Armenia
Strongest usable evidence: Agency, at 70.3. Raise Experimentation first, at 21.6. Shared purpose needs more evidence: confidence is 0.32.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- ExperimentationPeers 20.30.47 usable+4.4(3)
- BuildingPeers 32.40.63 usable+10.5(3)
- LearningPeers 38.10.55 usable-8.8(2)
- AnticipationPeers 43.40.46 usable+4.1(2)
Measure before managing, thinnest first
- Shared purposePeers 48.10.32 thin+8.6(2)
- TrustPeers 62.50.34 thin+11.9(2)
Keep watching, highest first
- AgencyPeers 45.40.49 usableno trend
- AdaptabilityPeers 60.90.60 usable+26.7(4)
- CoordinationPeers 69.90.47 usable+4.1(2)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Armenia beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
44.30.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationArmenia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+4.1 over 10 years (2016 to 2026), band +4.1 to +4.1. Median change: all countries +11.2, Income quartile 2 of 4 in 2000 +12.5.
+5.2 over 20 years (2006 to 2026), band -2.5 to +13.4, which includes no change. Median change: all countries +13.4, Income quartile 2 of 4 in 2000 +13.6.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+4.1 over 10 years, from 40.2 in 2016 to 44.3 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 270articles per million peoplefrom 801.49 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 82.2index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2024
0.29 % of GDP, rank 76 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2024
942 per million people, rank 52 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
1,735 per million people, rank 62 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median38.0-6.3 against the indicators
Round 2. How this layer works
- 38.0 institutionalist@claude-opus-5-5, self-confidence 0.60
I hold at 38: panelist C's 42 rests on statistics alone, and the lack of preparation before the 2020 war and the 2023 Karabakh exodus is evidence against institutional anticipation in Armenia.
- 38.0 bottom_up@claude-opus-5-5, self-confidence 0.50
I hold at 38: statistics are strong for the frame (78) but research output is lower-middle and the 2020 and 2023 security shocks showed weak preparation; panelist C's 42 does not answer that.
- 40.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Moved from 42 to 40. Both peers note the 2020 and 2023 shocks and no foresight body; strong statistics alone do not show anticipation.
Agency
How able are individuals and organizations to turn an intention into action?
70.30.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyArmenia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+6.6 over 10 years (2016 to 2026), band +5.9 to +12.1. Median change: all countries +1.9, Income quartile 2 of 4 in 2000 +3.
+16.5 over 20 years (2006 to 2026), band +15.6 to +20.8. Median change: all countries +9.3, Income quartile 2 of 4 in 2000 +10.4.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 4.1per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 97.8score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 3count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
81.3 % of population, rank 71 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
71.4 % aged 15+, rank 69 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
70.5 % of GDP, rank 35 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median62.0-8.3 against the indicators
Round 2. How this layer works
- 60.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Hold at 60. Entry efficiency of 97.8 and three procedures show a clean register, and density of 4.12 shows modest use. Panelist B's 2018 street change is a one-time political event and not a repeatable channel for action. The panel range of 60 to 64 is narrow, and I stay at the bottom because support after registration is weaker than the register (own knowledge).
- 64.0 bottom_up@claude-opus-5-5, self-confidence 0.50
Held at 64. Entry efficiency of 97.8 and 3 procedures sit near the top and density of 4.12 is modest, so A and C rightly trim the 70.3. A's point about weak support after registration is real, but from my own knowledge the 2018 street-led change of power, the tech sector and diaspora-funded ventures show action that the density row does not count. Displaced Karabakh Armenians have narrower options.
- 62.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held at 62; panel is 60 to 64. Entry efficiency 97.8 is a rules score, density 4.1 is modest. The 2018 street-led change of power and an IT sector are genuine action, but diaspora money and security shocks narrow the base. Nothing new moves me.
Coordination
How effectively can independent actors organize around shared objectives?
63.10.47 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 0.97About CoordinationArmenia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+2.7 over 10 years (2016 to 2026), band -2.6 to +8.5, which includes no change. Median change: all countries -1.7, Income quartile 2 of 4 in 2000 -1.6.
+12.8 over 20 years (2006 to 2026), band +7 to +17.8. Median change: all countries -2.7, Income quartile 2 of 4 in 2000 -2.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+4.1 over 10 years, from 74.9 in 2016 to 79.0 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 31.2score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 97.1percentage points from approved budget | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.66index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration, Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2024
12.461 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2000ArmeniaWater management contracts and leases, and the national lease from 2017still operating
Water management contracts and leases, and the national lease from 2017
Armenia ran a sequence of water public-private partnerships from 2000, a Yerevan management contract, a 2006 to 2016 Yerevan lease and management contracts for the national and three regional utilities, which raised daily supply from about 6 hours in 1998 to 24 hours in most of Yerevan by 2015, and from January 2017 consolidated them into a single 15-year national lease covering about 2.2 million people.
2,200,000 people (about two-thirds of the population), people in the area covered by the 15-year national water lease from january 2017, 2017. 6 hours per day (24 in most of Yerevan by 2015), average daily water supply in most parts of the country, including yerevan, before the ppps, 1998. World Bank and PPIAF, Review of Armenia's Experience with Water Public-Private Partnerships (Marin, Muzenda and Andreasyan), 2017, retrieved 2026-10-02.
How it worked: The government contracted private operators in stages, first to manage the Yerevan utility for a fee with performance incentives, then to lease it, then to manage the national and regional utilities, and finally to lease all of them as one national concession paying a lease fee to the state, while the state kept financing capital works.
Limits: All figures are in the executive summary of a PDF (printed pages ix to xi). The review was written by World Bank staff with support from PPIAF, a facility that promotes infrastructure PPPs, and credits the operators generously, and the 24-hour figure is 'most of Yerevan', not the country. The same review says non-revenue water barely improved, that tariffs outside Yerevan stayed below cost recovery when the management contracts ended in 2016, and that capital investment was financed by the government, so the private operators ran networks without financing them. The record's newest verified fact is the start of the national lease in January 2017; we did not find an official account of its performance since then at an open URL, so 'operating' rests on its 15-year term, and any later dispute, renegotiation or early termination is not covered. The national lease introduced a single national tariff, a cross-subsidy from Yerevan to the rest of the country, whose effect on supply hours outside Yerevan is not shown here.
Panel median58.0-5.1 against the indicators
Round 2. How this layer works
- 55.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Revised from 50 to 55. B's point that state and volunteer networks housed over 100,000 arrivals in 2023 is coordination I did not weigh; I stay below 63.1 because trade compliance at 31/100 and a thin post-2018 civil service limit durable coordination.
- 58.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 58: volunteer and diaspora networks housed and fed over 100,000 arrivals in 2023, which the indicators miss. Weak trade compliance and the thin post-2018 civil service, as panelist A says, keep me under the 63.1 indicator score.
- 58.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Revised down from 62 to 58. Panelist A's point about a thin civil service after 2018 is plausible but unmeasured; budget execution at 94/100 is one year, trade compliance is 31/100, so I move toward B's 58 while keeping credit for the 2023 civil-society reception effort.
Trust
How much cooperation is possible beyond immediate personal networks?
61.50.34 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 1.00About TrustArmenia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+5.9 over 10 years (2016 to 2026), band +0.8 to +10.8. Median change: all countries +1.9, Income quartile 2 of 4 in 2000 +2.5.
+11.9 over 20 years (2006 to 2026), band +7 to +17.6. Median change: all countries +2.1, Income quartile 2 of 4 in 2000 +4.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+11.9 over 10 years, from 56.8 in 2016 to 68.7 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 53.1score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 0.19% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 1.5scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median50.0-11.5 against the indicators
Round 2. How this layer works
- 50.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Hold at 50. Panelist C calls bribery of 0.19% an artefact. I read it as partly real, since petty payment fell after 2018 (own knowledge), but the size of the fall cannot be verified. Compliance of 1.48 and dispute resolution of 53 are the institutional readings and they pull down from 61.5. All three of us land at 50 by different routes, so the agreement is not independent evidence.
- 50.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 50. The panel is unanimous, but for different reasons: C treats bribery of 0.19% as an artefact, while A and I think petty bribery did fall after 2018. Either way compliance of 1.48 and dispute resolution of 53 pull below the 61.5 derived score. From my own knowledge judicial vetting is contested and the 2025 dispute with the church strains neutrality.
- 50.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Held at 50; the panel is unanimous. Bribery 0.19% looks like a survey artefact next to compliance 1.48 of 4 and politicised judicial vetting. Dispute resolution 53 is mid. The 2025 government-church conflict is a live test of neutral courts.
Learning
How effectively does the country acquire, distribute, and update knowledge?
32.50.55 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.81About LearningArmenia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-6.8 over 10 years (2016 to 2026), band -11.1 to -2.9. Median change: all countries -1.3, Income quartile 2 of 4 in 2000 -0.4.
-5.8 over 20 years (2006 to 2026), band -10.5 to +0.5, which includes no change. Median change: all countries +0.8, Income quartile 2 of 4 in 2000 +2.2.
The model fills at least one of the 3 indicators in 17 of 27 years, at most 2, last in 2016. The replay starts in 2002, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-8.8 over 10 years, from 33.1 in 2016 to 24.3 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.58index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 16% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 0.76ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2024
52.8 % gross, rank 65 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2023
2.4 % of GDP, rank 117 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
8.4 % of secondary, rank 83 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Panel median40.0+7.5 against the indicators
Round 2. How this layer works
- 40.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Revised from 38 to 40. B's TUMO centres are a durable organisation with branches and an institutional model, not individual effort, so I give some credit; firm training at 17/100 holds me below B's 42.
- 41.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held near my 42: TUMO centres and coding academies reach many teenagers and adults outside firm training and citation counts. Panelist A's Soviet-era engineering base supports a score above the 32.5 indicator score.
- 38.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Revised up from 37 to 38. Panelist B's TUMO and coding academies point to non-formal learning at scale, which I accept in part; firm training at 17/100 and citation impact at 32/100 keep it modest.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
21.60.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationArmenia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+2.6 over 10 years (2016 to 2026), band -1.9 to +6.2, which includes no change. Median change: all countries 0, Income quartile 2 of 4 in 2000 +0.5.
+1.5 over 20 years (2006 to 2026), band -2.4 to +4.2, which includes no change. Median change: all countries +0.1, Income quartile 2 of 4 in 2000 +0.7.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 4, last in 2025. The replay starts in 2004, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+4.4 over 10 years, from 14.7 in 2016 to 19.1 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 4.3per million peoplefrom 13 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 2,418per million peoplefrom 7,336 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 14.8per million peoplefrom 45 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 16,069per million peoplefrom 49,600 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 22.3score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.
This project retired one row: Business share of R&D.
Panel median32.0+10.4 against the indicators
Round 2. How this layer works
- 30.0 institutionalist@claude-opus-5-5, self-confidence 0.50
I move from 26 to 30 because panelist C is right that a trademark rate of 47 is a formal registry filing, which is the institutional kind of signal I weight; weak insolvency efficiency (22.6) keeps me below the 32 to 36 of the others.
- 32.0 bottom_up@claude-opus-5-5, self-confidence 0.40
I hold at 32: trademarks are high for the frame (47.1) and TUMO and diaspora founders add bottom-up trial; panelist A's 26 underweights trademarks, and C's 36 underweights the relocation distortion in recent counts.
- 33.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Moved from 36 to 33. Panelist B shows the relocation of Russian tech workers distorts recent repository and firm counts; trademark strength remains the real signal.
Adaptability
How effectively can the system respond when circumstances change?
64.50.60 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 0.98About AdaptabilityArmenia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+26.7 over 10 years (2016 to 2026), band +26.7 to +26.7. Median change: all countries -0.8, Income quartile 2 of 4 in 2000 -1.6.
+15.4 over 20 years (2006 to 2026), band +10 to +20.6. Median change: all countries -1, Income quartile 2 of 4 in 2000 +0.4.
The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+26.7 over 10 years, from 37.8 in 2016 to 64.5 on 4 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 12.9% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 22.4% of unemployed | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.26index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 5.7% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
70.8 % aged 15+, rank 64 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
20.3 per 100 people, rank 60 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
5.1 % of output, rank 17 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2017
76.1 % of employment, rank 70 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
1994ArmeniaEarthquake Reconstruction Project in the Spitak earthquake zonedelivered and closed
Earthquake Reconstruction Project in the Spitak earthquake zone
Armenia's Ministry of Economy, through a project implementation unit, restarted reconstruction in the zone of the December 1988 Spitak earthquake that had stopped when Soviet work crews withdrew in 1991, and by April 1997 had provided 2,857 housing units against 2,069 planned, completed 10 factories against 7 and laid 41 km of water pipes against about 27 km, under an IDA credit closed in June 1997.
2,857 housing units, housing units provided (completed unfinished apartments and repaired or strengthened units), 1997-04. 2,069 housing units, housing units planned at appraisal, 1993. World Bank, Implementation Completion Report, Armenia Earthquake Reconstruction Project (Credit 2562-AM), Report No. 17255, December 1997, retrieved 2026-10-02.
How it worked: A small, politically insulated implementation unit under the economy ministry took over half-finished Soviet reconstruction sites and completed them through competitive local contracts, choosing nearly finished buildings to maximise habitable units per dollar.
Limits: The World Bank wrote the report on a credit of about US$28 million. The unit counts are in Table 5 (Key Indicators for Project Implementation, printed page 17), which is OCR text with errors (the bathhouse row repeats the housing figure). The earthquake left about 530,000 people homeless (Part I, para. 1), so 2,857 units is a small fraction of the need, delivered five to eight years after the shock; the record shows recovery capacity in a newly independent state restarting a stalled Soviet programme, not a timely national recovery. The ICR says beneficiaries were slow to move out of temporary 'domiks', and that many families were still in temporary shelter in 1997. Units count apartments of different kinds (completion of unfinished blocks, repair and strengthening) and the project's single-family starter houses were scaled back. The ICR rates implementation satisfactory and credits an independent implementation unit, not a ministry line department.
2020ArmeniaCOVID-19 anti-crisis programmes of 2020delivered and closed
COVID-19 anti-crisis programmes of 2020
Armenia's government approved 18 anti-crisis programmes after the COVID-19 outbreak in spring 2020 and by 16 May 2020 had distributed 84.4 billion drams under them to 48,400 legal entities and about 1.1 million individuals.
1,100,000 people (approximate, as published), individuals who had benefited from the anti-crisis programmes, 2020-05-16. 84.4 billion Armenian drams, funds distributed under the anti-crisis programmes, 2020-05-16. Office of the Prime Minister of Armenia, press conference of 16 May 2020, retrieved 2026-10-16.
How it worked: The cabinet adopted emergency support as a series of numbered measures, each aimed at one group the state already held records on, such as registered employees, families on benefits and low-consumption utility subscribers.
Limits: The figures come from the head of government reporting on his own programmes in a press conference, not from a statistical series or an audit. The 1.1 million is rounded and sums programme uses, so a person who received two payments may count twice. The total includes subsidised loans to businesses as well as cash transfers. The page lists per-programme counts (for example 166,122 children under the child support measure and 84,810 families under the family benefit top-up) but gives no adoption dates, so speed rests on a separate state news agency report that the cabinet approved the first five measures on 26 March 2020. Most of the transfers were one-time payments; the record shows the state's ability to design and pay emergency schemes in seven weeks, not a lasting change in its social protection rules.
Panel median57.0-7.5 against the indicators
Round 2. How this layer works
- 55.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Revised from 50 to 55. C's point that long-term unemployment is low (81/100) and new export products at 64/100 shows reallocation I cannot dismiss; I stay below 64.5 because headline unemployment is high and much of the export shift is re-export trade.
- 58.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Revised down two points: panelist A's point that much post-2022 export growth is re-export trade makes the adaptation look less durable. The absorption of relocants and refugees is still a real stress test that the economy passed.
- 57.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Revised down from 62 to 57. Panelists A and B note that re-export trade after 2022 may reverse and the relocant inflow was luck, not planned reallocation; low long-term unemployment and export diversification still count as real, so I stay above A.
Building
How capable is the country of turning plans and knowledge into functioning systems?
29.20.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingArmenia beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+7.9 over 10 years (2016 to 2026), band +4.4 to +12.4. Median change: all countries -0.3, Income quartile 2 of 4 in 2000 +0.3.
+10 over 20 years (2006 to 2026), band +3.9 to +15.4. Median change: all countries -0.5, Income quartile 2 of 4 in 2000 -0.6.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 4, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+10.5 over 10 years, from 12.6 in 2016 to 23.1 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 11% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 23.6% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 60.5score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.03index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
50,463 constant 2021 PPP $, rank 58 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2010ArmeniaNorth-South Road Corridor Investment Program, Tranche 1delivered and closed
North-South Road Corridor Investment Program, Tranche 1
Armenia's Ministry of Transport, Communication and Information Technologies reconstructed about 30 km of the M1 Yerevan to Ashtarak and M2 Yerevan to Artashat roads under the first tranche of the ADB-financed North-South Road Corridor programme for an implementation cost of US$68.70 million against US$68.0 million at appraisal, but completed the project on 16 June 2016 against a planned 31 December 2013, after one round of bids was rejected and the M1 section was cut from 18.4 km to about 10 km.
68.7 million US dollars, total implementation cost, actual, 2018-02-23. 68 million US dollars, total implementation cost at appraisal, 2009-09. Asian Development Bank, Completion Report, Armenia North-South Road Corridor Investment Program (Tranche 1), Project 42145-023, Loan 2561, January 2020, retrieved 2026-10-02.
How it worked: The transport ministry used a multitranche ADB facility to rebuild the national north-south corridor section by section, adjusting each tranche's scope to land acquisition and fiscal limits instead of extending its budget.
Limits: ADB, the lender, wrote the report. The completion dates and costs are in the basic data table at the front of the PDF (pages 2 to 4); the scope changes are paras. 8 to 16. The 30-month slip from December 2013 to June 2016 is my subtraction from the two dates; the loan closed on 23 February 2018 against 30 June 2014 in the loan agreement. Cost held near appraisal only because the scope moved: the M1 section was cut to about 10 km because of land acquisition, 2 km was transferred to tranche 2 when Armenia hit fiscal limits, and 19.6 km of the M2 was added, so the outturn buys different roads; the combined tranche 1 and 2 works contract was US$10 million above the engineer's estimate and the government undertook to fund overruns (para. 14 and footnote 13). This is the first and smallest tranche of a programme to rebuild a 550 km corridor; later tranches, including the Talin to Gyumri works, were not read, and the programme's overall delivery is not evidenced here.
Panel median29.0-0.2 against the indicators
Round 2. How this layer works
- 28.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 28. B agrees and C is close: the high-tech share likely reflects re-exported electronics, economic fitness is near zero, and the North-South road corridor is delayed.
- 29.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held near the indicator score: panelist A's North-South corridor delays match my view, and the high-tech export share may include re-exported electronics. I know of no large domestically delivered system that would lift it.
- 29.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Revised from 31 to 29. Panelists A and B both at 28 point to re-exports behind the high-tech share and no domestically delivered large system; North-South road delay is a concrete case.