GDP2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Manufacturing value added

Manufacturing value added as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (NV.IND.MANF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

High-technology exports

High-technology exports as a share of manufactured exports.

Measured in % of manufactured exports; higher is better. Source: World Bank (TX.VAL.TECH.MF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (TX.VAL.TECH.MF.ZS)
17.9% of manufactured exports2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

High-technology exports

High-technology exports as a share of manufactured exports.

Measured in % of manufactured exports; higher is better. Source: World Bank (TX.VAL.TECH.MF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measureMeasures the thing itself.

Utility connection efficiency

B-READY score for the time to obtain electricity, water and internet connections and the reliability of their supply.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.US.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

direct capability measure
World Bank (IC.BRE.US.P3)
79score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Utility connection efficiency

B-READY score for the time to obtain electricity, water and internet connections and the reliability of their supply.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.US.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Economic fitness

Diversity and ubiquity-adjusted sophistication of the export basket.

Measured in index; higher is better. Source: World Bank (EF.EFM.UNIV.XD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (EF.EFM.UNIV.XD)
0.09index2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Economic fitness

Diversity and ubiquity-adjusted sophistication of the export basket.

Measured in index; higher is better. Source: World Bank (EF.EFM.UNIV.XD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.

This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025

    72,892 constant 2021 PPP $, rank 41 of 133. GDP per person employed, constant purchasing power parity.

    A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 1986CyprusFourth Highway Project, Larnaca-Nicosia and Larnaca-Kophinou roadsdelivered and closed
    Cypruslinked to Large project deliverystarted 1986delivered and closed

    Fourth Highway Project, Larnaca-Nicosia and Larnaca-Kophinou roads

    Cyprus's Ministry of Communications and Works, with World Bank and Kuwait Fund loans effective from August 1986, upgraded the Larnaca-Nicosia and Larnaca-Kophinou roads and rehabilitated 111 km of rural and secondary roads, finishing a year late (loan closing moved from March 1993 to March 1994) at a final cost estimate of US$98.11 million against an original estimate of US$68.9 million, an overrun of about 42 percent.

    98.11 US$ million, final project cost estimate at completion, 1995-04. 68.9 US$ million, original project cost estimate at appraisal, 1985. World Bank, Implementation Completion Report, Republic of Cyprus Fourth Highway Project (Loan 2684-CY), report 14267, 3 April 1995, retrieved 2026-10-16.

    How it worked: The Ministry of Communications and Works let the scope of a co-financed road programme grow during delivery, rebuilding a whole corridor and adding an interchange, and the government and the Kuwait Fund absorbed the extra cost rather than cutting the works.

    Limits: The lender wrote the report, and it rates the project a success: it calls the one-year delay not excessive and judges the decisions behind the overrun sound. Most of the 42 percent is scope the government added after appraisal (reconstruction of the whole Larnaca-Kophinou road, the Kophinou interchange and a larger maintenance programme), so it is weak evidence of estimating failure; the report itself says strict comparison between the appraised and completed project cannot be made, and that the Larnaca-Nicosia alignment had to be changed after the loans became effective because it had not been cleared with Parliament or the local population. The US$98.11 million is an estimate made before all final contract payments, and both figures are in US dollars converted from Cyprus pounds at changing rates. US$300,000 was cancelled for misprocurement. The case is 30 years old, predates EU accession and the procurement rules that followed, and says nothing about how Cyprus delivers large projects today.

Panel median31.0+2.2 against the indicators

Round 2. How this layer works

  • 31.0 institutionalist@claude-opus-5-5, self-confidence 0.45

    Held near 31. Panelist B's services-economy defence explains the low manufacturing share, but the repeated delays at Vasilikos, the EuroAsia interconnector and the Limassol marina are delivery failures, not a sector-mix artefact.

  • 31.0 bottom_up@claude-opus-5-5, self-confidence 0.40

    Revised marginally down from 32: C names a second delayed project in the Limassol marina, which adds to the Vasilikos record. I stay a little above 28.8 because utility connection works and a small services economy is not expected to show manufacturing depth.

  • 30.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Held at 30. Everyone reads low manufacturing as a services-economy fact, and I agree the base is not captured. But the only delivery evidence offered is delay on the LNG terminal and interconnector, which points down, not up.

Shared purpose

To what extent can people imagine themselves as participants in a common project?

71.30.30 thin2 of 6

Recency 0.96About Shared purposeCyprus beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 1 of 2 indicators modelled2001: 1 of 2 indicators modelled2002: 1 of 2 indicators modelled2003: 1 of 2 indicators modelled2004: 0 of 2 indicators modelled2005: 0 of 2 indicators modelled2006: 0 of 2 indicators modelled2007: 0 of 2 indicators modelled2008: 0 of 2 indicators modelled2009: 0 of 2 indicators modelled2010: 0 of 2 indicators modelled2011: 0 of 2 indicators modelled2012: 0 of 2 indicators modelled2013: 0 of 2 indicators modelled2014: 0 of 2 indicators modelled2015: 0 of 2 indicators modelled2016: 0 of 2 indicators modelled2017: 0 of 2 indicators modelled2018: 0 of 2 indicators modelled2019: 0 of 2 indicators modelled2020: 0 of 2 indicators modelled2021: 0 of 2 indicators modelled2022: 0 of 2 indicators modelled2023: 0 of 2 indicators modelled2024: 0 of 2 indicators modelled2025: 0 of 2 indicators modelled2026: 0 of 2 indicators modelledmodel
  • Reconstruction on today's 2 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+2.1 over 10 years (2016 to 2026), band +2.1 to +2.1. Median change: all countries +2.7, Income quartile 4 of 4 in 2000, highest +1.8.

-1.5 over 20 years (2006 to 2026), band -1.5 to -1.5. Median change: all countries +4, Income quartile 4 of 4 in 2000, highest +1.1.

The model fills at least one of the 2 indicators in 4 of 27 years, at most 1, last in 2003. The replay starts in 2004, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+2.1 over 10 years, from 69.2 in 2016 to 71.3 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Tax revenue

Central government tax revenue as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (GC.TAX.TOTL.GD.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (GC.TAX.TOTL.GD.ZS)
23.9% of GDP2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Tax revenue

Central government tax revenue as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (GC.TAX.TOTL.GD.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcomeMeasures a result that usually follows from the capability.

Income inequality

Gini index of disposable income.

Measured in Gini 0-100; lower is better. Source: World Bank (SI.POV.GINI), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

downstream outcome
World Bank (SI.POV.GINI)
31.8Gini 0-1002023. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Income inequality

Gini index of disposable income.

Measured in Gini 0-100; lower is better. Source: World Bank (SI.POV.GINI), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loadingโ€ฆ

No dataset exists for 4 rows, each a gap: Sense of national belonging, Volunteering, Political polarisation, Civic participation.

This project retired one row: Voice and accountability.

Behavioral check, not scored

Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.

  • Political polarizationV-Dem (v2cacamps_osp), 2025

    2.743 index 0-4, lower is better. Whether supporters of opposing political camps generally meet in a friendly or a hostile manner, rated by V-Dem country experts from 0, friendly, to 4, hostile.

    The question counts hostility and leaves disagreement alone, which is what pluralism asks for. It is not scored because a low reading has two causes the number cannot tell apart. Where camps compete openly, a calm reading means people who disagree still meet as fellow citizens. Where no opposition may organize, it means there is no camp left to be hostile to. In 2025 the five closed autocracies in the frame average 2.18 and the liberal democracies 1.67, while electoral democracies and electoral autocracies sit near 2.8 and 3.3. Scored, the reading would have lifted the United Arab Emirates about 11 points on this capability for a uniformity the benchmark does not count as shared purpose. Income is not why it is left out: richer countries read only somewhat calmer, at about -0.41 against log GDP per capita.

  • Voter turnoutV-Dem (v2eltrnout), 2023

    72.45 % of registered voters, higher is better. Share of registered voters who cast a vote in the latest national election up to 2025, according to official results, as coded by V-Dem from IDEA, IPU and IFES sources. Where executive and legislative elections fall on the same day, the executive turnout is coded.

    Turnout is the one act in which a whole population takes part in a common decision, so it is the closest behavioral reading of shared purpose the benchmark has. It is not scored for three reasons the number cannot separate. It reads the democratic channel, which is why voice and accountability was retired from this capability (A5): a country with no competitive elections cannot score well for reasons unrelated to whether its people see themselves in a common project. Compulsory voting turns it into a reading of the law: Brazil enforces it, and the eight countries that enforce sanctions average 83 percent against 65 where voting is voluntary. And closed and electoral autocracies manage it: Vietnam reads 95.6, Rwanda 98.2 and Singapore 92.8, which is mobilization, not participation (A13). The year shown is the latest national election, because elections are coded only in the year they happen.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Wealth held by the top 10%OECD (DSD_WEALTH@DF_WEALTH)

    No value for this country. Share of household net wealth held by the wealthiest 10% of households, excluding pension entitlements.

    A condition, not scored: how household wealth is divided describes the society a country works with and does not measure a capability. The rank orders values and is not a verdict. The OECD has this share for 29 benchmark countries, nearly all OECD members, so the row says nothing about the other 106. Net wealth here excludes pension entitlements, and the unit is the household. Surveys reach the richest households to different degrees, so a small gap between two countries means little. Denmark, the Netherlands and Norway use tax and administrative records; the rest use surveys. United Kingdom values cover Great Britain only. The latest year is 2016 for Poland and 2023 for Canada and the Netherlands.

Panel median50.0-21.3 against the indicators

Round 2. How this layer works

  • 50.0 institutionalist@claude-opus-5-5, self-confidence 0.45

    Held at 50. Tax of 23.9% and a Gini of 31.8 show a working fiscal compact in the south, and panelist C is wrong to dismiss them as mere wealth correlates at 46: a sustained tax take is an institutional fact. But partition since 1974 with no shared institutions is the central limit, and the indicators cannot see it. Panelist B agrees, and the failed 2017 talks support the point from my own knowledge.

  • 50.0 bottom_up@claude-opus-5-5, self-confidence 0.45

    Held at 50, far below the 71.3 indicator score. Tax of 23.9% and a Gini of 31.8 show a fiscal compact in the south only. C calls these rows wealth-correlated, but my objection is about scope: they do not see a partition with no shared institutions since 1974 (own knowledge). A at 50 agrees. C's added polarisation is not what limits Cyprus most. Co-ops and parish networks are real but local.

  • 46.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35

    I hold 46, below the others at 50. Tax 23.9% and Gini 31.8 are both wealth-correlated and cover only the government-controlled area. The island is divided with no settlement; panelists A and B agree the central common project is stalled but do not take the wealth-tracking argument far enough. Own knowledge.