How easily can new approaches be attempted, tested, abandoned, and improved?
Capability agenda
Azerbaijan
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Azerbaijan stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 30.6 | 0.46 | +15.6 over 10 years using 2 indicators |
| Agency | 65.6 | 0.49 | no trend |
| Coordination | 46.8 | 0.48 | +0.7 over 10 years using 2 indicators |
| Trust | 54.2 | 0.34 | +14.5 over 10 years using 2 indicators |
| Learning | 36.3 | 0.55 | +5 over 10 years using 2 indicators |
| Experimentation | 8.7 | 0.47 | +3.8 over 10 years using 3 indicators |
| Adaptability | 41.2 | 0.48 | +12.7 over 10 years using 3 indicators |
| Building | 26.4 | 0.63 | +1.2 over 10 years using 3 indicators |
| Shared Purpose | not scored | 0.16 | no trend |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Azerbaijanโs comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 โ 2026: 49.7 to 56.6 (+6.9) over 30 years using 2 indicators
Agenda items on this timeline
- 2019Housing reconstruction after the February 2019 Shamakhi earthquake
- 2020AZN 190 monthly allowance to people who lost work, April to June 2020
Historical values use todayโs frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How capable is the country of turning plans and knowledge into functioning systems?
+202
How capable is the country of identifying and preparing for emerging change?
+35
How effectively does the country acquire, distribute, and update knowledge?
+104
How effectively can the system respond when circumstances change?
+267
How effectively can independent actors organize around shared objectives?
+165
What to measure first
The evidence is too thin to manage these dimensions confidently.
Shared Purpose
0.16To what extent can people imagine themselves as participants in a common project?
Trust
0.34How much cooperation is possible beyond immediate personal networks?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Agency | 65.6 | 0.49 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of oneโs life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Azerbaijan
What the indicators miss about Azerbaijan
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- Self-Employment Program business training (Learning)
Azerbaijan's State Employment Agency trained 24,399 successful applicants to the national Self-Employment Program in business skills and business planning between May 2021 and November 2024, 2,155 of them in the third quarter of 2024, as a condition of receiving start-up assets.
- AZN 190 monthly allowance to people who lost work, April to June 2020 (Adaptability)
After Azerbaijan's first COVID-19 case on 28 February 2020 and the first lockdown in March, the government paid a monthly allowance of AZN 190 to 600,000 unemployed citizens, formal and informal, from April to June 2020, and in 2020 also granted targeted social assistance to 9,000 newly poor families without the usual household assessment and extended expired assistance for 9,408 households.
- Private solar and wind plants under government investment agreements (Coordination)
Azerbaijan's government brought its first utility-scale private solar plant, Masdar's 230 MW Garadagh plant built with US$262 million of foreign investment, into operation on 26 October 2023, followed on 16 September 2026 by the 100 MW Gobustan plant won at a 2024 auction, with further private wind and solar plants under investment agreements and power purchase contracts.
- Housing reconstruction after the February 2019 Shamakhi earthquake (Adaptability)
Azerbaijan's Minister of Emergency Situations reported on 5 December 2019, ten months after the February 2019 Shamakhi earthquake, that 580 houses had been built and 1,175 houses restored in Shamakhi district with state funds, while three apartment buildings with 174 flats were, by the President's account on the same page, still under construction.
- Second National Water Supply and Sanitation Project (rayon centres), and its downsizing (Building)
Azerbaijan's water agencies built water supply and sanitation systems in eight regional (rayon) centres under the Second National Water Supply and Sanitation Project, after a 2012 restructuring cut the scope from 21 rayons to 8 because of cost increases, while the total project cost rose from US$560 million to US$641.8 million and the loan closed on 30 June 2019 instead of 28 February 2013.
- Third Highway Project: M4 Baku-Shamakhi and M3 Yenikend-Shorsulu motorways (Building)
Azerbaijan's road administration upgraded 94 km of the M4 Baku-Shamakhi highway to a four-lane road and built 48 km of new M3 motorway under the World Bank-financed Third Highway Project, at US$2.47 million per km against US$2.96 million estimated at appraisal, with the loan closing in March 2021 instead of March 2015.
- Central Bank of Azerbaijan regulatory sandbox (Experimentation)
The Central Bank of the Republic of Azerbaijan began testing its first regulatory sandbox participant in December 2024 and admitted three more whose testing began in 2026, out of 14 applicants.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.