How easily can new approaches be attempted, tested, abandoned, and improved?
Capability agenda
Bulgaria
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Bulgaria stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 55.2 | 0.46 | +15.8 over 10 years using 2 indicators |
| Agency | 68.3 | 0.49 | no trend |
| Coordination | 83.3 | 0.48 | -2.5 over 10 years using 2 indicators |
| Trust | 84.3 | 0.33 | +5 over 10 years using 2 indicators |
| Learning | 32.7 | 0.54 | -17.8 over 10 years using 2 indicators |
| Experimentation | 30.7 | 0.47 | -5.3 over 10 years using 3 indicators |
| Adaptability | 80.3 | 0.62 | +5.3 over 10 years using 4 indicators, with 1 at the frame edge |
| Building | 36.7 | 0.48 | +5.4 over 10 years using 2 indicators |
| Shared Purpose | 55.9 | 0.30 | +2 over 10 years using 2 indicators |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Bulgariaโs comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 โ 2026: 68.6 to 91.2 (+22.6) over 30 years using 2 indicators
Agenda items on this timeline
- 2014Operational Programme Environment 2014-2020, flood and landslide risk axis
- 2020The 60/40 employment retention measure, 2020 to 2021
Historical values use todayโs frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How effectively does the country acquire, distribute, and update knowledge?
+104
How capable is the country of turning plans and knowledge into functioning systems?
+202
What to measure first
The evidence is too thin to manage these dimensions confidently.
Shared Purpose
0.30To what extent can people imagine themselves as participants in a common project?
Trust
0.33How much cooperation is possible beyond immediate personal networks?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Coordination | 83.3 | 0.48 |
| Adaptability | 80.3 | 0.62 |
| Agency | 68.3 | 0.49 |
| Anticipation | 55.2 | 0.46 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of oneโs life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Bulgaria
What the indicators miss about Bulgaria
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- Employment Agency adult training, including the DI-GI digital skills vouchers (Learning)
Bulgaria's Employment Agency (Agentsia po zaetostta) included more than 155,450 unemployed and employed adults in training in 2025, against just over 87,540 in 2024, with 97,911 people certified through digital skills vouchers financed under the national Recovery and Resilience Plan.
- The 60/40 employment retention measure, 2020 to 2021 (Adaptability)
Bulgaria's National Social Security Institute paid employers 60 percent of the wages and contributions of staff kept on during the COVID-19 emergency under Council of Ministers Decree No. 55 of 2020, starting with 68 employers and 1,065 employees on 15 April 2020, and by 4 March 2021 the Ministry of Labour and Social Policy reported BGN 884 million paid under the measure and 300,000 jobs kept.
- Road Infrastructure Rehabilitation Project, and its cut after the 2009 budget squeeze (Building)
Bulgaria's Road Infrastructure Agency rehabilitated national roads under a EUR144 million project approved in June 2007, but after budget cuts in 2010 cancelled three lots on about 87 km where works had not started, reducing the length from 450 km to 307 km, and closed in June 2013, two years late, at EUR97.1 million, 67 percent of the appraisal estimate.
- Belene nuclear power plant, and its cancellation (Building)
Bulgaria's state utility NEK ordered long-lead reactor equipment for the Belene nuclear plant from Atomstroyexport in 2008. The project was cancelled before any unit was completed, and on 6 December 2016 the Ministry of Energy transferred 601,617,133 euros to NEK so it could pay the damages awarded against it in ICC arbitration case 18086/GZ/MHM.
- Operational Programme Environment 2014-2020, flood and landslide risk axis (Adaptability)
The Ministry of Environment and Water, through Operational Programme Environment 2014-2020, funded 18 flood and landslide risk contracts, which by 18 October 2024 reported flood-protection measures benefiting more than 2,130,000 residents, 103 areas with prevented flood risk, six flood-preparedness centres, the BG-ALERT cell-broadcast warning system and a population early-warning system in 11 administrative regions.
- Varna and Burgas airports concession (Coordination)
Bulgaria's Ministry of Transport signed a concession on 10 September 2006 that gave Fraport Twin Star, a German-Bulgarian company 60 percent owned by Fraport, the operation of the state airports at Varna and Burgas, and the two airports served 3.7 million passengers in 2025.
- Centres of Excellence and Centres of Competence (Coordination)
Bulgaria's Operational Programme Science and Education for Smart Growth established 16 Centres of Excellence and Centres of Competence, led by universities and Bulgarian Academy of Sciences institutes, with 215 million euros of ERDF support, and by 2023 they reported 257 joint research projects with business against a target of 150.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.