Burundi
No capability reaches 50 on usable evidence. Raise Anticipation first, at 5.9. Trust needs more evidence: confidence is 0.21.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- AnticipationPeers 15.20.46 usable-4.7(2)
- BuildingPeers 10.60.46 usable-0.2(3)
- LearningPeers 23.00.55 usableno trend
- AdaptabilityPeers 44.40.49 usable+1.0(3)
Measure before managing, thinnest first
- TrustPeers 39.80.21 very thin+12.9(2)
- Shared purposePeers 44.20.22 very thinno trend
- CoordinationPeers 61.90.28 thin-13.5(2)
- AgencyPeers 39.50.30 thinno trend
- ExperimentationPeers 0.90.34 thinno trend
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Burundi beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
5.90.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationBurundi beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-4.7 over 10 years (2016 to 2026), band -4.7 to -4.7. Median change: all countries +11.2, Income quartile 1 of 4 in 2000, lowest +11.6.
-4.7 over 20 years (2006 to 2026), band -11.9 to +2.7, which includes no change. Median change: all countries +13.4, Income quartile 1 of 4 in 2000, lowest +11.7.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-4.7 over 10 years, from 10.6 in 2016 to 5.9 on 2 indicators seen in both years, with 1 at the frame edge. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 2.6articles per million peoplefrom 36.26 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 45.2index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2018
0.21 % of GDP, rank 91 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2018
22.5 per million people, rank 111 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
10.6 per million people, rank 130 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median5.0-0.9 against the indicators
Round 2. How this layer works
- 5.0 institutionalist@claude-opus-5-5, self-confidence 0.70
I hold at 5: the panel agrees, and Vision 2025 and the 2018-2027 plan have no administrative follow-through I can see.
- 6.0 bottom_up@claude-opus-5-5, self-confidence 0.60
I hold at 6: research output is at the floor, statistics are weak (11.7) and fiscal stress leaves no room for anticipation; the panel agrees within one point.
- 5.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.60
Held at 5. Peers at 5-6 agree; floor on both rows and no sign of foresight beyond donor early warning.
Agency
How able are individuals and organizations to turn an intention into action?
44.90.30 thin2 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.79About AgencyBurundi beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.9 over 10 years (2016 to 2026), band -0.9 to -0.9. Median change: all countries +1.9, Income quartile 1 of 4 in 2000, lowest +1.5.
+12.8 over 20 years (2006 to 2026), band +4.5 to +13.5. Median change: all countries +9.3, Income quartile 1 of 4 in 2000, lowest +10.9.
The model fills at least one of the 2 indicators in 12 of 27 years, at most 2, last in 2011. The replay starts in 2012, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 0.98per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| Business entry efficiencydirect capability measureWorld Bank (IC.BRE.BE.P3) | no datascore 0-100 | no data | no data |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 4count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
8.6 % of population, rank 135 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2014
7.1 % aged 15+, rank 131 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
38.5 % of GDP, rank 68 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median27.0-17.9 against the indicators
Round 2. How this layer works
- 22.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Hold at 22. Four procedures in 2019 is law on paper and density is 0.98 per 1,000. Panelist B's 38 counts savings groups and lake traders. These are real (own knowledge), but they are individual effort in place of working institutions, and fuel and foreign exchange shortages stop plans that need any supply beyond the local one. Panelist C's 25 is close and I see no fact that separates us.
- 33.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Revised from 38. I cannot answer A's point on fuel and foreign exchange shortages: from my own knowledge they stop the cross-border and lake traders I relied on as well as formal firms. I stay above A's 22 and C's 25 because smallholders and savings groups still act daily where density of 0.98 sees nothing. Four procedures from 2019 says little about real freedom.
- 27.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Raised from 25. Panelist B names smallholders, savings groups and Lake Tanganyika traders acting outside any registry. Four procedures is a rules score. Chronic fuel and foreign-exchange shortages stop firms acting on any plan (panelist A), so I stay near the lower end. Own knowledge.
Coordination
How effectively can independent actors organize around shared objectives?
50.20.28 thin2 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 0.96About CoordinationBurundi beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-13.5 over 10 years (2016 to 2026), band -13.5 to -13.5. Median change: all countries -1.7, Income quartile 1 of 4 in 2000, lowest +2.6.
-24.3 over 20 years (2006 to 2026), band -24.3 to -24.3. Median change: all countries -2.7, Income quartile 1 of 4 in 2000, lowest +0.7.
The model fills at least one of the 2 indicators in 5 of 27 years, at most 1, last in 2004. The replay starts in 2005, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-13.5 over 10 years, from 63.7 in 2016 to 50.2 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| Trade compliance efficiencydirect capability measureWorld Bank (IC.BRE.IT.P3) | no datascore 0-100 | no data | no data |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 112percentage points from approved budget | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.31index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration, Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2025
2.13 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2005BurundiPrivate-led coffee sector governance through InterCafe, and its dismantlingdismantled
Private-led coffee sector governance through InterCafe, and its dismantling
Burundi had run its coffee value chain through a public regulator, ARFIC, beside private-led bodies: InterCafe, whose members were producers, millers, roasters and exporters, and the growers' consortium CNAC with about 109,000 members. The government named all three as joint implementing agencies of the Coffee Sector Competitiveness Project. In January 2020 it replaced them by decree with ODECA, an office under state control. The project closed early in 2021, and 44 percent of the grant was cancelled.
44 % of grant funding, share of the ida coffee sector competitiveness grant cancelled after the government returned the coffee sector to state control, 2021. 109,000 members, individual members of cnac, the national coffee growers' consortium, one of the three private-led implementing bodies, project appraisal (c. 2016). World Bank, Implementation Completion and Results Report ICR00004849, Burundi Coffee Sector Competitiveness Project (P151869), March 2022, retrieved 2026-10-02.
How it worked: Over two decades the Government of Burundi handed coffee sector governance to an independent public regulator alongside a private interprofessional association and a growers' consortium, and wrote them into a donor project as co-implementers. In January 2020 it took the value chain back by presidential decree under a new state office, without consulting the partners.
Limits: The only source is the lender's own completion report, and it is written from the side that lost the argument: the World Bank calls the 2020 decision unilateral and made without advance warning. The 44 percent is the share of one donor project cancelled. It measures what the dismantling cost that project, not how much public-private delivery Burundi lost. The ICR publishes no series on the scale of the private-led arrangement, such as the private share of washing stations, InterCafe's budget or the volumes it governed. The 109,000 CNAC members is a membership count at appraisal, not a delivery figure. The liberalisation began under structural adjustment in the 1980s and was pushed by donors (IFC advised on the third phase), so how far the arrangement was Burundi's own institutional choice is contestable. The 2005 start year rests on a decree the ICR names as the one that reformed the sector. The ICR does not say in which year InterCafe itself was created. Nothing here shows whether coffee output, quality or grower prices fell after ODECA took over. The ICR reports the share of AA/A/FW+ grade coffee rising from 59 to 66 percent, 70 percent of the incremental target. No data exists for the second quality indicator, the specialty share of exports, because ARFIC was removed and ODECA provided none.
Panel median24.0-26.2 against the indicators
Round 2. How this layer works
- 18.0 institutionalist@claude-opus-5-5, self-confidence 0.35
Held at 18. B's village savings groups coordinate locally, not around shared national objectives, and C agrees that a single unaudited budget execution figure cannot carry a 50.2 score; donor withdrawal after 2015 broke channels that have not been rebuilt.
- 28.0 bottom_up@claude-opus-5-5, self-confidence 0.30
Revised down from 34: panelist C's point that budget execution counts only if independently audited, and panelist A's point on donor withdrawal after 2015, are ones I cannot answer. Village savings and loan groups still show local coordination.
- 24.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.25
Revised up from 22 to 24. Panelist B's village savings and loan groups are real local coordination; panelist A's point that donor withdrawal after 2015 broke channels is also fair, and one year of budget execution cannot carry the 50.2.
Trust
How much cooperation is possible beyond immediate personal networks?
46.50.21 very thin2 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 1.00About TrustBurundi beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+10 over 10 years (2016 to 2026), band +6.5 to +12.7. Median change: all countries +1.9, Income quartile 1 of 4 in 2000, lowest +4.7.
+1.1 over 20 years (2006 to 2026), band +1.1 to +1.1. Median change: all countries +2.1, Income quartile 1 of 4 in 2000, lowest +6.2.
The model fills at least one of the 2 indicators in 6 of 27 years, at most 1, last in 2005. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+12.9 over 10 years, from 33.6 in 2016 to 46.5 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| Dispute resolution efficiencydirect capability measureWorld Bank (IC.BRE.DR.P3) | no datascore 0-100 | no data | no data |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 14% of firms | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 0.85scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median25.0-21.5 against the indicators
Round 2. How this layer works
- 25.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Hold at 25. Compliance of 0.85 is the reliable signal, and bribery of 14% comes from a very small formal sector. Panelist B's Bashingantahe mediation is a real and old institution (own knowledge), but B concedes that it stops near the hill, so it does not lift cooperation among strangers. I stay well under 46.5.
- 30.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Held at 30. Compliance of 0.85 is the signal and bribery of 14% comes from a tiny formal sample, so A and C are right to go under 46.5. Their score of 25 gives no weight to Bashingantahe hill mediation, which from my own knowledge still settles local disputes, even though it reaches little beyond one's hill. Imbonerakure intimidation holds it low.
- 25.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Held at 25; panel is 25 to 30. Compliance 0.85 of 4 is the reliable signal and bribery 14% in a very small formal sector reflects who is surveyed. Bashingantahe mediation (panelist B) is local to the hill. Imbonerakure intimidation damaged cross-group cooperation after 2015.
Learning
How effectively does the country acquire, distribute, and update knowledge?
26.50.55 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.81About LearningBurundi beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-12.8 over 10 years (2016 to 2026), band -17.1 to -9. Median change: all countries -1.3, Income quartile 1 of 4 in 2000, lowest -2.3.
-3.1 over 20 years (2006 to 2026), band -9.7 to +4.1, which includes no change. Median change: all countries +0.8, Income quartile 1 of 4 in 2000, lowest +0.6.
The model fills at least one of the 3 indicators in 17 of 27 years, at most 3, last in 2016. The replay starts in 2010, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.39index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 13.2% of firms | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 1.1ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2025
6.4 % gross, rank 119 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2025
4.5 % of GDP, rank 56 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
9.4 % of secondary, rank 76 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Panel median16.0-10.5 against the indicators
Round 2. How this layer works
- 15.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 15. B and C agree that the citation ratio of 50/100 rests on a tiny number of co-authored papers; Human Capital Index at 16/100 and firm training at 14/100 show the institutions that transmit knowledge are near the floor.
- 17.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held near my 18: all panelists discount the citation ratio as a tiny base. Farmer-to-farmer learning exists, but I cannot size it.
- 16.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Held at 16. Panelists A and B at 15 and 18 agree that citation impact rests on a handful of co-authored papers; Human Capital Index at 16/100 and firm training at 14/100 are the real signals.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
0.30.34 thin4 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 0.92About ExperimentationBurundi beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.1 over 10 years (2016 to 2026), band -3.2 to +2.5, which includes no change. Median change: all countries 0, Income quartile 1 of 4 in 2000, lowest 0.
+0.1 over 20 years (2006 to 2026), band -4.9 to +3.1, which includes no change. Median change: all countries +0.1, Income quartile 1 of 4 in 2000, lowest +0.1.
The model fills at least one of the 4 indicators in 26 of 27 years, at most 3, last in 2025. The replay starts in 2017, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 0.08per million peoplefrom 1 national total | 2022. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 8.9per million peoplefrom 122 national total | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 1.1per million peoplefrom 15 national total | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 320per million peoplefrom 4,608 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| Insolvency efficiencydirect capability measureWorld Bank (IC.BRE.BI.P3) | no datascore 0-100 | no data | no data |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.
This project retired one row: Business share of R&D.
Panel median3.0+2.7 against the indicators
Round 2. How this layer works
- 1.0 institutionalist@claude-opus-5-5, self-confidence 0.60
I hold at 1: panelist B lifts for informal farm adjustment, but household subsistence adaptation is not experimentation through institutions, and every Burundian register sits at the floor.
- 7.0 bottom_up@claude-opus-5-5, self-confidence 0.25
I hold near 8 at 7: every register is at the floor, but most households run informal farming and trade with constant small adjustments; panelist A's 1 equates no registered activity with no trial.
- 3.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Moved from 4 to 3. Panelist B's informal-farming lift rests on unmeasured activity; I hold at the floor, close to panelist A.
Adaptability
How effectively can the system respond when circumstances change?
37.50.49 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 0.79About AdaptabilityBurundi beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.7 over 10 years (2016 to 2026), band -1.4 to +1.4, which includes no change. Median change: all countries -0.8, Income quartile 1 of 4 in 2000, lowest -0.2.
-0.9 over 20 years (2006 to 2026), band -4.9 to +1.7, which includes no change. Median change: all countries -1, Income quartile 1 of 4 in 2000, lowest +0.9.
The model fills at least one of the 4 indicators in 14 of 27 years, at most 2, last in 2013. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+1.0 over 10 years, from 48.2 in 2016 to 49.2 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 0.92% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 95.5% of unemployed | 2014. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.47index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 0.09% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
79.1 % aged 15+, rank 22 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2023
0.02 per 100 people, rank 130 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS)
No value for this country. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2014
98 % of employment, rank 111 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2023BurundiExchange rate unification of May 2023, and its erosionoperating below its peak
Exchange rate unification of May 2023, and its erosion
After the Banque de la République du Burundi opened an interbank foreign exchange market in May 2023 to start unifying the official and parallel exchange rates, the World Bank recorded a growing gap between the two rates, with the parallel market premium at 142.3 percent in September 2024, up from 51.6 percent a year earlier.
142.3 percent, foreign exchange parallel market premium, after the loss, September 2024. 51.6 percent, foreign exchange parallel market premium, after the may 2023 change, September 2023. World Bank, Macro Poverty Outlook for Burundi, October 2024, retrieved 2026-10-16.
How it worked: The central bank changed the foreign exchange rules and let one large step in the official rate run through a new interbank market, then held the official rate almost still while the parallel rate kept moving.
Limits: Both premium figures sit in a two-page PDF brief (page 2), and the brief gives no method or source for the parallel rate. The scale of the May 2023 change comes from a different publisher: the Banque de la République du Burundi's annual report for 2023 (page 62, https://www.brb.bi/sites/default/files/2024-12/Rapport_annuel_2023.pdf) says the franc depreciated 38.41 percent against the dollar to 2,856.11 BIF at end December 2023 after the May 2023 interbank market, and its annual report for 2024 (page 52) says the official rate then moved only 2.06 percent in 2024, to 2,914.99 BIF. The World Bank's April 2024 brief puts the premium at 75.0 percent in March 2023, before the change, so the narrowing to 51.6 percent rests on two documents and neither attributes it to the May 2023 market. A premium is a market outcome: fuel shortages from March 2024, low reserves and border closures also moved it, and the record cannot separate the central bank's choices from those conditions. The bank's own reports call unification a process, so the loss is of the narrowing that followed the first step, not of a finished reform.
2016BurundiInfrastructure Resilience Emergency Project, flood protection in Greater Bujumbura after the 2014 floodsdelivered and closed
After the February 2014 floods and landslides in Greater Bujumbura, Burundi's government ran the Infrastructure Resilience Emergency Project to its June 2019 close, constructing or rehabilitating 10.37 kilometres of drainage network, giving 66,151 people access to improved drainage and supporting 38,385 people with disaster-risk evaluation and early warning.
66,151 people, people with access to improved drainage in the project area, 2019-06. 10.37 km, drainage network newly constructed or rehabilitated, 2019-06. World Bank Independent Evaluation Group, Implementation Completion Report Review ICRR0022023 (P150929), retrieved 2026-10-16.
How it worked: After a flood disaster, the government routed an emergency grant through agencies already running two Bank-financed works projects, so designs and contracts moved within a month of effectiveness, and a contingency fund absorbed new flood damage without restructuring.
Limits: The implementing agencies (the National Road Agency and the Burundian Agency for Public Works, with the civil protection directorate for disaster-risk work) are named in the project's own completion report, not in the review. The numbers sit in a 14-page PDF (pages 4 to 6) and repeat the project's own completion report, which the review says lacked a quality indicator for climate resilience, a beneficiary survey and a unit cost analysis. Both figures missed their targets (77,000 people and 12.6 kilometres). The project was financed by a USD 25 million IDA grant and covered Greater Bujumbura and the RN1 corridor, not the country. The disaster-management objective was rated modest: the national emergency response plan revision and the national early warning equipment were not delivered before closing. New floods in April 2018 damaged newly built channels, and the review names the lack of maintenance financing as the main risk to the works lasting. The drainage counts show what was built, not a measured reduction in flood losses.
Panel median15.0-22.5 against the indicators
Round 2. How this layer works
- 12.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Held at 12. The panel agrees that 0.9% unemployment reflects subsistence farming; B's household coping is survival, and new export products at 1/100 show the system does not reallocate.
- 18.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Revised down four points: panelists A and C are right that the 0.9 percent unemployment rate reflects subsistence farming, and new export products near nil show no reallocation. Household coping exists but keeps me only a little above them.
- 15.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Held at 15. All three of us agree unemployment at 0.9% reflects subsistence farming; panelist B's 22 gives credit for household coping that I cannot size, and new export products near zero say the system does not reallocate.
Building
How capable is the country of turning plans and knowledge into functioning systems?
12.70.46 usable3 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 0.97About BuildingBurundi beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.2 over 10 years (2016 to 2026), band -0.2 to -0.2. Median change: all countries -0.3, Income quartile 1 of 4 in 2000, lowest -1.1.
+3.4 over 20 years (2006 to 2026), band -1.2 to +5.3, which includes no change. Median change: all countries -0.5, Income quartile 1 of 4 in 2000, lowest -0.5.
The model fills at least one of the 3 indicators in 13 of 27 years, at most 2, last in 2012. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-0.2 over 10 years, from 12.9 in 2016 to 12.7 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 13.1% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 1.3% of manufactured exports | 2023. The rail runs from 1960 to 2026. | |
| Utility connection efficiencydirect capability measureWorld Bank (IC.BRE.US.P3) | no datascore 0-100 | no data | no data |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
2,456 constant 2021 PPP $, rank 133 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2020BurundiJiji and Mulembwe hydropower projectdelivered and closed
Jiji and Mulembwe hydropower project
The Government of Burundi, through REGIDESO and a World Bank project unit, built the 49.5 MW Jiji (32.5 MW) and Mulembwe (17 MW) run-of-river plants with their transmission lines and substations. The project was approved in 2014 at US$270.3 million with an original closing date of December 2019. Construction began only in February 2020, after the 2015 political crisis. The World Bank put the estimated cost at US$319.1 million in November 2024. Jiji was inaugurated in June 2025 and Mulembwe in June 2026.
319.1 million USD, estimated total cost of the jiji and mulembwe hydropower project, all financiers, November 2024. 270.3 million USD, appraised total cost at board approval, April 2014. World Bank, Project Paper for Additional Financing, Burundi Jiji and Mulembwe Hydropower Project (P133610), December 2024, retrieved 2026-10-02.
How it worked: Burundi bundled two run-of-river plants, transmission and utility reform into one donor-pooled project under a World Bank-supervised implementation unit. It held the scheme together through a political crisis and two additional financings until both plants were commissioned.
Limits: The cost figure is the World Bank's estimate in November 2024, before either plant was commissioned. At that date it reported a financing gap of US$41.7 million still to close. The 18 percent is the Bank's own ratio in its cost table, set against the 2014 appraisal. It excludes a further estimated US$19 million lost to currency depreciation on the 2014 pledges. The schedule slip is not published as a figure. The original closing date of 31 December 2019 against inauguration in June 2025 (Jiji) and June 2026 (Mulembwe) is our reading of a 6.5-year slip. Much of it comes from the 2015 to 2020 political crisis, which delayed hiring the owner's engineer to 2017 and the contractor's mobilisation to 2020, so it is not purely an execution failure. The project was financed and supervised by IDA, the EU, the EIB and the AfDB. Delivery was shared, and the Bank reports weak contract management in the project unit. Completion rests on press releases: the Presidency's June 2025 release for Jiji, and the EIB's June 2026 release for Mulembwe. Neither release shows that the plants deliver the planned 235 GWh a year.
Panel median9.0-3.7 against the indicators
Round 2. How this layer works
- 8.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 8. B notes Rusumo Falls and Jiji-Mulembwe depend on outside finance and builders, which agrees with my view; C reads the manufacturing share as noise from a tiny base, as I do.
- 9.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held near my 10: manufacturing share reflects small food processing, and hydro projects depend on outside finance and builders. All panelists sit between 8 and 10.
- 9.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Revised up from 8 to 9. Panelist B notes hydro projects depend on outside finance and builders, matching my reading; manufacturing at 36/100 is a noisy figure from a small base.