How effectively does the country acquire, distribute, and update knowledge?
Capability agenda
Tajikistan
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Tajikistan stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 22.9 | 0.46 | +11.9 over 10 years using 2 indicators |
| Agency | 59.4 | 0.40 | no trend |
| Coordination | 51.0 | 0.45 | +10.9 over 10 years using 2 indicators |
| Trust | 50.2 | 0.34 | +24.3 over 10 years using 2 indicators |
| Learning | 22.2 | 0.55 | -9.7 over 10 years using 2 indicators |
| Experimentation | 8.1 | 0.34 | no trend |
| Adaptability | 56.0 | 0.46 | +6.2 over 10 years using 3 indicators |
| Building | 34.2 | 0.62 | -8.3 over 10 years using 3 indicators |
| Shared Purpose | 46.3 | 0.32 | -2.2 over 20 years using 2 indicators |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Tajikistanโs comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 โ 2026: 68.7 to 71.8 (+3.1) over 30 years using 2 indicators
Agenda items on this timeline
- 1998Emergency Flood Assistance Project after the 1998 and 1999 floods
- 2016Bank bailout of 2016, and the liquidation of both banks
Historical values use todayโs frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How capable is the country of identifying and preparing for emerging change?
+35
How capable is the country of turning plans and knowledge into functioning systems?
+203
What to measure first
The evidence is too thin to manage these dimensions confidently.
Shared Purpose
0.32To what extent can people imagine themselves as participants in a common project?
Trust
0.34How much cooperation is possible beyond immediate personal networks?
Experimentation
0.34How easily can new approaches be attempted, tested, abandoned, and improved?
Agency
0.40How able are individuals and organizations to turn an intention into action?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Adaptability | 56.0 | 0.46 |
| Coordination | 51.0 | 0.45 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of oneโs life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Tajikistan
What the indicators miss about Tajikistan
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- Emergency Flood Assistance Project after the 1998 and 1999 floods (Adaptability)
After floods in 1998 caused damage estimated at US$40 million, about 2 percent of GDP, Tajikistan's Republican Project Coordination Unit for Liquidation of Consequences of Natural Disasters had repaired about 210 km of roads and fully completed seven bridges and structures by the credit's closing on 31 December 2001, with about 80 km of road repairs and three bridges unfinished, and the World Bank rated the outcome unsatisfactory.
- Rogun hydropower plant (Building)
The Government of Tajikistan resumed construction of the Soviet-era Rogun hydropower plant in 2007 from the state budget, signed the main dam contract in 2016 and commissioned two temporary units (400 MW) in 2018 and 2019. It invested about US$3.3 billion in 2007 to 2022, and in November 2024 the World Bank put the cost to complete the plant at US$6.29 billion, with construction completion moved to 2033 and full reservoir impoundment not before 2039, 63 years after construction first began in 1976.
- Bank bailout of 2016, and the liquidation of both banks (Adaptability)
The Government of Tajikistan injected TJS 3.3 billion of public money into Agroinvestbank and Tojiksodirotbank in 2016, after both had been in difficulty since 2015, and in May 2021 the National Bank of Tajikistan revoked both licences and the Economic Court of Dushanbe ordered their compulsory liquidation.
- Adult learning centres of the Agency of Labour and Employment (Learning)
Tajikistan's Agency of Labour and Employment trained 55,361 people in 2024 in its network of adult learning centres, built up since the 2008 government decree that created the Adult Education Centre of Tajikistan, and 20,100 of them were sent and paid for by the agency.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.