Skip to content
NCBNational Capability Benchmark
Navigate with ↑ ↓Enter to openEsc to close

Challenge the benchmark

Choose a score and give the benchmark a specific reason to reconsider it.

When you submit, the form attaches the current score and confidence for the country and capability you chose.

Submissions are public and start as awaiting review. A maintainer can add a response and signature after review.

Belgium

Strongest usable evidence: Coordination, at 93.3. Experimentation needs more evidence: confidence is 0.28.

A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.

Measure before managing, thinnest first

  • Experimentation

    Experimentation

    How easily can new approaches be attempted, tested, abandoned, and improved?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loading…

    Peers 51.80.28 thinno trend
  • Shared purpose

    Shared purpose

    To what extent can people imagine themselves as participants in a common project?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loading…

    Peers 71.40.30 thin+1.2(2)
  • Trust

    Trust

    How much cooperation is possible beyond immediate personal networks?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loading…

    Peers 91.60.34 thinno trend

Keep watching, highest first

  • Coordination

    Coordination

    How effectively can independent actors organize around shared objectives?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loading…

    Peers 89.90.45 usable-4.3(2)
  • Learning

    Learning

    How effectively does the country acquire, distribute, and update knowledge?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loading…

    Peers 77.00.55 usableno trend
  • Anticipation

    Anticipation

    How capable is the country of identifying and preparing for emerging change?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loading…

    Peers 77.50.46 usable+10.5(2)
  • Adaptability

    Adaptability

    How effectively can the system respond when circumstances change?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loading…

    Peers 73.50.62 usable+4.2(4)
  • Agency

    Agency

    How able are individuals and organizations to turn an intention into action?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loading…

    Peers 61.20.47 usableno trend
  • Building

    Building

    How capable is the country of turning plans and knowledge into functioning systems?

    Scores use one 0 to 100 scale for all countries. Each flag is a country, and the ring around it carries how well evidenced that score is. The band beside each score in the list shows its evidence level, and the last column shows the trend and the number of indicators behind it.

    Loading…

    Peers 42.70.63 usable+2.4(3)

These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.

255075100
AnticipationBelgium71.0Income peers77.5Confidence0.46usableHow capable is the country of identifying and preparing for emerging change?
BelgiumIncome peers

Read Belgium beside up to three other countries, down to the indicator behind every row.

  • Usable or good evidence
  • Thin evidence, hollow point. The dashes open further as confidence falls.
  • The point still sits at the score, because confidence never moves it.
  • Click any axis to see every country on that dimension.

A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.

Confidence

Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.

Download this country as CSV
How to read this page

Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.

A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.

A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.

The record behind each score

Anticipation

How capable is the country of identifying and preparing for emerging change?

71.00.46 usable2 of 4

Recency 0.96About AnticipationBelgium beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 1 of 2 indicators modelled2001: 1 of 2 indicators modelled2002: 1 of 2 indicators modelled2003: 1 of 2 indicators modelled2004: 1 of 2 indicators modelled2005: 1 of 2 indicators modelled2006: 1 of 2 indicators modelled2007: 1 of 2 indicators modelled2008: 1 of 2 indicators modelled2009: 1 of 2 indicators modelled2010: 1 of 2 indicators modelled2011: 1 of 2 indicators modelled2012: 1 of 2 indicators modelled2013: 1 of 2 indicators modelled2014: 1 of 2 indicators modelled2015: 1 of 2 indicators modelled2016: 0 of 2 indicators modelled2017: 0 of 2 indicators modelled2018: 0 of 2 indicators modelled2019: 0 of 2 indicators modelled2020: 0 of 2 indicators modelled2021: 0 of 2 indicators modelled2022: 0 of 2 indicators modelled2023: 0 of 2 indicators modelled2024: 0 of 2 indicators modelled2025: 0 of 2 indicators modelled2026: 0 of 2 indicators modelledmodel
  • Reconstruction on today's 2 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+10.5 over 10 years (2016 to 2026), band +10.5 to +10.5. Median change: all countries +11.2, Income quartile 4 of 4 in 2000, highest +8.4.

+15.1 over 20 years (2006 to 2026), band +6.9 to +22.4. Median change: all countries +13.4, Income quartile 4 of 4 in 2000, highest +12.4.

The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+10.5 over 10 years, from 60.5 in 2016 to 71.0 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Scientific articles

Scientific and technical journal articles published, per million people.

Measured in articles per million people; higher is better. Source: World Bank (IP.JRN.ARTC.SC), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
World Bank (IP.JRN.ARTC.SC)
1,428articles per million peoplefrom 16,816.32 national total2023. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Scientific articles

Scientific and technical journal articles published, per million people.

Measured in articles per million people; higher is better. Source: World Bank (IP.JRN.ARTC.SC), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measureMeasures the thing itself.

Statistical performance

World Bank Statistical Performance Indicators overall score for the national statistical system.

Measured in index 0-100; higher is better. Source: World Bank (IQ.SPI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (IQ.SPI.OVRL)
87.3index 0-1002024. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Statistical performance

World Bank Statistical Performance Indicators overall score for the national statistical system.

Measured in index 0-100; higher is better. Source: World Bank (IQ.SPI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

No dataset exists for 2 rows, each a gap: Government foresight capacity (1 case below), Long-horizon research commitments.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2023

    3.3 % of GDP, rank 6 of 123. Gross domestic expenditure on research and development as a share of GDP.

    A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.

  • Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2023

    5,990 per million people, rank 10 of 118. Full-time-equivalent researchers per million people.

    A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.

  • Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024

    36,732 per million people, rank 24 of 135. Servers using encryption in internet transactions, per million people.

    A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 1959BelgiumBureau federal du Planstill operating
    Belgiumlinked to Government foresight capacitystarted 1959still operating

    Bureau federal du Plan

    Belgium's Federal Planning Bureau, which produces the government's economic forecasts and long-term demographic, ageing, energy and transport outlooks, published 34 publications in 2025 and employed 91 full-time equivalents at the end of the year, down from 96 at the end of 2023, after it stopped replacing departing staff in 2024 to meet savings targets.

    91 FTE, staff, full-time equivalents at 31 december, 2025-12-31. 96 FTE, staff, full-time equivalents at 31 december (earlier level, not shown to be a peak), 2023-12-31. Bureau federal du Plan, Rapport d'activite 2025, retrieved 2026-10-02.

    How it worked: A statutory, de facto independent planning bureau receives mandates from government, parliament and social partners, and publishes forecasts and long-term outlooks that the federal budget and pension debates rely on; in a savings drive the government cut its grant and it stopped replacing leavers.

    Limits: The bureau reports on itself; the 91 FTE (80 funded by the federal grant, 11 by contracts) and the hiring freeze are on PDF page 12, the 34 publications on page 19. The 96 FTE is from the 2023 activity report (https://www.plan.be/sites/default/files/documents/OTH_ACTIV_2023_FR.pdf) and the 2024 report gives 94 (https://www.plan.be/sites/default/files/documents/OTH_ACTIV_2024_FR.pdf). The record is filed as operating, not eroded: the fall is five FTE, about 5 percent, from a 2023 level that is not shown to be a peak (earlier reports were not found at the same address), and output held, with 37 publications in 2023, 45 in 2024 and 34 in 2025. The staff trend and the bureau's statement that it no longer replaces leavers to meet savings targets are a documented squeeze on capacity, and a later report showing a deeper loss would justify eroded. Most of the bureau's work is medium-term forecasting and policy costing, not scenario-based strategic foresight; its long-term population, ageing and sustainable development outlooks are the foresight part. The report says nearly 40 percent of staff will retire within ten years, which is a risk stated by the bureau, not a measured loss. The 1959 start is the Act of 23 December 1959 named on the bureau's legal basis page (https://www.plan.be/en/about-us/legal-basis).

Panel median63.0-8.0 against the indicators

Round 2. How this layer works

  • 66.0 institutionalist@claude-opus-5-5, self-confidence 0.60

    I hold at 66: the Federal Planning Bureau is a standing institution with long-term projections, and panelists B and C apply the same fragmentation discount I already applied.

  • 63.0 bottom_up@claude-opus-5-5, self-confidence 0.55

    I hold close to 62 at 63: strong statistics, research and Federal Planning Bureau projections, but foresight is split across federal and regional governments; panelist A's 66 underweights that split.

  • 61.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50

    Moved from 60 to 61. Peers note the Federal Planning Bureau as real long-horizon capability, but federal-regional split still limits action; research volume remains income-linked.

Agency

How able are individuals and organizations to turn an intention into action?

66.30.47 usable3 of 5

Recency 0.83About AgencyBelgium beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 3 of 3 indicators modelled2001: 3 of 3 indicators modelled2002: 3 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 1 of 3 indicators modelled2007: 1 of 3 indicators modelled2008: 1 of 3 indicators modelled2009: 1 of 3 indicators modelled2010: 1 of 3 indicators modelled2011: 1 of 3 indicators modelled2012: 1 of 3 indicators modelled2013: 1 of 3 indicators modelled2014: 1 of 3 indicators modelled2015: 1 of 3 indicators modelled2016: 1 of 3 indicators modelled2017: 1 of 3 indicators modelled2018: 1 of 3 indicators modelled2019: 1 of 3 indicators modelled2020: 1 of 3 indicators modelled2021: 1 of 3 indicators modelled2022: 1 of 3 indicators modelled2023: 1 of 3 indicators modelled2024: 1 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+2.9 over 10 years (2016 to 2026), band -0.5 to +7.7, which includes no change. Median change: all countries +1.9, Income quartile 4 of 4 in 2000, highest +0.8.

+6.3 over 20 years (2006 to 2026), band +2.5 to +11.1. Median change: all countries +9.3, Income quartile 4 of 4 in 2000, highest +6.8.

The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

New business density

New limited liability companies registered per 1,000 working-age people.

Measured in per 1,000 aged 15-64; higher is better. Source: World Bank (IC.BUS.NDNS.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (IC.BUS.NDNS.ZS)
5.3per 1,000 aged 15-642023. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

New business density

New limited liability companies registered per 1,000 working-age people.

Measured in per 1,000 aged 15-64; higher is better. Source: World Bank (IC.BUS.NDNS.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measureMeasures the thing itself.

Business entry efficiency

B-READY score for the time and cost to register a new domestic or foreign limited liability company.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BE.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (IC.BRE.BE.P3)
91.2score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Business entry efficiency

B-READY score for the time and cost to register a new domestic or foreign limited liability company.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BE.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measureMeasures the thing itself.

Procedures to start a business

Number of separate official procedures to register a company.

Measured in count; lower is better. Source: World Bank (IC.REG.PROC.MA.NO), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (IC.REG.PROC.MA.NO)
5count2019. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Procedures to start a business

Number of separate official procedures to register a company.

Measured in count; lower is better. Source: World Bank (IC.REG.PROC.MA.NO), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.

This project retired one row: Time to start a business.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024

    95.8 % of population, rank 10 of 135. Share of the population that used the internet in the last three months.

    A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.

  • Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024

    98.2 % aged 15+, rank 19 of 131. Adults with an account at a bank or mobile money provider.

    A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.

  • Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2024

    68.1 % of GDP, rank 37 of 134. Domestic credit provided to the private sector by financial corporations.

    A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.

Panel median62.0-4.3 against the indicators

Round 2. How this layer works

  • 64.0 institutionalist@claude-opus-5-5, self-confidence 0.60

    Hold at 64. Entry efficiency of 91.2 and density of 5.3 fit the 66.3 derived score. The Crossroads Bank registry and business associations work (own knowledge). Panelist C's government-formation point concerns the political layer, not what firms and persons can do, and panelists B and C sit only two points from me, so no argument here requires a move.

  • 62.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Held at 62. Entry of 91.2 and 5 procedures sit high and density of 5.3 is moderate. C and I agree, with A two points higher on the strength of firm associations. From my own knowledge mutualist associations and cooperatives are dense while labour taxes and three-layer rules slow action. No panelist's point moves this.

  • 62.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Held at 62; panel is 62 to 64. Entry efficiency 91.2 is a rules score and density 5.3 is moderate. Federal, regional and community layers slow permits and the 541-day government formation shows weak central decision capacity. Mutualist associations are a real lever.

Coordination

How effectively can independent actors organize around shared objectives?

93.30.45 usable3 of 5

Recency 0.94About CoordinationBelgium beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 3 indicators modelled2001: 2 of 3 indicators modelled2002: 2 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 2 of 3 indicators modelled2009: 2 of 3 indicators modelled2010: 2 of 3 indicators modelled2011: 2 of 3 indicators modelled2012: 2 of 3 indicators modelled2013: 2 of 3 indicators modelled2014: 1 of 3 indicators modelled2015: 1 of 3 indicators modelled2016: 1 of 3 indicators modelled2017: 1 of 3 indicators modelled2018: 1 of 3 indicators modelled2019: 1 of 3 indicators modelled2020: 1 of 3 indicators modelled2021: 1 of 3 indicators modelled2022: 1 of 3 indicators modelled2023: 1 of 3 indicators modelled2024: 1 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-2.9 over 10 years (2016 to 2026), band -4.7 to +1.8, which includes no change. Median change: all countries -1.7, Income quartile 4 of 4 in 2000, highest -3.2.

-1.5 over 20 years (2006 to 2026), band -6 to +4, which includes no change. Median change: all countries -2.7, Income quartile 4 of 4 in 2000, highest -3.4.

The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2014, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

-4.3 over 10 years, from 96.5 in 2016 to 92.2 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

Trade compliance efficiency

B-READY score for the time and cost firms report to comply with export and import requirements.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.IT.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (IC.BRE.IT.P3)
89.6score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Trade compliance efficiency

B-READY score for the time and cost firms report to comply with export and import requirements.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.IT.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measureMeasures the thing itself.

Budget execution fidelity

Distance between primary government expenditure and the original approved budget.

Measured in percentage points from approved budget; lower is better. Source: World Bank (GF.XPD.BUDG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (GF.XPD.BUDG.ZS)
106percentage points from approved budget2022. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Budget execution fidelity

Distance between primary government expenditure and the original approved budget.

Measured in percentage points from approved budget; lower is better. Source: World Bank (GF.XPD.BUDG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measureMeasures the thing itself.

Civil society strength

Autonomy, density and participatory reach of civil society organisations.

Measured in index 0-1; higher is better. Source: V-Dem (v2x_cspart), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
V-Dem (v2x_cspart)
0.95index 0-12025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Civil society strength

Autonomy, density and participatory reach of civil society organisations.

Measured in index 0-1; higher is better. Source: V-Dem (v2x_cspart), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

No dataset exists for 2 rows, each a gap: University-industry collaboration (1 case below), Public-private collaboration (1 case below).

This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.

Behavioral check, not scored

Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.

  • Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2025

    5.224 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.

    Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 2023BelgiumDe Kade prison in Antwerp, a federal DBFM contractstill operating
    Belgiumlinked to Public-private collaborationstarted 2023still operating

    De Kade prison in Antwerp, a federal DBFM contract

    Belgium's federal Buildings Agency had the new 440-place prison de Kade in Antwerp, part of the federal prisons masterplan, designed, built and financed by the consortium Hortus Conclusus under a DBFM contract, with works from 2023 to 2026 at a construction cost of EUR 195.5 million and an annual availability fee of EUR 23.1 million for 25 years of maintenance, after which the prison returns to the federal state free of charge.

    195.5 EUR million, construction cost of the dbfm prison, excluding vat, 2025-09. 23.1 EUR million per year, annual availability fee, including vat, 2023 prices, 2025-09. Régie des Bâtiments / Regie der Gebouwen, Nouvelle prison « de Kade » (project page, updated September 2025), retrieved 2026-10-02.

    How it worked: The federal Buildings Agency tendered a design, build, finance and maintain contract for a new prison, a consortium of an infrastructure investor and contractors built and financed it, and the state pays an annual availability fee for 25 years while the Justice ministry runs the prison.

    Limits: The page is the contracting agency's own project sheet. It says the prison 'a été réalisée' under a DBFM contract and that Antwerp 'now has two prisons', but it states the works period as 2023 to 2026 and gives no opening date or planned date, so the record cannot show whether the prison opened on time or on budget; status operating rests on the page's own past tense, updated September 2025. The construction cost and the availability fee are the agency's figures, not an audit; 25 years of fees at EUR 23.1 million in 2023 prices would be about EUR 578 million before indexation (our arithmetic), well above the construction cost, which is the normal shape of a DBFM but means the cost to the state is the fee stream, not the build cost. One project is not a programme: the page places the prison in the federal masterplan for detention and internment, but this record documents only this contract and says nothing about the masterplan's other projects. The consortium's members are named on the page (TINC, Jan De Nul, EEG, with ISS for services).

  • 2006BelgiumWallonia's pôles de compétitivitéstill operating
    Belgiumlinked to University-industry collaborationstarted 2006still operating

    Wallonia's pôles de compétitivité

    The Walloon government labelled 266 collaborative research, development and innovation projects through its six pôles de compétitivité over 24 calls from 2006 to June 2018, each needing at least two firms and two distinct research actors, with forecast budgets of 930 million euros, and 126 of those projects had been completed with final payment by early 2019.

    266 projects, collaborative rdi projects labelled by the walloon government, calls 1 to 24, 2006-2018. 126 projects, rdi projects completed with final payment, 2019. IWEPS (Walloon Institute for Evaluation, Prospective and Statistics), Rapport de recherche n°25, La politique des pôles de compétitivité dans le cadre de la Stratégie de spécialisation intelligente, Tableau 2.2, retrieved 2026-10-17.

    How it worked: The Walloon government funds research only through consortia that pair at least two firms with at least two research actors, labels projects on an international jury's advice, and pays a higher public rate (the pôle bonus) to projects that pass through a pôle.

    Limits: This is a regional delivery, not a federal one: research and innovation policy is a regional competence in Belgium, and the record covers Wallonia only, not Flanders or Brussels. The figures are read from a PDF (Tableau 2.2, page 18) that IWEPS computed from the administration's SIPOLES project database; they stop at call 24 (June 2018) and are seven years old. The 930 million euros is the sum of forecast project budgets at submission, public and private together, not money spent. A research actor can be a university laboratory, an accredited research centre or a haute école, so the count is firm-research collaboration of which university collaboration is a part, not all of it. The same report's causal analysis covers only calls 1 to 16 and is cautious about effects on firm performance. The Walloon government's procedure page, updated 30 September 2026, describes a 47th call with a forecast budget of 20 million euros, which is the basis for the operating status; no later project count was found.

Panel median70.0-23.3 against the indicators

Round 2. How this layer works

  • 72.0 institutionalist@claude-opus-5-5, self-confidence 0.50

    Held at 72 with B. C's 65 applies a wealth discount, but trade compliance at 96/100 reflects port and customs organisations that work across governments; the 541-day formation gap and split pandemic health ministers are why I stay far below 93.3.

  • 70.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Revised down two points: panelist C's point that trade compliance at 96 reflects the port of Antwerp, not cross-government coordination, is fair. Unions, mutual societies and associations keep coordination high despite 541 days without a government.

  • 68.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30

    Revised up from 65 to 68. Panelists A and B at 72 note that the 541-day government gap and split pandemic health policy hurt cross-level coordination, which I counted; trade compliance, budget execution and civil society are direct measures, and administration kept working through the gaps, so I move up a little.

Trust

How much cooperation is possible beyond immediate personal networks?

79.70.34 thin3 of 7

Recency 1.00About TrustBelgium beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 3 indicators modelled2001: 2 of 3 indicators modelled2002: 2 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 2 of 3 indicators modelled2009: 2 of 3 indicators modelled2010: 2 of 3 indicators modelled2011: 2 of 3 indicators modelled2012: 2 of 3 indicators modelled2013: 2 of 3 indicators modelled2014: 2 of 3 indicators modelled2015: 2 of 3 indicators modelled2016: 2 of 3 indicators modelled2017: 2 of 3 indicators modelled2018: 2 of 3 indicators modelled2019: 2 of 3 indicators modelled2020: 1 of 3 indicators modelled2021: 1 of 3 indicators modelled2022: 1 of 3 indicators modelled2023: 1 of 3 indicators modelled2024: 1 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-5.5 over 10 years (2016 to 2026), band -12.6 to +0.3, which includes no change. Median change: all countries +1.9, Income quartile 4 of 4 in 2000, highest +0.1.

-6.2 over 20 years (2006 to 2026), band -11.5 to +0.6, which includes no change. Median change: all countries +2.1, Income quartile 4 of 4 in 2000, highest +0.1.

The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2020, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

Dispute resolution efficiency

B-READY score for the reliability, time and cost of resolving a commercial dispute and enforcing the decision.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.DR.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (IC.BRE.DR.P3)
70.9score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Dispute resolution efficiency

B-READY score for the reliability, time and cost of resolving a commercial dispute and enforcing the decision.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.DR.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcomeMeasures a result that usually follows from the capability.

Bribery incidence

Firms asked for at least one bribe payment across six public transactions covering utilities, permits, licences and taxes.

Measured in % of firms; lower is better. Source: World Bank (IC.FRM.BRIB.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
World Bank (IC.FRM.BRIB.ZS)
5.7% of firms2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Bribery incidence

Firms asked for at least one bribe payment across six public transactions covering utilities, permits, licences and taxes.

Measured in % of firms; lower is better. Source: World Bank (IC.FRM.BRIB.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcomeMeasures a result that usually follows from the capability.

Government compliance with the courts

How often the government complies with important decisions of the ordinary and specialised courts that it disagrees with.

Measured in scale 0-4 (never to always); higher is better. Source: V-Dem (v2jucomp_osp), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
V-Dem (v2jucomp_osp)
2.7scale 0-4 (never to always)2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Government compliance with the courts

How often the government complies with important decisions of the ordinary and specialised courts that it disagrees with.

Measured in scale 0-4 (never to always); higher is better. Source: V-Dem (v2jucomp_osp), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.

This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.

Panel median72.0-7.7 against the indicators

Round 2. How this layer works

  • 74.0 institutionalist@claude-opus-5-5, self-confidence 0.55

    Revised from 76 to 74. Panelist B presses the same fact I cited: the federal state has ignored thousands of labour court orders on asylum reception since 2021 (own knowledge). Under my own stance a state that refuses court orders at that scale deserves a larger penalty than two points. Bribery of 5.7% and dispute resolution of 70.9 still hold it well above panelist C's 68. C's Qatargate is mainly about EU institutions.

  • 72.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Held at 72. Dispute efficiency of 70.9, bribery of 5.7% and compliance of 2.71 give 79.7. A shares my fact, the thousands of unmet labour court orders on asylum reception since 2021, yet stays at 76, which I think underweights a state openly ignoring its courts. C's Qatargate is mostly a European Parliament case and adds less, so I do not follow C to 68.

  • 70.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Raised from 68. Both panelists (76, 72) stress that the federal state ignored thousands of labour-court orders on asylum reception since 2021, which is a serious court-compliance failure not captured in 2.71. I weigh that, but dispute efficiency 70.9 and bribery 5.7% are good. Qatargate hit the European Parliament, not Belgian courts directly.

Learning

How effectively does the country acquire, distribute, and update knowledge?

80.40.55 usable3 of 4

Recency 0.81About LearningBelgium beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 3 indicators modelled2001: 2 of 3 indicators modelled2002: 2 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 2 of 3 indicators modelled2009: 2 of 3 indicators modelled2010: 1 of 3 indicators modelled2011: 1 of 3 indicators modelled2012: 1 of 3 indicators modelled2013: 1 of 3 indicators modelled2014: 1 of 3 indicators modelled2015: 1 of 3 indicators modelled2016: 1 of 3 indicators modelled2017: 1 of 3 indicators modelled2018: 1 of 3 indicators modelled2019: 1 of 3 indicators modelled2020: 0 of 3 indicators modelled2021: 0 of 3 indicators modelled2022: 0 of 3 indicators modelled2023: 0 of 3 indicators modelled2024: 0 of 3 indicators modelled2025: 0 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+3.3 over 10 years (2016 to 2026), band -2.3 to +8.9, which includes no change. Median change: all countries -1.3, Income quartile 4 of 4 in 2000, highest +0.8.

+8.6 over 20 years (2006 to 2026), band +2.9 to +15.6. Median change: all countries +0.8, Income quartile 4 of 4 in 2000, highest +1.9.

The model fills at least one of the 3 indicators in 20 of 27 years, at most 2, last in 2019. The replay starts in 2010, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
direct capability measureMeasures the thing itself.

Human Capital Index

Expected productivity of a child born today relative to full health and complete education.

Measured in index 0-1; higher is better. Source: World Bank (HD.HCI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (HD.HCI.OVRL)
0.76index 0-12020. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Human Capital Index

Expected productivity of a child born today relative to full health and complete education.

Measured in index 0-1; higher is better. Source: World Bank (HD.HCI.OVRL), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measureMeasures the thing itself.

Firms offering formal training

Share of firms that provide formal training to permanent employees.

Measured in % of firms; higher is better. Source: World Bank (IC.FRM.TRNG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (IC.FRM.TRNG.ZS)
62% of firms2025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Firms offering formal training

Share of firms that provide formal training to permanent employees.

Measured in % of firms; higher is better. Source: World Bank (IC.FRM.TRNG.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcomeMeasures a result that usually follows from the capability.

Research citation impact

Share of a country's articles and reviews that are in the top 10% most cited for their subfield and year, as a ratio to the same share across all country-affiliated works.

Measured in ratio to world average; higher is better. Source: OpenAlex (citation_normalized_percentile.is_in_top_10_percent), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
OpenAlex (citation_normalized_percentile.is_in_top_10_percent)
1.7ratio to world average2021. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Research citation impact

Share of a country's articles and reviews that are in the top 10% most cited for their subfield and year, as a ratio to the same share across all country-affiliated works.

Measured in ratio to world average; higher is better. Source: OpenAlex (citation_normalized_percentile.is_in_top_10_percent), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

No dataset exists for one row, each a gap: Adult learning participation.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2023

    82.1 % gross, rank 19 of 134. Gross enrolment ratio in tertiary education.

    A condition, not scored: enrolment counts people in formal education and records nothing learned.

  • Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2022

    6.3 % of GDP, rank 14 of 135. Government expenditure on education as a share of GDP.

    A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.

  • Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2018

    43.3 % of secondary, rank 4 of 135. Vocational pupils as a share of total secondary enrolment.

    A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.

Panel median77.0-3.4 against the indicators

Round 2. How this layer works

  • 78.0 institutionalist@claude-opus-5-5, self-confidence 0.55

    Revised from 80 to 78. B's point that the gap in outcomes between Flemish and French-speaking schools limits distribution of knowledge is one I did not weigh; firm training at 78/100 keeps the score high, and C's discount of citations ignores durable universities such as KU Leuven.

  • 77.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Held near my 78: human capital, firm training and citations are strong. The gap between Flemish and French-speaking school outcomes limits distribution of knowledge.

  • 73.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35

    Revised up from 70 to 73. Panelists A and B at 80 and 78 note high human capital, firm training and citations; I counted firm training at 78/100 as the behaviour signal, but panelist B's Flemish and French-speaking outcome gap is a distribution problem I cannot dismiss.

Experimentation

How easily can new approaches be attempted, tested, abandoned, and improved?

53.00.28 thin3 of 10

Recency 1.00About ExperimentationBelgium beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 3 indicators modelled2001: 2 of 3 indicators modelled2002: 2 of 3 indicators modelled2003: 2 of 3 indicators modelled2004: 2 of 3 indicators modelled2005: 2 of 3 indicators modelled2006: 2 of 3 indicators modelled2007: 2 of 3 indicators modelled2008: 2 of 3 indicators modelled2009: 2 of 3 indicators modelled2010: 2 of 3 indicators modelled2011: 2 of 3 indicators modelled2012: 2 of 3 indicators modelled2013: 2 of 3 indicators modelled2014: 2 of 3 indicators modelled2015: 2 of 3 indicators modelled2016: 2 of 3 indicators modelled2017: 2 of 3 indicators modelled2018: 2 of 3 indicators modelled2019: 2 of 3 indicators modelled2020: 2 of 3 indicators modelled2021: 2 of 3 indicators modelled2022: 2 of 3 indicators modelled2023: 2 of 3 indicators modelled2024: 2 of 3 indicators modelled2025: 1 of 3 indicators modelled2026: 0 of 3 indicators modelledmodel
  • Reconstruction on today's 3 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

-7.6 over 10 years (2016 to 2026), band -12.6 to -1.7. Median change: all countries 0, Income quartile 4 of 4 in 2000, highest -4.2.

+1.6 over 20 years (2006 to 2026), band -4.3 to +8, which includes no change. Median change: all countries +0.1, Income quartile 4 of 4 in 2000, highest -5.

The model fills at least one of the 3 indicators in 26 of 27 years, at most 2, last in 2025. The replay starts in 2025, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

No trend is shown because too few indicators have values at both ends. The rows below still show the available history.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Resident patent applications

Patent applications filed by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.PAT.RESD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
World Bank (IP.PAT.RESD)
54.6per million peoplefrom 647 national total2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Resident patent applications

Patent applications filed by residents, per million people.

Measured in per million people; higher is better. Source: World Bank (IP.PAT.RESD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

Resident trademark applicationsdownstream outcomeWorld Bank (IP.TMK.RSCT)no dataper million peopleno datano data
Resident industrial design applicationsdownstream outcomeWorld Bank (IP.IDS.RSCT)no dataper million peopleno datano data
downstream outcomeMeasures a result that usually follows from the capability.

New public software repositories

Growth over one year in the public GitHub repositories located in the country, per million people.

Measured in per million people; higher is better. Source: GitHub Innovation Graph (data/repositories.csv), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
GitHub Innovation Graph (data/repositories.csv)
15,135per million peoplefrom 180,734 national total2026. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

New public software repositories

Growth over one year in the public GitHub repositories located in the country, per million people.

Measured in per million people; higher is better. Source: GitHub Innovation Graph (data/repositories.csv), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate)no data% aged 18-64no datano data
Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate)no data% not deterredno datano data
direct capability measureMeasures the thing itself.

Insolvency efficiency

B-READY score for the time and cost of in-court liquidation and reorganization of a failed firm.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BI.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (IC.BRE.BI.P3)
98.6score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Insolvency efficiency

B-READY score for the time and cost of in-court liquidation and reorganization of a failed firm.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.BI.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes (1 case below), University spinouts.

This project retired one row: Business share of R&D.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 2020BelgiumBRUGEL derogation framework for innovative energy projects (projets innovants)delivered and closed
    Belgiumlinked to Firms through regulatory sandboxesstarted 2020delivered and closed

    BRUGEL derogation framework for innovative energy projects (projets innovants)

    BRUGEL, the Brussels-Capital energy regulator, granted derogations from market and tariff rules to energy-sharing pilot projects under article 90 of the Brussels electricity ordinance as amended on 23 July 2018, and states that six such pilot projects started from 2020 until the derogation framework ended when the ordinance of 17 March 2022 entered into force.

    6 pilot projects, energy-sharing pilot projects that started under the derogation framework, 2020-2022. BRUGEL (Commission de régulation de l'énergie en Région de Bruxelles-Capitale), Projet d'étude BRUGEL-Etude-20230425-45, Coûts-avantages relative aux communautés d'énergie et au partage d'électricité, retrieved 2026-10-16.

    How it worked: The regional energy regulator used a statutory derogation clause to let named energy-sharing projects operate outside market and tariff rules for a limited time and area, studied the results with the grid operator, and the regional parliament then wrote energy sharing into ordinary law.

    Limits: The count is of pilot projects, not of firms: the participants are energy communities, a business incubator, a social housing building and co-ownership associations, with the distribution system operator Sibelga metering each one. The regulator reports on its own programme. The number is read from a PDF: the regulator's cover note (page 4) says six projects started, while the consultant's annex in the same file (page 21) describes five, so the figure is uncertain by one. The study is a consultation draft dated 25 April 2023. Six projects in about two years in a region of about 1.2 million people is a small flow, and the framework covered energy sharing and the connection of decentralised production only. The derogations ran for two years, some with an extension, and the source does not say how each project exited. The framework ended because the 2022 ordinance transposed the EU directives and put energy sharing into ordinary rules, so its end is a rule change and not a documented failure. It covers one region: the Flemish regulatory-free zone for energy (Thor Park, recognised 2020) and the Walloon pilot projects under article 27 of the electricity decree are separate regimes that this number does not include.

Panel median48.0-5.0 against the indicators

Round 2. How this layer works

  • 50.0 institutionalist@claude-opus-5-5, self-confidence 0.45

    I move from 55 to 50 because panelist B is right that coverage is only 30% and Belgian trademarks and designs are filed at Benelux and EU level; insolvency at the frame top still keeps me above panelist C's 42.

  • 48.0 bottom_up@claude-opus-5-5, self-confidence 0.40

    I move up to 48: panelist A is right that top-of-frame insolvency efficiency (100) is the institutional base for cheap failure, but coverage is only 30% so I stay below the 53 indicator.

  • 46.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35

    Moved from 42 to 46. Panelist A is right that insolvency efficiency at 100 is a direct capability signal; trademarks and designs are missing because they file at EU level, so coverage is thin.

Adaptability

How effectively can the system respond when circumstances change?

70.30.62 usable4 of 6

Recency 1.00About AdaptabilityBelgium beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 2 of 4 indicators modelled2001: 2 of 4 indicators modelled2002: 2 of 4 indicators modelled2003: 2 of 4 indicators modelled2004: 2 of 4 indicators modelled2005: 2 of 4 indicators modelled2006: 2 of 4 indicators modelled2007: 2 of 4 indicators modelled2008: 2 of 4 indicators modelled2009: 2 of 4 indicators modelled2010: 0 of 4 indicators modelled2011: 0 of 4 indicators modelled2012: 0 of 4 indicators modelled2013: 0 of 4 indicators modelled2014: 0 of 4 indicators modelled2015: 0 of 4 indicators modelled2016: 0 of 4 indicators modelled2017: 0 of 4 indicators modelled2018: 0 of 4 indicators modelled2019: 0 of 4 indicators modelled2020: 0 of 4 indicators modelled2021: 0 of 4 indicators modelled2022: 0 of 4 indicators modelled2023: 0 of 4 indicators modelled2024: 0 of 4 indicators modelled2025: 0 of 4 indicators modelled2026: 0 of 4 indicators modelledmodel
  • Reconstruction on today's 4 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+4.3 over 10 years (2016 to 2026), band +4.3 to +4.3. Median change: all countries -0.8, Income quartile 4 of 4 in 2000, highest -0.9.

+2.2 over 20 years (2006 to 2026), band -2.7 to +6.9, which includes no change. Median change: all countries -1, Income quartile 4 of 4 in 2000, highest -1.9.

The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+4.2 over 10 years, from 66.1 in 2016 to 70.3 on 4 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Unemployment rate

Unemployed as a share of the labour force, modelled ILO estimate.

Measured in % of labour force; lower is better. Source: World Bank (SL.UEM.TOTL.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
World Bank (SL.UEM.TOTL.ZS)
5.9% of labour force2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Unemployment rate

Unemployed as a share of the labour force, modelled ILO estimate.

Measured in % of labour force; lower is better. Source: World Bank (SL.UEM.TOTL.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcomeMeasures a result that usually follows from the capability.

Long-term unemployment share

Unemployed for 12 months or more, as a share of total unemployment.

Measured in % of unemployed; lower is better. Source: ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB)
31.9% of unemployed2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Long-term unemployment share

Unemployed for 12 months or more, as a share of total unemployment.

Measured in % of unemployed; lower is better. Source: ILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measureMeasures the thing itself.

Export diversification

Concentration of the merchandise export basket across products: the normalised Herfindahl-Hirschman index over SITC Rev.3 3-digit lines, 0 when exports are spread evenly and 1 when one product is everything.

Measured in index 0-1, lower = more diversified; lower is better. Source: UNCTAD (US.ConcentDiversIndices), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
UNCTAD (US.ConcentDiversIndices)
0.11index 0-1, lower = more diversified2025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Export diversification

Concentration of the merchandise export basket across products: the normalised Herfindahl-Hirschman index over SITC Rev.3 3-digit lines, 0 when exports are spread evenly and 1 when one product is everything.

Measured in index 0-1, lower = more diversified; lower is better. Source: UNCTAD (US.ConcentDiversIndices), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcomeMeasures a result that usually follows from the capability.

New export products

Share of the products a country did not export competitively in 2009-2011 that it exported competitively in 2022-2024.

Measured in % of products not exported competitively at the start; higher is better. Source: Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ))
3.8% of products not exported competitively at the start2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

New export products

Share of the products a country did not export competitively in 2009-2011 that it exported competitively in 2022-2024.

Measured in % of products not exported competitively at the start; higher is better. Source: Harvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (2 cases below), Institutional responsiveness (1 case below).

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025

    71 % aged 15+, rank 60 of 135. Share of the working-age population in the labour force.

    A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.

  • Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024

    44.2 per 100 people, rank 9 of 135. Fixed broadband subscriptions per 100 people.

    A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.

  • Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2025

    4.5 % of output, rank 13 of 122. Power lost in transmission and distribution, including unbilled use.

    A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.

  • Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025

    2.4 % of employment, rank 6 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.

    A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 2020BelgiumChômage temporaire corona, 2020delivered and closed
    Belgiumlinked to Institutional responsivenessstarted 2020delivered and closed

    Chômage temporaire corona, 2020

    Belgium's National Employment Office treated every COVID-19 work stoppage as temporary unemployment for force majeure and paid allowances to 939,532 workers for March 2020 and 1,117,133 for April, when 1,221,412 workers, 35.3 percent of private and contractual employees, were declared temporarily unemployed; almost 1.4 million received at least one payment during 2020.

    1,117,133 workers, workers paid a temporary unemployment allowance for april 2020, 2020-04. 939,532 workers, workers paid a temporary unemployment allowance for march 2020, 2020-03. Office national de l'emploi (ONEM), Chômage temporaire en chiffres (press page, May 2020); annual report figures in Rapport annuel ONEM 2020, retrieved 2026-10-02.

    How it worked: The employment office widened an existing rule, temporary unemployment for force majeure, to cover every corona stoppage and simplified the employer procedure, so firms could suspend contracts without proving economic grounds and existing payment bodies paid workers within the month.

    Limits: The monthly counts and the 35.3 percent share are on the ONEM press page; the 1.4 million for 2020 and the monthly average of 504,657 are on the annual report page (https://www.onem.be/espace-presse/rapport-annuel-onem-2020). The press page gives no date for the rule change itself, so the record shows speed only as payment for the first month of the crisis, not as days from shock to rule. ONEM does not pay most allowances itself: the payment bodies (the trade union funds CSC, FGTB and CGSLB, and the public fund CAPAC) do, and the press page splits the amounts between them. The 35.3 percent is computed on 3,458,136 salaried employees excluding civil servants. A worker counted in April was unemployed for 14 days on average, and only 20 percent for the whole month, so the head count overstates lost hours. The cost was large: ONEM's annual report records EUR 4.042 billion of extra temporary unemployment spending in 2020. ONEM later ran controls on corona temporary unemployment; their results are not reflected here.

  • 2006BelgiumFederal strategic stock of protective masks, and its dismantlingdismantled
    Belgiumlinked to Disaster preparedness and recoverystarted 2006dismantled

    Federal strategic stock of protective masks, and its dismantling

    The Federal Public Service Public Health held a strategic stock of masks for pandemic influenza in military warehouses in Namur from 2006, sized at 32 million surgical masks when the Bioethics Committee reviewed the pandemic plan in 2009. It destroyed the expired masks in operations in late 2015 and late 2018 without replacing them, so Belgium entered the COVID-19 crisis in early 2020 with no strategic mask stock.

    0 masks, federal strategic stock of masks at the start of the covid-19 crisis, early 2020. 32,000,000 surgical masks, strategic stock of surgical masks referred to in the 2009 review of the pandemic plan, 2009. Chambre des représentants de Belgique, Rapport de la Commission spéciale COVID-19, DOC 55 1394/002, 13 September 2021, retrieved 2026-10-02.

    How it worked: From 2006 the federal health administration stored a national reserve of masks under its pandemic plan, then destroyed expired stock in 2015 and 2018 without a replacement contract, so the reserve ran down to nothing between two pandemics.

    Limits: The zero is not a counted figure. It is our reading of the committee's prose statement that no strategic mask stock existed when the crisis began. The 32 million is the stock named in the 2009 bioethics advice and the plan's target; the report never gives an audited count of masks actually held in any year. Some of the stock was probably unusable before it was destroyed: the report records that the Namur warehouses lost their heating in 2012 and the masks stayed in unheated storage. The dates of destruction (late 2015 and late 2018) come from a chronology entry built from hearing testimony, which the committee marks as contradicted by other witnesses, not from a finding of its own. Responsibility for the decision not to replace the stock is disputed in the report itself between the former health minister and the experts heard. A mask stock is one narrow input to pandemic preparedness. It says nothing about the pandemic plan, testing, hospital surge capacity or the later rebuilding of a stock.

  • 2017BelgiumBE-Alertstill operating
    Belgiumlinked to Disaster preparedness and recoverystarted 2017still operating

    BE-Alert

    The National Crisis Centre of the Federal Public Service Interior has run BE-Alert, the national system that lets municipalities and provinces alert the population by SMS, including location-based SMS, and information screens, since 2017. By 1 September 2025, 537 of 565 municipalities, covering 95 percent of Belgian territory, were affiliated, 1,369,659 citizen addresses were registered, and the system had been used 273 times in 2025.

    537 municipalities of 565, municipalities affiliated to be-alert, September 2025. 1,369,659 addresses, citizen addresses registered in be-alert, 1 September 2025. Centre de Crise National, SPF Intérieur, 'Toutes les communes flamandes sont affiliées à BE-Alert', 16 September 2025, retrieved 2026-10-02.

    How it worked: The federal crisis centre built one national alerting platform and offered it to municipalities and provinces, which keep the legal power to warn. It added channels over time (registered SMS, location-based SMS, screens) and runs an annual national test.

    Limits: This is the crisis centre's own news release, not a statistic or an audit. Affiliation means a municipality can send alerts, not that it does so well or in time: the release gives no measure of how fast or how accurately any alert reached people in a real emergency. The 273 uses in 2025 mix real alerts, vigilance messages and tests, and the release does not split them. One person can register up to five addresses, so the count is not people. Location-based SMS reaches unregistered phones, but this page gives no reach figure for it. Coverage took eight years to reach 95 percent of territory, and 28 Walloon municipalities were still outside it in 2025. The page says nothing about the July 2021 floods in Wallonia, the largest recent test of national warning, so it cannot show that the system works when a major shock arrives. A warning channel is one part of preparedness and says nothing about recovery.

Panel median65.0-5.3 against the indicators

Round 2. How this layer works

  • 66.0 institutionalist@claude-opus-5-5, self-confidence 0.50

    Revised from 68 to 66. B's point on low employment rates in Wallonia and Brussels adds to my concern about wage indexation slowing reallocation; C's claim that diversification is mostly re-export is plausible but unshown.

  • 65.0 bottom_up@claude-opus-5-5, self-confidence 0.45

    Held near my 66: panelist C's point on Antwerp re-export flows inflating diversification adds to my concern about low employment in Wallonia and Brussels.

  • 63.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30

    Revised up from 62 to 63. I hold the re-export discount on diversification that neither panelist applied; panelist B's low employment rates in Wallonia and Brussels and panelist A's wage indexation point the same way.

Building

How capable is the country of turning plans and knowledge into functioning systems?

52.80.63 usable4 of 6

Recency 1.00About BuildingBelgium beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 3 of 4 indicators modelled2001: 3 of 4 indicators modelled2002: 3 of 4 indicators modelled2003: 3 of 4 indicators modelled2004: 3 of 4 indicators modelled2005: 3 of 4 indicators modelled2006: 3 of 4 indicators modelled2007: 1 of 4 indicators modelled2008: 1 of 4 indicators modelled2009: 1 of 4 indicators modelled2010: 1 of 4 indicators modelled2011: 1 of 4 indicators modelled2012: 1 of 4 indicators modelled2013: 1 of 4 indicators modelled2014: 1 of 4 indicators modelled2015: 1 of 4 indicators modelled2016: 1 of 4 indicators modelled2017: 1 of 4 indicators modelled2018: 1 of 4 indicators modelled2019: 1 of 4 indicators modelled2020: 1 of 4 indicators modelled2021: 1 of 4 indicators modelled2022: 1 of 4 indicators modelled2023: 1 of 4 indicators modelled2024: 1 of 4 indicators modelled2025: 0 of 4 indicators modelled2026: 0 of 4 indicators modelledmodel
  • Reconstruction on today's 4 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+1.9 over 10 years (2016 to 2026), band -1.9 to +5.5, which includes no change. Median change: all countries -0.3, Income quartile 4 of 4 in 2000, highest +0.3.

+1.8 over 20 years (2006 to 2026), band -3.2 to +6.2, which includes no change. Median change: all countries -0.5, Income quartile 4 of 4 in 2000, highest -0.2.

The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+2.4 over 10 years, from 51.8 in 2016 to 54.2 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Manufacturing value added

Manufacturing value added as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (NV.IND.MANF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
World Bank (NV.IND.MANF.ZS)
11.2% of GDP2025. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Manufacturing value added

Manufacturing value added as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (NV.IND.MANF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcomeMeasures a result that usually follows from the capability.

High-technology exports

High-technology exports as a share of manufactured exports.

Measured in % of manufactured exports; higher is better. Source: World Bank (TX.VAL.TECH.MF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
World Bank (TX.VAL.TECH.MF.ZS)
19.8% of manufactured exports2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

High-technology exports

High-technology exports as a share of manufactured exports.

Measured in % of manufactured exports; higher is better. Source: World Bank (TX.VAL.TECH.MF.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measureMeasures the thing itself.

Utility connection efficiency

B-READY score for the time to obtain electricity, water and internet connections and the reliability of their supply.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.US.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

direct capability measure
World Bank (IC.BRE.US.P3)
61.1score 0-1002025. The rail runs from 1960 to 2026.
direct capability measureMeasures the thing itself.

Utility connection efficiency

B-READY score for the time to obtain electricity, water and internet connections and the reliability of their supply.

Measured in score 0-100; higher is better. Source: World Bank (IC.BRE.US.P3), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcomeMeasures a result that usually follows from the capability.

Economic fitness

Diversity and ubiquity-adjusted sophistication of the export basket.

Measured in index; higher is better. Source: World Bank (EF.EFM.UNIV.XD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
World Bank (EF.EFM.UNIV.XD)
3.3index2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Economic fitness

Diversity and ubiquity-adjusted sophistication of the export basket.

Measured in index; higher is better. Source: World Bank (EF.EFM.UNIV.XD), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

No dataset exists for 2 rows, each a gap: Large project delivery (2 cases below), Firm scale-up rate.

This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025

    147,482 constant 2021 PPP $, rank 6 of 133. GDP per person employed, constant purchasing power parity.

    A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.

Evidence for missing indicators

Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.

  • 2001BelgiumBrussels regional express rail network (GEN/RER) infrastructure works, and their stalloperating below its peak
    Belgiumlinked to Large project deliverystarted 2001operating below its peak

    Brussels regional express rail network (GEN/RER) infrastructure works, and their stall

    Belgium's federal state and three regions agreed in 2001 to fund the infrastructure for a regional express rail network around Brussels through the RER Fund, with every work due by the end of 2012. The Court of Audit told the Chamber in February 2017 that the cost of the works charged to the fund had risen by more than 27 percent over 2001 to 2016, that all but one project ran six to 17.5 years late, that the works were largely at a standstill and that full four-tracking of lines 124 and 161 had been postponed with no date.

    27 % (more than), 2001 to 2016, increase in the cost of the infrastructure works charged to the rer fund, 2016. 17.5 years, longest delay of an rer fund infrastructure project against its planned completion date, 2017-01. Belgian Chamber of Representatives, integral report CRIV 54 COM 602 of the joint committee hearing of 21 February 2017 on the Court of Audit report 'Het GEN-Fonds / Le Fonds RER' of 25 January 2017, retrieved 2026-10-16.

    How it worked: The federal state and the three regions ring-fenced a closed envelope for RER works in a cooperation agreement, paid it into a fund managed by the railway holding company, and left the infrastructure manager Infrabel to build four-track upgrades on existing lines under permits issued separately by each region.

    Limits: The figures are the Court of Audit's own, but they are read from the Chamber's transcript of the auditors presenting their report, not from the report itself, which sits on the Court's website behind bot protection; the transcript is a PDF whose text a plain download is refused, though it opens in a browser. The 27 percent is the Court's cost growth for the fund as a whole, which an auditor says is understated, because the least advanced projects (lines 124 and 161) show the smallest increases only because most of their cost is still to come; individual items rose far more, 53 percent for Watermael-Schuman-Josaphat and 100 percent for stations and car parks. Part of the increase is indexation and part is a financing effect that Infrabel puts at just under 200 million euros, which is Infrabel's calculation rather than the Court's. The minimum shortfall of 800 million euros to finish the works in the pipeline is in current euros and is also called a floor. The delays are attributed to late regional permits, repeated appeals (three Brussels permits for line 124 were annulled by the Council of State on language law grounds), the 60/40 regional spending key and the suspension of the 2013 to 2025 investment plan, so much of the loss lies in Belgium's multi-level permitting and budget rules rather than in project management. The figures date from early 2017. What happened after, including later federal funding and the phased reopening of sections, was not verified at an official source here, so the record documents the stall and the abandoned 2012 target, not the final outturn. The 2003 RER convention's service targets were themselves replaced in 2012 by a less ambitious intermediate scenario adopted only at ministerial level. The started year is the cooperation agreement that set the fund up, not the first construction contract.

  • 1994BelgiumAutomated voting, and its withdrawal from Walloniaoperating below its peak
    Belgiumlinked to Large project deliverystarted 1994operating below its peak

    Automated voting, and its withdrawal from Wallonia

    Belgium extended electronic voting after a 1991 trial in two cantons until 44 percent of the electorate voted on machines in 1999, when 22 percent of polling stations in Wallonia were equipped; the Walloon Parliament abolished automated voting for French-speaking communes by a decree of 9 March 2017, the Constitutional Court rejected a challenge in September 2018, and the FPS Interior now lists the 252 communes in Wallonia as voting on paper while 152 Flemish, all 19 Brussels and the nine German-speaking communes vote electronically.

    252 communes, communes in wallonia voting on paper, 2024. 22 % of Walloon polling stations, share of polling stations in wallonia equipped with voting machines at the 1999 peak, 1999. FPS Interior (SPF Intérieur), Elections directorate, voting mode by commune, retrieved 2026-10-17.

    How it worked: A 1994 federal law let the government designate volunteer communes for machine voting, so coverage grew where communes asked for it. After regionalisation of local elections, the Walloon Parliament used its competence to abolish the system for French-speaking communes, and the Constitutional Court upheld that choice.

    Limits: The two numbers are in different units and come from different publishers, so the loss cannot be read as one falling series. The 1999 figures, 44 percent of the national electorate and 22 percent of Walloon polling stations, come from a comparative study by the French Senate (Législation comparée LC 176, 2007), read from a PDF. The FPS Interior pages for paper and electronic voting carry no date and no electorate figures; their commune counts match the municipal map after the 2024 local elections, which is why the record dates them 2024, and the current national share of voters on machines is not published there. The decree and its date are taken from Constitutional Court judgment 115/2018. The loss is regional: Brussels, the German-speaking communes and about half of the Flemish communes still vote electronically, and 49 percent of Flemish polling stations were equipped in 1999, so the national system eroded rather than ended. Wallonia had never equipped more than a minority of its polling stations.

Panel median54.0+1.2 against the indicators

Round 2. How this layer works

  • 60.0 institutionalist@claude-opus-5-5, self-confidence 0.45

    Held at 60. B adds the Puurs vaccine scale-up, which supports the industrial side; C's nuclear phase-out reversals are policy instability, not failure to build, while Oosterweel and the Brussels RER delays already hold me back.

  • 54.0 bottom_up@claude-opus-5-5, self-confidence 0.45

    Held near my 55: vaccine production scale-up at Puurs shows real capability, while the Oosterweel link and Brussels metro line 3 run late.

  • 49.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30

    Revised up from 45 to 49. Panelist B's rapid vaccine production scale-up at Puurs is a delivery capability the indicators miss; economic fitness at the cap carries the score, and Oosterweel, Brussels metro line 3 and nuclear phase-out reversals show planning instability, so I stay below A (60).

Shared purpose

To what extent can people imagine themselves as participants in a common project?

76.80.30 thin2 of 6

Recency 0.96About Shared purposeBelgium beside its income peers

Reconstructed history, 2000 to 2026, provisional

0501002000200520102015202020262000: 0 of 2 indicators modelled2001: 0 of 2 indicators modelled2002: 0 of 2 indicators modelled2003: 0 of 2 indicators modelled2004: 0 of 2 indicators modelled2005: 0 of 2 indicators modelled2006: 0 of 2 indicators modelled2007: 0 of 2 indicators modelled2008: 0 of 2 indicators modelled2009: 0 of 2 indicators modelled2010: 0 of 2 indicators modelled2011: 0 of 2 indicators modelled2012: 0 of 2 indicators modelled2013: 0 of 2 indicators modelled2014: 0 of 2 indicators modelled2015: 0 of 2 indicators modelled2016: 0 of 2 indicators modelled2017: 0 of 2 indicators modelled2018: 0 of 2 indicators modelled2019: 0 of 2 indicators modelled2020: 0 of 2 indicators modelled2021: 0 of 2 indicators modelled2022: 0 of 2 indicators modelled2023: 0 of 2 indicators modelled2024: 0 of 2 indicators modelled2025: 0 of 2 indicators modelled2026: 0 of 2 indicators modelledmodel
  • Reconstruction on today's 2 indicators, band 10th to 90th percentile
  • Replay on the values that existed each year
  • Darker means more indicators modelled

+1.2 over 10 years (2016 to 2026), band +1.2 to +1.2. Median change: all countries +2.7, Income quartile 4 of 4 in 2000, highest +1.8.

-1.5 over 20 years (2006 to 2026), band -1.5 to -1.5. Median change: all countries +4, Income quartile 4 of 4 in 2000, highest +1.1.

No indicator is modelled in any year. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.

+1.2 over 10 years, from 75.6 in 2016 to 76.8 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.

Indicators behind this capability
IndicatorValueYearNormalized
downstream outcomeMeasures a result that usually follows from the capability.

Tax revenue

Central government tax revenue as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (GC.TAX.TOTL.GD.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
World Bank (GC.TAX.TOTL.GD.ZS)
23% of GDP2024. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Tax revenue

Central government tax revenue as a share of GDP.

Measured in % of GDP; higher is better. Source: World Bank (GC.TAX.TOTL.GD.ZS), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcomeMeasures a result that usually follows from the capability.

Income inequality

Gini index of disposable income.

Measured in Gini 0-100; lower is better. Source: World Bank (SI.POV.GINI), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

downstream outcome
World Bank (SI.POV.GINI)
26.8Gini 0-1002023. The rail runs from 1960 to 2026.
downstream outcomeMeasures a result that usually follows from the capability.

Income inequality

Gini index of disposable income.

Measured in Gini 0-100; lower is better. Source: World Bank (SI.POV.GINI), also in the indicator registry. Each flag is a country at its normalized position from 0 to 100, where higher always means better. The bar in the list below shows the same position.

Loading…

No dataset exists for 4 rows, each a gap: Sense of national belonging, Volunteering, Political polarisation, Civic participation.

This project retired one row: Voice and accountability.

Behavioral check, not scored

Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.

  • Political polarizationV-Dem (v2cacamps_osp), 2025

    1.447 index 0-4, lower is better. Whether supporters of opposing political camps generally meet in a friendly or a hostile manner, rated by V-Dem country experts from 0, friendly, to 4, hostile.

    The question counts hostility and leaves disagreement alone, which is what pluralism asks for. It is not scored because a low reading has two causes the number cannot tell apart. Where camps compete openly, a calm reading means people who disagree still meet as fellow citizens. Where no opposition may organize, it means there is no camp left to be hostile to. In 2025 the five closed autocracies in the frame average 2.18 and the liberal democracies 1.67, while electoral democracies and electoral autocracies sit near 2.8 and 3.3. Scored, the reading would have lifted the United Arab Emirates about 11 points on this capability for a uniformity the benchmark does not count as shared purpose. Income is not why it is left out: richer countries read only somewhat calmer, at about -0.41 against log GDP per capita.

  • Voter turnoutV-Dem (v2eltrnout), 2024

    87.42 % of registered voters, higher is better. Share of registered voters who cast a vote in the latest national election up to 2025, according to official results, as coded by V-Dem from IDEA, IPU and IFES sources. Where executive and legislative elections fall on the same day, the executive turnout is coded.

    Turnout is the one act in which a whole population takes part in a common decision, so it is the closest behavioral reading of shared purpose the benchmark has. It is not scored for three reasons the number cannot separate. It reads the democratic channel, which is why voice and accountability was retired from this capability (A5): a country with no competitive elections cannot score well for reasons unrelated to whether its people see themselves in a common project. Compulsory voting turns it into a reading of the law: Brazil enforces it, and the eight countries that enforce sanctions average 83 percent against 65 where voting is voluntary. And closed and electoral autocracies manage it: Vietnam reads 95.6, Rwanda 98.2 and Singapore 92.8, which is mobilization, not participation (A13). The year shown is the latest national election, because elections are coded only in the year they happen.

Conditions, not scored

What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.

  • Wealth held by the top 10%OECD (DSD_WEALTH@DF_WEALTH), 2020

    45.9 % of household net wealth, rank 6 of 29. Share of household net wealth held by the wealthiest 10% of households, excluding pension entitlements.

    A condition, not scored: how household wealth is divided describes the society a country works with and does not measure a capability. The rank orders values and is not a verdict. The OECD has this share for 29 benchmark countries, nearly all OECD members, so the row says nothing about the other 106. Net wealth here excludes pension entitlements, and the unit is the household. Surveys reach the richest households to different degrees, so a small gap between two countries means little. Denmark, the Netherlands and Norway use tax and administrative records; the rest use surveys. United Kingdom values cover Great Britain only. The latest year is 2016 for Poland and 2023 for Canada and the Netherlands.

Panel median62.0-14.8 against the indicators

Round 2. How this layer works

  • 62.0 institutionalist@claude-opus-5-5, self-confidence 0.50

    Revised from 60 to 62. Panelist C notes that Flemish-Walloon division is also managed pluralism, and I weighted formation days too heavily: the 541 days ran in 2010-11, not 2020-21 as C says, and each crisis still ended in a negotiated state reform (own knowledge). Tax of 23% and Gini of 26.8 reflect social insurance that crosses the language line. Parties split by community keep me far under 76.8.

  • 62.0 bottom_up@claude-opus-5-5, self-confidence 0.50

    Held at 62, in the middle of a narrow range. Gini of 26.8 and tax of 23.0% give 76.8, but none of us accept that this sees the linguistic split. C rightly asks whether that split is hostile or managed. From my own knowledge it is mostly managed, with unions and sickness funds binding people across the line, but record-long government formations still cost shared action.

  • 62.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40

    Lowered from 65. Panelist B discounts about 15 points from 76.8 for the linguistic divide, and panelist A at 60 stresses community-organised parties and record formation times. Unions and sickness funds bind people across the line. Gini 26.8 is welfare, not common project. Managed pluralism holds my score above 60.