How easily can new approaches be attempted, tested, abandoned, and improved?
Capability agenda
Armenia
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Armenia stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 44.3 | 0.46 | +4.1 over 10 years using 2 indicators |
| Agency | 70.3 | 0.49 | no trend |
| Coordination | 63.1 | 0.47 | +4.1 over 10 years using 2 indicators |
| Trust | 61.5 | 0.34 | +11.9 over 10 years using 2 indicators |
| Learning | 32.5 | 0.55 | -8.8 over 10 years using 2 indicators |
| Experimentation | 21.6 | 0.47 | +4.4 over 10 years using 3 indicators |
| Adaptability | 64.5 | 0.60 | +26.7 over 10 years using 4 indicators |
| Building | 29.2 | 0.63 | +10.5 over 10 years using 3 indicators |
| Shared Purpose | 75.1 | 0.32 | +8.6 over 10 years using 2 indicators |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Armenia’s comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 → 2026: 73.6 to 56.5 (-17.1) over 30 years using 2 indicators
Agenda items on this timeline
- 1994Earthquake Reconstruction Project in the Spitak earthquake zone
- 2020COVID-19 anti-crisis programmes of 2020
Historical values use today’s frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How capable is the country of turning plans and knowledge into functioning systems?
+203
How effectively does the country acquire, distribute, and update knowledge?
+105
How capable is the country of identifying and preparing for emerging change?
+35
What to measure first
The evidence is too thin to manage these dimensions confidently.
Shared Purpose
0.32To what extent can people imagine themselves as participants in a common project?
Trust
0.34How much cooperation is possible beyond immediate personal networks?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Agency | 70.3 | 0.49 |
| Adaptability | 64.5 | 0.60 |
| Coordination | 63.1 | 0.47 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of one’s life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Armenia
What the indicators miss about Armenia
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- Water management contracts and leases, and the national lease from 2017 (Coordination)
Armenia ran a sequence of water public-private partnerships from 2000, a Yerevan management contract, a 2006 to 2016 Yerevan lease and management contracts for the national and three regional utilities, which raised daily supply from about 6 hours in 1998 to 24 hours in most of Yerevan by 2015, and from January 2017 consolidated them into a single 15-year national lease covering about 2.2 million people.
- Earthquake Reconstruction Project in the Spitak earthquake zone (Adaptability)
Armenia's Ministry of Economy, through a project implementation unit, restarted reconstruction in the zone of the December 1988 Spitak earthquake that had stopped when Soviet work crews withdrew in 1991, and by April 1997 had provided 2,857 housing units against 2,069 planned, completed 10 factories against 7 and laid 41 km of water pipes against about 27 km, under an IDA credit closed in June 1997.
- North-South Road Corridor Investment Program, Tranche 1 (Building)
Armenia's Ministry of Transport, Communication and Information Technologies reconstructed about 30 km of the M1 Yerevan to Ashtarak and M2 Yerevan to Artashat roads under the first tranche of the ADB-financed North-South Road Corridor programme for an implementation cost of US$68.70 million against US$68.0 million at appraisal, but completed the project on 16 June 2016 against a planned 31 December 2013, after one round of bids was rejected and the M1 section was cut from 18.4 km to about 10 km.
- COVID-19 anti-crisis programmes of 2020 (Adaptability)
Armenia's government approved 18 anti-crisis programmes after the COVID-19 outbreak in spring 2020 and by 16 May 2020 had distributed 84.4 billion drams under them to 48,400 legal entities and about 1.1 million individuals.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.