How capable is the country of turning plans and knowledge into functioning systems?
Capability agenda
Argentina
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Argentina stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 41.2 | 0.46 | +13.5 over 10 years using 2 indicators |
| Agency | 22.5 | 0.30 | no trend |
| Coordination | 55.6 | 0.25 | -1.7 over 10 years using 2 indicators |
| Trust | 73.8 | 0.15 | no trend |
| Learning | 43.4 | 0.42 | no trend |
| Experimentation | 23.6 | 0.54 | +3 over 10 years using 3 indicators |
| Adaptability | 56.4 | 0.62 | -4.9 over 10 years using 4 indicators |
| Building | 19.7 | 0.48 | -4.6 over 10 years using 3 indicators |
| Shared Purpose | 37.2 | 0.32 | -2.5 over 10 years using 2 indicators |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Argentinaโs comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 โ 2026: 53.1 to 69.8 (+16.7) over 30 years using 2 indicators
Agenda items on this timeline
- 1991The Convertibility Plan, and its collapse
- 2009Asignaciรณn Universal por Hijo child benefit
- 2010SUBE national electronic fare and subsidy rail
- 2011SINARAME national weather radar network
Historical values use todayโs frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How easily can new approaches be attempted, tested, abandoned, and improved?
+53
How capable is the country of identifying and preparing for emerging change?
+35
What to measure first
The evidence is too thin to manage these dimensions confidently.
Trust
0.15How much cooperation is possible beyond immediate personal networks?
Coordination
0.25How effectively can independent actors organize around shared objectives?
Agency
0.30How able are individuals and organizations to turn an intention into action?
Shared Purpose
0.32To what extent can people imagine themselves as participants in a common project?
Learning
0.42How effectively does the country acquire, distribute, and update knowledge?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Adaptability | 56.4 | 0.62 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of oneโs life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What Argentina built that no indicator counts
What Argentina built that no indicator counts
These are documented institutional changes in Argentina that the framework records as evidence. They appear beside the score and do not change it or its confidence.
- The Convertibility Plan, and its collapse (Adaptability)
Argentina ended hyperinflation by fixing the peso to the dollar by law in April 1991, taking annual inflation from 4,923 percent in 1989 to 3.9 percent in 1994, and the regime held until it collapsed in the 2001-2002 crisis.
- Asignaciรณn Universal por Hijo child benefit (Adaptability)
Argentina's Asignaciรณn Universal por Hijo (AUH) reached 4,083,987 children and adolescents in June 2024, with 2,324,716 adult titulars receiving the benefit through the national social-security administration and its health, vaccination and education conditions.
- SUBE national electronic fare and subsidy rail (Adaptability)
Argentina's SUBE system distributed more than five million cards and recorded about 6.7 million new cards in 2024, while expanding the network to more than 30,000 recharge points and making SUBE Digital available in every locality.
- Vaca Muerta unconventional energy build-out (Coordination)
Argentina's energy ministry reported that Vaca Muerta supplied 54.9% of national oil output and 50.1% of national gas output in December 2024, within a year in which national oil production reached its highest level since 2003 and gas its highest since 2006.
- ARSAT-3 satellite programme suspended before launch (Building)
Argentina's government review found that the ARSAT-3 construction programme, approved in 2015 with a 2019 launch plan, was suspended in 2016โ17; the unbuilt satellite forced two later orbital-protection operations and left the original nationwide broadband objective undelivered.
- Atucha II nuclear plant, and its 33-year build (Building)
Argentina's state nuclear operator connected Atucha II to the grid in June 2014, almost 33 years after construction began in July 1981, and began commercial operation in May 2016, after a build halted in 1994 and restarted in 2006.
- SINARAME national weather radar network (Adaptability)
The national water resources secretariat contracted the state technology firm INVAP in 2011 to build Argentine weather radars, and by December 2024 the network operated 14 radars feeding an operations centre at the national weather service, after 11 had covered 40 percent of the territory together with three INTA radars in 2023.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.