How capable is the country of turning plans and knowledge into functioning systems?
Capability agenda
Côte d'Ivoire
Generated 2026-11-05
The frame includes 135 countries. Each dimension is scored from 0 to 100, with no overall ranking, and each score shows its confidence beside it. Read the known limits of the data before you quote a score.
Open the profile: indicators, values, years and sources
Where Côte d'Ivoire stands
| Dimension | Score | Confidence | Trend |
|---|---|---|---|
| Anticipation | 28.6 | 0.46 | +21.1 over 10 years using 2 indicators |
| Agency | 69.9 | 0.49 | no trend |
| Coordination | 62.5 | 0.37 | no trend |
| Trust | 58.8 | 0.33 | +3.1 over 10 years using 2 indicators |
| Learning | 21.2 | 0.54 | -8.4 over 10 years using 2 indicators |
| Experimentation | 14.9 | 0.19 | no trend |
| Adaptability | 47.7 | 0.55 | -1.5 over 10 years using 3 indicators |
| Building | 21.1 | 0.63 | -2.2 over 10 years using 3 indicators |
| Shared Purpose | 50.8 | 0.26 | +10.9 over 10 years using 2 indicators |
Score
- weakNear the floor of the frame. Check the confidence before reading anything into it.0 to 25
- below middleIn the lower half of the frame.25 to 50
- above middleIn the upper half of the frame.50 to 75
- strongNear the top of the frame on this dimension.75 and above
Confidence
- very thin0.00 to 0.25
The score rests on one or two indicators. Do not quote it on its own.
- thin0.25 to 0.45
A minority of indicators, or evidence old enough to have moved. Read with care.
- usable0.45 to 0.65
Enough evidence to compare countries, with known holes.
- good0.65 and above
Most indicators observed, recent, from official or intergovernmental sources.
Capability over time
Select a dimension to see how Côte d'Ivoire’s comparable evidence has moved over time. The vertical scale is the current comparison frame, from 0 to 100.
Dimension
Period
Adaptability 1996 → 2026: 71.2 to 72.7 (+1.5) over 30 years using 2 indicators
Agenda items on this timeline
- 2020Programme de transferts monetaires productifs (PTMP), government-funded COVID-19 expansion
- 2021COVID-19 vaccination campaign
Historical values use today’s frame from 0 to 100 and a matched basket of indicators. They show movement in the available evidence, not an overall development score. Dated agenda items appear on a separate timeline and do not change the score. A missing line means the evidence does not support a comparable trend for that dimension.
What to raise
These are the lowest scores with usable evidence. Thin evidence appears below.
How effectively does the country acquire, distribute, and update knowledge?
+104
How capable is the country of identifying and preparing for emerging change?
+34
How effectively can the system respond when circumstances change?
+267
What to measure first
The evidence is too thin to manage these dimensions confidently.
Experimentation
0.19How easily can new approaches be attempted, tested, abandoned, and improved?
Shared Purpose
0.26To what extent can people imagine themselves as participants in a common project?
Trust
0.33How much cooperation is possible beyond immediate personal networks?
Coordination
0.37How effectively can independent actors organize around shared objectives?
What to keep watching
These dimensions score at least 50 with usable evidence.
| Dimension | Score | Confidence |
|---|---|---|
| Agency | 69.9 | 0.49 |
Missing data
22 requested indicators have no comparable dataset, and each one lowers confidence. A gap can become an indicator when a comparable series covers at least two countries.
| Dimension | Missing indicator | What it asks |
|---|---|---|
| Anticipation | Government foresight capacity | Existence, mandate and continuity of a national strategic foresight function. |
| Anticipation | Long-horizon research commitments | New competitively awarded public research grants that run for five years or longer, as a share of all new competitive public research grants awarded in the year. |
| Agency | Adults doing digital tasks | Share of adults who carried out a named digital task in the last three months, such as sending a message with an attached file, moving a file between devices or using a spreadsheet formula, counted one task at a time and never as a skill level. |
| Agency | Perceived control over life | Self-reported freedom of choice and control over the course of one’s life. |
| Coordination | University-industry collaboration | Intensity of research collaboration between universities and firms. |
| Coordination | Public-private collaboration | Frequency and scale of joint public-private delivery of national objectives. |
| Trust | Generalised interpersonal trust | Share agreeing that most people can be trusted. |
| Trust | Trust in public institutions | Confidence in national government, courts and civil service. |
| Trust | Cooperation beyond the in-group | Share of adults who trust people they meet for the first time completely or somewhat. |
| Trust | Court case clearance rate | Civil and commercial cases resolved in a year as a share of cases filed in the same year. |
| Learning | Adult learning participation | Share of adults in formal or non-formal education and training in the last 12 months. |
| Experimentation | Venture deals | First venture capital rounds closed by companies based in the country in the year, per million people, counted by deal and never by amount. |
| Experimentation | Firms through regulatory sandboxes | Firms admitted to, and firms completing, a regulatory sandbox or controlled trial regime in the year, per million people, summed across every regulator in the country. |
| Experimentation | University spinouts | Companies formed to commercialise university research, per million people. |
| Adaptability | Disaster preparedness and recovery | Demonstrated capacity to prepare for and recover from major shocks. |
| Adaptability | Institutional responsiveness | Speed at which rules and public programmes are changed in response to new conditions. |
| Building | Large project delivery | Cost and schedule performance of major public infrastructure projects. |
| Building | Firm scale-up rate | Share of young firms reaching significant employment or turnover thresholds. |
| Shared Purpose | Sense of national belonging | Reported identification with and attachment to the national community, as distinct from pride in the nation. |
| Shared Purpose | Volunteering | Share of adults who volunteered time to an organisation in the last month. |
| Shared Purpose | Political polarisation | Degree to which political differences run along a single hostile divide. |
| Shared Purpose | Civic participation | Share of adults who report belonging to a humanitarian or charitable organisation. |
What the indicators miss about Côte d'Ivoire
What the indicators miss about Côte d'Ivoire
Documented deliveries linked to missing indicators. They do not affect scores or confidence.
- Centres d'alphabétisation, and their erosion (Learning)
Côte d'Ivoire's education ministry ran a national network of literacy centres. It counted 75,275 learners in 2,828 centres in 2015-16 and 53,311 learners in 2,707 centres in 2024-25, a fall of about 29 percent in learners over the decade.
- Henri Konan Bédié toll bridge (Coordination)
The Ivorian government let a third Abidjan lagoon crossing as a toll-bridge concession to SOCOPRIM, the project company formed in 1997, whose investors include Bouygues Travaux Publics, after a 1996 tender. It funded initial works from October 2011 after the conflict. Private equity and loans, insured by MIGA guarantees of $145 million, built the 1.5 km bridge and 6.7 km road at a cost of about $282 million, and the bridge opened on 16 December 2014.
- Bureau National de la Prospective et de la Veille Stratégique and the national prospective studies (Anticipation)
Côte d'Ivoire's Ministry of Planning and Development completed its fourth national prospective study, Côte d'Ivoire 2040, under the technical responsibility of the Bureau National de la Prospective et de la Veille Stratégique, after earlier national studies in 1973 to 1974, 1983 to 1984 and 1993 to 1995, and built eighteen thematic and three global scenarios to the 2040 horizon.
- Programme de transferts monetaires productifs (PTMP), government-funded COVID-19 expansion (Adaptability)
In response to COVID-19, the government of Cote d'Ivoire used its own budget to enrol a fourth cohort of 100,000 households (80,000 urban, 20,000 rural) in December 2020 into the World Bank supported productive cash transfer programme, through the programme's existing targeting, enrolment and digital payment systems, taking it to 227,000 households and over 1.3 million people.
- Yabayo-Gagnoa road under the Fourth Highway Project, and its cost and time overrun (Building)
Côte d'Ivoire's Ministry of Public Works built the 70 km Yabayo-Gagnoa road and rebuilt the bridge over the N'Zi River under the Fourth Highway Project (Credit 406-IVC, approved June 1973), completing it in September 1978 against a planned June 1976, at a cost of US$24.7 million against an appraisal estimate of US$12.3 million, an overrun of 101 percent.
- COVID-19 vaccination campaign (Adaptability)
Côte d'Ivoire's health authorities reported to WHO that 13,568,372 people, 51 per 100 population, had received at least one COVID-19 vaccine dose by 31 December 2023, from a first dose given on 1 March 2021, with 12,164,304 (46 per 100) completing the primary series.
Contribute
Fill a gap, file evidence or challenge an indicator at github.com/envisioning/national-capability-benchmark. The docs explain the method and decisions.