Lebanon
Strongest usable evidence: Adaptability, at 53.6. Raise Anticipation first, at 24.1. Agency needs more evidence: confidence is 0.11.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- AnticipationPeers 33.50.46 usable+19.8(2)
- LearningPeers 34.10.46 usableno trend
Measure before managing, thinnest first
- AgencyPeers 40.30.11 very thinno trend
- ExperimentationPeers 14.20.14 very thinno trend
- TrustPeers 66.20.16 very thinno trend
- CoordinationPeers 72.20.24 very thinno trend
- Shared purposePeers 51.50.29 thin-8.5(2)
- BuildingPeers 31.20.44 thin-7.6(3)
Keep watching, highest first
- AdaptabilityPeers 58.70.54 usable-4.7(3)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Lebanon beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
24.10.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationLebanon beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+19.7 over 10 years (2016 to 2026), band +19.7 to +19.7. Median change: all countries +11.2, Income quartile 3 of 4 in 2000 +12.5.
+21.5 over 20 years (2006 to 2026), band +14.9 to +21.5. Median change: all countries +13.4, Income quartile 3 of 4 in 2000 +15.2.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+19.8 over 10 years, from 4.3 in 2016 to 24.1 on 2 indicators seen in both years, with 1 at the frame edge. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 360articles per million peoplefrom 2,079.31 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 57.8index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS)
No value for this country. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6)
No value for this country. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
267 per million people, rank 85 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median18.0-6.1 against the indicators
Round 2. How this layer works
- 18.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 18: the panel agrees; state statistical and planning institutions collapsed after 2019, and private university science does not anticipate for the state.
- 18.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held 18: the 2019 collapse and 2020 port explosion were state anticipation failures, and the panel agrees within two points.
- 19.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Held. Peers at 18 agree that the 2019 collapse and 2020 port explosion were failures to anticipate.
Agency
How able are individuals and organizations to turn an intention into action?
not measured. No score. One indicator is observed here; this model needs two before it can average a dimension score.0.11 very thin1 of 5. Below the coverage floor: this model needs 2 observed rows before it publishes a score.
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.58About AgencyLebanon beside its income peers
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| New business densitydirect capability measureWorld Bank (IC.BUS.NDNS.ZS) | no dataper 1,000 aged 15-64 | no data | no data |
| Business entry efficiencydirect capability measureWorld Bank (IC.BRE.BE.P3) | no datascore 0-100 | no data | no data |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 8count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
80.6 % of population, rank 72 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
23 % aged 15+, rank 127 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2017
107 % of GDP, rank 18 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median36.0
Round 2. How this layer works
- 34.0 institutionalist@claude-opus-5-5, self-confidence 0.30
Revised up from 30. Panelist C named NGOs and diaspora bodies that run services, and from my own knowledge universities and hospitals in Lebanon are long-lived private institutions that kept operating through the collapse. That is organisational capacity, not only individual effort. Panelist B's solar panels and generators are workarounds that my stance discounts, so I stay well below 48. Only one row exists, 8 procedures from 2019, so evidence is thin.
- 48.0 bottom_up@claude-opus-5-5, self-confidence 0.30
Held at 48, and I record this as a disagreement with panelist A. Only 8 procedures from 2019 exists. A discounts private workarounds as compensating for institutional failure, while the benchmark rule says a poor country that reallocates fast scores high on adaptation, and people turning intent into action despite the state is what agency asks. From my own knowledge rooftop solar, generators and diaspora funds spread after 2019. Locked deposits and war damage cap scale.
- 36.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Lower slightly from 38 to 36. Only 8 procedures (2019) exists; no derived score. Panelist B (48) credits solar, generators and diaspora funding as improvised agency; panelist A (30) discounts effort compensating for a failed state. I land between: private workarounds are real conversion but the state itself converts nothing. Own knowledge.
Coordination
How effectively can independent actors organize around shared objectives?
85.70.24 very thin2 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 0.83About CoordinationLebanon beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+11.2 over 10 years (2016 to 2026), band +7.9 to +14.4. Median change: all countries -1.7, Income quartile 3 of 4 in 2000 +0.5.
+13.1 over 20 years (2006 to 2026), band +8.9 to +17.4. Median change: all countries -2.7, Income quartile 3 of 4 in 2000 -1.8.
The model fills at least one of the 2 indicators in 7 of 27 years, at most 1, last in 2006. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| Trade compliance efficiencydirect capability measureWorld Bank (IC.BRE.IT.P3) | no datascore 0-100 | no data | no data |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 95.3percentage points from approved budget | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.81index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration, Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2019
12.279 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2004LebanonPrivate management of the state mobile networks, and its enddismantled
Private management of the state mobile networks, and its end
Lebanon's government kept ownership of its two mobile networks, Alfa and Touch, and paid private operators to run them under management contracts from 2004, and mobile subscriptions grew from 884,445 in 2004 to 4,237,962 in 2019, the last full year of private management; the government did not renew the contracts in September 2020 and took management back itself.
4,237,962 subscriptions, mobile cellular subscriptions, last full year under private management, 2019. 884,445 subscriptions, mobile cellular subscriptions, first year of private management, 2004. World Bank, World Development Indicators, mobile cellular subscriptions (IT.CEL.SETS), from ITU data, retrieved 2026-10-17.
How it worked: The state kept the licences, the assets and the prices, and hired private telecom groups for fixed fees to run the two networks, then let the contracts lapse into provisional extensions and finally took management back into the ministry when it could not agree a new tender.
Limits: The subscription series shows national mobile scale, not the quality of the management contracts or what the state paid for them, and growth from 2004 also reflects the spread of mobile phones everywhere in those years. Both numbers are at the World Bank URL, but the contract history is not: the end of the contracts in September and October 2020 comes from Freedom House, Freedom on the Net 2021, Lebanon (republished at ecoi.net/de/dokument/2060922.html), and the 2004 start of private management from secondary sources. The loss is the arrangement, not the service: subscriptions stood at 4,251,774 in 2022, about the 2019 level, so the record does not show that service fell after the state took over. The series peaked at 4,657,651 in 2015, under private management, and the 2020 and 2021 values are identical, which suggests a carried-forward estimate. Freedom House also records that the contracts were provisional after the tender expired in 2019, so the collaboration was weakening before it ended.
Panel median40.0-45.7 against the indicators
Round 2. How this layer works
- 30.0 institutionalist@claude-opus-5-5, self-confidence 0.35
Revised up from 28. B and C credit NGO and municipal coordination of port-explosion relief, which is real, but it compensated for a state that could not pass budgets or fill the presidency, so I stay well below them.
- 42.0 bottom_up@claude-opus-5-5, self-confidence 0.35
I revise down slightly from 45 to 42: A is right that the state ran years without timely budgets and with long vacancies. NGOs and municipalities coordinated port-explosion relief, which keeps me above A's 28.
- 40.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Revised down from 45 to 40. Panelist A at 28 argues the budget figure is from 2020 and the state has run years without timely budgets; panelist B at 45 credits civil society relief after the port blast, which I weigh but which compensates for state failure.
Trust
How much cooperation is possible beyond immediate personal networks?
54.70.16 very thin2 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 0.79About TrustLebanon beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-1.4 over 10 years (2016 to 2026), band -3.7 to +2.2, which includes no change. Median change: all countries +1.9, Income quartile 3 of 4 in 2000 +1.4.
+7.8 over 20 years (2006 to 2026), band +3.1 to +12.1. Median change: all countries +2.1, Income quartile 3 of 4 in 2000 +2.
The model fills at least one of the 2 indicators in 9 of 27 years, at most 1, last in 2008. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| Dispute resolution efficiencydirect capability measureWorld Bank (IC.BRE.DR.P3) | no datascore 0-100 | no data | no data |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 21.8% of firms | 2019. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 2scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median28.0-26.7 against the indicators
Round 2. How this layer works
- 28.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Held at 28. The panel is within one point and agrees the derived 54.7 misleads, since bribery of 21.8% dates from 2019 before the collapse and court compliance of 2.03 does not reflect the blocked Beirut port blast probe. Depositors locked out of banks broke contract trust. No panelist gave a reason to move. I note the agreement rests on own knowledge, not on rows in the brief.
- 28.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 28. Compliance of 2.03 and 2019 bribery of 21.8% give 54.7, with bribery predating the collapse. The panel is almost unanimous. From my own knowledge obstruction of the Beirut port blast probe and depositors locked out of banks broke impersonal trust, and sect networks carry what cooperation exists.
- 27.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Hold 27. Bribery 21.8% is a 2019 figure from before the collapse; compliance 2.03 (52.6). Both panelists (28, 28) agree with me. The Beirut port blast investigation blocked since 2021 shows courts cannot bind elites. Own knowledge.
Learning
How effectively does the country acquire, distribute, and update knowledge?
40.70.46 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.67About LearningLebanon beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-1.6 over 10 years (2016 to 2026), band -5.5 to +2.5, which includes no change. Median change: all countries -1.3, Income quartile 3 of 4 in 2000 -1.6.
-8.6 over 20 years (2006 to 2026), band -14.1 to -2.4. Median change: all countries +0.8, Income quartile 3 of 4 in 2000 -0.3.
The model fills at least one of the 3 indicators in 17 of 27 years, at most 2, last in 2016. The replay starts in 2009, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.52index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 20.8% of firms | 2019. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 1.3ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2023
54.4 % gross, rank 61 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2024
1.2 % of GDP, rank 131 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
16.1 % of secondary, rank 48 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Panel median40.0-0.7 against the indicators
Round 2. How this layer works
- 40.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Held at 40. B's private university system is real, but skilled emigration drains it, and data are stale.
- 43.0 bottom_up@claude-opus-5-5, self-confidence 0.35
I revise down slightly from 45 to 43: A is right that emigration of skilled people drains the system. Strong private universities and high citation impact keep me above 41.
- 40.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Held at 40, same as panelist A. Citation impact from strong private universities is real, but HCI is weak, data are 2019 and 2020, and skilled emigration drains it; B at 45 does not weigh the data age.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
10.60.14 very thin3 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 0.50About ExperimentationLebanon beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
0 over 10 years (2016 to 2026), band -6.4 to +5.1, which includes no change. Median change: all countries 0, Income quartile 3 of 4 in 2000 0.
+0.2 over 20 years (2006 to 2026), band -7.2 to +6.4, which includes no change. Median change: all countries +0.1, Income quartile 3 of 4 in 2000 +0.8.
The model fills at least one of the 3 indicators in 26 of 27 years, at most 3, last in 2025. The replay starts in 2013, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 17per million peoplefrom 110 national total | 2015. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 194per million peoplefrom 1,253 national total | 2015. The rail runs from 1960 to 2026. | |
| Resident industrial design applicationsdownstream outcomeWorld Bank (IP.IDS.RSCT) | no dataper million people | no data | no data |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 10,169per million peoplefrom 59,481 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| Insolvency efficiencydirect capability measureWorld Bank (IC.BRE.BI.P3) | no datascore 0-100 | no data | no data |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes, University spinouts.
This project retired one row: Business share of R&D.
Panel median14.0+3.4 against the indicators
Round 2. How this layer works
- 12.0 institutionalist@claude-opus-5-5, self-confidence 0.30
Held at 12: panelist B's diaspora-linked founders are individuals compensating for institutional failure, the exact case I discount; IP data from 2015 is stale.
- 22.0 bottom_up@claude-opus-5-5, self-confidence 0.25
Moved 28 to 22: panelist A's point that the banking collapse removed the main finance for new ventures is one I cannot answer; diaspora-funded founders and repository activity (17.9) still lift me above 12 to 14.
- 14.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.25
Held. Peer B lifts to 28 on diaspora-linked founders, but IP data is from 2015 and I cannot show attempts rise in the crisis.
Adaptability
How effectively can the system respond when circumstances change?
53.60.54 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 0.88About AdaptabilityLebanon beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-1.9 over 10 years (2016 to 2026), band -4 to +0.3, which includes no change. Median change: all countries -0.8, Income quartile 3 of 4 in 2000 +0.8.
-11.3 over 20 years (2006 to 2026), band -16.2 to -5.8. Median change: all countries -1, Income quartile 3 of 4 in 2000 -1.5.
The model fills at least one of the 4 indicators in 19 of 27 years, at most 2, last in 2018. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-4.7 over 10 years, from 61.4 in 2016 to 56.7 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 11% of labour force | 2023. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 56.6% of unemployed | 2019. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.14index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 2.9% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2023
48 % aged 15+, rank 126 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2022
7.3 per 100 people, rank 85 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
11.4 % of output, rank 74 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2019
55.4 % of employment, rank 47 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2021LebanonEmergency Social Safety Net (AMAN), and its slow startstill operating
Emergency Social Safety Net (AMAN), and its slow start
Lebanon's emergency cash transfer for the economic collapse that began in 2019 was approved by the World Bank in January 2021, rewritten by Parliament in March 2021 and declared effective only in July 2021, so that in October 2021 the number of households receiving basic cash transfers still stood at its 15,153 baseline against a target of 147,000; the programme later reached 158,770 households by March 2025.
15,153 households, households receiving basic cash transfers, unchanged from the june 2020 baseline, 2021-10-31. 158,770 households, households that had received cash assistance under the programme (aman), 2025-03. World Bank, Implementation Status and Results Report, Lebanon Emergency Crisis and COVID-19 Response Social Safety Net Project (P173367), sequence 2, 17 November 2021, retrieved 2026-10-02.
How it worked: The government borrowed for a new cash transfer rather than extending an existing one, and the loan had to pass Parliament, which amended it, so the programme waited for a revised law, a new government and fiduciary conditions before it could pay.
Limits: The 15,153 is the PDO indicator table on pages 2 and 3 of the status report, identical at baseline (30 June 2020), March 2021 and October 2021; the approval, ratification and effectiveness dates are on page 1, which says Parliament's changes cut budget allocations for fiduciary activities and that the Bank judged some of them would impede implementation, and that the government still had to meet disbursement conditions so that payments could begin before the end of 2021. The 158,770 is in paragraph 4 of the World Bank restructuring paper of 13 May 2025 (https://documents.worldbank.org/curated/en/099051325103513216/pdf/P173367-bed938d8-7d2a-4120-80a5-3da01c595ba8.pdf), which says about 94,000 households were enrolled in 2022 and 2023 and 65,000 were migrated in October 2024 from the National Poverty Targeting Program after it closed in June 2024 for lack of donor funding. The baseline households were beneficiaries of that older programme, not of this one. The record documents slowness, not failure: once paying, the programme reached roughly its target. The publisher is the lender, and part of the delay was the World Bank's own conditions and the process of agreeing them with Parliament across a change of government in September 2021; the record does not apportion blame. The start year is the year of approval, not the start of the crisis in late 2019.
2021LebanonCOVID-19 vaccination campaigndelivered and closed
Lebanon's health authorities reported to WHO that 2,740,227 people, 40 per 100 population, had received at least one COVID-19 vaccine dose by 22 December 2022, from a first dose given on 14 February 2021, with 2,414,223 (35 per 100) completing the primary series.
2,740,227 people, people vaccinated with at least one covid-19 vaccine dose, 2022-12-22. 35 per 100 population, people who completed the primary series (last dose), 2022-12-22. World Health Organization, COVID-19 dashboard vaccination data (vaccination-data.csv), retrieved 2026-10-02.
How it worked: Lebanon's health ministry ran a national COVID-19 campaign through its primary care network and mass vaccination sites and reported progress to WHO.
Limits: The figures are Lebanon's own reports to WHO (DATA_SOURCE 'REPORTING'), with no independent coverage survey behind them. Completion of the primary series reached 35 per 100 and boosters 660,249 people (10 per 100), so the record shows a partial delivery. The campaign ran through Lebanon's 2019 to 2022 financial collapse and the August 2020 port explosion, and first-dose reach stopped at 40 per 100, which is the more informative reading: a partial delivery by a state in crisis. Donor financing of the doses, if any, is not shown in the CSV. The VACCINES_USED field is empty, so the record cannot show which products were used or where the doses came from, and it evidences distribution only. The per-100 rates divide by WHO's population estimate. Vaccination is a response to one shock, not proof of general preparedness, and it is filed under the precedent of bol-covid-vaccination and ven-covid-vaccination as a judgement call because no hazard-specific delivery with an official figure was found for this country in this batch. The source is a CSV with no prose; the numbers are read from one row. The cited URL is the blob the WHO dashboard serves, the same one bol-covid-vaccination cites.
Panel median40.0-13.6 against the indicators
Round 2. How this layer works
- 30.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Revised up from 28. B and C agree households adapted while the system did not; I stay well below them because six years without bank restructuring is an institutional failure to respond.
- 42.0 bottom_up@claude-opus-5-5, self-confidence 0.30
I revise down from 45 to 42: A and C are right that six years without bank restructuring is a system failure. I hold above A because households adapted fast through dollarisation, rooftop solar and remittances.
- 40.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.30
Revised down from 44 to 40. Panelist A at 28 says the banking crisis has not been resolved after six years; households adapted through solar and dollarisation, which is not institutional response, but export diversification at 90 is real.
Building
How capable is the country of turning plans and knowledge into functioning systems?
2.30.44 thin3 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 0.92About BuildingLebanon beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-7.6 over 10 years (2016 to 2026), band -7.6 to -7.6. Median change: all countries -0.3, Income quartile 3 of 4 in 2000 -0.3.
-6 over 20 years (2006 to 2026), band -9.6 to -3.4. Median change: all countries -0.5, Income quartile 3 of 4 in 2000 -0.8.
The model fills at least one of the 3 indicators in 7 of 27 years, at most 2, last in 2006. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-7.6 over 10 years, from 9.9 in 2016 to 2.3 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 1.4% of GDP | 2021. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 2.9% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| Utility connection efficiencydirect capability measureWorld Bank (IC.BRE.US.P3) | no datascore 0-100 | no data | no data |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.07index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (1 case below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2023
39,998 constant 2021 PPP $, rank 72 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2012LebanonGreater Beirut Water Supply Project (Awali to Beirut conveyor), and its unfinished deliveryoperating below its peak
Greater Beirut Water Supply Project (Awali to Beirut conveyor), and its unfinished delivery
Lebanon's Council for Development and Reconstruction and the Beirut Mount Lebanon Water Establishment built most of a system to bring 250,000 cubic metres a day from the Awali to 1.2 million people in Greater Beirut, but when the World Bank loan closed on 30 April 2025, 106 months after the original June 2016 closing date, no additional water had been delivered, the 24/7 supply reached in a 20,000-customer pilot zone in 2018 had not been maintained, and component costs had risen from US$370 million at approval to US$561.7 million.
0 customers, customers in the achrafieh pilot zone receiving 24/7 water supply at closing, 2025-04-30. 20,000 customers, customers in the achrafieh pilot zone receiving 24/7 water supply when the target was reached, 2018. World Bank, Implementation Completion and Results Report, Lebanon Greater Beirut Water Supply Project (P103063, Loan 7967-LE), report ICR00441, 16 December 2025, retrieved 2026-10-02.
How it worked: The reconstruction council and the regional water utility split a gravity conveyance, treatment and distribution system between them, financed the start with a World Bank loan, and depended on utility surpluses and a second loan for the rest; when the utility's revenue and the state's finances collapsed, the scheme stopped short of delivering water.
Limits: The World Bank wrote the report and rated the outcome Highly Unsatisfactory and its own performance Moderately Unsatisfactory. The 106 months are in para. 17; the zero water delivered, the 75, 84 and 89 percent completion of tunnels, pipelines and treatment plant and the 20,000-customer pilot are in Table 2 and paras. 29 to 31 (ICR pages 8 to 9). The US$561.7 million is the project budget at closing printed in Table 3 of the report against US$370 million at appraisal, and matches the sum of the three components in Annex 3 (US$434.0, 112.7 and 15.0 million; page 31) against 294.0, 61.0 and 15.0 at approval. Lebanon's 2019 financial collapse, COVID-19, the 2020 port explosion and a contractor's insolvency all fall inside the delay, so it is not a clean measure of institutional capacity in normal times, and a US$90 million additional financing approved in 2018 lapsed because Lebanon did not make it effective. The erosion is the pilot zone's 24/7 supply, reached in 2018 and lost; that is a small part of the project, and the main failure is non-completion, not loss. A follow-on Second Greater Beirut Water Supply Project was approved on 14 January 2025 to finish the works, so the delivery may still complete. The related Bisri dam, financed under a separate project, was partly cancelled before construction (footnote in para. 8) and is not counted here.
Panel median8.0+5.7 against the indicators
Round 2. How this layer works
- 8.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Held at 8. B's private solar build-out is distributed self-provision around a failed state utility, not institutional building capacity.
- 12.0 bottom_up@claude-opus-5-5, self-confidence 0.30
I hold at 12: A and C do not answer that the 2021 manufacturing value is a crisis-year low and that the private solar build-out is distributed building. Electricitรฉ du Liban's failure keeps me near the bottom.
- 8.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Held at 8, level with panelist A. Manufacturing at the floor on a crisis-year value and the state's inability to supply electricity are the clearest delivery failure; panelist B's private solar build-out is distributed building but not state capacity.