How easily can new approaches be attempted, tested, abandoned, and improved?
Capability agenda
Costa Rica
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Costa Rica stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 49.6 | 0.46 | +12.2 over 10 years using 2 indicators |
| Agency | 45.7 | 0.49 | no trend |
| Coordination | 75.0 | 0.44 | -2.9 over 10 years using 2 indicators |
| Trust | 71.1 | 0.33 | no trend |
| Learning | 43.6 | 0.54 | 0 over 20 years using 2 indicators |
| Experimentation | 26.7 | 0.64 | no trend |
| Adaptability | 65.2 | 0.62 | +0.5 over 10 years using 4 indicators |
| Building | 36.5 | 0.63 | +4.7 over 10 years using 3 indicators |
| Shared Purpose | 37.3 | 0.32 | +4.4 over 10 years using 2 indicators |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Costa Rica’s comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 → 2026: 72.1 to 70.1 (-2) over 30 years using 2 indicators
Agenda items on this timeline
- 2005Certified digital signature across public services
- 2010REDCUDI childcare network and SINIRUBE referrals
- 2017Hurricane Otto priority reconstruction works
Historical values use today’s frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How capable is the country of turning plans and knowledge into functioning systems?
+202
How effectively does the country acquire, distribute, and update knowledge?
+104
How able are individuals and organizations to turn an intention into action?
How capable is the country of identifying and preparing for emerging change?
+35
What to measure first
The evidence is too thin to manage these dimensions confidently.
Shared Purpose
0.32To what extent can people imagine themselves as participants in a common project?
Trust
0.33How much cooperation is possible beyond immediate personal networks?
Coordination
0.44How effectively can independent actors organize around shared objectives?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Adaptability | 65.2 | 0.62 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of one’s life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What Costa Rica built that no indicator counts
What Costa Rica built that no indicator counts
These are documented institutional changes in Costa Rica that the framework records as evidence. They appear beside the score and do not change it or its confidence.
- FONAFIFO Payment for Environmental Services (Coordination)
Costa Rica's FONAFIFO Payment for Environmental Services programme paid contracts covering 208,089 hectares in 2024, disbursing ₡9.234 billion while using public, donor and market-linked finance to keep private land in forest uses.
- ICE and a mostly renewable national electricity system (Building)
Costa Rica's integrated electricity system generated 89.4% of its electricity from renewable sources in 2024, while ICE reported electrical coverage reaching 98.7% of households despite one of the country's driest years on record.
- Certified digital signature across public services (Adaptability)
Costa Rica's MICITT reported in October 2023 that more than 60 public institutions used certified digital signatures across more than 100 citizen services, with almost 75,000 certificates issued during that year.
- REDCUDI childcare network and SINIRUBE referrals (Adaptability)
Costa Rica's IMAS reported that its national Childcare and Early Development benefit reached 25,704 children in 2024 with an investment of ₡13.2 billion, while interinstitutional referrals used SINIRUBE to match eligible families to available places.
- CCSS universal health-insurance reach (Building)
Costa Rica's Caja Costarricense de Seguro Social reported health-insurance coverage of 92.92% of the national population in 2024, using household-survey and administrative records to include contributors, dependents, pensioners and state-covered households.
- INA national vocational training, and its contraction (Learning)
Costa Rica's Instituto Nacional de Aprendizaje (INA) recorded 204,773 training enrolments in 2024, down from 313,276 in 2015 at the high point of its 2010 to 2019 plateau, a fall of about 35 percent that the 2020 to 2024 recovery did not reverse.
- Hurricane Otto priority reconstruction works (Adaptability)
In the 17 months to September 2018, the Instituto Costarricense de Electricidad, under an agreement with the national emergency commission (CNE), completed 64 of the 65 priority reconstruction works after Hurricane Otto of November 2016, rebuilding 20 bridges and 211 km of rural roads for ₡18,500 million.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.