Pakistan
Strongest usable evidence: Adaptability, at 69.4. Raise Experimentation first, at 15.2. Shared purpose needs more evidence: confidence is 0.32.
A solid dot has usable or good evidence and a hollow dot has thin evidence. The tick is the median of the 10 countries nearest in income. A score is a position among the 135 countries, not a percentage.
Raise, lowest first
- ExperimentationPeers 6.40.47 usable+0.8(3)
- LearningPeers 25.90.52 usable-9.1(2)
- AnticipationPeers 23.90.46 usable+10.8(2)
- BuildingPeers 17.50.63 usable+1.9(3)
Measure before managing, thinnest first
- Shared purposePeers 46.70.32 thin-1.3(2)
- TrustPeers 45.70.32 thin+18.0(2)
Keep watching, highest first
- AdaptabilityPeers 54.30.62 usable+8.5(4)
- AgencyPeers 38.60.49 usableno trend
- CoordinationPeers 68.10.48 usable-7.3(2)
These groups are the country's capability agenda, computed from the scores. Read the full agenda. It names comparable evidence from other countries and the 22 gaps in the registry.
Read Pakistan beside up to three other countries, down to the indicator behind every row.
- Usable or good evidence
- Thin evidence, hollow point. The dashes open further as confidence falls.
- The point still sits at the score, because confidence never moves it.
- Click any axis to see every country on that dimension.
A score from 0 to 100 is a position inside the frame that all the benchmark countries set: zero is the weakest on a dimension and 100 is the strongest. A score of 10 puts a country near the floor of that frame and does not mean 10 percent of a capability.
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Why this country is included: Added in the 9.0.0 completion, which takes every country of a million people or more that is measurable in all nine capabilities.
Download this country as CSVHow to read this page
Each dimension has a score from 0 to 100. It shows where this country sits among all 135 countries in the comparison frame, not a percentage. Confidence sits beside the score. A dashed radar edge and hollow point mean the evidence is thin. The records below show each indicator, its raw value, year and source.
A panel estimate, when present, is a separate judgment about what the indicators miss. It does not change the score or confidence. The panel's provenance is shown beside the estimate.
A row marked no dataset exists is a gap: the benchmark wants data that nobody publishes. A retired row has a source this project chose not to use. Both reduce confidence. The glossary defines each term, and the limits page lists where these numbers are known to be wrong about the world.
The record behind each score
- direct capability measuredirect capability measure Measures the thing itself.
- capability inputcapability input Measures something that supports the capability.
- downstream outcomedownstream outcome Measures a result that usually follows from the capability.
- perception proxyperception proxy Records what people or experts say, not what they did.
Anticipation
How capable is the country of identifying and preparing for emerging change?
28.00.46 usable2 of 4
Anticipation
How capable is the country of identifying and preparing for emerging change?
Recency 0.96About AnticipationPakistan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 2 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+10.9 over 10 years (2016 to 2026), band +10.9 to +10.9. Median change: all countries +11.2, Income quartile 1 of 4 in 2000, lowest +11.6.
+11.3 over 20 years (2006 to 2026), band +3.6 to +17.1. Median change: all countries +13.4, Income quartile 1 of 4 in 2000, lowest +11.7.
The model fills at least one of the 2 indicators in 16 of 27 years, at most 1, last in 2015. The replay starts in 2016, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+10.8 over 10 years, from 17.2 in 2016 to 28.0 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.JRN.ARTC.SC) | 82.9articles per million peoplefrom 20,519.11 national total | 2023. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IQ.SPI.OVRL) | 68.1index 0-100 | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Government foresight capacity, Long-horizon research commitments.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
R&D expenditureWorld Bank (GB.XPD.RSDV.GD.ZS), 2023
0.16 % of GDP, rank 97 of 123. Gross domestic expenditure on research and development as a share of GDP.
A condition, not scored: money committed to research is what a country spends, and spending it does not show the country reads the future well.
Researchers in R&DWorld Bank (SP.POP.SCIE.RD.P6), 2023
474 per million people, rank 69 of 118. Full-time-equivalent researchers per million people.
A condition, not scored: a standing stock of people who could investigate is what a country has, not a record of what they found. Correlates with income but survives size normalization.
Secure internet serversWorld Bank (IT.NET.SECR.P6), 2024
110 per million people, rank 98 of 135. Servers using encryption in internet transactions, per million people.
A condition, not scored: a diffusion stock of digital adoption that money buys, not an act of anticipation. Spans four orders of magnitude, so its rank is read on the published value and its correlations on the logged one.
Panel median23.0-5.0 against the indicators
Round 2. How this layer works
- 22.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Hold at 22. C's point that the 2022 floods show warning did not convert into preparation supports my score below the indicator.
- 26.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 26: panelist C's 2022 flood point supports my score; panelist A's 22 underweights mid-frame statistics.
- 23.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Moved down 3 to 23: A and B both note IMF cycles shorten horizons and I cannot answer that; the 2022 floods show warning did not convert to preparation.
Agency
How able are individuals and organizations to turn an intention into action?
57.70.49 usable3 of 5
Agency
How able are individuals and organizations to turn an intention into action?
Recency 0.86About AgencyPakistan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+14.3 over 10 years (2016 to 2026), band +11.9 to +19.2. Median change: all countries +1.9, Income quartile 1 of 4 in 2000, lowest +1.5.
+14.3 over 20 years (2006 to 2026), band +9 to +21.4. Median change: all countries +9.3, Income quartile 1 of 4 in 2000, lowest +10.9.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2013, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
No trend is shown because too few indicators have values at both ends. The rows below still show the available history.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BUS.NDNS.ZS) | 0.2per 1,000 aged 15-64 | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.BE.P3) | 94.8score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.REG.PROC.MA.NO) | 5count | 2019. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Adults doing digital tasks, Perceived control over life.
This project retired one row: Time to start a business.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Individuals using the internetWorld Bank (IT.NET.USER.ZS), 2024
57.3 % of population, rank 97 of 135. Share of the population that used the internet in the last three months.
A condition, not scored: access to the basic tool of modern agency is what people have to act with, not a record of them acting. Saturates near 95%, which compresses the top of the range.
Financial account ownershipWorld Bank (FX.OWN.TOTL.ZS), 2024
27.3 % aged 15+, rank 124 of 131. Adults with an account at a bank or mobile money provider.
A condition, not scored: holding an account is the precondition for almost any economic action, not the action. Global Findex, published every three years.
Credit to the private sectorWorld Bank (FS.AST.PRVT.GD.ZS), 2025
10.7 % of GDP, rank 123 of 134. Domestic credit provided to the private sector by financial corporations.
A condition, not scored: financial depth is a stock of money available to actors, not what they do with it. High values can also signal a credit bubble, so more is not always better.
Panel median42.0-15.7 against the indicators
Round 2. How this layer works
- 38.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised from 35 to 38. B's Sialkot cluster is a point my stance must credit: its chamber built institutions including an airport (own knowledge), and that is organised action that lasted. Still, entry efficiency of 94.758 (93.1) and 5 procedures (78.9) against density of 0.202 (0.9) is the widest gap between paper and use in my batch, as C also says. Security, credit, tax uncertainty and military business interests are unchanged, so I stay well below 57.7.
- 50.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 50, and I keep the disagreement with panelist A (35). A and panelist C are right that entry efficiency of 94.758 and density of 0.202 form a paper-to-practice gap, and that an SECP form does not supply security. But I do not rest on the form. Karachi workshops, Sialkot export clusters and a large freelance base act mostly off-register (own knowledge), and neither repeated IMF programmes nor military business reach those actors directly.
- 42.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.45
I move from 44 to 42. Entry efficiency 94.8 against density 0.202 (0.9) is the widest paper-to-practice gap in my batch; rules do not produce firms. Panelist A's point on civil and military business interests is own knowledge. Panelist B's informal clusters at Sialkot and Karachi are real but power shortages and repeated IMF programmes limit execution. 57.7 is inflated by a paper score.
Coordination
How effectively can independent actors organize around shared objectives?
56.70.48 usable3 of 5
Coordination
How effectively can independent actors organize around shared objectives?
Recency 1.00About CoordinationPakistan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-4.9 over 10 years (2016 to 2026), band -10 to -0.3. Median change: all countries -1.7, Income quartile 1 of 4 in 2000, lowest +2.6.
+7.4 over 20 years (2006 to 2026), band +2.2 to +12.5. Median change: all countries -2.7, Income quartile 1 of 4 in 2000, lowest +0.7.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2006, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-7.3 over 10 years, from 79.8 in 2016 to 72.5 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.IT.P3) | 25.5score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (GF.XPD.BUDG.ZS) | 91.1percentage points from approved budget | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureV-Dem (v2x_cspart) | 0.65index 0-1 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: University-industry collaboration (1 case below), Public-private collaboration (1 case below).
This project retired 4 rows: Government effectiveness, Regulatory quality, Logistics performance, Border compliance time to export.
Behavioral check, not scored
Each number below is published beside the score and stays out of it. It is not in the frame, the average, the indicator count or the confidence.
Customs clearance time for exportsWorld Bank (IC.CUS.DURS.EX), 2022
18.588 days, lower is better. Average number of days to clear direct exports through customs, as reported by manufacturing firms that export directly, in the World Bank Enterprise Surveys.
Days a manufacturer that exports directly says its goods took to clear customs, from the World Bank Enterprise Surveys. It is the time the border took on firms' own shipments, current where the Doing Business border time this capability scores is frozen at 2019. It is not scored for two reasons. The number of firms behind each country's figure is published only in the survey microdata, and on a proxy from the published tables 37 of the 53 countries in the frame when it was checked clear 30 exporting firms; Mexico, the Philippines, Israel and nine others may not. And the question changed: surveys fielded from 2024 also ask how long release took across all border agencies, and drop an answer where customs alone took longer, so a country surveyed on both sides of the change can move severalfold with nothing at its border changing. India reads 17.3 days in 2022 and 2.5 in 2025, on more than 9,000 firms each time. No country in the frame has two surveys on the new questionnaire yet. Income is not why it is left out: it barely tracks log GDP per capita.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
1994PakistanIndependent power producer programme, and its erosionoperating below its peak
Independent power producer programme, and its erosion
Through the Private Power and Infrastructure Board, Pakistan's government commissioned 101 private power plants with 25,841 MW of capacity under long-term purchase contracts, and by March 2025 only 88 plants with 20,726 MW still operated, after the government terminated the purchase agreements of six of them, Hub, Lalpir, Pakgen, Roush, Saba and Atlas, with effect from 1 October 2024.
20,726 MW, capacity of operational ppib-facilitated ipps, 2025-03. 25,841 MW, cumulative capacity of ipps commissioned through ppib, 2025-03. Finance Division, Government of Pakistan, Pakistan Economic Survey 2024-25, chapter 14 Energy, retrieved 2026-10-17.
How it worked: The federal government let private firms build and own power plants and bought their output under long-term purchase agreements with sovereign guarantees issued through PPIB, which closed the shortage, then made the state liable for capacity payments it could not afford and led it to terminate the oldest contracts.
Limits: Both numbers sit in one PDF and are read from its text, with PPIB as the underlying source. The 25,841 MW is cumulative capacity ever commissioned, not a published peak of capacity operating at one time, so the 5,115 MW gap overstates the loss: some of the 13 plants that no longer operate left at the scheduled end of their contracts, and the survey does not split expiries from terminations. The survey ties the six terminations to a fall in installed thermal capacity from 28,766 MW in FY 2024 to 25,937 MW in March 2025, and it calls them a deliberate removal of costly and underutilized thermal contracts, so a reader can also see this as a buyer ending contracts it no longer needed rather than a loss of collaboration capacity. The same chapter shows the programme still adding plants, among them the 884 MW Suki Kinari hydropower project. The record does not show the price of capacity payments that drove the terminations, the settlement terms, or the later renegotiation of other contracts, none of which appear at this URL. The survey does not state the 1994 start or how close the terminated contracts were to their end: Dawn reported that four of the plants were set up under the 1994 power policy, Hub Power before it, and that their contracts were set to expire within two to three years, which makes the early loss smaller than the termination suggests.
2016PakistanHEC Technology Development Fundstill operating
HEC Technology Development Fund
Pakistan's Higher Education Commission funds joint academia-industry projects that take university research to prototype and licence through its Technology Development Fund, which had awarded 238 projects by December 2025, 192 of them completed, with 162 technology licences signed.
238 projects, joint academia-industry projects awarded under the fund, cumulative, 2025-12. 162 licences, technology licences signed under the fund, cumulative, 2025-12. Higher Education Commission (HEC) Pakistan, HEC Displays Over 100 Tech Solutions Developed under Technology Development Fund (news release, Islamabad, 31 December 2025), archived copy, retrieved 2026-10-17.
How it worked: The Higher Education Commission pays university faculty to take finished lab research to a prototype, but only for proposals filed jointly with an industry partner, and it then brokers licences for the results.
Limits: The figures are HEC's own report of its own programme, given in a news release about a showcase event, and no independent evaluation is cited. They are cumulative counts since the first call, not a yearly rate, and a project count says nothing about the size, success or additionality of each project. HEC reports licences signed, not licence revenue or products sold, and the release gives no count of firms involved. The programme's own introduction page says it funds proposals submitted by consortia of industry and academic partners, so the industry side is a condition of the grant, but the scale of each firm's contribution is not published. The hec.gov.pk host did not answer on 17 October 2026, so the source is the Internet Archive copy of 12 February 2026. The start year follows the August 2016 press report of HEC opening the first call; neither HEC page states it.
Panel median40.0-16.7 against the indicators
Round 2. How this layer works
- 38.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Moved from 35 to 38: panelist C is right that budget fidelity of 81.5 is a real reading, but trade compliance at 25 and weak federal-provincial coordination after the 18th Amendment, shown in the 2022 flood response, keep it well below 56.7 and below B's 50.
- 44.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Revised down from 50. Panelist C's point about weak federal-provincial coordination in the 2022 flood response and A's point about military dominance over civilian agencies are ones I cannot answer; dense charitable networks keep me above them.
- 40.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Held, between A at 35 and B at 50. Budget fidelity of 81.5 is a headline; trade compliance at 25 and federal-provincial friction in the 2022 flood response argue lower.
Trust
How much cooperation is possible beyond immediate personal networks?
53.30.32 thin3 of 7
Trust
How much cooperation is possible beyond immediate personal networks?
Recency 0.94About TrustPakistan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+8.7 over 10 years (2016 to 2026), band +2.6 to +13.5. Median change: all countries +1.9, Income quartile 1 of 4 in 2000, lowest +4.7.
+26.3 over 20 years (2006 to 2026), band +20.3 to +31. Median change: all countries +2.1, Income quartile 1 of 4 in 2000, lowest +6.2.
The model fills at least one of the 3 indicators in 25 of 27 years, at most 2, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+18.0 over 10 years, from 55.3 in 2016 to 73.3 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (IC.BRE.DR.P3) | 34.6score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IC.FRM.BRIB.ZS) | 15.9% of firms | 2022. The rail runs from 1960 to 2026. | |
| downstream outcomeV-Dem (v2jucomp_osp) | 3scale 0-4 (never to always) | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 4 rows, each a gap: Generalised interpersonal trust, Trust in public institutions, Cooperation beyond the in-group, Court case clearance rate.
This project retired 4 rows: Rule of law, Control of corruption, Time to enforce a contract, Intentional homicide rate.
Panel median31.0-22.3 against the indicators
Round 2. How this layer works
- 30.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Revised from 28 to 30. B's Edhi point moves me a little because the foundation outlived its founder (own knowledge), a formal body in which strangers support strangers at national scale. Dispute resolution of 34.55 (13.3) is the credible direct row, as C also says. Compliance of 2.983 (78.1) is hard to accept after the 26th and 27th amendments and military trials of civilians. Sectarian and ethnic violence narrows reach, so I stay at the low end of the panel.
- 33.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Held at 33. Compliance of 2.983 (78.1) sits oddly with the 26th amendment and military trials, and the panel agrees. Dispute resolution of 34.55 (13.3) is the better row. Panelist A's 28 omits Edhi and similar charities, where strangers fund strangers (own knowledge). Panelist C's 36 credits bribery of 15.898% more than I do. Sectarian violence narrows reach.
- 31.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
I move from 36 to 31. Panelists A and B both argue that compliance 2.983 (78.1) conflicts with the 2024 election dispute and the 2024-2025 constitutional amendments that curbed judicial independence and moved civilian cases to military trials. That is a point I cannot answer, so I mark compliance as unreliable. Dispute resolution 34.6 (13.3) is weak and direct. Edhi-style charities show strangers helping strangers, narrowed by sectarian violence.
Learning
How effectively does the country acquire, distribute, and update knowledge?
26.90.52 usable3 of 4
Learning
How effectively does the country acquire, distribute, and update knowledge?
Recency 0.75About LearningPakistan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 3 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
-1.3 over 10 years (2016 to 2026), band -4.9 to +3.3, which includes no change. Median change: all countries -1.3, Income quartile 1 of 4 in 2000, lowest -2.3.
+11.8 over 20 years (2006 to 2026), band +6.6 to +16.7. Median change: all countries +0.8, Income quartile 1 of 4 in 2000, lowest +0.6.
The model fills at least one of the 3 indicators in 17 of 27 years, at most 2, last in 2016. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
-9.1 over 10 years, from 39.8 in 2016 to 30.7 on 2 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| direct capability measureWorld Bank (HD.HCI.OVRL) | 0.41index 0-1 | 2020. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.FRM.TRNG.ZS) | 5.9% of firms | 2022. The rail runs from 1960 to 2026. | |
| downstream outcomeOpenAlex (citation_normalized_percentile.is_in_top_10_percent) | 1.2ratio to world average | 2021. The rail runs from 1960 to 2026. |
No dataset exists for one row, each a gap: Adult learning participation (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Tertiary enrolmentWorld Bank (SE.TER.ENRR), 2024
10.9 % gross, rank 106 of 134. Gross enrolment ratio in tertiary education.
A condition, not scored: enrolment counts people in formal education and records nothing learned.
Public education expenditureWorld Bank (SE.XPD.TOTL.GD.ZS), 2023
1.9 % of GDP, rank 125 of 135. Government expenditure on education as a share of GDP.
A condition, not scored: public spending on education is a pure input, and learning is what the dimension asks about.
Vocational share of secondaryWorld Bank (SE.SEC.ENRL.VO.ZS), 2019
3.2 % of secondary, rank 109 of 135. Vocational pupils as a share of total secondary enrolment.
A condition, not scored: the share of secondary pupils on a vocational track describes how a school system is built, not what anyone learns in it, and higher is not unambiguously better. It marks a route into skilled work that does not run through university. Learning reads research citation impact, firm training and the human capital index instead.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2002PakistanNCHD Adult Literacy Programme, and its collapse after 2013operating below its peak
NCHD Adult Literacy Programme, and its collapse after 2013
Pakistan's National Commission for Human Development opened 19,399 adult literacy centres enrolling 482,295 learners in 2009-10, but its literacy programme 'came to a halt since 2013 due to scarcity of funds', and in 2021 it ran a phase of 1,490 centres, financed by the Pakistan Human Development Fund, that enrolled 36,529 learners, mostly women aged 15 to 45.
36,529 learners, learners enrolled in the 1,490 adult literacy centres of the project 'promoting literacy in rural communities of pakistan', 2021. 482,295 learners, peak: learners enrolled in 19,399 adult literacy centres, nchd annual report 2012, year-wise table, 2009-10. National Commission for Human Development (NCHD), Ministry of Federal Education and Professional Training, Annual Report 2021, retrieved 2026-10-02.
How it worked: A federal commission recruited local teachers to run six-month literacy centres in villages, mostly for women, funded from the federal development budget; when that budget line lapsed, delivery fell to small donor-funded rounds.
Limits: The commission reports on itself. The 2021 figure is in the foreword of the 2021 annual report (PDF page 10, printed page 8, 'Around 36,529 learners, mostly women benefitted') and in its programme chapter (PDF page 38), which says 1,490 centres were established in 116 districts 'wherein, 36529 learners were enrolled' and 33,377 graduated; 1,500 centres were allocated and ten in North Waziristan could not be opened. The peak comes from a different document at the same host, NCHD Annual Report 2012 (https://www.nchd.org.pk/SiteImage/Misc/files/NCHD_Annual_Report_2012.pdf, PDF page 16), whose table gives 19,399 centres and 482,295 learners for 2009-10, 8,317 and 197,907 for 2010-11 and 8,270 and 202,349 for 2011-12; 2009-10 is the highest year in that table, not a demonstrated all-time peak, and the commission's cumulative claim of about 4.07 million people made literate since 2002 implies that earlier years were also large. The statement that the programme halted in 2013 for lack of funds is in NCHD Annual Report 2016 (https://www.nchd.org.pk/SiteImage/Misc/files/Annual%20Report-2016.pdf, PDF page 8), which also says the 2017 project approval cut the planned centres from 12,000 to 6,000. Enrolment is not completion or tested literacy. The 2021 centres were financed by the Pakistan Human Development Fund, a support fund set up under the commission's ordinance, rather than the commission's core development budget. Part of the fall may reflect the devolution of education to the provinces after the 2010 constitutional amendment, which moved literacy work to provincial departments that this record does not count. No annual figure after 2021 was found at the commission's site.
Panel median26.0-0.9 against the indicators
Round 2. How this layer works
- 25.0 institutionalist@claude-opus-5-5, self-confidence 0.60
Held at 25: the panel agrees that HCI and firm training are very weak, and panelist C's point that citation impact reflects a handful of strong institutions supports not lifting the score on it.
- 26.0 bottom_up@claude-opus-5-5, self-confidence 0.55
Held near 26. The panel agrees that low human capital and near-zero firm training outweigh a citation impact that reflects a few institutions.
- 26.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.50
Revised down one point. A and B discount citation impact against human capital of 19.5 and firm training of 4, and I agree; 25 million out-of-school children are stronger evidence than citation counts.
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
15.20.47 usable5 of 10
Experimentation
How easily can new approaches be attempted, tested, abandoned, and improved?
Recency 1.00About ExperimentationPakistan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 5 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+0.5 over 10 years (2016 to 2026), band -3.5 to +4.3, which includes no change. Median change: all countries 0, Income quartile 1 of 4 in 2000, lowest 0.
+0.8 over 20 years (2006 to 2026), band -3.1 to +4.9, which includes no change. Median change: all countries +0.1, Income quartile 1 of 4 in 2000, lowest +0.1.
The model fills at least one of the 5 indicators in 26 of 27 years, at most 3, last in 2025. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+0.8 over 10 years, from 1.3 in 2016 to 2.1 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (IP.PAT.RESD) | 1.9per million peoplefrom 480 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.TMK.RSCT) | 203per million peoplefrom 50,989 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (IP.IDS.RSCT) | 2.4per million peoplefrom 612 national total | 2024. The rail runs from 1960 to 2026. | |
| downstream outcomeGitHub Innovation Graph (data/repositories.csv) | 5,857per million peoplefrom 1,494,844 national total | 2026. The rail runs from 1960 to 2026. | |
| Early-stage entrepreneurial activitydirect capability measureGlobal Entrepreneurship Monitor (APS key indicators, TEA rate) | no data% aged 18-64 | no data | no data |
| Tolerance of entrepreneurial failureperception proxyGlobal Entrepreneurship Monitor (APS key indicators, fear of failure rate) | no data% not deterred | no data | no data |
| direct capability measureWorld Bank (IC.BRE.BI.P3) | 58.8score 0-100 | 2025. The rail runs from 1960 to 2026. |
No dataset exists for 3 rows, each a gap: Venture deals, Firms through regulatory sandboxes (1 case below), University spinouts.
This project retired one row: Business share of R&D.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2020PakistanSECP Regulatory Sandbox, four cohorts and an open windowstill operating
SECP Regulatory Sandbox, four cohorts and an open window
Pakistan's Securities and Exchange Commission approved 31 business models for testing in its Regulatory Sandbox across four annual cohorts from 2020 to 2023, out of 125 fintech applicants, with intake rising from six selected in the first cohort to 11 in the fourth.
31 business models, business models approved for testing in the secp regulatory sandbox, four cohorts, cumulative, 2024-06-30. 11 applicants, applicants selected in cohort iv, 2023. Securities and Exchange Commission of Pakistan, Annual Report 2024 (year ended 30 June 2024), section 'Promoting fintech and encouraging innovation', Regulatory Sandbox, retrieved 2026-10-02.
How it worked: The securities regulator issued sandbox guidelines under the Companies Act and ran annual cohorts in which fintech, insurtech and capital-market applicants were screened and the selected ones tested for six to nine months under agreed limits, then switched to year-round applications.
Limits: The regulator reports on its own sandbox. The figures are in a PDF on PDF page 82 (printed page 81), with a cohort chart giving applicants and selections per year (33 and 6, 38 and 6, 28 and 8, 26 and 11); the live secp.gov.pk site returns a Cloudflare challenge to scripts, so the report was read from a Wayback Machine copy of the SECP download link. 'Approved for testing' counts admissions, not completions: the report does not say how many business models finished testing or went to market. The cohort figures sum to 31, matching the stated total. After 2023 the SECP moved to an always-open format, and the same page says it had then received three applications with one testing, a much smaller intake than cohort IV, but over a shorter and unstated period, so it is not read as a decline. The State Bank of Pakistan runs a separate sandbox whose admissions are not counted here, so the figure understates the country total the construct asks for.
Panel median18.0+2.8 against the indicators
Round 2. How this layer works
- 15.0 institutionalist@claude-opus-5-5, self-confidence 0.50
Move from 12 to 15. C is right that insolvency at 59.7, the SBP sandbox and Raast are formal institutions I underweighted; B's freelancer workforce is individual effort and does not lift it further.
- 22.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Held at 22: panelist A's 12 treats reliance on informal networks as a minus, but a large online freelance workforce and 1.49 million repositories are distributed trial that formal filings do not count.
- 18.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Moved down 2 to 18: B's freelancer base and 1.49M repositories are real, but A notes firm trial depends on informal networks; SBP sandbox cohorts are unquantified.
Adaptability
How effectively can the system respond when circumstances change?
69.40.62 usable4 of 6
Adaptability
How effectively can the system respond when circumstances change?
Recency 1.00About AdaptabilityPakistan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+8.4 over 10 years (2016 to 2026), band +8.4 to +8.4. Median change: all countries -0.8, Income quartile 1 of 4 in 2000, lowest -0.2.
-10.7 over 20 years (2006 to 2026), band -15.4 to -5.5. Median change: all countries -1, Income quartile 1 of 4 in 2000, lowest +0.9.
The model fills at least one of the 4 indicators in 10 of 27 years, at most 2, last in 2009. The replay starts in 2000, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+8.5 over 10 years, from 60.9 in 2016 to 69.4 on 4 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (SL.UEM.TOTL.ZS) | 5.4% of labour force | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeILOSTAT (DF_UNE_TUNE_SEX_AGE_DUR_NB) | 25% of unemployed | 2025. The rail runs from 1960 to 2026. | |
| direct capability measureUNCTAD (US.ConcentDiversIndices) | 0.2index 0-1, lower = more diversified | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeHarvard Growth Lab (hs92_country_product_year_4.csv (doi:10.7910/DVN/T4CHWJ)) | 3.7% of products not exported competitively at the start | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Disaster preparedness and recovery (1 case below), Institutional responsiveness (1 case below).
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Labour force participationWorld Bank (SL.TLF.ACTI.ZS), 2025
54.7 % aged 15+, rank 117 of 135. Share of the working-age population in the labour force.
A condition, not scored: how much of the population is in the labor force at all is what a country has to reallocate, a level set by norms, schooling and age, not a record of it reallocating. Participation norms confound it, especially for India. Adaptability reads reallocation through long-term unemployment and export diversification instead.
Fixed broadband subscriptionsWorld Bank (IT.NET.BBND.P2), 2024
1.5 per 100 people, rank 104 of 135. Fixed broadband subscriptions per 100 people.
A condition, not scored: installed infrastructure is what a country has to change with, not a record of it changing. Penalizes mobile-first countries such as India and South Africa.
Electricity transmission lossesWorld Bank (EG.ELC.LOSS.ZS), 2024
15.2 % of output, rank 89 of 122. Power lost in transmission and distribution, including unbilled use.
A condition, not scored: the state of the grid, and whether its operator can bill what it delivers, is infrastructure a country has to change with, not a record of it changing. Read it beside broadband, the other installed network beside Adaptability.
Informal employmentILOSTAT (DF_SDG_0831_SEX_ECO_RT), 2025
88.7 % of employment, rank 86 of 111. Informal employment as a share of total employment, SDG indicator 8.3.1.
A condition, not scored: how much work carries no contract, registration or social protection describes the labor market a country reallocates through, not it reallocating. Read it beside the unemployment rate: where most work is informal, a person who loses a job takes any work within weeks, so a low rate is not a fluid market. Its direction for Adaptability cannot be defended, since informal work is both the slack that absorbs a shock and the precarity that keeps a worker from moving up, so the rank orders values and is not a verdict. Comparability is weak: the European values come from an income survey (EU-SILC) with a proxy definition, and the rest from labor force or household surveys processed by the ILO. ILOSTAT has no value for the United States, Canada, Australia, Japan, Singapore, Israel, Malaysia, China, the Philippines or Cuba, and some values are old (Haiti and Nicaragua 2012).
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2020PakistanEhsaas Emergency Cashdelivered and closed
Pakistan's government launched Ehsaas Emergency Cash in early April 2020 on BISP's existing payment and registry systems and had paid US$464 million to 6.4 million beneficiaries by 30 April 2020, reaching 15 million beneficiaries in all.
6.4 million beneficiaries, beneficiaries paid emergency cash by 30 april 2020, within about four weeks of launch, 2020-04-30. 15 million beneficiaries, beneficiaries given temporary income support through ehsaas in 2020, 2020. World Bank, COVID-19 G2Px country brief: Pakistan, retrieved 2026-10-02.
How it worked: The federal government raised the eligibility cutoff on an existing proxy-means-test registry, added an SMS application channel, and pushed one-off payments through BISP's contracted payment providers, so a new caseload was paid without building a new delivery system.
Limits: Both figures are government-reported disbursement counts passed through World Bank documents, not independent verification that the money reached eligible families; the brief does not report inclusion or exclusion errors. The two World Bank documents disagree on the launch month (early April in the brief, March in the PAD) and do not reconcile the 15 million with the 12 million originally targeted. The transfer was one-off and small, about US$71 per family, so it shows speed of reconfiguration, not depth of protection. The speed rested on assets built over a decade (the BISP payment network and the national socio-economic registry), so the record evidences a programme being changed fast, which is the construct, but credits the 2020 government with infrastructure its predecessors built. The 'four weeks' is our reading of the brief's dates, not a published duration.
2006PakistanRural housing reconstruction after the 2005 Kashmir earthquakedelivered and closed
Rural housing reconstruction after the 2005 Kashmir earthquake
Pakistan's Earthquake Reconstruction and Rehabilitation Authority inspected all 463,243 houses due for reconstruction in Azad Jammu and Kashmir and Khyber Pakhtunkhwa after the October 2005 earthquake and certified 438,789 of them, 95 percent, as compliant with seismic-resistant standards by the time the World Bank credit closed in May 2011.
438,789 houses, reconstructed houses certified compliant with erra's seismic standards, 2011-05-31. 463,243 houses, houses to be reconstructed (ajk and kp), 2011-05-31. World Bank, Implementation Completion and Results Report, Pakistan Earthquake Emergency Recovery Credit Project (P099110), 31 December 2011, retrieved 2026-10-02.
How it worked: A federal authority with army support paid owner-driven housing grants in four tranches, each conditional on an inspection against a seismic-resistant design, and trained masons to build to it.
Limits: The table is in Annex 2 (printed page 23) and was read from the plain-text version. The same annex's text gives a different base, 353,931 houses to be reconstructed of which 337,177 were completed, and says 3.8 percent of eligible houses saw no work at all; the record uses the table, and the two figures cannot be reconciled from the document. The data are ERRA's own, compiled from army monitoring teams and partner organisations. Compliance at certification is not occupancy or durability. The programme cost about US$1.5 billion, of which the World Bank credit financed part, and the credit was later enlarged to cover the 2010 floods, which are outside this figure. It is a 2006 to 2011 delivery and says nothing about Pakistan's response to the 2022 floods.
Panel median46.0-23.4 against the indicators
Round 2. How this layer works
- 42.0 institutionalist@claude-opus-5-5, self-confidence 0.40
Moved from 40 to 42: panelist C's point that textile exporters shift markets is credible firm-level adaptation, but repeated IMF rescues and slow flood recovery show institutions that do not adjust before a crisis forces them.
- 48.0 bottom_up@claude-opus-5-5, self-confidence 0.40
Revised down slightly from 50. Repeated balance-of-payments crises and slow recovery after the 2022 floods show weak institutional response, as A and C argue, but household resilience and exporters shifting markets keep me near mid-frame.
- 46.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.35
Held. A at 40 and B at 50 bracket me; repeated balance-of-payments crises and slow flood recovery argue against 69.4, but textile exporters shifting markets and household resilience keep me from the bottom.
Building
How capable is the country of turning plans and knowledge into functioning systems?
30.70.63 usable4 of 6
Building
How capable is the country of turning plans and knowledge into functioning systems?
Recency 1.00About BuildingPakistan beside its income peers
Reconstructed history, 2000 to 2026, provisional
- Reconstruction on today's 4 indicators, band 10th to 90th percentile
- Replay on the values that existed each year
- Darker means more indicators modelled
+1.4 over 10 years (2016 to 2026), band -3 to +5.3, which includes no change. Median change: all countries -0.3, Income quartile 1 of 4 in 2000, lowest -1.1.
+1 over 20 years (2006 to 2026), band -3.2 to +4.9, which includes no change. Median change: all countries -0.5, Income quartile 1 of 4 in 2000, lowest -0.5.
The model fills at least one of the 4 indicators in 25 of 27 years, at most 3, last in 2024. The replay starts in 2007, the first year with two indicators in force. This never enters a score. How it is built, every country and cohort.
+1.9 over 10 years, from 15.0 in 2016 to 16.9 on 3 indicators seen in both years. Trends use fewer indicators than the current score and use today's frame.
| Indicator | Value | Year | Normalized |
|---|---|---|---|
| downstream outcomeWorld Bank (NV.IND.MANF.ZS) | 13% of GDP | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (TX.VAL.TECH.MF.ZS) | 2.4% of manufactured exports | 2024. The rail runs from 1960 to 2026. | |
| direct capability measureWorld Bank (IC.BRE.US.P3) | 78score 0-100 | 2025. The rail runs from 1960 to 2026. | |
| downstream outcomeWorld Bank (EF.EFM.UNIV.XD) | 0.33index | 2024. The rail runs from 1960 to 2026. |
No dataset exists for 2 rows, each a gap: Large project delivery (2 cases below), Firm scale-up rate.
This project retired 2 rows: Logistics infrastructure quality, Electricity connection speed.
Conditions, not scored
What the country has to work with on this capability. The values are shown as the source published them and are not part of the score, the confidence or the trend. The rank counts the countries with a value, best first.
Output per workerWorld Bank (SL.GDP.PCAP.EM.KD), 2025
17,800 constant 2021 PPP $, rank 101 of 133. GDP per person employed, constant purchasing power parity.
A condition, not scored: output per worker is income per worker, the wealth the benchmark tests capability against, so it is published beside Building as context.
Evidence for missing indicators
Cases the indicators cannot see. They do not affect the score or confidence, because one case is not comparable across countries.
2008PakistanNeelum-Jhelum Hydropower Project, and its shutdownoperating below its peak
Neelum-Jhelum Hydropower Project, and its shutdown
WAPDA's subsidiary NJHPC's 969 MW Neelum-Jhelum project, under construction from January 2008 and substantially completed in 2018, had cost Rs 423,446 million by June 2023 against Rs 84,502 million in the 2002 revised PC-I, nine years late; it peaked at 4,940.67 GWh in 2020 and was forced into complete shutdown by a head race tunnel failure on 2 April 2024 (the auditor counts 1,797.704 million units lost in FY2023-24), after an earlier tail race tunnel collapse in July 2022.
338,944 Rs million, cost overrun against the 1st revised pc-i (2002), actual expenditure to june 2023, 2023-06. 4,940.67 GWh, peak annual generation, before the 2022 and 2024 tunnel collapses, 2020. Auditor-General of Pakistan, Performance Audit Report on Neelum Jhelum Hydropower Project, audit year 2022-23, retrieved 2026-10-02.
How it worked: WAPDA started tunnelling in difficult Himalayan geology before design issues were settled, and the planning ministry re-approved the cost four times rather than stopping or re-scoping the project, so the bill rose with each revision and the tunnels later failed where weak rock had been flagged.
Limits: This is a delivery that ran backwards twice: badly over cost and schedule while it was being built, then lost its output after it was finished. The overrun is measured against the 2002 revision, which is the auditor's choice of baseline; against the 1989 original (Rs 15,012 million) it would be far larger, and against the 2018 fourth revision (Rs 506,808 million) the project came in under. Part of the rupee overrun is exchange-rate depreciation and interest during construction, which a cost-performance reading should not charge entirely to delivery. The plant never reached its design output of 5,150 GWh even at its 2020 peak, partly because India's upstream Kishanganga project and a higher environmental flow reduced water, which management cites and the auditor rejects. The overrun percentage (about 400 percent) is our computation from two published figures, and the Rs 338,944 million is the auditor's own subtraction. The 2024 shutdown is documented in a second AGP report; the expected restart date circulating in the press is not from this source and is not claimed here. Management disputes several findings and never convened the Departmental Accounts Committee, so the report records the auditor's view without a settled reply.
2012PakistanTarbela Fourth Extension Hydropower Projectdelivered and closed
Tarbela Fourth Extension Hydropower Project
WAPDA built a 1,410 MW powerhouse on Tarbela Dam's fourth tunnel, effective April 2012 and commissioned in 2018; the World Bank recorded it as completed on time and below its estimated cost, with a capital cost expected at US$749 million.
749 US$ million, expected capital cost of t4hp, physical works and supervision excluding interest during construction, 2019-09. 21,000 GWh, electricity generated since commissioning, 2023-09. World Bank, Tarbela Fourth Extension Hydropower Project (P115893) restructuring paper RES40334, retrieved 2026-10-02.
How it worked: WAPDA added generating capacity to an existing dam's spare tunnel under World Bank procurement and supervision, so the geological and resettlement risks that sink greenfield hydropower were mostly absent.
Limits: The lender is grading its own project: 'on time and in less than estimated cost' is the World Bank's sentence in a restructuring paper, not an audit, and the paper gives no baseline figure, so the size of the saving cannot be checked from this source. The cost is an expectation in 2019, before every work was closed; the intakes for tunnels 3 and 4 were still being finished, and the loan closing date moved from 2018 to 2024 because the same project was extended to build T5HP. That fifth extension, financed under the same project number, is rated Moderately Satisfactory in the 2023 ISR and was due for completion in 2025; T4's record is not the record of the whole project. The World Bank financed about 90 percent of the civil and electro-mechanical works, so the case shows WAPDA delivering under a lender's procurement and supervision regime, which is a precondition rather than proof of domestic capability. Building a powerhouse on an existing dam and tunnel is much less risky than a greenfield dam, which is part of why it came in on budget.
Panel median32.0+1.3 against the indicators
Round 2. How this layer works
- 31.0 institutionalist@claude-opus-5-5, self-confidence 0.45
Revised up from 28 to 31: panelist C's list of the motorway network, Tarbela extensions and the nuclear programme is delivery by durable bodies such as WAPDA and the NHA that I underweighted, but circular debt and load-shedding show systems that do not run once built.
- 32.0 bottom_up@claude-opus-5-5, self-confidence 0.45
Revised up slightly from 30. Panelist C's list of the motorway network, Raast and the Tarbela and Neelum-Jhelum works is delivery I underweighted; load-shedding, circular debt and CPEC overruns keep it low.
- 33.0 wealth_sceptic@claude-sonnet-5-5, self-confidence 0.40
Revised down two points. The motorways, Raast and Neelum-Jhelum are real delivery, but circular debt, load-shedding and CPEC overruns pull against it; A at 28 and B at 30 are not wrong.