Nepal
Strongest usable evidence: Coordination, at 70.1. Raise Building first, at 17.4. Shared purpose needs more evidence: confidence is 0.28.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- BuildingPeers 21.80.61 usable+0.1(3)
- AnticipationPeers 24.50.46 usable+11.6(2)
- LearningPeers 25.90.54 usable-10.3(2)
Measure before managing, thinnest first
- Shared purposePeers 47.10.28 thin+26.5(2)
- ExperimentationPeers 8.00.30 thinno trend
- TrustPeers 45.70.33 thin+7.9(2)
- AgencyPeers 41.90.43 thinno trend
Keep watching, highest first
- CoordinationPeers 57.70.48 usable+4.5(2)
- AdaptabilityPeers 54.10.53 usable-5.4(3)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Nepal beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
20.50.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationNepal beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+11.6 over 10 years (2016 to 2026), band +11.6 to +11.6. Median change: all countries +11.2, Income quartile 1 of 4 in 2000, lowest +11.6.
+11.7 over 20 years (2006 to 2026), band +4.2 to +20. Median change: all countries +13.4, Income quartile 1 of 4 in 2000, lowest +11.7.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+11.6 over 10 years, from 8.9 in 2016 to 20.5 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 53.6articles per million peoplefrom 1,590.74 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 60.4index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2010
0.3 % of GDP, rank 74 of 123. Gross domestic expenditure on research and development as a share of GDP.
The value is from 2010, more than 15 years old.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2002
59.7 per million people, rank 97 of 118. Full-time-equivalent researchers per million people.
The value is from 2002, more than 15 years old.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
541 per million people, rank 73 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median20.0-0.5 against the indicators
Round 2. How this layer works
- 18.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Hold at 18. C's community-based early warning after 2015 is largely NGO-run; federal restructuring has spread state planning thin, as B says.
- 20.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 20: panelist C's community early-warning point supports staying above A's 18; federal restructuring still spreads planning thin.
- 20.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Moved down 2 to 20: A and B note high government turnover and federal restructuring spreading planning thin; post-2015 community early warning keeps me above A.
Agency
How able are individuals and organizations to turn an intention into action?
35.40.43 thin3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.75About AgencyNepal beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-0.9 over 10 years (2016 to 2026), band -6.1 to +3.1, which includes no change. Median change: all countries +1.9, Income quartile 1 of 4 in 2000, lowest +1.5.
+0.3 over 20 years (2006 to 2026), band -4.6 to +4.8, which includes no change. Median change: all countries +9.3, Income quartile 1 of 4 in 2000, lowest +10.9.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 1.4per 1,000 aged 15-64 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 50.4score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 8count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
46.3 % of population, rank 105 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
60 % aged 15+, rank 82 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
90.5 % of GDP, rank 21 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median41.0+5.6 against the indicators
Round 2. How this layer works
- 41.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised from 38 to 41. B's community forest user groups are a point I must credit under my own stance: they are legally registered bodies under the Forest Act that have lasted for decades and manage real resources (own knowledge). Density of 1.398 (2020, 8.1), efficiency of 50.42 (35) and 8 procedures (63.2) give 35.4. I reject B's 48: labour migration funded by families is exit from weak domestic channels, and overlapping federal layers since 2015 add requirements.
- 48.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 48. Panelists A and C sit at the 35.4 indicator and A reads migration as action abroad and not at home. My answer: families finance that migration through savings cooperatives and return remittances into land, shops and schools, so it starts and ends at home. Density of 1.398 (2020) misses this, and community forest groups run resources at scale (own knowledge). Hard terrain and weak credit keep me mid-frame.
- 40.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
I move from 38 to 40. Density 1.398 (2020) is low, entry efficiency 50 and 8 procedures are middling. Panelist B's point about community forestry user groups and migration-funded households is a fair argument that registers miss action, and I accept it partly. Overlapping federal, provincial and local layers add friction (own knowledge). I stay under B's 48.
Coordination
How effectively can independent actors organize around shared objectives?
70.10.48 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 1.00About CoordinationNepal beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3 over 10 years (2016 to 2026), band -0.8 to +8.7, which includes no change. Median change: all countries -1.7, Income quartile 1 of 4 in 2000, lowest +2.6.
-9.1 over 20 years (2006 to 2026), band -14.2 to -4.4. Median change: all countries -2.7, Income quartile 1 of 4 in 2000, lowest +0.7.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+4.5 over 10 years, from 65.6 in 2016 to 70.1 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 66.5score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 77.7percentage points from approved budget | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.86index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration, Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2023
2.903 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2000NepalIndependent power producers under NEA power purchase agreementsstill operating
Independent power producers under NEA power purchase agreements
The Nepal Electricity Authority bought power from private hydropower, solar and bagasse producers under long-term power purchase agreements, and in fiscal year 2025/26 those producers supplied 10,825 GWh of the 18,624 GWh available on the national grid, up from 1,623 GWh in 2017.
10,825 GWh, energy purchased by nea from independent power producers, 2026. 1,623 GWh, energy purchased by nea from independent power producers, fiscal year 2017, 2017. Nepal Electricity Authority, A Year in Review, Fiscal Year 2025/2026 (annual report), retrieved 2026-10-17.
How it worked: The state utility signed standard long-term power purchase agreements with licensed private developers and kept the grid and the single-buyer role, so private capital built most new generation while NEA carried the offtake and transmission risk.
Limits: The numbers sit inside a 232-page PDF of about 10 MB: the purchased-energy figures are in the financial highlights table and the ten-year availability table, and NEA is the buyer reporting on its own purchases. Purchased energy measures what the private side delivered, not the quality of the collaboration: the same report shows NEA froze new hydropower agreements for years, and press reports put about 16,000 MW of private projects in limbo, so the pipeline side of the partnership is strained even while delivery grows. The report's figure of 227 IPP projects with 3,459 MW reads, against its own installed capacity table, as including the 748.4 MW of NEA subsidiaries, which are state-controlled companies, so the private-only capacity is closer to the table's 2,710 MW of IPP hydro, solar and bagasse. The fiscal year ends in mid-July, so '2026' means fiscal year 2025/26. The start year rests on the commercial operation date of the Khimti Khola plant, listed in the report's appendix in the Bikram Sambat calendar as 2057.03.27, which converts to mid-2000. The purchased volume includes energy NEA later exported: the same report shows 3,965 GWh exported to India and Bangladesh in the year, so the IPP figure is not all domestic consumption.
Panel median55.0-15.1 against the indicators
Round 2. How this layer works
- 48.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Revised up from 40 to 48: panelists B and C are right that community forest user groups are coordination I underweighted, and they are legally constituted bodies under the Forest Act with decades of continuity, but budget underspend of 22 points and weak provincial delivery keep me below both.
- 60.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held near 60. Panelist A's 40 ignores that community forest user groups and other local bodies coordinate thousands of actors; C and I agree weak budget execution and provincial delivery cap it below 70.
- 55.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held between A at 40 and B at 62. A is right on budget underspend of 22 points and provincial weakness; B is right that civil society strength at 86.6 captures community forest user groups, which are a real case of coordination.
Trust
How much cooperation is possible beyond immediate personal networks?
82.00.33 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 0.97About TrustNepal beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+3.7 over 10 years (2016 to 2026), band -0.5 to +8.7, which includes no change. Median change: all countries +1.9, Income quartile 1 of 4 in 2000, lowest +4.7.
+6.9 over 20 years (2006 to 2026), band +1.2 to +11.6. Median change: all countries +2.1, Income quartile 1 of 4 in 2000, lowest +6.2.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+7.9 over 10 years, from 70.5 in 2016 to 78.4 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 76.1score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 6.2% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 2.6scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median50.0-32.0 against the indicators
Round 2. How this layer works
- 50.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Held at 50. Dispute resolution of 76.116 (89), bribery of 6.168% (87.8) and compliance of 2.645 (69) give 82 and the whole panel rejects that. The September 2025 youth protests against corruption brought down the government within days (own knowledge). B's cooperative collapses and C's nepotism point fit this. I stay above C at 45 because a former chief justice led the interim government, which shows the courts kept standing. B's forest groups are local, so they do not move trust beyond the village.
- 50.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Revised down from 55. All panelists reject the 82 built on dispute resolution of 76.116 and bribery of 6.168%. Panelist A's point that party cartels shape courts and the CIAA adds to my own evidence, the cooperative savings collapses and the September 2025 uprising (own knowledge). I named forest groups as support, but I also said they stay within villages, so they cannot hold 55. I stay above panelist C's 45 because compliance of 2.645 is a current mid-frame row.
- 47.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
I move from 45 to 47. Dispute resolution 76.1 (89) and bribery 6.2% (87.8, 2023) look very high for a low-income country, and the September 2025 Gen Z protests that toppled the government followed anger over corruption. Court compliance 2.645 is mid. I accept panelists A and B that the composite is not credible, and B's forest groups example shows local cooperation. I sit between them.
Learning
How effectively does the country acquire, distribute, and update knowledge?
26.80.54 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.78About LearningNepal beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-3.7 over 10 years (2016 to 2026), band -7 to -0.3. Median change: all countries -1.3, Income quartile 1 of 4 in 2000, lowest -2.3.
+5.9 over 20 years (2006 to 2026), band +1.2 to +10.3. Median change: all countries +0.8, Income quartile 1 of 4 in 2000, lowest +0.6.
The model fills at least one of the 3 indicators in 17 of 27 years, at most 2, last in 2016. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-10.3 over 10 years, from 32.4 in 2016 to 22.1 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.51index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 14.1% of firms | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 0.72ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2024
21.3 % gross, rank 95 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2024
3.7 % of GDP, rank 81 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
1.2 % of secondary, rank 123 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2018NepalEnhanced Vocational Education and Training (EVENT II) short-term trainingdelivered and closed
Enhanced Vocational Education and Training (EVENT II) short-term training
Nepal's Ministry of Education, Science and Technology, through the EVENT II project secretariat, put 111,062 people aged 16 to 40 through market-relevant short-term vocational training between 2018 and 2023, delivered by 142 private and public training providers in 68 of the 77 districts and paid partly on trainees' employment six months after completion.
111,062 trainees, youth (16 to 40) who enrolled in and completed project-supported short-term training, 2018-02/2023-07 (project period). 23,735 trainees, of which trained with vouchers redeemed at a provider of their choice, 2018-02/2023-07. World Bank, Implementation Completion and Results Report, Nepal Second Enhanced Vocational Education and Training Project (EVENT II), 26 February 2024, retrieved 2026-10-02.
How it worked: The education ministry bought short courses from accredited private and public providers and paid them per trainee, with part of the payment withheld until the trainee was verified as employed six months later, and paid more for women, disadvantaged youth and the poorest districts.
Limits: The figure is in a PDF completion report written by the World Bank about its own project, from data supplied by the ministry's project secretariat and checked by a joint monitoring team of local education officers, CTEVT, the ministry and SDC-Helvetas, which is not fully independent of the delivery; the Bank rated its own outcome. It counts trainees over a five-year project, not participation in the last 12 months, and amounts to roughly 22,000 a year against a labour force in the millions. The project defined youth as 16 to 40, so the count mixes recent school leavers with older adults and gives no age split. The total was 96.5 percent of a 115,000 target and training stopped for about 18 months during the pandemic. The training was financed by IDA credit, not the national budget, and the report does not say whether the government continued the results-based short-term training after the July 2023 closing, so 'concluded' describes the project window, not a measured end of the model. Employment rates of 70 to 83 percent six months after training are from the project's own tracer verification.
Panel median29.0+2.2 against the indicators
Round 2. How this layer works
- 28.0 institutionalist@claude-opus-5-5, self-confidence 0.55
Held near 27, moved to 28: panelist C's school enrolment gain is real and partly in the HCI, but panelist B's skill transfer from returning migrants is unobserved and does not pass through any institution that keeps it, so I stay low.
- 31.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held near 31. C's point about enrolment gains supports a small lift, and skills carried home by returning migrants are learning the formal firm training measure misses.
- 29.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Held. B raises on migrant return skills, which is unmeasured; firm training of 14 and HCI of 36.3 are consistent with 27 to 30.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
4.30.30 thin5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 0.65About ExperimentationNepal beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.2 over 10 years (2016 to 2026), band -4 to +3.3, which includes no change. Median change: all countries 0, Income quartile 1 of 4 in 2000, lowest 0.
+0.6 over 20 years (2006 to 2026), band -3 to +3.7, which includes no change. Median change: all countries +0.1, Income quartile 1 of 4 in 2000, lowest +0.1.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 3, last in 2025. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 0.71per million peoplefrom 20 national total | 2017. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 143per million peoplefrom 4,005 national total | 2017. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 0.54per million peoplefrom 15 national total | 2017. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 10,346per million peoplefrom 306,434 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 0score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.
This project retired one row: Business share of R&D.
Panel median10.0+5.7 against the indicators
Round 2. How this layer works
- 8.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Hold at 8. An insolvency score of 0 means failure has no legal exit; repositories and cooperatives show individual effort, not an institution that protects trial.
- 14.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Moved from 16 to 14: the 2024 savings cooperative collapses show that Nepal's grassroots finance has weak failure handling, which supports the zero insolvency score; repository activity still keeps me above the panel's 8.
- 10.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Moved up 2 to 10: B's remittance-funded enterprise and 18.2 repositories are credible, but an insolvency score of 0 and 2017 filings keep it low.
Adaptability
How effectively can the system respond when circumstances change?
52.60.53 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 0.85About AdaptabilityNepal beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-4 over 10 years (2016 to 2026), band -5.9 to -1.9. Median change: all countries -0.8, Income quartile 1 of 4 in 2000, lowest -0.2.
-7.9 over 20 years (2006 to 2026), band -13 to -3.2. Median change: all countries -1, Income quartile 1 of 4 in 2000, lowest +0.9.
The model fills at least one of the 4 indicators in 17 of 27 years, at most 2, last in 2016. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-5.4 over 10 years, from 51.1 in 2016 to 45.7 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 10.5% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 29.6% of unemployed | 2017. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.32index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 1.8% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
41.9 % aged 15+, rank 132 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
10.1 per 100 people, rank 79 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
13.4 % of output, rank 82 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2022
78.3 % of employment, rank 72 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2016NepalEarthquake housing reconstruction programme (National Reconstruction Authority)delivered and closed
Earthquake housing reconstruction programme (National Reconstruction Authority)
After the April 2015 Gorkha earthquake, Nepal's National Reconstruction Authority ran an owner-driven housing grant programme that, by 23 September 2021, had paid the third and final tranche of the reconstruction grant to 704,341 of 866,207 eligible households across 32 districts, with the World Bank-financed share revised to 309,335 houses.
704,341 households, eligible beneficiary households that had received the third tranche of the housing reconstruction grant, 2021-09-23. 309,335 houses, houses whose safer reconstruction was supported by the ida-financed earthquake housing reconstruction project, final revised count, 2023-05. World Bank, Implementation Status and Results Report, Earthquake Housing Reconstruction Project (P155969), Sequence No. 13, retrieved 2026-10-02.
How it worked: Parliament created a time-limited National Reconstruction Authority that enrolled every damaged household, paid a flat grant in three tranches, and released each tranche only after engineers verified that the house met a seismic building code, so the payment schedule enforced the standard.
Limits: A grant tranche is a payment, not a finished house: in the programme's rules the third tranche is released on completion of construction up to the roof band, so 704,341 counts households verified to that stage, not occupied, completed homes. The figures are reported by the government agencies to the lender and published by the lender, which financed about $700 million of the programme and rates its own operation; the 309,335 count was itself revised in 2023 after the project clarified that its reported total had included 3,766 houses financed by a trust fund grant (TF0A4783). About 162,000 eligible households had not received the final tranche at the reporting date, and the World Bank's ICR for the MDTF Funding for Earthquake Housing Reconstruction project (P162067, TF0A4783) notes the average rebuilding cost was about three times the NPR 300,000 grant, and one third of households used loans to close the gap. The number shows recovery after one shock; it says nothing about preparedness before the next one, and the NRA was a temporary body dissolved in December 2021, with its residual work passed to the National Disaster Risk Reduction and Management Authority. The record documents the national programme's scale through a single donor's monitoring report; there is no independent national statistical series behind it.
2020NepalNepal Rastra Bank COVID-19 refinance and loan reliefdelivered and closed
Nepal Rastra Bank COVID-19 refinance and loan relief
Nepal Rastra Bank's monetary policy of 17 July 2020 expanded its subsidised refinance facility to five times the available fund for COVID-19 affected businesses, and by mid-July 2021 Rs 148.75 billion had been approved to 48,890 borrowers, against Rs 7.49 billion of refinance outstanding a year earlier.
148.75 billion Nepalese rupees (48,890 borrowers), covid-19 refinance approved, cumulative, 2021-07. 7.49 billion Nepalese rupees, refinance outstanding before the expansion, 2020-07. Nepal Rastra Bank, Monetary Policy for 2021/22 (unofficial English translation, August 2021), paragraph 54, retrieved 2026-10-02.
How it worked: The central bank turned an existing subsidised refinance window into a pandemic credit programme by multiplying its size, setting sector rates (1 percent special, 2 percent small business, 3 percent general) and letting commercial banks, development banks, finance companies and microfinance institutions on-lend it.
Limits: The URL serves a PDF, which NRB labels an unofficial translation; the 7.49 billion baseline is in the Monetary Policy for 2020/21 (https://www.nrb.org.np/ofg/monetary-policy-2020-21-full-text-english-version/, paragraph 48) and the expansion in paragraphs 100 to 103 of the same document. The central bank reports on its own scheme. 'Approved' is not disbursed, and the two figures are different measures (an annual stock against a cumulative approval), so the comparison shows scale, not a like-for-like increase. The rule changed about four months after the March 2020 lockdown, at the regular annual monetary policy rather than in an emergency statement, so the speed is moderate. Uptake was uneven: under the same document the business continuity loan for tourism and small firms to pay wages reached only Rs 956.7 million, and 30 percent of refinance could go through customer evaluation or microfinance lump sums that the source does not break down. Refinance at 1 to 3 percent with borrowers paying 3 to 5 percent went to borrowers banks chose, and the document gives no count of first-time or small borrowers. Other relief in the same section (repayment extensions for Rs 93.63 billion of loans, restructuring of Rs 129.21 billion) is not added here.
Panel median52.0-0.6 against the indicators
Round 2. How this layer works
- 44.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Revised up from 40 to 44: panelist C is right that the National Reconstruction Authority accelerated after a slow start and completed most private housing grants before it was dissolved, which is an institutional response, but labour adjustment still runs through emigration and unemployment is 10.5 percent.
- 55.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Revised down slightly from 58. Panelist A's point that the reconstruction authority was slow is fair, but household rebuilding after 2015 and migration-based income diversification are real adaptive capacity the labour indicators do not read.
- 52.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Revised down four points. A at 40 is right that adjustment is emigration and a slow reconstruction authority; B at 58 credits household recovery, which is resilience but not system response.
Building
How capable is the country of turning plans and knowledge into functioning systems?
17.40.61 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 0.96About BuildingNepal beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
0 over 10 years (2016 to 2026), band -4 to +3.6, which includes no change. Median change: all countries -0.3, Income quartile 1 of 4 in 2000, lowest -1.1.
-1.5 over 20 years (2006 to 2026), band -6.4 to +2.3, which includes no change. Median change: all countries -0.5, Income quartile 1 of 4 in 2000, lowest -0.5.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+0.1 over 10 years, from 4.3 in 2016 to 4.4 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 5% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 0.62% of manufactured exports | 2022. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 66.8score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.04index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
20,874 constant 2021 PPP $, rank 93 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2001NepalMelamchi Water Supply Project, and its erosion after the 2021 floodoperating below its peak
Melamchi Water Supply Project, and its erosion after the 2021 flood
Nepal's government built the Melamchi River diversion tunnel and headworks to pipe an additional 170 million litres a day into the Kathmandu Valley, closing the project in June 2021, more than 14 years after its original March 2007 closing date; the 2021 flood then damaged the headworks, and water has since been diverted for about eight months a year.
14 years, delay of project closing beyond the originally planned closing date (march 2007 planned, june 2021 actual), 2021-06. 8 months per year, months per year melamchi water could be diverted after the 2021 flood damaged the headworks, 2025-08. Asian Development Bank, Independent Evaluation Department, Validation Report PVR-1165 (Melamchi Water Supply Project and Kathmandu Valley Water Services Sector Development Program), retrieved 2026-10-02.
How it worked: The Ministry of Physical Planning and Works and later the Ministry of Water Supply, with ADB as lead financier, tied a trans-basin water diversion to a reform of Kathmandu's water utility in a single loan. The infrastructure was delivered and the institutional reforms largely were not.
Limits: The 14 years is the gap between two loan closing dates, which is a lender's administrative milestone, not a measured completion date for the tunnel; the source gives no physical completion schedule against a baseline. The cost figure is not usable as an overrun: appraisal was $464 million and completion $345.3 million, but the 2008 scope change and the exit of the World Bank, NORAD and Sida mean the two totals price different projects, and ADB says separately that a 2014 additional loan covered tunnel cost overruns without stating the overrun in percent. The erosion is stated in words and one current number: the source publishes no figure for the year-round flow before the 2021 flood, so the secondMetric holds the post-flood level, not a measured peak. The flood is an exogenous shock, though ADB attributes the vulnerability to design that did not fit the terrain. The validation rests on the project completion report written by the lender and the executing agency, and ADB was itself a party to the project's design. The delay mixes national causes (slow decisions, leadership turnover, poor contractor management) with contractor failure, the cancelled and re-bid contracts of nonperforming contractors.
Panel median25.0+7.6 against the indicators
Round 2. How this layer works
- 23.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised up from 20 to 23: panelist C's point that the Nepal Electricity Authority ended load-shedding in 2018 is an institutional delivery I accept, but Melamchi water and Pokhara airport ran years late and manufacturing and fitness are near the floor, so I stay below C's 27.
- 25.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised up from 22. Panelist C's point that Nepal ended load-shedding in 2018 and extended grid access to most households is delivery I underweighted; Melamchi and Pokhara airport delays keep it low.
- 26.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held within a point. Hydropower additions and the end of load-shedding in 2018 are real delivery, offset by Melamchi and Pokhara airport delays and manufacturing at 5 percent of GDP.