Skip to content
NCBNational Capability Benchmark
Navigate with โ†‘ โ†“Enter to openEsc to close

Challenge the benchmark

Choose a score and give the benchmark a specific reason to reconsider it.

When you submit, the form attaches the current score and confidence for the country and capability you chose.

Submissions are public and start as awaiting review. A maintainer can add a response and signature after review.

Capability agenda

Sudan

Generated 2026-10-03

The frame includes 125 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.

Open the profile: indicators, values, years and sources

Where Sudan stands

DimensionScoreConfidenceTrend
Anticipation3.20.46+3.1 over 10 years using 2 indicators, with 1 at the frame edge
Agency53.60.22no trend
Coordination34.00.39no trend
Trust47.30.20no trend
Learning14.50.36no trend
Experimentation1.00.31no trend
Adaptability35.70.57no trend
Building27.20.33no trend
Shared Purpose45.00.08no trend

Score

  • weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
  • below middleIn the lower half of the frame.25 to 50
  • above middleIn the upper half of the frame.50 to 75
  • strongNear the top of the frame on this dimension.75 and above

Confidence

  • very thin0.00 to 0.25

    The score rests on one or two indicators. Do not quote it on its own.

  • thin0.25 to 0.45

    A minority of indicators, or evidence old enough to have moved. Read with care.

  • usable0.45 to 0.65

    Enough evidence to compare countries, with known holes.

  • good0.65 and above

    Most indicators observed, recent, from official or intergovernmental sources.

Capability over time

Select a dimension to see how Sudanโ€™s comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.

Dimension

Capability position in the current frame0 to 100
025507510020162017201820192020202120222023202420252026

Anticipation 2016 โ†’ 2026: 0.1 to 3.2 (+3.1) over 10 years using 2 indicators; 1 touched the frame edge

Historical values use todayโ€™s frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.

What to raise

These are the lowest scores with usable evidence. Thin evidence appears below.

Anticipation

3.20.46

How capable is the country of identifying and preparing for emerging change?

Uses 2 observed indicators. +3.1 over 10 years using 2 indicators, with 1 at the frame edge.

Highest usable scores: Denmark 98.1, Norway 97.2, Switzerland 93.4.

Related deliveries in other countries: Embrapa, a fifty-year bet on tropical agriculture (Brazil); The Delta Programme and its fund (Netherlands); Lei de Informรกtica, a sectoral industrial policy (Brazil); CGEE, the strategic studies center (Brazil); Centre for Strategic Futures, foresight inside government (Singapore); Legally binding carbon budgets (United Kingdom); Fukushima decommissioning roadmap, a 30โ€“40-year risk-reduction horizon (Japan); National basic-research funding allocation (China); PLANAPP and REPLAN, a centre-of-government foresight network (Portugal); Labour Market Intelligence Programme and forward skills planning (South Africa); Government Report on the Future and the parliamentary Committee for the Future (Finland); Foresight Centre at the Riigikogu (Arenguseire Keskus) (Estonia); Office of Technology Assessment, defunded and closed in 1995 (United States); Rzฤ…dowe Centrum Studiรณw Strategicznych, liquidated in 2006 (Poland); Office of Technology Assessment at the German Bundestag (TAB) (Germany); National Assembly Futures Institute (South Korea); Federal Chancellery situation and environment analysis (Perspektivstab) (Switzerland); Senate foresight delegation (Dรฉlรฉgation sรฉnatoriale ร  la prospective) (France); Senate Commission on Future Challenges, Science, Technology and Innovation (Chile); Policy Horizons Canada, the federal foresight unit, and its 2024 disruption scan (Canada); Framtidskommissionen, the Prime Minister's time-limited future commission (Sweden); National Planning Commission foresight work for Malawi 2063 (Malawi); Bureau National de la Prospective et de la Veille Stratรฉgique and the national prospective studies (Cรดte d'Ivoire); Teknologiraadet, the Norwegian Board of Technology (Norway); Teknologiraadet, the Danish Board of Technology, abolished in 2012 (Denmark); Bureau federal du Plan (Belgium); Special Secretariat of Foresight (now of Long-term Planning) (Greece); STRATA foresight for the Lietuva 2050 state progress strategy (Lithuania); Institut Royal des Etudes Stratรฉgiques (IRES) (Morocco); Long-term Insights Briefings under the Public Service Act 2020 (New Zealand).

Missing indicators: Government foresight capacity, Long-horizon research commitments.

Adaptability

35.70.57

How effectively can the system respond when circumstances change?

Uses 4 observed indicators. no trend.

Highest usable scores: Poland 89.5, Vietnam 88.1, Thailand 87.6.

Related deliveries in other countries: Plano Real, the 1994 currency stabilisation (Brazil); Proalcool, the fuel substitution after the oil shock (Brazil); The Convertibility Plan, and its collapse (Argentina); Kurzarbeit in the 2008-2009 crisis (Germany); The 2001 stabilisation, and its unwinding (Turkey); Telebras, the telecom system that was dismantled (Brazil); Estonian Defence League, national defence rebuilt after independence (Estonia); Korea Internet and Security Agency, a consolidated digital authority (South Korea); Federal siren warning network, and its dismantling (Germany); Room for the River, flood safety delivered across the Rhine branches (Netherlands); Childcare benefits administration, and the recovery after institutional failure (Netherlands); National Police, one corps from twenty-five regional forces (Netherlands); NL-Alert, a tested multi-channel emergency warning system (Netherlands); DigiD Machtigen, delegated access to public services (Netherlands); DigiNotar, a certificate breach that forced a trust-chain reset (Netherlands); Programmatic Approach to Nitrogen, and the permitting reversal (Netherlands); 27F reconstruction, a nationwide recovery programme after the 2010 earthquake (Chile); Cรฉdula digital, an identity service upgraded for mobile use (Colombia); Victims' reparations, a long-running administrative response to conflict (Colombia); Fondo Adaptaciรณn, recovery and safer resettlement after La Niรฑa (Colombia); My Number Card, a national identity rail extended into services (Japan); Tลhoku reconstruction, a decade-long recovery programme (Japan); Juntos, a conditional-transfer system at national scale (Peru); Certified digital signature across public services (Costa Rica); REDCUDI childcare network and SINIRUBE referrals (Costa Rica); Dollarization as an emergency monetary redesign (Ecuador); 2016 earthquake national emergency coordination (Ecuador); 120 a los 65 social pension (Panama); Canal water-and-transit response to the 2023โ€“24 drought (Panama); Bono Juana Azurduy maternal and child health transfer (Bolivia); Renta Dignidad non-contributory old-age pension (Bolivia); Tekoporรฃ Mbarete family-support programme (Paraguay); SIFEN national electronic invoicing rollout (Paraguay); Asignaciรณn Universal por Hijo child benefit (Argentina); SUBE national electronic fare and subsidy rail (Argentina); PhilSys foundational national ID rollout (Philippines); Pantawid Pamilyang Pilipino Program (4Ps) (Philippines); Typhoon Yolanda shelter and recovery programme (Philippines); Jaminan Kesehatan Nasional, a near-universal health-insurance pool (Indonesia); InaRISK national disaster-risk information platform (Indonesia); VNeID national electronic identity (Vietnam); Vietnam Social Security health-insurance expansion (Vietnam); Typhoon Yagi emergency restoration (Vietnam); MySejahtera and the national COVID-19 immunisation programme (Malaysia); National flood-warning SMS system (Malaysia); Universal Coverage Scheme and the 30-baht health system (Thailand); National Digital ID framework (Thailand); T-Alert national cell-broadcast warning system (Thailand); Cl@ve shared digital identity (Spain); La Palma volcanic-eruption recovery and monitoring (Spain); mObywatel digital ID wallet (Poland); Rodzina 500+ and 800+ child-benefit delivery (Poland); Alert RCB national emergency SMS channel (Poland); BankID federated electronic identity (Sweden); 1177 national health portal and helpline (Sweden); VMA multi-channel public warning system (Sweden); MyGovID single sign-on for public services (Ireland); National COVID-19 vaccination delivery (Ireland); National Asset Management Agency crisis workout (Ireland); Met ร‰ireann national weather-warning service (Ireland); Salรกrio mรญnimo and its permanent revaluation rule (Brazil); eNaira, a national rollout with an adoption gap (Nigeria); Productive Safety Net Programme for drought resilience (Ethiopia); National 9-1-1 emergency-response system (Dominican Republic); Sistema Nacional de Emergencias 911 (Honduras); National COVID-19 vaccination campaign (Cuba); Bitcoin Law, and its 2025 rollback (El Salvador); Routine immunization coverage, and its erosion (Haiti); Chave Mรณvel Digital and Portugal's digital identity layer (Portugal); Empresa na Hora and the one-stop company registry (Portugal); Sistema de Gestรฃo Integrada de Fogos Rurais (Portugal); Simplex and LabX, a standing simplification-and-experimentation loop (Portugal); Programa Nacional de Vacinaรงรฃo and seasonal immunisation (Portugal); STAYAWAY COVID, a contact-tracing app suspended after the emergency (Portugal); CoWIN national COVID-19 vaccination platform (India); Gauteng e-tolls, and their cancellation after public resistance (South Africa); COFEPRIS digital regulatory procedures (Mexico); Simulacro Nacional 2024, a nationwide emergency exercise (Mexico); PROSPERA, and its replacement by a new scholarship authority (Mexico); AFAD earthquake shelter and recovery operation (Turkey); Civil defence shelters (Finland); Public civil defence shelters, and their dismantling (Germany); The 1997 Canada Pension Plan financing reform (Canada); Dynamic zero-COVID containment, and its dismantling (China); Nigeria's 2014 Ebola containment (Nigeria); SINAPRED evacuation for hurricanes Eta and Iota (Nicaragua); National cholera elimination drive, and the return of cholera (Haiti); Civil Defence hurricane evacuation system (Cuba); Tarea Ordenamiento's single exchange rate, and its fragmentation (Cuba); Covid-19 bridging credits (Switzerland); Civil protection shelters (Switzerland); COVID-19 vaccination campaign (Venezuela); JobKeeper Payment (Australia); Quรฉdate en Casa emergency cash transfer (Dominican Republic); Estonian Stockpiling Agency (Eesti Varude Keskus) national emergency stocks (Estonia); Bono Familia, the COVID-19 emergency cash transfer (Guatemala); Strategic stock of pandemic masks, and its erosion (France); National COVID-19 vaccination campaign (United Arab Emirates); Plan Panamรก Solidario, Vale Digital (Panama); Public disaster warning network of the Department of Disaster Prevention and Mitigation, and its erosion (Thailand); SINARAME national weather radar network (Argentina); Rwanda's 2024 Marburg outbreak response (Rwanda); Jobs Support Scheme and the four 2020 Budgets (Singapore); PUB drainage programme and the shrinking of flood-prone land (Singapore); Catastrophe risk insurance through CCRIF (Nicaragua); National COVID-19 vaccination campaign (Israel); National Social Safety Nets Project and the COVID-19 Rapid Response Register (Nigeria); State medical emergency stockpiles, and their dismantling (Sweden); COVID-19 Vaccine Taskforce and national vaccination rollout (United Kingdom); FONDEN, the natural disaster fund, and its abolition (Mexico); DASK compulsory earthquake insurance (Turkey); Disaster Recovery Funding Arrangements (Australia); Disaster Financial Assistance Arrangements (Canada); National Flood Insurance Program coverage, and its erosion (United States); KMA earthquake early warning service (South Korea); South African Weather Service radar network, and its erosion (South Africa); Hunger Safety Net Programme, a shock-responsive cash transfer for drought (Kenya); Auxรญlio Reconstruรงรฃo, the federal cash grant after the 2024 Rio Grande do Sul floods (Brazil); Hurricane Otto priority reconstruction works (Costa Rica); Contingent disaster credit with a Catastrophe Deferred Drawdown Option (Guatemala); National COVID-19 vaccination campaign (Peru); Secretarรญa de Emergencia Nacional response to the 2019 floods (Paraguay); National COVID-19 vaccination campaign (El Salvador); Coronavirus Job Retention Scheme (United Kingdom); Activitรฉ partielle in the 2020 crisis (France); Expanded Child Tax Credit of 2021, and its lapse (United States); Pradhan Mantri Garib Kalyan Anna Yojana, the free foodgrain response to COVID-19 (India); Targeted Economic Support Scheme (TESS) (United Arab Emirates); Phased exemption of enterprise social insurance contributions, 2020 (China); Business Finland disruption funding, 2020 (Finland); Partial and flexible unemployment subsidy, 2020-2021 (Uruguay); Ingreso Familiar de Emergencia, the COVID-19 household transfer (Chile); Central Bank of Kenya emergency loan restructuring measures (Kenya); Conditional cash transfer shock response, and its suspension after 2022 (Honduras); Food relief from the national reserve during the July 2021 lockdown (Rwanda); Bank of Israel COVID-19 small-business credit programme (Israel); Plan Nacional de Relocalizaciones, moving households out of flood-prone land (Uruguay); Floating the birr, July 2024 (Ethiopia); COVID-19 vaccination campaign (Bolivia); Ehsaas Emergency Cash (Pakistan); Cyclone Preparedness Programme (Bangladesh); eRecovery (ั”ะ’ั–ะดะฝะพะฒะปะตะฝะฝั) housing compensation programme (Ukraine); Catastrophe insurance regime and the Solidarity Fund against Catastrophic Events (FSEC) (Morocco); Takaful and Karama cash transfer programme (Egypt); Emergency Operation for Development, reconstruction of areas affected by terroristic operations (Iraq); Targeted Subsidy Reform cash transfer, and its erosion (Iran); Earthquake Emergency Recovery after the 2002 Changureh-Avaj earthquake (Iran); Fuel subsidy removal, and its erosion (Angola); Instituto Nacional de Gestao de Calamidades (INGC) (Mozambique); FID crisis response transfers, including Fiavota (Madagascar); Earthquake housing reconstruction programme (National Reconstruction Authority) (Nepal); Drought Emergency Cash Transfer through the Social Cash Transfer (Zambia); Guinea's 2021 Ebola outbreak response (Guinea); Shock-responsive social cash transfers and the Cat DDO (Malawi); Tosika Fameno, the COVID-19 urban emergency cash transfer (Madagascar); Wage Assistance Scheme and Self-Employed Assistance Scheme, paid by the MRA (Mauritius); Child Grants Programme drought top-ups, 2020 (Lesotho); COVID-19 Urban Cash Intervention, and its slow payment (Malawi); Bank of Uganda COVID-19 credit relief and loan restructuring (Uganda); Response to the 2022 Sudan ebolavirus outbreak (Uganda); COVID-19 vaccination campaign (Botswana); COVID-19 vaccination campaign (Mauritius); Burkin-Naong-Sa Ya adaptive cash transfers for COVID-19 and the lean season (Burkina Faso); Programme de transferts monetaires productifs (PTMP), government-funded COVID-19 expansion (Cรดte d'Ivoire); Lisungi emergency cash transfers for COVID-19 (Republic of the Congo); Domestic Debt Exchange Programme, December 2022 to February 2023 (Ghana); Nafa Quick, the COVID-19 cash transfer carved out of the Nafa programme (Gambia); Programme Gouvernemental de Transferts Monetaires d'Urgence COVID-19 (PGTMU) (Mali); Response to the 2018 to 2020 North Kivu and Ituri Ebola outbreak (Democratic Republic of the Congo); Response to the 2025 cholera outbreak, with a high fatality rate (Angola); Ghana's 2022 Marburg virus disease response (Ghana); COVID-19 vaccination campaign (Cรดte d'Ivoire); Mali's 2014 Ebola containment (Mali); COVID-19 emergency food support distributed by the National Disaster Management Agency (Gambia); COVID-19-Kurzarbeit, 2020 to 2021 (Austria); Lรธnkompensation, the 2020 wage compensation scheme (Denmark); Chรดmage temporaire corona, 2020 (Belgium); Cassa integrazione con causale Covid-19, 2020 (Italy); Antivirus job retention programme, 2020 to 2022 (Czechia); Prvรก pomoc (First Aid) job retention scheme, 2020 to 2022 (Slovakia); Potpore za oฤuvanje radnih mjesta (job preservation grants), 2020 (Croatia); Reconstruction after the 2016 and 2017 Central Italy earthquakes (Italy); Zagreb earthquake recovery under the World Bank loan, and its delays (Croatia); Civil defence public warning sirens (tyfoner) and their twice-yearly test (Norway); Recovery after the August 2023 floods (Slovenia); First state aid payments after Storm Daniel (Kratiki Arogi) (Greece); Civil defence shelters and protective trenches, and their erosion (Denmark); National warning siren network and its twice-yearly test (Latvia); eSupport one-off 6,500 hryvnia payment to workers in combat regions, March 2022 (Ukraine); State-paid technical unemployment indemnity in the 2020 state of emergency (Romania); Automatic loan repayment moratorium, March 2020 (Hungary); Three minimum wages paid to private employers in the 2020 state of emergency (Serbia); The 60/40 employment retention measure, 2020 to 2021 (Bulgaria); Recovery from the May 2014 floods: power supply and flood defences (Serbia); Floods Emergency Recovery Project after the May 2014 floods (Bosnia and Herzegovina); Hazard Risk Mitigation and Emergency Preparedness Project: seismic retrofitting and the emergency information system (Romania); State Hydrometeorological Service severe weather warning upgrade (Moldova); Reconstruction programme after the 26 November 2019 earthquake (Albania); AZN 190 monthly allowance to people who lost work, April to June 2020 (Azerbaijan); Temporary unemployment benefit and one-off support for the self-employed, 2020 (Georgia); National Aid Fund temporary cash transfers to informal workers, 2020 (Jordan); KZT 42,500 income-loss payment during the 2020 state of emergency (Kazakhstan); Emergency Social Safety Net (AMAN), and its slow start (Lebanon); Tadamon emergency cash transfers to informal workers, 2020 (Morocco); One-off COVID-19 payments to families with children, 2020 (Russia); AMEN Social emergency transfers, 2020 (Tunisia); COVID-19 low-income family allowances and unemployment benefits, 2020 (Uzbekistan); Response and housing recovery after the spring 2024 floods (Kazakhstan); Earthquake Reconstruction Project in the Spitak earthquake zone (Armenia); Flood Emergency Project after the 1998 southern floods (Kyrgyzstan); Sfax flood protection (belt canal) after the 1982 flood (Tunisia); Housing reconstruction after the February 2019 Shamakhi earthquake (Azerbaijan); Housing recovery after the Sardoba reservoir dam failure, 2020 (Uzbekistan); Emergency Flood Assistance Project after the 1998 and 1999 floods (Tajikistan); Roshydromet modernization: accuracy of hazard warnings to emergency agencies (Russia); COVID-19 vaccination campaign (Egypt); COVID-19 vaccination campaign (Jordan); COVID-19 vaccination campaign (Lebanon); COVID-19 Wage Subsidy Scheme (New Zealand); COVID-19 Allocation of Resources for Employees (CARE) programme (Jamaica); COVID-19 frontloading of old age, widow and disability allowances (Bangladesh); COVID-19 Economic Relief Plan household transfers, and their halt after the 2021 coup (Myanmar); Social insurance contribution exemption, April to September 2020 (Mongolia); Emergency cash transfer top-ups after the 2022 default (Sri Lanka); Nepal Rastra Bank COVID-19 refinance and loan relief (Nepal); COVID-19 Salary Relief Grant and income support (Trinidad and Tobago); Flood and Landslide Emergency Recovery Project, and its slow delivery (Myanmar); Rural housing reconstruction after the 2005 Kashmir earthquake (Pakistan); Owner-driven housing reconstruction after the 2004 tsunami (Sri Lanka); Typhoon Ketsana road recovery under the Road Sector Project (Laos); Earthquake Commission Canterbury Home Repair Programme (New Zealand); Catastrophe bond payout after Hurricane Melissa (Jamaica); Federal strategic stock of protective masks, and its dismantling (Belgium); BE-Alert (Belgium); Work permits for Syrian refugees under the Jordan Compact, and the end of the fee waiver (Jordan); Defence against the June 2013 Danube flood (Hungary).

Missing indicators: Disaster preparedness and recovery, Institutional responsiveness.

What to measure first

The evidence is too thin to manage these dimensions confidently.

Agency

0.22

How able are individuals and organizations to turn an intention into action?

Uses 2 observed indicators.

Missing indicators: Adults doing digital tasks.

Missing data

18 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.

DimensionMissing indicatorWhat it asks
AnticipationGovernment foresight capacityExistence, mandate and continuity of a national strategic foresight function.
AnticipationLong-horizon research commitmentsNew competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year.
AgencyAdults doing digital tasksShare of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level.
CoordinationUniversity-industry collaborationIntensity of research collaboration between universities and firms.
CoordinationPublic-private collaborationFrequency and scale of joint public-private delivery of national objectives.
TrustTrust in public institutionsConfidence in national government, courts and civil service.
TrustCourt case clearance rateCivil and commercial cases resolved in a year as a share of cases filed in the same year.
LearningAdult learning participationShare of adults in formal or non-formal education and training in the last 12 months.
ExperimentationVenture dealsFirst venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount.
ExperimentationFirms through regulatory sandboxesFirms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country.
ExperimentationUniversity spinoutsCompanies formed to commercialise university research, per million people.
AdaptabilityDisaster preparedness and recoveryDemonstrated capacity to prepare for and recover from major shocks.
AdaptabilityInstitutional responsivenessSpeed at which rules and public programmes are changed in response to new conditions.
BuildingLarge project deliveryCost and schedule performance of major public infrastructure projects.
BuildingFirm scale-up rateShare of young firms reaching significant employment or turnover thresholds.
Shared PurposeSense of national belongingReported identification with and attachment to the national community, as distinct from pride in the nation.
Shared PurposeVolunteeringShare of adults who volunteered time to an organisation in the last month.
Shared PurposePolitical polarisationDegree to which political differences run along a single hostile divide.

What the indicators miss about Sudan

Documented deliveries linked to missing indicators. They do not affect scores or confidence.

  • Sudan Family Support Programme (Thamarat), and its halt after the October 2021 coup (Adaptability)

    After Sudan cut fuel subsidies and unified its exchange rate in February 2021, the transitional government's Sudan Family Support Programme began paying cash in March 2021 and by 25 October 2021 had registered about 2.7 million families and paid about 30.6 billion Sudanese pounds to 1.4 million families, about 4.7 million people, before all activities, including cash delivery, were halted after the military takeover of that day.

  • Rahad Irrigation Project, and its cost and time overrun (Building)

    Sudan's government and the Rahad Corporation (RAHCO) built the Rahad irrigation scheme, 300,000 feddans east of the Rahad River, a tributary of the Blue Nile, with a main pumping station, a siphon under the Dinder River and a barrage on the Rahad River, under credits approved in March 1973; the physical works were completed in December 1982 against a planned June 1978, at a final cost of US$395.6 million against an appraisal estimate of US$125.0 million.

  • Routine immunization through the 2023 war, and its erosion (Adaptability)

    WHO and UNICEF estimated that Sudan's national DTP3 coverage among one-year-olds fell from 95 percent in 2017 and 84 percent in 2022 to 51 percent in 2023 and 39 percent in 2024, after war broke out in April 2023, before recovering to 71 percent in 2025.

Contribute

Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.