How capable is the country of turning plans and knowledge into functioning systems?
Capability agenda
Nigeria
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Nigeria stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 28.2 | 0.46 | +11.3 over 10 years using 2 indicators |
| Agency | 37.4 | 0.27 | no trend |
| Coordination | 39.3 | 0.29 | -34.4 over 10 years using 2 indicators |
| Trust | 47.3 | 0.21 | +0.6 over 10 years using 2 indicators |
| Learning | 26.2 | 0.55 | +4.5 over 10 years using 2 indicators |
| Experimentation | 3.1 | 0.27 | no trend |
| Adaptability | 46.4 | 0.62 | +8 over 10 years using 3 indicators |
| Building | 9.1 | 0.48 | -0.7 over 10 years using 3 indicators |
| Shared Purpose | 43.6 | 0.28 | +6.7 over 10 years using 2 indicators |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Nigeriaโs comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 โ 2026: 41.7 to 61.8 (+20.1) over 30 years using 2 indicators; 1 touched the frame edge
Agenda items on this timeline
- 2014Nigeria's 2014 Ebola containment
- 2017National Social Safety Nets Project and the COVID-19 Rapid Response Register
- 2021eNaira, a national rollout with an adoption gap
Historical values use todayโs frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How effectively does the country acquire, distribute, and update knowledge?
+104
How capable is the country of identifying and preparing for emerging change?
+35
How effectively can the system respond when circumstances change?
+266
What to measure first
The evidence is too thin to manage these dimensions confidently.
Trust
0.21How much cooperation is possible beyond immediate personal networks?
Agency
0.27How able are individuals and organizations to turn an intention into action?
Experimentation
0.27How easily can new approaches be attempted, tested, abandoned, and improved?
Shared Purpose
0.28To what extent can people imagine themselves as participants in a common project?
Coordination
0.29How effectively can independent actors organize around shared objectives?
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of oneโs life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Nigeria
What the indicators miss about Nigeria
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- eNaira, a national rollout with an adoption gap (Adaptability)
By June 2024, the Central Bank of Nigeria reported 28.46 million eNaira customers onboarded but only 197,041 active wallets, showing that the national CBDC rollout had not converted broad registration into sustained use.
- Nigeria's 2014 Ebola containment (Adaptability)
After an infected traveller brought Ebola virus into Lagos on 20 July 2014, Nigeria's government set up an emergency operations centre with WHO country office support, traced contacts in Lagos and Port Harcourt, and held the outbreak to 19 cases and 7 deaths before WHO declared the country free of transmission on 20 October 2014.
- SEC Nigeria Regulatory Incubation Program (Experimentation)
Nigeria's Securities and Exchange Commission opened a one-year Regulatory Incubation sandbox in September 2023 and had admitted seven firms across cohorts 001/23 and 002/24 to test capital-market products, then cleared seven more entities into its Accelerated Regulatory Incubation Programme in July 2026.
- National Social Safety Nets Project and the COVID-19 Rapid Response Register (Adaptability)
Nigeria's National Social Safety Nets Coordinating Office built a National Social Register of 15,673,296 households and, during COVID-19, a new Rapid Response Register that captured 2.7 million households, while the project paid targeted cash transfers to 9,666,420 direct beneficiaries in 37 states between 2017 and its close in December 2022.
- Abuja-Kaduna-Zaria-Kano dual carriageway, and the termination of its 2017 contract (Building)
Nigeria's Federal Ministry of Works awarded the rehabilitation of the Abuja-Kaduna-Zaria-Kano dual carriageway to Julius Berger on 20 December 2017 at an initial N155.7 billion with a 36-month completion period; after repeated variations and augmentations, the Federal Executive Council cut the contract sum under Section I from N797.3 billion to N740.8 billion on 23 September 2024, and the ministry issued a 14-day termination notice on 4 November 2024 after the contractor rejected the reviewed sum and stopped work.
- Adult literacy education under the National Commission for Mass Literacy, Adult and Non-Formal Education (Learning)
Enrolment in adult literacy education in Nigeria, reported by the National Commission for Mass Literacy, Adult and Non-Formal Education, rose from 322,288 in 2020 to 2,152,146 in 2021 and 2,915,453 in 2022, according to the National Bureau of Statistics.
- NIBSS Instant Payment (NIP) (Coordination)
NIBSS Instant Payment, run since 2011 by the interbank settlement company jointly owned by the Central Bank of Nigeria and the banks, grew from 2 billion transactions in 2020 to 11 billion in 2024, with values rising from US$457 billion to US$1.1 trillion, and had 57.7 million unique users.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.