Azerbaijan
Strongest usable evidence: Agency, at 65.6. Raise Experimentation first, at 8.7. Shared purpose needs more evidence: confidence is 0.16.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- ExperimentationPeers 23.10.47 usable+3.8(3)
- BuildingPeers 31.90.63 usable+1.2(3)
- AnticipationPeers 44.50.46 usable+15.6(2)
- LearningPeers 38.10.55 usable+5.0(2)
- AdaptabilityPeers 64.30.48 usable+12.7(3)
- CoordinationPeers 76.30.48 usable+0.7(2)
Measure before managing, thinnest first
- Shared purposePeers 59.10.16 very thinno trend
- TrustPeers 64.20.34 thin+14.5(2)
Keep watching, highest first
- AgencyPeers 45.40.49 usableno trend
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Azerbaijan beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
30.60.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationAzerbaijan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+15.6 over 10 years (2016 to 2026), band +15.6 to +15.6. Median change: all countries +11.2, Income quartile 2 of 4 in 2000 +12.5.
+16.1 over 20 years (2006 to 2026), band +9.4 to +22.5. Median change: all countries +13.4, Income quartile 2 of 4 in 2000 +13.6.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+15.6 over 10 years, from 15.0 in 2016 to 30.6 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 152articles per million peoplefrom 1,544.24 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 69.5index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2024
0.21 % of GDP, rank 92 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2024
1,663 per million people, rank 44 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
541 per million people, rank 74 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median24.0-6.6 against the indicators
Round 2. How this layer works
- 22.0 institutionalist@claude-opus-5-5, self-confidence 0.60
I hold at 22: panelists B and C cite the same facts (mid statistics, oil planning, closed system) at higher scores, but a presidency-centred planning system with no independent scanning body is weaker than the indicator says.
- 26.0 bottom_up@claude-opus-5-5, self-confidence 0.50
I move down to 26: panelist A's point that planning centres on the presidency and hydrocarbon revenue with little independent scanning is one I cannot answer, though the 2030 priorities keep me above 22.
- 24.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Moved from 25 to 24. Both peers stress oil-centred planning in a closed system; nothing answers that.
Agency
How able are individuals and organizations to turn an intention into action?
65.60.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyAzerbaijan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+1.9 over 10 years (2016 to 2026), band +0.9 to +6.6. Median change: all countries +1.9, Income quartile 2 of 4 in 2000 +3.
+19.7 over 20 years (2006 to 2026), band +15.7 to +24.1. Median change: all countries +9.3, Income quartile 2 of 4 in 2000 +10.4.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2008, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 2per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 96.7score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 3count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2025
90.8 % of population, rank 37 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
56.3 % aged 15+, rank 91 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
24.9 % of GDP, rank 93 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median46.0-19.6 against the indicators
Round 2. How this layer works
- 47.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised from 50 to 47. Entry efficiency of 96.7 and three procedures reflect real administration, and ASAN centres are a serious institution (own knowledge). Panelist C's point moved me: the Karabakh campaigns show action by the state, not by individuals or independent organisations, and I gave ASAN too much credit for a service that does not open space for them. Density of 2 per 1,000 fits that.
- 46.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 46. Entry of 96.7 and 3 procedures reflect ASAN, while density is 2.0. C credits state execution in Karabakh, which is real but does not show that a citizen or independent group can act. From my own knowledge NGO grant rules and arrests since 2023 shut non-state initiative, while bazaar and cross-border traders keep moving, which keeps me at A and C's level or a little above.
- 44.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Lowered from 45. Panelists A (50) and B (46) point to ASAN one-stop centres as serious administration; I accept that, but entry efficiency 96.7 is a rules score and density is 2.0. State execution (Karabakh recovery) is bought with oil income and does not show individual agency. NGO grant rules and activist arrests since 2023 limit who can act.
Coordination
How effectively can independent actors organize around shared objectives?
46.80.48 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 1.00About CoordinationAzerbaijan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.5 over 10 years (2016 to 2026), band -4.2 to +4.8, which includes no change. Median change: all countries -1.7, Income quartile 2 of 4 in 2000 -1.6.
-6.2 over 20 years (2006 to 2026), band -11.6 to -0.5. Median change: all countries -2.7, Income quartile 2 of 4 in 2000 -2.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+0.7 over 10 years, from 44.3 in 2016 to 45.0 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 48.5score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 105percentage points from approved budget | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.08index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration, Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2024
1.511 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2023AzerbaijanPrivate solar and wind plants under government investment agreementsstill operating
Private solar and wind plants under government investment agreements
Azerbaijan's government brought its first utility-scale private solar plant, Masdar's 230 MW Garadagh plant built with US$262 million of foreign investment, into operation on 26 October 2023, followed on 16 September 2026 by the 100 MW Gobustan plant won at a 2024 auction, with further private wind and solar plants under investment agreements and power purchase contracts.
230 MW, capacity of the garadagh solar power plant, the first private utility-scale plant, in operation, 2023-10-26. 262 million US$, foreign investment in the garadagh plant, 2023. Ministry of Energy of the Republic of Azerbaijan, 'Use of renewable energy sources in Azerbaijan', retrieved 2026-10-02.
How it worked: The government signed investment agreements, land leases, power purchase, grid connection and balancing agreements with foreign developers, first bilaterally with Masdar and then through an auction, for private plants connected to the national grid.
Limits: The ministry describes its own programme on an undated web page that has been updated at least to September 2026; the investment figure and capacities are the ministry's, with no audited cost and no published tariff. Two private plants are operating, 330 MW together by our sum, against 2,170 MW of renewable capacity the same page reports in operation, most of it state hydropower; the rest of the private pipeline (ACWA Power's 240 MW Khizi-Absheron wind farm, bp's 240 MW Shafag plant, Masdar's 1 GW 'mega project', two 50 MW plants in Jabrayil) is under construction or planned, and the page gives no completion dates. 'Implemented jointly with local and international partners' covers different structures: Garadagh and Gobustan are built and owned by foreign developers, though the page does not name their buyer or contract terms, Shafag serves bp's own terminal through a 'virtual' transmission swap, and the page does not say which plants were competitively tendered beyond Gobustan. The collaboration is recent, so the record shows a start, not a sustained programme. The ministry's page describes Garadagh as 'put into operation as a pilot project'; it is a 230 MW grid-connected plant, so we read the word as first-of-kind rather than as a trial, but the source uses it.
Panel median31.0-15.8 against the indicators
Round 2. How this layer works
- 35.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Held at 35. B and C read budget execution at 90/100 as executive control, which I share, but trade compliance at 50/100 and fiscal fidelity are real state capacity; C's 28 gives that capacity no credit, while civil society at 0/100 keeps me well below the indicator.
- 31.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised down three points: panelist C's point that budget execution shows executive control, not coordination across actors, is my own argument applied harder. Civil society at the floor means independent actors barely organise.
- 31.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Revised up from 28 to 31. Panelists A and B at 35 and 34 say budget execution reflects central command; I agree on civil society at the floor, but budget execution at 90/100 and trade compliance at 50/100 are direct measures of plans being carried out, so I give the state some credit.
Trust
How much cooperation is possible beyond immediate personal networks?
54.20.34 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 1.00About TrustAzerbaijan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+8.4 over 10 years (2016 to 2026), band +2.8 to +13.7. Median change: all countries +1.9, Income quartile 2 of 4 in 2000 +2.5.
+31 over 20 years (2006 to 2026), band +25.4 to +35.8. Median change: all countries +2.1, Income quartile 2 of 4 in 2000 +4.5.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+14.5 over 10 years, from 35.4 in 2016 to 49.9 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 61.7score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 0.75% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 0.11scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median28.0-26.2 against the indicators
Round 2. How this layer works
- 28.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Hold at 28. Compliance of 0.11 is near the frame floor, and all of us reject bribery of 0.75% as non-credible where firms have reason not to report. The 54.2 average has no meaning. Dispute resolution of 61.7 reads commercial process, which is why I do not follow panelist C to 22. Arrests of journalists since 2023 (own knowledge) set the top bound near panelist B's 30.
- 30.0 bottom_up@claude-opus-5-5, self-confidence 0.35
Held at 30. All three of us set aside bribery of 0.75% as not credible beside compliance of 0.11. C's 22 reads only the court row, but dispute efficiency of 61.7 and everyday bazaar credit, from my own knowledge, show some commercial cooperation that does not depend on the executive. I keep that small gap above A and C.
- 24.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Raised from 22. All three panelists discard bribery 0.75% as not credible next to compliance 0.11 of 4, near the frame floor. Dispute efficiency 61.7 is commercial process that the state controls. I stay at the bottom of the panel (28, 30) because courts follow the executive.
Learning
How effectively does the country acquire, distribute, and update knowledge?
36.30.55 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.81About LearningAzerbaijan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
0 over 10 years (2016 to 2026), band -3.4 to +2.6, which includes no change. Median change: all countries -1.3, Income quartile 2 of 4 in 2000 -0.4.
+18.1 over 20 years (2006 to 2026), band +13.2 to +23.4. Median change: all countries +0.8, Income quartile 2 of 4 in 2000 +2.2.
The model fills at least one of the 3 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2002, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+5.0 over 10 years, from 25.1 in 2016 to 30.1 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.58index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 34% of firms | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 0.53ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2024
41.3 % gross, rank 74 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2023
3.7 % of GDP, rank 82 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
15.3 % of secondary, rank 51 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2021AzerbaijanSelf-Employment Program business trainingstill operating
Self-Employment Program business training
Azerbaijan's State Employment Agency trained 24,399 successful applicants to the national Self-Employment Program in business skills and business planning between May 2021 and November 2024, 2,155 of them in the third quarter of 2024, as a condition of receiving start-up assets.
24,399 people, successful sep applicants who completed business training (cumulative), May 2021 to 30 November 2024. 2,155 people, applicants who completed training and prepared business plans in one quarter, Q3 2024. World Bank, Azerbaijan Employment Support Project (P171250), Implementation Status and Results Report, sequence 9, archived 23 January 2025, retrieved 2026-10-02.
How it worked: The employment agency selects vulnerable jobseekers into a self-employment programme, trains them to write a business plan, and transfers start-up assets to those whose plans pass, with mentoring visits afterwards.
Limits: The count is from the World Bank's monitoring of a loan it finances, reported by the implementing agency, and covers only programme participants financed under the project from May 2021, not the Self-Employment Program's earlier cohorts, which the state budget financed from 2017. The training is short business training that gates an asset transfer, not vocational or general education, so it is a narrow slice of adult learning. The same report gives 27,452 SEP beneficiaries 'in training or have completed trainings' and 'over 27,000' participating in business training, so the denominator varies by indicator; the completed count is used. About 3,000 people a year passed through the ministry's two vocational training centres, by the 2020 appraisal document's account, and the vocational certification and on-the-job training windows of the restructured project had not started by December 2024.
Panel median32.0-4.3 against the indicators
Round 2. How this layer works
- 30.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 30. B and C are within four points; I stay lowest because universities lack autonomy and citation impact at 20/100 shows weak research institutions, which firm training at 41/100 does not offset.
- 33.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held near my 34: human capital and firm training are mid-low, and panelist A's point on limited university autonomy fits. I know of no informal learning network large enough to lift it.
- 32.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Held at 32, between panelist A (30) and B (34). Human capital and firm training are moderate and citation impact is low; I know of no informal learning network that would lift it.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
8.70.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationAzerbaijan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+2.2 over 10 years (2016 to 2026), band -1.5 to +5.1, which includes no change. Median change: all countries 0, Income quartile 2 of 4 in 2000 +0.5.
+0.6 over 20 years (2006 to 2026), band -3.4 to +4.2, which includes no change. Median change: all countries +0.1, Income quartile 2 of 4 in 2000 +0.7.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 4, last in 2025. The replay starts in 2001, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+3.8 over 10 years, from 5.1 in 2016 to 8.9 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 19per million peoplefrom 194 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 649per million peoplefrom 6,619 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 5.5per million peoplefrom 56 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 9,476per million peoplefrom 97,102 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 0score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes (1 case below), University spinouts.
This project retired one row: Business share of R&D.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2024AzerbaijanCentral Bank of Azerbaijan regulatory sandboxstill operating
Central Bank of Azerbaijan regulatory sandbox
The Central Bank of the Republic of Azerbaijan began testing its first regulatory sandbox participant in December 2024 and admitted three more whose testing began in 2026, out of 14 applicants.
3 firms, firms whose sandbox testing began in 2026, counted from the registry, 2026. 14 applicants (cumulative), applicants to the sandbox since launch, 2026-10. Central Bank of the Republic of Azerbaijan, Regulatory Sandbox Registry, retrieved 2026-10-02.
How it worked: The central bank wrote rules on a special regulation regime that exempt participants from licensing, opened cohort application windows, and admitted a handful of banks and crypto firms to test products with capped users under its supervision.
Limits: The year count of three is computed from testing start dates in the registry; the central bank publishes only undated cumulative counters (14 applicants, 4 participants), so the series has no official annual figure and earlier years cannot be reconstructed if entries are removed. The registry's completed projects section shows no entries although the first test was scheduled to end in February 2026 and is still listed as current, so firms completing the regime, half of what the indicator asks for, cannot be counted. Only one regulator is covered. A sandbox of four firms is not a national flagship in the sense of a programme policymakers name first; it is filed because it evidences this gap's construct literally.
Panel median10.0+1.3 against the indicators
Round 2. How this layer works
- 9.0 institutionalist@claude-opus-5-5, self-confidence 0.55
I move from 8 to 9 because panelist C notes patent filings above peers, but insolvency at 0 and concentrated ownership in Azerbaijan leave no institutional route for new entrants to try and fail.
- 13.0 bottom_up@claude-opus-5-5, self-confidence 0.35
I move down to 13: insolvency at 0 and state and oligarchic ownership block entry, as panelist A argued; I stay above 8 because informal trade and patent filings above peers show some trial.
- 10.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
Moved from 12 to 10. Insolvency 0 and concentrated ownership leave no exit; I cannot show the patent rate is not state-driven.
Adaptability
How effectively can the system respond when circumstances change?
41.20.48 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 0.78About AdaptabilityAzerbaijan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+9.5 over 10 years (2016 to 2026), band +7.3 to +11.5. Median change: all countries -0.8, Income quartile 2 of 4 in 2000 -1.6.
+8.4 over 20 years (2006 to 2026), band +4.4 to +13. Median change: all countries -1, Income quartile 2 of 4 in 2000 +0.4.
The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+12.7 over 10 years, from 31.2 in 2016 to 43.9 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 5.5% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 67% of unemployed | 2013. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.55index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 1.7% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
70.9 % aged 15+, rank 62 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
21.8 per 100 people, rank 57 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
7.9 % of output, rank 51 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT)
No value for this country. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2020AzerbaijanAZN 190 monthly allowance to people who lost work, April to June 2020delivered and closed
AZN 190 monthly allowance to people who lost work, April to June 2020
After Azerbaijan's first COVID-19 case on 28 February 2020 and the first lockdown in March, the government paid a monthly allowance of AZN 190 to 600,000 unemployed citizens, formal and informal, from April to June 2020, and in 2020 also granted targeted social assistance to 9,000 newly poor families without the usual household assessment and extended expired assistance for 9,408 households.
600,000 people, unemployed citizens paid the azn 190 monthly allowance, april to june 2020, 2020-06. 9,000 families (37,350 persons), newly poor families granted targeted social assistance without a full household assessment, 2020. World Bank, Project Information Document, Azerbaijan COVID-19 Emergency Response Project (P176503), 11 May 2021, retrieved 2026-10-02.
How it worked: The government created a temporary flat allowance for anyone who registered as having lost work, including informal workers, through an online registration with the State Employment Service, and relaxed the targeted social assistance rules so newly poor families could be added without a home assessment.
Limits: The figures are in paragraph 14 and footnote 4 on page 6 of 9 of a World Bank project information document, written a year later to prepare a loan that would retroactively finance the payment for 170,000 of the 600,000 recipients; it relays the government's figures and is not an evaluation. The document says 'from April to June 2020' but not whether all 600,000 were paid in April or how many months each received, so the speed shown is the month, not days; registration was online, with a phone route through district employment centres. 600,000 is a round number. The first case date and 'three lockdowns between March 2020 and January 2021' are in paragraph 4 (page 4). The document calls AZN 190 commensurate to the cost of living, and the payment stopped after three months; the 9,000 families added to targeted social assistance were few next to 600,000 allowance recipients, which suggests the standing safety net expanded little.
2019AzerbaijanHousing reconstruction after the February 2019 Shamakhi earthquakedelivered and closed
Housing reconstruction after the February 2019 Shamakhi earthquake
Azerbaijan's Minister of Emergency Situations reported on 5 December 2019, ten months after the February 2019 Shamakhi earthquake, that 580 houses had been built and 1,175 houses restored in Shamakhi district with state funds, while three apartment buildings with 174 flats were, by the President's account on the same page, still under construction.
1,175 houses, houses restored in shamakhi district, 2019-12-05. 580 houses, new houses built in shamakhi district (three apartment buildings with 174 flats still under construction), 2019-12-05. Official website of the President of the Republic of Azerbaijan, 'Ilham Aliyev viewed conditions created at newly constructed building for earthquake-affected families in Shamakhi', 5 December 2019 (statement by Minister of Emergency Situations Kamaladdin Heydarov), retrieved 2026-10-02.
How it worked: The Ministry of Emergency Situations acts as the builder after an earthquake, demolishing damaged houses and building replacements with state money within the year, under direct presidential instruction instead of through insurance.
Limits: The figures are spoken by the emergency minister during a presidential visit and published on the President's website, in a text that is largely praise of the President; there is no independent verification, no count of houses damaged to set them against, and no cost. The President says on the same page that the three high-rise buildings with 174 flats were still under construction and that work was also done in Aghsu and Ismayilli districts, which the figures do not cover. The page says there were no fatalities, which reflects the earthquake's size as much as preparedness. The earlier May 2012 Zagatala and Gakh earthquake, where the ministry's commission found 3,336 private houses unusable in Gakh alone and construction had started on 266 by September 2012 (president.az articles 4823 and 5940), shows the same model at larger scale but with no completion figure read. The record shows rapid state-financed reconstruction, not risk reduction: nothing on the page concerns seismic codes or warning.
Panel median32.0-9.2 against the indicators
Round 2. How this layer works
- 32.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Held at 32. B and C agree the 2013 long-term unemployment figure is stale and low unemployment reflects agricultural self-employment; hydrocarbon concentration and few new export products show weak reallocation.
- 32.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised down two points: the long-term unemployment figure dates from 2013, and low headline unemployment reflects agricultural self-employment. Hydrocarbon concentration and few new products leave little sign of reallocation.
- 31.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Revised up from 30 to 31. Panelists A and B at 32 and 34 stress the 2013 long-term unemployment figure and hydrocarbon concentration; I credit headline unemployment weakly as it reflects self-employment.
Building
How capable is the country of turning plans and knowledge into functioning systems?
26.40.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingAzerbaijan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.9 over 10 years (2016 to 2026), band -2.6 to +4.5, which includes no change. Median change: all countries -0.3, Income quartile 2 of 4 in 2000 +0.3.
-0.3 over 20 years (2006 to 2026), band -4 to +4.3, which includes no change. Median change: all countries -0.5, Income quartile 2 of 4 in 2000 -0.6.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+1.2 over 10 years, from 5.4 in 2016 to 6.6 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 6% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 2.9% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 87.9score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.03index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (2 cases below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
47,327 constant 2021 PPP $, rank 65 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2009AzerbaijanSecond National Water Supply and Sanitation Project (rayon centres), and its downsizingdelivered and closed
Second National Water Supply and Sanitation Project (rayon centres), and its downsizing
Azerbaijan's water agencies built water supply and sanitation systems in eight regional (rayon) centres under the Second National Water Supply and Sanitation Project, after a 2012 restructuring cut the scope from 21 rayons to 8 because of cost increases, while the total project cost rose from US$560 million to US$641.8 million and the loan closed on 30 June 2019 instead of 28 February 2013.
641.8 million US dollars, total project cost, actual disbursed (world bank us$407.8 million plus government us$234 million), 2019-06-30. 560 million US dollars, total project cost at approval, for 21 rayons, 2008-05. World Bank, Implementation Completion and Results Report, Azerbaijan Second National Water Supply and Sanitation Project (P109961), 18 December 2019, retrieved 2026-10-02.
How it worked: The government launched a national programme to rebuild water systems in all regional centres on rough cost estimates, financed slices of it with World Bank loans, and when real costs emerged, cut the number of towns and stretched the timetable instead of finding the money.
Limits: The World Bank wrote the report and rated the outcome Moderately Satisfactory. The financing and dates are in the data sheet (ICR pages 1 to 2); the cut from 21 to 8 rayons, the reasons and the closing extensions are in Box 1 (page 8), and footnote 7 attributes the reduction to cost increases and unanticipated investments. The approval cost and the final cost cover different scopes: the original estimates for 43 rayons across both national projects were 'not supported by thorough technical studies', so the 2008 figure was not a real baseline, and a US$150 million additional financing in 2014 paid for design changes required by new government policy (legalised dwellings, EU standards), not only for overruns. Implementation moved from AzerSu to the irrigation agency SAWMA in 2009 and then to its successor company after mis-procurement in Nakhchivan, so 'the country's institutions' here are several, and the record does not separate their performance. People served and service quality are in the report but are not the subject of this record.
2010AzerbaijanThird Highway Project: M4 Baku-Shamakhi and M3 Yenikend-Shorsulu motorwaysdelivered and closed
Third Highway Project: M4 Baku-Shamakhi and M3 Yenikend-Shorsulu motorways
Azerbaijan's road administration upgraded 94 km of the M4 Baku-Shamakhi highway to a four-lane road and built 48 km of new M3 motorway under the World Bank-financed Third Highway Project, at US$2.47 million per km against US$2.96 million estimated at appraisal, with the loan closing in March 2021 instead of March 2015.
2.47 US$ million per km, actual cost per km of the upgraded m4 baku-shamakhi highway (appraisal estimate us$2.96 million per km), 2021. 72 months, slip of the actual loan closing date against the original closing date, 2021-03. World Bank, Implementation Completion and Results Report ICR00005553, Azerbaijan Third Highway Project (P118023), retrieved 2026-10-02.
How it worked: The road administration borrowed from the World Bank for a defined corridor, accepted the lender's procurement and engineering review, held to the original alignment instead of the ministry's costlier viaduct proposal, and reused savings by adding a motorway section through restructuring.
Limits: The completion report is the lender's own evaluation of its loan, drafted with the borrower's data. The cost saving is not mainly efficiency: the report says the lower dollar outcome is mainly attributable to the manat losing more than half its value in 2015 to 2017 while works contracts were priced in local currency, so in local terms the project may have overrun. The 72-month slip is computed here from the two closing dates; the scope also changed twice (the M3 section added, part of the M4 dropped in a landslide zone), and the report concedes the final extension may have been avoidable, so not all of it is construction delay. The efficiency rating is only Modest. It is one corridor of 142 km, with a lender supervising procurement, so it is weak evidence about Azerbaijan's road programme outside donor projects.
Panel median33.0+6.6 against the indicators
Round 2. How this layer works
- 33.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Revised from 30 to 33. B's point on fast state delivery of Fuzuli airport and post-2020 reconstruction, with utility connection at 86/100, is delivery I underweighted; foreign contractors and economic fitness near zero keep me below B.
- 33.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Revised down three points: panelist A notes post-2020 reconstruction and pipelines run mostly through foreign contractors, which I named but underweighted. Utility connection at 86/100 and the fast Fuzuli airport build keep me above the 26.4 indicator score.
- 33.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Revised up from 30 to 33. Panelist B's point on pipelines and post-2020 reconstruction such as Fuzuli airport shows state delivery that the manufacturing indicators miss; utility connection at 86/100 supports it, but foreign contractors and economic fitness near zero cap it.