How capable is the country of identifying and preparing for emerging change?
Capability agenda
Burundi
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Burundi stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 5.9 | 0.46 | -4.7 over 10 years using 2 indicators, with 1 at the frame edge |
| Agency | 44.9 | 0.30 | no trend |
| Coordination | 50.2 | 0.28 | -13.5 over 10 years using 2 indicators |
| Trust | 46.5 | 0.21 | +12.9 over 10 years using 2 indicators |
| Learning | 26.5 | 0.55 | no trend |
| Experimentation | 0.3 | 0.34 | no trend |
| Adaptability | 37.5 | 0.49 | +1 over 10 years using 3 indicators |
| Building | 12.7 | 0.46 | -0.2 over 10 years using 3 indicators |
| Shared Purpose | 47.2 | 0.22 | no trend |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Burundiโs comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 โ 2026: 56.4 to 73.2 (+16.8) over 30 years using 2 indicators
Agenda items on this timeline
- 2016Infrastructure Resilience Emergency Project, flood protection in Greater Bujumbura after the 2014 floods
- 2023Exchange rate unification of May 2023, and its erosion
Historical values use todayโs frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How capable is the country of turning plans and knowledge into functioning systems?
+203
How effectively does the country acquire, distribute, and update knowledge?
+105
How effectively can the system respond when circumstances change?
+267
What to measure first
The evidence is too thin to manage these dimensions confidently.
Trust
0.21How much cooperation is possible beyond immediate personal networks?
Shared Purpose
0.22To what extent can people imagine themselves as participants in a common project?
Coordination
0.28How effectively can independent actors organize around shared objectives?
Agency
0.30How able are individuals and organizations to turn an intention into action?
Experimentation
0.34How easily can new approaches be attempted, tested, abandoned, and improved?
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of oneโs life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Burundi
What the indicators miss about Burundi
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- Private-led coffee sector governance through InterCafe, and its dismantling (Coordination)
Burundi had run its coffee value chain through a public regulator, ARFIC, beside private-led bodies: InterCafe, whose members were producers, millers, roasters and exporters, and the growers' consortium CNAC with about 109,000 members. The government named all three as joint implementing agencies of the Coffee Sector Competitiveness Project. In January 2020 it replaced them by decree with ODECA, an office under state control. The project closed early in 2021, and 44 percent of the grant was cancelled.
- Jiji and Mulembwe hydropower project (Building)
The Government of Burundi, through REGIDESO and a World Bank project unit, built the 49.5 MW Jiji (32.5 MW) and Mulembwe (17 MW) run-of-river plants with their transmission lines and substations. The project was approved in 2014 at US$270.3 million with an original closing date of December 2019. Construction began only in February 2020, after the 2015 political crisis. The World Bank put the estimated cost at US$319.1 million in November 2024. Jiji was inaugurated in June 2025 and Mulembwe in June 2026.
- Exchange rate unification of May 2023, and its erosion (Adaptability)
After the Banque de la Rรฉpublique du Burundi opened an interbank foreign exchange market in May 2023 to start unifying the official and parallel exchange rates, the World Bank recorded a growing gap between the two rates, with the parallel market premium at 142.3 percent in September 2024, up from 51.6 percent a year earlier.
- Infrastructure Resilience Emergency Project, flood protection in Greater Bujumbura after the 2014 floods (Adaptability)
After the February 2014 floods and landslides in Greater Bujumbura, Burundi's government ran the Infrastructure Resilience Emergency Project to its June 2019 close, constructing or rehabilitating 10.37 kilometres of drainage network, giving 66,151 people access to improved drainage and supporting 38,385 people with disaster-risk evaluation and early warning.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.