How capable is the country of turning plans and knowledge into functioning systems?
Capability agenda
Austria
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Austria stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 74.6 | 0.46 | +3.8 over 10 years using 2 indicators |
| Agency | 34.4 | 0.29 | no trend |
| Coordination | 87.5 | 0.27 | -9.9 over 10 years using 2 indicators |
| Trust | 88.3 | 0.21 | no trend |
| Learning | 65.0 | 0.55 | no trend |
| Experimentation | 44.1 | 0.37 | -2.9 over 10 years using 3 indicators |
| Adaptability | 75.4 | 0.62 | -4.8 over 10 years using 4 indicators |
| Building | 42.5 | 0.48 | -1.7 over 10 years using 3 indicators |
| Shared Purpose | 74.8 | 0.30 | -0.6 over 10 years using 2 indicators |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Austriaโs comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Experimentation 1996 โ 2026: 100.0 to 58.0 (-42) over 30 years using 2 indicators
Agenda items on this timeline
- 2020FMA Regulatory Sandbox
Historical values use todayโs frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
What to measure first
The evidence is too thin to manage these dimensions confidently.
Trust
0.21How much cooperation is possible beyond immediate personal networks?
Coordination
0.27How effectively can independent actors organize around shared objectives?
Agency
0.29How able are individuals and organizations to turn an intention into action?
Shared Purpose
0.30To what extent can people imagine themselves as participants in a common project?
Experimentation
0.37How easily can new approaches be attempted, tested, abandoned, and improved?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Adaptability | 75.4 | 0.62 |
| Anticipation | 74.6 | 0.46 |
| Learning | 65.0 | 0.55 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of oneโs life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Austria
What the indicators miss about Austria
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- FMA Regulatory Sandbox (Experimentation)
Austria's Financial Market Authority admitted eight FinTechs to its Regulatory Sandbox between its launch on 1 September 2020 and January 2023, five seeking authorisation as European crowdfunding service providers and three offering crypto-asset or securities services, and one participant had obtained a licence for a digital trading platform by the start of 2022.
- AMS training measures (Schulungen) for jobseekers (Learning)
Austria's Public Employment Service (AMS) had on average 76,496 people a day enrolled in its training measures in 2025, up 1.3 percent on 2024, against an annual average of 65,126 in 2015.
- COMET, Competence Centers for Excellent Technologies (Coordination)
Austria's COMET programme, run by the FFG for the federal ministries and co-funded by the Lรคnder, had approved 81 competence centres and K-projects with eligible costs of 1,669.80 million euros by 30 March 2017, in which about 450 scientific partners and about 1,000 company partners cooperated, according to the Court of Audit.
- COVID-19-Kurzarbeit, 2020 to 2021 (Adaptability)
Austria's social partners drafted a COVID-19 short-time work model on 13 and 14 March 2020, the AMS adopted its directive on 18 March and the ministers approved it on 19 March, three days after the first lockdown began, and in 2020 113,771 firms with 1.25 million employees used the scheme, against 508 firms in 2009.
- Koralmbahn Graz to Klagenfurt, opened seven years after its contracted completion date (Building)
Austria's federal rail infrastructure company รBB-Infrastruktur AG forecast the Koralmbahn's total cost at 6.139 billion euros at the end of 2023, 282.4 million euros or 5 percent above the 2012 baseline, but missed both the 2018 completion date in the 2004 Koralmbahn contract and the 2023 opening date in the 2012 to 2017 framework plan, according to the Court of Audit, and the line entered passenger service on 14 December 2025.
- Bildungskarenz with Weiterbildungsgeld, and its abolition (Learning)
Austria's Public Employment Service (AMS) paid Weiterbildungsgeld from 1998 to employees taking up to a year of educational leave, an average of about 14,000 recipients in 2021 at a cost that rose from 236 million euros in 2019 to 646 million in 2024, until the Nationalrat ended the benefit on 31 March 2025 in a budget consolidation law.
- Katastrophenfonds, the federal disaster prevention and recovery fund (Adaptability)
Austria's federal Katastrophenfonds, a standing fund set up by law in 1966 and financed from a fixed share of income and corporate tax, paid out 667.5 million euros in 2024, including 219.5 million euros for flood and avalanche prevention through the agriculture ministry and 211.7 million euros towards private damage after the September 2024 floods, 180.75 million euros of it in Lower Austria.
- Duale Lehrausbildung, and the erosion of its training firms (Coordination)
Austria runs apprenticeship as a joint delivery in which firms train and pay apprentices under the federal Berufsausbildungsgesetz and the economic chambers and the state certify them, and the number of firms that train fell from 39,906 in 1999 to 26,237 at the end of 2024, a loss of about a third, while apprentices fell from 194,089 in 1980 to 106,452 in 2024.
- Foresight und Technikfolgenabschรคtzung fรผr das รถsterreichische Parlament (Anticipation)
Austria's parliament has bought external foresight and technology assessment since July 2017, after the Presidial Conference agreed unanimously in October 2016 to provide EUR 200,000 a year; the service delivers a half-yearly monitoring of future topics, survived a Europe-wide re-tender in 2022, and parliament commissioned six studies from it between 2019 and 2026.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.