How easily can new approaches be attempted, tested, abandoned, and improved?
Capability agenda
Serbia
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Serbia stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 52.5 | 0.46 | +12.2 over 10 years using 2 indicators |
| Agency | 59.2 | 0.49 | no trend |
| Coordination | 73.6 | 0.47 | -2.2 over 10 years using 2 indicators |
| Trust | 63.9 | 0.34 | +5 over 10 years using 2 indicators |
| Learning | 40.8 | 0.55 | -7.8 over 10 years using 2 indicators |
| Experimentation | 16.3 | 0.47 | -1.7 over 10 years using 3 indicators |
| Adaptability | 69.6 | 0.62 | +20.7 over 10 years using 3 indicators |
| Building | 36.3 | 0.48 | -6.8 over 10 years using 2 indicators |
| Shared Purpose | 69.9 | 0.28 | +10.4 over 10 years using 2 indicators |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Serbia’s comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Learning 2006 → 2026: 37.6 to 28.4 (-9.2) over 20 years using 2 indicators
Agenda items on this timeline
- 2009National Employment Service labour market training, and its 2025 non-delivery
Historical values use today’s frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How capable is the country of turning plans and knowledge into functioning systems?
+203
How effectively does the country acquire, distribute, and update knowledge?
+104
What to measure first
The evidence is too thin to manage these dimensions confidently.
Shared Purpose
0.28To what extent can people imagine themselves as participants in a common project?
Trust
0.34How much cooperation is possible beyond immediate personal networks?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Coordination | 73.6 | 0.47 |
| Adaptability | 69.6 | 0.62 |
| Agency | 59.2 | 0.49 |
| Anticipation | 52.5 | 0.46 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of one’s life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Serbia
What the indicators miss about Serbia
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- Innovation Fund Collaborative Grant Scheme (Program saradnje nauke i privrede) (Coordination)
Serbia's Innovation Fund financed 79 joint research and development projects of private small and medium firms with public research organisations across eight calls of its Collaborative Grant Scheme, the eighth call, decided in 2024, funding eight.
- National Employment Service labour market training, and its 2025 non-delivery (Learning)
Serbia's National Employment Service put 1,613 unemployed people into labour market training (obuke za trziste rada) in 2024, but in 2025 it delivered none of the 1,100 places planned for that year for lack of accredited providers, and only 626 people trained under contracts carried over from the 2023 and 2024 plans.
- Three minimum wages paid to private employers in the 2020 state of emergency (Adaptability)
After the state of emergency of 15 March 2020, Serbia's Government presented a EUR 5.1 billion economic package on 31 March that included paying micro, small and medium firms one minimum wage per employee for three months if they cut staff by no more than 10 percent, and on 7 May 2020 the Ministry of Finance paid about RSD 32 billion as the first minimum wage for 1.055 million employees of 232,000 businesses.
- Moja prva plata, state-paid first-job training placed with employers, and its 2025 halt (Coordination)
Serbia's Government paid a monthly allowance to young people without work experience while employers trained them for nine months under the Moja prva plata programme run by the National Employment Service, which placed 9,237 young people with 5,471 employers in the 2021 cycle and 7,214 with 4,520 employers from the 2023 call in January 2024, but ran no call for 2024 and started no activity under the measure in 2025 against a plan of 10,000 places.
- Corridor X motorway sections (E-75 and E-80) (Building)
Serbia's state road company Koridori Srbije built 45.5 km of Corridor X motorway on the E-75 towards North Macedonia and the E-80 Dimitrovgrad bypass towards Bulgaria under a loan approved in July 2009, finishing at a total project cost of EUR316.2 million against an appraisal estimate of EUR318.2 million, but taking about 10 years from approval to full completion against a planned 6.5, with the loan closing in September 2019 instead of December 2015.
- Recovery from the May 2014 floods: power supply and flood defences (Adaptability)
After the May 2014 floods evacuated about 32,000 people and flooded the Kolubara open-pit mines that fuel 40 percent of Serbia's generating capacity, the state utility EPS dewatered the Tamnava West mine by the first quarter of 2015 and kept supply at pre-flood levels with no recorded shortages, and the Directorate of Water Management rebuilt or upgraded 71 km of flood protection that by October 2019 covered 24,944 households against a target of 9,000.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.